# Central Southern Construction Corp.

Canonical: https://sealedbidder.com/vendors/central-southern-construction-corp-gku1xrd7bcx7

- UEI: GKU1XRD7BCX7
- CAGE: 609K6
- Location: Jacksonville, FL
- Awards in window: 36 (99 transactions), $93,257,468 obligated, February 2, 2024 to September 16, 2026

## Awarding agencies

- Federal Highway Administration: 34 awards, $92,481,793
- National Park Service: 2 awards, $775,675

## Industries

- 237310 Highway, Street, and Bridge Construction: $92,481,793
- 238910 Site Preparation Contractors: $775,675
- 237110 Water and Sewer Line and Related Structures Construction: $0

## Competition

- Full and Open Competition After Exclusion of Sources: 21 awards
- Full and Open Competition: 11 awards
- Not Competed Under SAP: 2 awards
- Not Available for Competition: 1 awards
- Not Competed: 1 awards

## Solicitations won

- IN NP INDU PMS(1), Pavement Preservation Indiana Dunes (69056726F00025N), $4,775,722. https://sealedbidder.com/opportunities/69056726f00009n
- IN NP INDU PMS(1), Pavement Preservation Indiana Dunes (69056725R000016). https://sealedbidder.com/opportunities/69056725r000016
- TX NP MULTI PMS(1) Pavement Preservation Texas (69056725R000006). https://sealedbidder.com/opportunities/69056725r000006
- Rock Creek Park (693C73-25-B-000006), $8,615,235. https://sealedbidder.com/opportunities/693c7325b000006
- Gulf Islands National Seashore (693C73-25-B-000008), $9,123,185. https://sealedbidder.com/opportunities/693c7325b000008
- Vicksburg National Military Park (693C73-25-B-000002), $7,438,460. https://sealedbidder.com/opportunities/693c7325b000002
- REPLACE WASTEWATER TREATMENT PLANT AT DRY TORTUGAS (140P5424R0009). https://sealedbidder.com/opportunities/140p5424r0009
- REPAIR COLLAPSED STORM DRAIN AT CASTILLO DE SAN MA (140P5424R0008). https://sealedbidder.com/opportunities/140p5424r0008
- MI NP MULTI PMS(1), Pavement Preservation Michigan (69056724R000002), $6,621,060. https://sealedbidder.com/opportunities/69056724r000002

