Skip to content

SealedBidder is a private company, not a government agency.

Sign upDashboard
  • 8,695 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell SealedBidder what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and SealedBidder tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans

Special notice

Construction of a New District Cooling Plant at Wright Patterson Aire Force Base, OH

W912QR25R-DCP1

Department of the Army, W072 Endist Louisville. Commercial and Institutional Building Construction.

Response deadline

July 7, 2025 at 11:00 AM EDT

Closed 507 days ago. Posted June 23, 2025. Scheduled to archive July 22, 2025.

Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities

This one closed in 2025

191 like it are open now in commercial and institutional building construction

All 191 open in commercial and institutional building construction

Reading this notice

Worked out from the publications and the award on this page.

Kind of notice
Special notice. Industry days, draft requirements, program announcements and other notices that are not a solicitation. Glossary

Description

As published on SAM.gov.

Description: The Corps of Engineers Louisville District is soliciting comments from the construction community addressing the potential use of Project Labor Agreements (PLAs) from large scale construction projects (exceeding $35 million) for projects consisting of interior and exterior modernization, renovation, and repair of existing residential/commercial construction projects.

This project will construct a one-story new chilled water District Cooling Plant (DCP), approximately 17,135 SF. There will be a Construction option of a new parking area to replace existing parking that will be lost due to the boundaries of the new building. This project will be located in Area A of Wright Patterson Air Force Base (WPAFB). OH.

The DCP will be an unoccupied one-story building. The exterior façade is to be pre-cast panels.

The DCP will consist of four 675-ton chillers to provide for the existing 2000 tons of load with N+1 capacity. Space, but not equipment, will be provided for the 500-ton energy recovery chiller for the ISF and for one additional 675-ton chiller.

Electrical switchgear, transformers, and cabling will be installed for the four base 675-ton chillers. Space for transformers, switchgear, and conduits will be installed for the future 500-ton ISF chiller and the additional future 675-ton chiller. 

The cooling towers will be stainless steel, open crossflow units with above ground basins to match chiller

capacity at N+1. Space will be provided for future chiller tower additions.

Water softening treatment will be installed in the DCP and will feed the DCP and will back feed existing facilities.

Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. This project will comply with DoD antiterrorism/force protection requirements per UFC 4-010-01. Facility-Related Control Systems will be designed IAW with Unified Facilities Criteria (UFC) 4-010-06 Cybersecurity of Facility-Related Control Systems Sep 2016, and DFARS 252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting.

A PLA is defined as a pre-hire collective bargaining agreement with one or more labor organizations that establishes the terms and conditions of employment for a specific construction project and is an agreement described in 29 U.S.C. 158(f). Federal Acquisition Regulation (FAR) Policy:

(a) Project Labor Agreement (PLA) is a tool that agencies may use to promote economy and efficiency in Federal procurement. Pursuant to Executive Order 14036, agencies are encouraged to consider requiring the use of project labor agreements in connection with large-scale construction projects.

(b) An agency may, if appropriate, require that every contractor and subcontractor engaged in construction on the project agree, for that project, to negotiate or become a party to a project labor agreement with one or more labor organizations if the agency decides that the use of project labor agreements will

(1) Advance the Federal Governments interest in achieving economy and efficiency in Federal procurement, producing labor-management stability, and ensuring compliance with laws and regulations governing safety and health, equal employment opportunity, labor and employment standards, and other matters; and (2) Be consistent with law.

Reference: Provision: 52.222-33 Notice of Requirement for Project Labor Agreement and Clause 52.222-34 Project Labor Agreement.

In consideration of the above factors, and any others which may be deemed appropriate, the construction community is invited to comment on the use of PLAs. Of particular interest to the Government are responses to the following questions:

 

Are you responding as a Prime Contractor or a Subcontractor?

Do you have knowledge that a PLA has been used in the local area on projects of this kind? If so, please provide supporting documentation.

Are you aware of skilled labor shortages in the area for those crafts that will be needed to complete the referenced project? If so, please elaborate and provide supporting documentation where possible.

Are you aware of time sensitive issues/scheduling requirements that would affect the rate at which the referenced project should be completed? If so, please elaborate and provide supporting documentation where possible.

Identify specific reasons why or how you believe a PLA would advance the Federal Governments interest in achieving economy and efficiency in federal procurement.

Identify specific reasons why you do not believe a PLA would advance the Federal Governments interest in achieving economy and efficiency in federal procurement.

Identify any additional information you believe should be considered on the use of a PLA on the referenced project.

Identify any additional information you believe should be considered on the non-use of a PLA on the referenced project.

How likely are you to submit a proposal on this project if a PLA is required (choose a response):

            1 – My company will not submit a proposal if PLA is required.

2 – My company plans to submit a proposal whether PLA is required or not.

3 – My company only plans to submit a proposal if PLA is required.

Please provide your comments via e-mail to Ranzel Merideth at Ranzel.L.Merideth@usace.army.mil no later than 11:00 AM EST on 7 July 2025.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. June 23, 2025

    Special notice

    Due July 7, 2025 at 11:00 AM EDT. SAM.gov, notice a2260562eadf463f8ba7ffd0206b6efa

    1 revision on SAM
    • June 23, 2025: publish, special notice

Points of contact