# Advance RRP LLC

Canonical: https://sealedbidder.com/vendors/advance-rrp-llc-jlmcghhmk5d4

- UEI: JLMCGHHMK5D4
- CAGE: 6URS8
- Location: Pleasantville, NJ
- Awards in window: 10 (17 transactions), $1,801,580 obligated, January 23, 2024 to September 8, 2026

## Awarding agencies

- National Park Service: 7 awards, $1,660,975
- Federal Aviation Administration: 1 awards, $126,659
- Public Buildings Service: 2 awards, $13,946

## Industries

- 238350 Finish Carpentry Contractors: $1,129,461
- 238160 Roofing Contractors: $322,722
- 325998 All Other Miscellaneous Chemical Product and Preparation Manufacturing: $126,659
- 238990 All Other Specialty Trade Contractors: $103,501
- 332510 Hardware Manufacturing: $59,900
- 321911 Wood Window and Door Manufacturing: $45,391
- 236220 Commercial and Institutional Building Construction: $10,946
- 238220 Plumbing, Heating, and Air-Conditioning Contractors: $3,000

## Competition

- Not Available for Competition: 4 awards
- Competed Under SAP: 3 awards
- Not Competed Under SAP: 3 awards

## Solicitations won

- Equipment Design, fabrication, and Installation - (140P5126Q0041), $59,900. https://sealedbidder.com/opportunities/140p5126q0041
- HOFU STORM WINDOWS (140P4224Q0107), $36,980. https://sealedbidder.com/opportunities/140p4224q0107

## Largest awards

- 140P5425C0003 (definitive contract): $830,113, Ser South Mabo. Replace Wood Windows and Doors- San Juan NHS. https://www.usaspending.gov/award/CONT_AWD_140P5425C0003_1443_-NONE-_-NONE-/
- 140P4524C0041 (definitive contract): $322,722, Ner Supply Mabo. 140P4524C0041: Masonry Repairs and Roof Membrane Replacement - Beach Centers B&c, Gateway National Recreation Area, Sandy Hook Unit, Fort Hancock, NJ. https://www.usaspending.gov/award/CONT_AWD_140P4524C0041_1443_-NONE-_-NONE-/
- 140P5425C0011 (definitive contract): $299,348, Ser South Mabo. Replace Colonial Entrance Wood Doors-Em. https://www.usaspending.gov/award/CONT_AWD_140P5425C0011_1443_-NONE-_-NONE-/
- 697DCK24C00092 (definitive contract): $126,659, 697DCK Regional Acquisitions SVCS. The Purpose of This Project Is for Repairs Due to Hurrican Maria. Work Needed IT to Apply a Corrosion Treatment to the Existing Tower, Replace/Repair Some Areas Where Corrosion Has Eaten Thru the Grates of the Tower, Paint the Existing Tower (Not the. https://www.usaspending.gov/award/CONT_AWD_697DCK24C00092_6920_-NONE-_-NONE-/
- 140P2125P0009 (purchase order): $108,834, Washington Contracting Office. Contractor Shall Provide All Labor, Tools, Equipment, Materials, and Supervision to Furnish Historic Hardware for Ten (10) Door Openings and Three (3) Shutter Openings for San Juan Nhs.. https://www.usaspending.gov/award/CONT_AWD_140P2125P0009_1443_-NONE-_-NONE-/
- 140P5126P0087 (purchase order): $59,900, Ser East Mabo. Cremone Bolt Design, Fabrication, and Install. the Contractor Shall Provide All Labor, Supervision, Tools, Equipment, Transportation, Materials, Procurement, Modification, Adaptation, Fabrication, Technical Expertise, Documentation, and Incidentals N. https://www.usaspending.gov/award/CONT_AWD_140P5126P0087_1443_-NONE-_-NONE-/
- 140P4224P0106 (purchase order): $45,391, Northeast Regional Contracting. Hofu - Removable Compression Storm Windows. https://www.usaspending.gov/award/CONT_AWD_140P4224P0106_1443_-NONE-_-NONE-/
- 47PD0425C0003 (definitive contract): $10,946, PBS R3 Delaware Valley Field Office. The Contractor Must Supply All Material Tools Equipment and Supervision to Furnish and Install a New Wall Mount Air Conditioning Unit in the Telecon Room at the IRS 1400 N. Providence RD Media, PA 19063-2043 (Pa0582zz). https://www.usaspending.gov/award/CONT_AWD_47PD0425C0003_4740_-NONE-_-NONE-/
- 47PD0424C0007 (definitive contract): $3,000, PBS R3 Delaware Valley Field Office. The Contractor Will Provide All Labor, Materials, Tools, Equipment and Supervision to Perform a Study on the Air Conditioning System at the IRS Office in Mays Landing, NJ and Provide a Report to Recommend Action to Repair or Replace System. Nj6998zz. https://www.usaspending.gov/award/CONT_AWD_47PD0424C0007_4740_-NONE-_-NONE-/
- 140P4223C0013 (definitive contract): -$5,333, Northeast Regional Contracting. Hopewell Furnace Parking Lot and Trail Rehab. https://www.usaspending.gov/award/CONT_AWD_140P4223C0013_1443_-NONE-_-NONE-/

---
Source: USAspending.gov award data, keyed by UEI. Obligations in the window only. Cite https://sealedbidder.com/vendors/advance-rrp-llc-jlmcghhmk5d4.