## Largest awards

- 693C7325F00023N (delivery order): $14,661,421, 693C73 Eastern Fed Lands Division. Project NC Erfo NP Blri 2024-1(1): the Project Consists of Repairing Damage to the Blue Ridge Parkway Caused by Hurricane Helene. the Work Includes Two Slide Repairs with Reinforced Soil Slope (Rss), Deep Patch, Minimal Tree Removal for Access, Ditc. https://www.usaspending.gov/award/CONT_AWD_693C7325F00023N_6925_693C7320D000015_6925/
- 69056726F00009N (delivery order): $10,492,605, 690567 Western Federal Lands Div. Funds Construction Project TX NP Multi PMS(1) ), Pavement Preservation Texas. This Work Consists of Crack Sealing, Patching, Application of Chip Seal and Micro Surface Treatments and Pavement Marking.. https://www.usaspending.gov/award/CONT_AWD_69056726F00009N_6925_69056724D000006_6925/
- 693C7325C000012 (definitive contract): $9,271,935, 693C73 Eastern Fed Lands Division. MS NP Guis 15(4) This Project Consists of the Construction of Paved Shoulders, Boardwalks, Culvert Replacement, and Guardrail Replacement. the Work Includes the Installation of a Bottomless Box Culvert, Grading, Paving Shoulders, Microsurfacing and. https://www.usaspending.gov/award/CONT_AWD_693C7325C000012_6925_-NONE-_-NONE-/
- 693C7325C000007 (definitive contract): $8,933,610, 693C73 Eastern Fed Lands Division. Project MS Erfo NPS Vick 2020-1(2) the Project Consists of Slide Repairs on Grant Avenue and Union Avenue. the Work Includes Clearing and Grubbing, Roadway Excavation and Embankment Construction, Geogrid, Gabions, Aggregate Base, Mechanically Compac. https://www.usaspending.gov/award/CONT_AWD_693C7325C000007_6925_-NONE-_-NONE-/
- 693C7325C000014 (definitive contract): $7,927,036, 693C73 Eastern Fed Lands Division. Project DC NP Rocr 503(1), 24(2) the Project Consists of Roadway Repairs on Waterside Drive from the Southern Intersection with Rock Creek and Potomac Parkway to Massachusetts Avenue Nw, and Piney Branch Parkway from Arkansas Avenue to Beach Drive. https://www.usaspending.gov/award/CONT_AWD_693C7325C000014_6925_-NONE-_-NONE-/
- 693C7325F00075N (delivery order): $6,637,924, 693C73 Eastern Fed Lands Division. Project NC Erfo NP Blri 2024-1(5) the Project Consists of Slide Repairs, Culvert Replacement, Stone Masonry Headwall Repair, Pavement Reconstruction, Pavement Markings and Other Miscellaneous Work.. https://www.usaspending.gov/award/CONT_AWD_693C7325F00075N_6925_693C7320D000015_6925/
- 693C7325F00025N (delivery order): $4,866,161, 693C73 Eastern Fed Lands Division. Project NC Erfo NP Blri 2024-1(3): the Project Consists of Repairing Damage to the Blue Ridge Parkway Caused by Hurricane Helene. the Work Includes a Slide Repair with Reinforced Soil Slope (Rss), Minimal Tree Removal for Access, Ditch Reconditionin. https://www.usaspending.gov/award/CONT_AWD_693C7325F00025N_6925_693C7320D000015_6925/
- 69056726F00025N (delivery order): $4,775,722, 690567 Western Federal Lands Div. Construction Services for Project in NP Indu PMS(1), Pavement Preservation Indiana Dunes. This Work Consists of Crack Sealing, Patching, Application of Chip Seal and Micro Surface Treatments and Pavement Marking.. https://www.usaspending.gov/award/CONT_AWD_69056726F00025N_6925_69056724D000006_6925/
- 69056724F00019N (delivery order): $4,569,517, 690567 Western Federal Lands Div. Mi NP Muilti PMS(1), Pavement Preservation Michigan. Work Consists of Patching, Crack Sealing, and Resurfacing of Asphalt Surfaces Through Pictured Rocks National Lakeshore and Sleeping Bear Funes National Lakeshore.. https://www.usaspending.gov/award/CONT_AWD_69056724F00019N_6925_69056724D000006_6925/
- 693C7325F00085N (delivery order): $4,309,500, 693C73 Eastern Fed Lands Division. Project NC Erfo NP Blri 2024-1(6) the Project Consists of Slide Repairs, Guardrail Replacement, Replacement And/Or Cleaning of Culverts, Pavement Reconstruction, Pavement Markings and Other Miscellaneous Work.. https://www.usaspending.gov/award/CONT_AWD_693C7325F00085N_6925_693C7320D000015_6925/
- 693C7325F00034N (delivery order): $3,495,405, 693C73 Eastern Fed Lands Division. Project Il Erfo Coe 2019-1(1) the Project Consists of the Removal and Replacement of Five Damaged Pedestrian Timber Bridges. the Work Includes Concrete Abutments with Helical Pile Foundation, Repair of Wooden Trail Steps, Stabilization of Eroded Are. https://www.usaspending.gov/award/CONT_AWD_693C7325F00034N_6925_693C7320D000022_6925/
