Special notice
PLA Survey - Construction of Ops Group Facility in Dover, DE
W912QR-26-Dover-AFB-Ops-Group-Facility
Department of the Army, W072 Endist Louisville. Commercial and Institutional Building Construction.
Response deadline
June 25, 2026 at 2:00 PM EDT
Closed 154 days ago. Posted June 10, 2026. Scheduled to archive July 10, 2026.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed in 2026
191 like it are open now in commercial and institutional building construction
- FY27 NRM | 460-26-011 - CON Replace West Entrance Return Air Gan | NCO 4 Construction East (VA-26-00069614)
Department of Veterans Affairs, 244-Network Contract Office 4
PresolicitationSDVOSBNAICS 236220Wilmington, DE36C24426B0025Closes in 25 daysDec 21 - Outdoor Fitness Facility, Building 389— Supply, Delivery, and Limited Installation Support
Department of the Air Force, FA6648 482 LSS LGC
Sources soughtNAICS 236220Ship to Homestead, FLHARBSS-2027-01Due tomorrowNov 27 - 657-24-102JC - Prepare Site for New PET/CT, Room A011D (MD) FY27 NRM VISN Base, CON (VA-27-00017492) 657-27-1-8434-0001
Department of Veterans Affairs, 255-Network Contract Office 15
PresolicitationSDVOSBNAICS 236220Missouri36C25527R0016Due tomorrowNov 27
All 191 open in commercial and institutional building construction
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Special notice. Industry days, draft requirements, program announcements and other notices that are not a solicitation. Glossary
Description
As published on SAM.gov.
THIS IS A PROJECT LABOR AGREEMENT (PLA) SURVEY ONLY.
This is a SPECIAL NOTICE. The U.S. Army Corps of Engineers Louisville District is soliciting comments from the construction community addressing use of a PLA for the upcoming construction of a new Operations Group Facility located at Dover Air Force Base (AFB), Delaware.
***No proposals are being requested or accepted with this PLA notice***
Description:
The Corps of Engineers Louisville District is soliciting comments from the construction community addressing the potential use of Project Labor Agreements (PLAs) for a large-scale construction project ($35 million or more) for the following:
Project scope: This Design-Bid-Build project includes the construction of a two-story 3,069 square meter (SM) facility located at Dover AFB, Delaware to include all required supporting utilities, pavements/parking lot, site improvements, and communications. The construction scope will include coordinated construction of the new Operations Group Facility and the demolition of the existing facility (2,305 SM), along with underground utilities as required to support both facilities through completion of the project. A properly configured facility is required to support training, administration, operations, and storage requirements for base operations. This facility will be adequately sized and designed to support command and support sections and using Squadrons. Demolition will include the removal and disposal of all related hazardous materials. Structure will comply with base architectural compatibility standards. Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, General Building requirements, installation architectural standards, and local building codes. This project will comply with DoD Antiterrorism/Force Protection requirements per UFC 4-010-01. Air Conditioning: 40 Tons. All testing, balancing, and commissioning shall be completed. This project will also include a Comprehensive Interior Design (CID) package, to include the Structural Interior Design and Furniture.
The construction of this project will require project phasing and coordination with Government stakeholders. The existing facility must remain in operation during construction. It should be considered that the existing facility is in proximity (approximately 20-feet in location), from the proposed new facility. The project phasing will include construction of the new facility, then relocation of personnel to the new facility, then demolition of the existing facility.
Contract duration is estimated at 810 calendar days.
A PLA is defined as a pre-hire collective bargaining agreement with one or more labor organizations that establishes the terms and conditions of employment for a specific construction project and is an agreement described in 29 U.S.C. 158(f).
Federal Acquisition Regulation (FAR) Policy:
1) Project Labor Agreement (PLA) is a tool that agencies may use to promote economy and efficiency in Federal procurement. Pursuant to Executive Order 13502, agencies are encouraged to consider requiring the use of project labor agreements in connection with large-scale construction projects.
2) An agency may, if appropriate, require that every contractor and subcontractor engaged in construction on the project agree, for that project, to negotiate or become a party to a project labor agreement with one or more labor organizations if the agency decides that the use of project labor agreements will:
- Advance the Federal Governments interest in achieving economy and efficiency in Federal procurement, producing labor-management stability, and ensuring compliance with laws and regulations governing safety and health, equal employment opportunity, labor and employment standards, and other matters; and
- Be consistent with law.
References:
Provision: 52.222-33 Notice of Requirement for Project Labor Agreement
Clause: 52.222-34 Project Labor Agreement.
3) In consideration of the above factors, and any others which may be deemed appropriate, the construction community is invited to comment on the use of PLAs. Of particular interest to the Government are responses to the following questions:
- A) Do you have knowledge that a PLA has been used in the local area on projects of this kind? If so, please provide supporting documentation.
- B) Are you aware of skilled labor shortages in the area for those crafts that will be needed to complete the referenced project? If so, please elaborate and provide supporting documentation where possible.
- C) Are you aware of time sensitive issues/scheduling requirements that would affect the rate at which the referenced project should be completed? If so, please elaborate and provide supporting documentation where possible.
- D) Identify specific reasons why or how you believe a PLA would advance the Federal Government’s interest in achieving economy and efficiency in Federal procurement.
- E) Identify specific reasons why you do not believe a PLA would advance the Federal Government’s interest in achieving economy and efficiency in Federal procurement.
- F) Identify any additional information you believe should be considered on the use of a PLA on the referenced project.
- G) Identify any additional information you believe should be considered on the non-use of a PLA on the referenced project.
- H) What are the likely cost impacts, if any, to your bid/proposal price if a PLA requirement is included in the solicitation? Please provide as much detail as possible regarding any anticipated cost impacts (positive or negative) of the inclusion of a PLA requirement, including any information you can provide about the magnitude of the anticipated impact.
- I) Please select one of the following:
- My company will not submit a proposal if PLA is required but is interested in proposing if a PLA is not a requirement.
- My company plans to submit a proposal whether PLA is required or not.
- My company only plans to submit a proposal if PLA is required.
4) In addition to affirmative responses, we are seeking negative responses to identify any potential actions we may take to improve the competitive environment. Please provide a response with feedback including rationale for not wanting to submit a proposal and any recommendations that could promote interest.
Please provide your comments via e-mail to alex.j.hamilton@usace.army.mil no later than 2:00 PM Eastern Standard Time on 25 June 2026.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
June 10, 2026
Special notice
Due June 25, 2026 at 2:00 PM EDT. SAM.gov, notice 4ce3cf925de7478c9efb5d4281f80cbd
1 revision on SAM
- June 10, 2026: publish, special notice
Points of contact
- Alex Hamiltonalex.j.hamilton@usace.army.mil