# Ams Industrial LLC

Canonical: https://sealedbidder.com/vendors/ams-industrial-llc-cgpzmj12xgk8

- UEI: CGPZMJ12XGK8
- CAGE: 875R6
- Parent: American Mine Services, LLC
- Location: Lafayette, CO
- Awards in window: 13 (40 transactions), $31,859,351 obligated, January 2, 2024 to August 27, 2026

## Awarding agencies

- Department of the Army: 11 awards, $28,852,080
- Bureau of Reclamation: 2 awards, $3,007,271

## Industries

- 237990 Other Heavy and Civil Engineering Construction: $29,085,075
- 333996 Fluid Power Pump and Motor Manufacturing: $1,403,506
- 238290 Other Building Equipment Contractors: $1,305,770
- 237110 Water and Sewer Line and Related Structures Construction: $65,000

## Competition

- Full and Open Competition After Exclusion of Sources: 10 awards
- Competed Under SAP: 2 awards
- Full and Open Competition: 1 awards

## Solicitations won

- Friant Dam Gate Compressor System Replacement (140R2026B0002), $2,986,251. https://sealedbidder.com/opportunities/140r2026b0002
- Mud Mountain Dam Steel Liner Repair (W912DW26BA002), $1,143,313. https://sealedbidder.com/opportunities/w912dw26ba002
- Big Bend Draft Tube Bulkhead Replacement (W9128F25RA058), $5,297,700. https://sealedbidder.com/opportunities/w9128f25ra058
- JENNINGS RANDOLPH LAKE (JRL) DAM PORT GATE VALVE AND INSULATION REPAIR PROJECT (W912DR25RA028), $9,086,696. https://sealedbidder.com/opportunities/w912dr25ra028
- John Day Generator Water Cooling System Rehab (W9127N25CA041), $8,439,911. https://sealedbidder.com/opportunities/w9127n25ca041
- Tenkiller Dam Mechanical Repairs, Tenkiller Ferry Dam, Gore, Oklahoma (W912BV24R0012), $3,583,542. https://sealedbidder.com/opportunities/w912bv24r0012
- Big Bend Depressing Air System Replacement (W9128F24R0044), $1,499,786. https://sealedbidder.com/opportunities/w9128f24r0044

## Largest awards

- W912DR25CA007 (definitive contract): $9,481,344, W2SD Endist Baltimore. All Work Required to Replace Valves. https://www.usaspending.gov/award/CONT_AWD_W912DR25CA007_9700_-NONE-_-NONE-/
- W9127N25CA041 (definitive contract): $7,461,046, W071 Endist Portland. Project Title: John Day Generator Water Cooling System Rehab Location: Sherman County, Oregon and Klickitat County, Washingtonmagnitude of Construction: $5,000,000.00 to $10,000,000.00. https://www.usaspending.gov/award/CONT_AWD_W9127N25CA041_9700_-NONE-_-NONE-/
- W9128F26CA007 (definitive contract): $5,297,700, W071 Endist Omaha. This Project Will Replace Six Draft Tube Bulkheads, Consisting of 12 Sheafs, Are Required. Dewatering of a Unit Is Required for Annual Maintenance, Cavitation Repair, Contracted Work, and Periodic Inspections.. https://www.usaspending.gov/award/CONT_AWD_W9128F26CA007_9700_-NONE-_-NONE-/
- W912BV24C0013 (definitive contract): $4,114,947, W076 Endist Tulsa. Tenkiller Dam Mechanical Repairs, Tenkiller Ferry Dam, Gore, Oklahoma. https://www.usaspending.gov/award/CONT_AWD_W912BV24C0013_9700_-NONE-_-NONE-/
- 140R2026C0012 (definitive contract): $2,986,251, Mp-Regional Office. Eo 14398 - Friant Dam Gate Compressor System Replacement. https://www.usaspending.gov/award/CONT_AWD_140R2026C0012_1425_-NONE-_-NONE-/
- W9128F25PA094 (purchase order): $1,403,506, W071 Endist Omaha. Fort Peck Unwatering Pump Replacement Fort Peck Dam Montana This Solicitation Is Being Advertised as 100% Total Small Business. https://www.usaspending.gov/award/CONT_AWD_W9128F25PA094_9700_-NONE-_-NONE-/
- W9128F24C0023 (definitive contract): $1,305,770, W071 Endist Omaha. BB Depressing Air System Rehabilitation. https://www.usaspending.gov/award/CONT_AWD_W9128F24C0023_9700_-NONE-_-NONE-/
- W912DW26CA003 (definitive contract): $1,143,313, W071 Endist Seattle. Repair Steel Liner. https://www.usaspending.gov/award/CONT_AWD_W912DW26CA003_9700_-NONE-_-NONE-/
- W912DR23P0025 (purchase order): $206,806, W2SD Endist Baltimore. Replace the Emergency Gate and Hoist and Removal of Leaf Gates at Foster Joseph Sayers Dam on the Bald Eagle Creek, West Branch Susquehanna River Basin, Howard Township, Centre County, Pennsylvania. Notice to Proceed Issued.. https://www.usaspending.gov/award/CONT_AWD_W912DR23P0025_9700_-NONE-_-NONE-/
- W912P523C0010 (definitive contract): $65,000, W072 Endist Nashville. Case BH-001 Modification A00001 Barkley Hatch Delay. https://www.usaspending.gov/award/CONT_AWD_W912P523C0010_9700_-NONE-_-NONE-/
- W912ES23C0014 (definitive contract): $38,447, W07V Endist ST Paul. LD3 - Formwork Installation & Stripping. https://www.usaspending.gov/award/CONT_AWD_W912ES23C0014_9700_-NONE-_-NONE-/
- 140R1021C0008 (definitive contract): $21,020, Pacific NW Region PN 6615. 140R1021C0008 Green Springs Guard Rotary Valve Modernization, Green Springs Power Plant Rogue River Project, Oregon - Closure Plate Request for Equitable Adjustment. https://www.usaspending.gov/award/CONT_AWD_140R1021C0008_1425_-NONE-_-NONE-/
- W912ES23C0015 (definitive contract): -$1,665,798, W07V Endist ST Paul. Upon Court of Federal Claims Protest Ruling, Termination for Convenience of the Government.. https://www.usaspending.gov/award/CONT_AWD_W912ES23C0015_9700_-NONE-_-NONE-/

---
Source: USAspending.gov award data, keyed by UEI. Obligations in the window only. Cite https://sealedbidder.com/vendors/ams-industrial-llc-cgpzmj12xgk8.
