# Fuller Construction Holding Company, Inc.

Canonical: https://sealedbidder.com/vendors/fuller-construction-holding-company-inc-cxurljn8erz4

- UEI: CXURLJN8ERZ4
- CAGE: 3ZGN3
- Location: Chadron, NE
- Awards in window: 15 (27 transactions), $1,931,516 obligated, February 5, 2024 to November 18, 2026

## Awarding agencies

- Forest Service: 9 awards, $1,010,107
- National Park Service: 4 awards, $919,409
- Department of the Army: 2 awards, $2,000

## Industries

- 238910 Site Preparation Contractors: $667,270
- 236220 Commercial and Institutional Building Construction: $655,272
- 238210 Electrical Contractors and Other Wiring Installation Contractors: $278,760
- 238110 Poured Concrete Foundation and Structure Contractors: $154,787
- 238350 Finish Carpentry Contractors: $79,000
- 238160 Roofing Contractors: $75,350
- 237310 Highway, Street, and Bridge Construction: $14,708
- 238170 Siding Contractors: $6,369
- 236118 Residential Remodelers: $0

## Competition

- Full and Open Competition After Exclusion of Sources: 8 awards
- Competed Under SAP: 5 awards
- Not Competed Under SAP: 1 awards
- Full and Open Competition: 1 awards

## Solicitations won

- CHADRON WORK CENTER SHOP ROOF REPLACEMENTS (1240LT26Q0149), $40,686. https://sealedbidder.com/opportunities/1240lt26q0149
- JECA Q13 WINDOWS & EXTERIOR DOORS (140P6326Q0032), $79,000. https://sealedbidder.com/opportunities/140p6326q0032
- TRAIL SAFETY RESTORATION (140P6326P0024). https://sealedbidder.com/opportunities/140p6326p0024
- WICA EMERGENCY REPLACEMENT B-101 ROOF (140P6326P0016). https://sealedbidder.com/opportunities/140p6326p0016
- JECA Visitor Center Restroom Remodel and Airlock Door Hinges (140P6325B0004), $615,250. https://sealedbidder.com/opportunities/140p6325b0004
- Job Corps Pine Ridge Building 511 – Dorm Siding (12970225R0002), $667,270. https://sealedbidder.com/opportunities/12970225r0002
- GAOA Bessey Group Electrical (1282B125R0009). https://sealedbidder.com/opportunities/1282b125r0009
- Nebraska Construction MATOC (W50S8924D0006), $38,000,000. https://sealedbidder.com/opportunities/w50s8924d0006