- 693C7324F00045N (delivery order): $2,592,163, 693C73 Eastern Fed Lands Division. Project NP Slbe 5109(1): the Project Consists of Constructing Left and Right Turning Lanes on South Dune Highway (M-109) at Dune Climb Parking Area (Route 920). the Work Includes Grading; Aggregate Base; Asphalt Pavement Milling; Concrete Paving; MS. https://www.usaspending.gov/award/CONT_AWD_693C7324F00045N_6925_693C7320D000022_6925/
- 693C7325F00021N (delivery order): $2,279,350, 693C73 Eastern Fed Lands Division. NC Erfo NP Blri 2024-1(2): the Project Consists of Stabilizing Damage to the Blue Ridge Parkway Caused by Hurricane Helene. the Work Includes Stabilizing an Embankment with NC DOT Shot Rock, Installing Geomembrane with Sandbags, Placing Barriers to. https://www.usaspending.gov/award/CONT_AWD_693C7325F00021N_6925_693C7320D000015_6925/
- 693C7325F00093N (delivery order): $1,843,125, 693C73 Eastern Fed Lands Division. Ga NP CHCH Multi (2): the Project Consists of the Rehabilitation of 0.44 Miles of Snodgrass Road and 0.76 Miles of Dyer Road, Including Parking Areas and Pull-Offs. the Work Includes Asphalt Pavement Removal, Roadbed Reconditioning, Grading, Aggreg. https://www.usaspending.gov/award/CONT_AWD_693C7325F00093N_6925_693C7320D000015_6925/
- 693C7323C000008 (definitive contract): $1,831,655, 693C73 Eastern Fed Lands Division. NP-NATR 3E16, 3F25 693C7323C000008 CM #4 Increase Contract Amount by $700,000.00 Extend Contract Time by 21 Calendar Days. https://www.usaspending.gov/award/CONT_AWD_693C7323C000008_6925_-NONE-_-NONE-/
- 693C7325F00008N (delivery order): $1,703,080, 693C73 Eastern Fed Lands Division. Project NP Ser PMS FY24(3): the Project Consists of the Pavement Preservation of Identified Roadways Including Parking Areas. the Work Includes Thin Lift Overlay of Asphalt Concrete Pavement, Sami, Full Depth Patching, and Other Miscellaneous Work.. https://www.usaspending.gov/award/CONT_AWD_693C7325F00008N_6925_693C7320D000015_6925/
- 693C7325F00007N (delivery order): $1,582,756, 693C73 Eastern Fed Lands Division. Project NP Ser PMS FY24(2): the Project Consists of the Pavement Preservation of Identified Roadways Including Parking Areas. the Work Includes Thin Lift Overlay of Asphalt Concrete Pavement, Sami, Full Depth Patching, and Other Miscellaneous Work.. https://www.usaspending.gov/award/CONT_AWD_693C7325F00007N_6925_693C7320D000015_6925/
- 140P5424C0019 (definitive contract): $775,675, Ser South Mabo. Construction, Repair Collapsed Storm Drain at Castillo De San Marcos. https://www.usaspending.gov/award/CONT_AWD_140P5424C0019_1443_-NONE-_-NONE-/
- 693C7325F00055N (delivery order): $662,370, 693C73 Eastern Fed Lands Division. Project NC Erfo FS Nfnc811 2020-1(1): the Project Consists of the Repair of a Fill Slope Failure on Tuni Gap Road (Rte 440). the Work Includes Grading, Drainage, Geofoam Lightweight Fill Embankment, Aggregate Surface Course, and Other Miscellaneou. https://www.usaspending.gov/award/CONT_AWD_693C7325F00055N_6925_693C7320D000015_6925/
- 693C7325F00080N (delivery order): $477,370, 693C73 Eastern Fed Lands Division. Project NC Erfo NP Blri 2024-1(7) the Project Consists of Slide Repairs, Guardrail Replacement, Replacement And/Or Cleaning of Culverts, Pavement Reconstruction, Pavement Markings and Other Miscellaneous Work.. https://www.usaspending.gov/award/CONT_AWD_693C7325F00080N_6925_693C7320D000015_6925/
- 693C7326P000005 (purchase order): $150,000, 693C73 Eastern Fed Lands Division. Project - VA NP GWMP MVT(4) - Stipend Fee for Unsuccessful Firm. https://www.usaspending.gov/award/CONT_AWD_693C7326P000005_6925_-NONE-_-NONE-/
- 693C7324P000031 (purchase order): $25,000, 693C73 Eastern Fed Lands Division. Project NP Natr 3N16, 3H25, Etc for Stipend Fee for Unsuccessful Firm.. https://www.usaspending.gov/award/CONT_AWD_693C7324P000031_6925_-NONE-_-NONE-/
- 140P5424C0027 (definitive contract): $0, Ser South Mabo. Construction, Replace Wastewater Treatment Plant at Dry Tortugas National Park. https://www.usaspending.gov/award/CONT_AWD_140P5424C0027_1443_-NONE-_-NONE-/
- 693C7319C000001 (definitive contract): $0, 693C73 Eastern Fed Lands Division. The Purpose of This No Cost Administrative Modification Is to Close This Contract Contractually and Financially in the Total Amount of $471,902.00.. https://www.usaspending.gov/award/CONT_AWD_693C7319C000001_6925_-NONE-_-NONE-/
