# Ames Construction, Inc.

Canonical: https://sealedbidder.com/vendors/ames-construction-inc-m459w4scym19

- UEI: M459W4SCYM19
- CAGE: 0K3W0
- Location: Burnsville, MN
- Awards in window: 6 (41 transactions), $12,556,399 obligated, January 4, 2024 to September 1, 2026

## Awarding agencies

- Department of the Army: 4 awards, $7,165,244
- Bureau of Reclamation: 2 awards, $5,391,155

## Industries

- 237990 Other Heavy and Civil Engineering Construction: $12,556,399

## Competition

- Full and Open Competition: 6 awards

## Largest awards

- 140R6021C0015 (definitive contract): $3,814,220, Great Plains Regional Office. Glen Elder Dam Spillway Chute Replacement, Glen Elder Unit, Solomon Division, Pick-Sloan Missouri Basin Program, Kansas. https://www.usaspending.gov/award/CONT_AWD_140R6021C0015_1425_-NONE-_-NONE-/
- W912ES22C0003 (definitive contract): $3,065,005, W07V Endist ST Paul. (1) (R-02) Rebar Size Change and Gate Seal Heater (2) (R-04) Revise Trunnion Girder Transverse Bars (3) (R-06) Compensate Contractor for Removal of House Foundation (4) (R-10) Provide a Credit to the Government for Replacing the CQC Manager.. https://www.usaspending.gov/award/CONT_AWD_W912ES22C0003_9700_-NONE-_-NONE-/
- W912ES20C0001 (definitive contract): $2,889,073, W07V Endist ST Paul. This Contract Is Modified To: Add 1) R-049 Transformer Pad-Plc-Handrail Changes 2) R-050 J-Bulb Seal Changes 3) R-051 Installation of Survey Monitoring Points 4) R-052 Rea Temporary Access Crossing 5) Rea I-29 Tie-In.. https://www.usaspending.gov/award/CONT_AWD_W912ES20C0001_9700_-NONE-_-NONE-/
- W912ES17C0003 (definitive contract): $1,738,831, W07V Endist ST Paul. Add a PLC Manual Override Option Adjust the Safety Chain Height Remove the Design Impact Load for the Concrete Barrier Embed Door Add Compressible Joint Filler to the Concrete Barrier.. https://www.usaspending.gov/award/CONT_AWD_W912ES17C0003_9700_-NONE-_-NONE-/
- 140R6020C0015 (definitive contract): $1,576,936, Great Plains Regional Office. Webster Dam Spillway Chute Replacement, Webster Unit, Solomon Division, Pick-Sloan Missouri Basin Program, Kansas. https://www.usaspending.gov/award/CONT_AWD_140R6020C0015_1425_-NONE-_-NONE-/
- W9128F18C0031 (definitive contract): -$527,664, W071 Endist Omaha. CD - Yellowstone Intake Fish Passage - R00020 Final Veq. https://www.usaspending.gov/award/CONT_AWD_W9128F18C0031_9700_-NONE-_-NONE-/

---
Source: USAspending.gov award data, keyed by UEI. Obligations in the window only. Cite https://sealedbidder.com/vendors/ames-construction-inc-m459w4scym19.