Presolicitation, total small business set-aside
Fort Gibson Turbine Maintenance Platform (TMP)
Yandell0001
Department of the Army, W076 Endist Tulsa. Ornamental and Architectural Metal Work Manufacturing.
Response deadline
May 29, 2025 at 3:00 PM EDT
Closed 545 days ago. Posted May 15, 2025, first published May 15, 2025. Scheduled to archive May 30, 2025.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed in 2025
1 like it is open now in ornamental and architectural metal work manufacturing
- HEATER,WATER,ELECTRIC
Defense Logistics Agency, DLA Troop Support
Combined synopsis and solicitationSmall businessNAICS 332323Ship to the buyerSPE8E827T0762Closes in 13 daysDec 7
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Presolicitation. Advance notice that a solicitation is coming, usually within a few weeks. Glossary
- Who may compete
- Total small business set-aside. Only small businesses may compete. Small, under NAICS 332323 (ornamental and architectural metal work manufacturing), means no more than 500 employees, counted with affiliates. Open Small business opportunities
- What comes next
- No solicitation was published under this number after the presolicitation of May 15, 2025. An agency sometimes issues the solicitation under a new number.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
The work includes fabrication and load testing of one new Turbine Maintenance Platform (TMP) for the Fort Gibson Powerhouse main unit turbines ready for installation, as specified, and as shown in the contract drawings. Deliver all fabricated items complete to the Fort Gibson Powerhouse. The TMP will be fabricated from aluminum and steel including, but not limited to, aluminum sheet and plate, extrusions, and structural shapes. Provide a competent assembly specialist during the first at-site assembly (this assembly will be performed by Project personnel). The assembly specialist will be responsible to clarify assembly instructions, check the assembly and make any field adjustments necessary to correctly assemble the TMP.
See attachment for further information.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Presolicitation Notice_FTG TMP_15 May 2025.pdf250 KB, May 15, 2025
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
May 15, 2025
Presolicitation
Due May 30, 2025 at 3:00 PM EDT. SAM.gov, notice 947892b81626419388458fd5a1b9cf81
2 revisions on SAM
- May 15, 2025: publish, presolicitation
- May 15, 2025: publish, presolicitation
May 15, 2025
Presolicitation
Due May 29, 2025 at 3:00 PM EDT. SAM.gov, notice 99947b6d7701416fbefbb0a8b63eede2
2 revisions on SAM
- May 15, 2025: publish, presolicitation
- May 15, 2025: publish, presolicitation
Points of contact
- Clinton J. Yandellclinton.j.yandell@usace.army.mil9186694920
- Shawn Bradyshawn.g.brady@usace.army.mil9186694984