- 693C7319C000003 (definitive contract): $0, 693C73 Eastern Fed Lands Division. The Purpose of This No Cost Administrative Modification Is to Financially and Contractually Close This Contract in the Amount of $910,000.00.. https://www.usaspending.gov/award/CONT_AWD_693C7319C000003_6925_-NONE-_-NONE-/
- 693C7321F000048 (delivery order): $0, 693C73 Eastern Fed Lands Division. The Purpose of This No Cost Administrative Modification Is to Financially and Contractually Close This Task Order Contract in Its Entirety in the Amount of $489,380.00.. https://www.usaspending.gov/award/CONT_AWD_693C7321F000048_6925_693C7320D000018_6925/
- 693C7321F000087 (delivery order): $0, 693C73 Eastern Fed Lands Division. Project FL Erfo NPS Guis 2020-1(1): the Purpose of This No Cost Administrative Modification Is to Reclassify Funds for Reimbursing FLTP Funds with Erfo Funds Using New Accounting Information 151512ER20001 540.Cn.Er02.12 1512000000 as Follows: 1. C. https://www.usaspending.gov/award/CONT_AWD_693C7321F000087_6925_693C7320D000015_6925/
- 693C7321F000109 (delivery order): $0, 693C73 Eastern Fed Lands Division. NP-EVER 219(1), 222(1) the Purpose of Modification Is to Financially and Contractually Close This Task Order Contract in Its Entirety in the Amount of $2,276,874.70.. https://www.usaspending.gov/award/CONT_AWD_693C7321F000109_6925_693C7320D000015_6925/
- 693C7320D000015: $0, 693C73 Eastern Fed Lands Division. South-Atlantic Regional Construction IDIQ Matoc: the Purpose of This Modification Is To: 1. in Accordance with FAR Clause 52.217-9, Entitled "option to Extend the Term of the Contract," Cited Contract Is Hereby Modified to Exercise the Op. https://www.usaspending.gov/award/CONT_IDV_693C7320D000015_6925/
- 693C7320D000018: $0, 693C73 Eastern Fed Lands Division. Northeast Regional Construction IDIQ Matoc. the Purpose of This Modification Is To: 1. in Accordance with FAR Clause 52.217-9, Entitled "option to Extend the Term of the Contract," Cited Contract Is Hereby Modified to Exercise the Option. https://www.usaspending.gov/award/CONT_IDV_693C7320D000018_6925/
- 693C7320D000022: $0, 693C73 Eastern Fed Lands Division. MID-WEST Regional Construction IDIQ Matoc: the Purpose of This Modification Is To: 1. in Accordance with FAR Clause 52.217-9, Entitled "option to Extend the Term of the Contract," Cited Contract Is Hereby Modified to Exercise the Option Y. https://www.usaspending.gov/award/CONT_IDV_693C7320D000022_6925/
- 69056724D000006: -$25,000, 690567 Western Federal Lands Div. This Contract Modification (P00001) Will De-Obligate the Guaranteed Minimum Amount of $25,000.00 That Was Met by Award of a Task Order. This Modification Cancels Item 00201 in Its Entirety.. https://www.usaspending.gov/award/CONT_IDV_69056724D000006_6925/
- 693C7322C000013 (definitive contract): -$68,976, 693C73 Eastern Fed Lands Division. NP-SER PMS FY21(2) 693C7322C000013 CM #5 Decrease Contract Amount by $68,976.15 Extend Contract Time by 146 Calendar Days Finalize Existing Quantities. https://www.usaspending.gov/award/CONT_AWD_693C7322C000013_6925_-NONE-_-NONE-/
- 693C7322C000011 (definitive contract): -$117,654, 693C73 Eastern Fed Lands Division. NP-SER PMS FY21(1) 693C7322C000011 CM #4 Decrease Contract Amount by $117,653.72 Extend Contract Time by 110 Calendar Days Finalize Existing Quantities. https://www.usaspending.gov/award/CONT_AWD_693C7322C000011_6925_-NONE-_-NONE-/
- 693C7320F000078 (delivery order): -$183,057, 693C73 Eastern Fed Lands Division. NP-DEWA 14(18), 121(1) CM #5 No Change to Contract Amount No Change to Contract Time Extend Period of Performance to September 30, 2024. https://www.usaspending.gov/award/CONT_AWD_693C7320F000078_6925_693C7320D000018_6925/
- 693C7322C000017 (definitive contract): -$211,224, 693C73 Eastern Fed Lands Division. NP-SER PMS FY22(1) 693C7322C000017 CM #3 Decrease Contract Amount by $211,224.05 No Change to Contract Time Finalize Existing Quantities. https://www.usaspending.gov/award/CONT_AWD_693C7322C000017_6925_-NONE-_-NONE-/

---
Source: USAspending.gov award data, keyed by UEI. Obligations in the window only. Cite https://sealedbidder.com/vendors/central-southern-construction-corp-gku1xrd7bcx7.