Combined synopsis and solicitation, total small business set-aside
William H. Harsha Lake Service Bridge Fall Protection
W912QR24Q0130
Department of the Army, W072 Endist Louisville. Structural Steel and Precast Concrete Contractors.
Response deadline
September 23, 2024 at 1:00 PM EDT
Closed 794 days ago. Posted September 10, 2024, first published September 10, 2024. Scheduled to archive September 10, 2025.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed in 2024
1 like it is open now in structural steel and precast concrete contractors
- FY27 NRM-Base (PROJ 516-23-604) BB - Install Temp Shoring in Crawl Space at Building 1
Department of Veterans Affairs, 248-Network Contract Office 8
PresolicitationSDVOSBNAICS 238120Bay Pines, FL36C24827R0028Closes in 54 daysJan 19, 2027
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Combined synopsis and solicitation. A streamlined commercial-item buy where the notice itself is the solicitation. Glossary
- Who may compete
- Total small business set-aside. Only small businesses may compete. Small, under NAICS 238120 (structural steel and precast concrete contractors), means no more than $19 million in average annual receipts, counted with affiliates. Open Small business opportunities
- Time to respond
- Bidders had 13 days from the day the solicitation was posted, September 10, 2024, to the deadline.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
This project consists of a base quote to install a government furnished contractor installed (GFCI) horizontal lifeline fall protection system on the catwalk under the control tower service bridge at William H. Harsha Lake in Batavia Township, OH. The contractor is responsible for fabricating and installing the steel assemblies for the lifeline connection points. There are 24 connection points which consist of 5 different types of connection configurations.
The contractor is also responsible for all materials and labor associated with the installation of the government furnished contractor installed (GFCI) horizontal lifeline system. The horizontal lifeline system has already been acquired by the site staff and will be provided to the contractor for installation (GFCI). The final system will consist of a total of 680 LF of lifeline, made up of two 160 LF systems and two 180 LF systems. There are no options to the contract.
Work will begin within 14 calendar days of the Notice to Proceed (NTP) and will conclude 120 calendar days after the NTP.One award will be made from this Solicitation.Total Small Business Set-AsideNAICS:
238120PSC: Z1KAPer FAR 36.204, the estimated price range for this project will be between $25,000 and $100,000
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
Points of contact
- Justin Mcphersonjustin.m.mcpherson@usace.army.mil5023157057