## Largest awards

- 12441925C0011 (definitive contract): $667,270, USDA Forest Service-Spoc East. The Project Involves the Rehabilitation of Dorm Building 511 at the Pine Ridge Job Corps Civilian Conservation Center in Dawes County, Nebraska. the Work Includes Siding Replacement, Sheathing, Insulation, Flashing Installation, Roof Modifications, W. https://www.usaspending.gov/award/CONT_AWD_12441925C0011_12C2_-NONE-_-NONE-/
- 140P6325C0009 (definitive contract): $650,772, MWR Nekota. Jewel Cave NM Visitor Center Restroom Remodel and Airlock Door Hinges. https://www.usaspending.gov/award/CONT_AWD_140P6325C0009_1443_-NONE-_-NONE-/
- 1282B125C0014 (definitive contract): $278,760, USDA Forest Service-Spoc Im. Gaoa Project - This Project Is to Remove the Existing RV Pedestals and Associated Electrical System in the Group and Cedar Loop Campgrounds and Replace Them with New 50-AMP Pedestals. the New Electrical System Will Be from the Distribution Panel All. https://www.usaspending.gov/award/CONT_AWD_1282B125C0014_12C2_-NONE-_-NONE-/
- 140P6326P0024 (purchase order): $154,787, MWR Nekota. Eo 14398: This Request for Quotation Was for an Urgent and Compelling Requirement to Repair Jewel Cave National Monument Trail Head.. https://www.usaspending.gov/award/CONT_AWD_140P6326P0024_1443_-NONE-_-NONE-/
- 140P6326P0040 (purchase order): $79,000, MWR Nekota. Eo 14398: This Award Is for Construction Services to Remove and Replace Windows/Doors Located at Jewel Cave National Monument.. https://www.usaspending.gov/award/CONT_AWD_140P6326P0040_1443_-NONE-_-NONE-/
- 1240LT26C0050 (definitive contract): $40,500, Usda-Fs, Csa Intermountain 8. This Project Consists of the Removal of the Asphalt Shingles on a Garage-Like Structure and Roofing Replacement with New Asphalt Roofing System Per Specifications. Also, the Removal and Replacement of the Underlayment Per Specifications. the Removal. https://www.usaspending.gov/award/CONT_AWD_1240LT26C0050_12C2_-NONE-_-NONE-/
- 140P6326P0016 (purchase order): $34,850, MWR Nekota. This Is an Urgent and Compelling Purchase Order for Construction Services to Repair a Roof at Wind Cave National Park.. https://www.usaspending.gov/award/CONT_AWD_140P6326P0016_1443_-NONE-_-NONE-/
- 1284LM22C0017 (definitive contract): $14,708, Usda-Fs, Csa Intermountain 2. 2022 Bordeaux Creek Aop Culvert Replacement / Nebraska National Forest, Pine R.D / Dawes County, Nebraska Mod for Changes Iaw FAR 52.243-5, Actual Quantities. https://www.usaspending.gov/award/CONT_AWD_1284LM22C0017_12C2_-NONE-_-NONE-/
- 1240LT23C0062 (definitive contract): $6,369, Usda-Fs, Csa Intermountain 8. Modification 00002: Change Order Contract #1240LT23C0062 Northern Hills Siding - Replace Exterior Gfci Outlets. Provide Labor and Material to Remove and Replace All the Exterior Receptacles with 20-AMP Weather Rated Gfci Protected Outlets with Cov. https://www.usaspending.gov/award/CONT_AWD_1240LT23C0062_12C2_-NONE-_-NONE-/
- 1282A724F0140 (delivery order): $2,500, USDA Forest Service. Minimum Guarantee for Idiq.. https://www.usaspending.gov/award/CONT_AWD_1282A724F0140_12C2_1282A724D0010_12C2/
- W50S8924FA034 (delivery order): $2,000, W7NL Uspfo Activity Neang 155. Covers the Minimum Guarantee of $2,000.00.. https://www.usaspending.gov/award/CONT_AWD_W50S8924FA034_9700_W50S8924D0006_9700/
- 1240LT23P0039 (purchase order): $0, Usda-Fs, Csa Intermountain 8. Removal of Designated Existing Windows and Doors on the Bunkhouse and Two Shops at the Chadron Work Center. Replacement with New Vinyl Windows and Commercial Steel Doors on the Bunkhouse and Two Shops.. https://www.usaspending.gov/award/CONT_AWD_1240LT23P0039_12C2_-NONE-_-NONE-/
- 1240LT25D0039: $0, Usda-Fs, Csa Intermountain 8. USFS Region 2 Road and Bridge Construction Matoc. https://www.usaspending.gov/award/CONT_IDV_1240LT25D0039_12C2/
- 1282A724D0010: $0, USDA Forest Service. MT Zone Construction IDIQ Parent Contract for Job Corp. https://www.usaspending.gov/award/CONT_IDV_1282A724D0010_12C2/
- W50S8924D0006: $0, W7NL Uspfo Activity Neang 155. Indefinite Delivery-Indefinite Quantity, Multiple Award Task Order Contract (Matoc) for Maintenance, Repair, and Construction Services in Support of Nebraska National Guard Activities. $38M Shared Capacity Over 5-Year Ordering Period.. https://www.usaspending.gov/award/CONT_IDV_W50S8924D0006_9700/

---
Source: USAspending.gov award data, keyed by UEI. Obligations in the window only. Cite https://sealedbidder.com/vendors/fuller-construction-holding-company-inc-cxurljn8erz4.
