Solicitation, total small business set-aside
Hydraulic pumps/reservoir replacement and Hydraulic Cylinder Shaft Repacking in Water Control Tower located at Rough River Lake, Kentucky.
W912QR24Q0113
Department of the Army, W072 Endist Louisville. Other Heavy and Civil Engineering Construction.
Response deadline
September 6, 2024 at 12:00 PM EDT
Closed 811 days ago. Posted August 30, 2024, first published August 13, 2024. Scheduled to archive August 30, 2025.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed in 2024
143 like it are open now in other heavy and civil engineering construction
- Fishtrap Lake Intake Structure and Dam Rehabilitation; W91237-26-R-A020
Department of the Army, W072 Endist Huntington
SolicitationNAICS 237990KentuckyW9123726RA020Closes in 8 daysDec 4 - CAMP NELSON NATIONAL CEMETERY, KY 833CM3030 – CORRECT FCA DEFICIENCIES
Department of Veterans Affairs, National Cemetery Admin
SolicitationSDVOSBNAICS 237990Nicholasville, KY36C78626R0058Closes in 25 daysDec 21 - United States Air Force Academy (USAFA) Varsity Baseball Stadium
Department of the Army, W071 Endist Omaha
PresolicitationSmall businessNAICS 237990ColoradoNAF128F27B0001Due tomorrowNov 27
All 143 open in other heavy and civil engineering construction
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
- Who may compete
- Total small business set-aside. Only small businesses may compete. Small, under NAICS 237990 (other heavy and civil engineering construction), means no more than $45 million in average annual receipts, counted with affiliates. Open Small business opportunities
- Time to respond
- Bidders had 24 days from the day the solicitation was posted, August 13, 2024, to the deadline. The deadline moved once: it was first September 3, 2024 and ended as September 6, 2024.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
The scope of work will include the removal and replacement of two hydraulic pumps, two electric motors, one oil storage tank and all components that support the hydraulic system and repack (3) three-cylinder shafts in the water control tower.
All work is located at the Rough River Lake Project water control tower, Breckinridge County, Kentucky.The contractor shall furnish all personnel, materials, supplies, tools, parts, equipment, transportation, labor ,and incidentals necessary to perform the following work listed below per the specifications herein. The contractor?s work and responsibility shall also include all planning, programming, administration, management, supervision, communications, engineering, and quality control.
Mobilization, de-mobilization, and delivery of all materials, and equipment shall be included in the price. The contractor shall be responsible for all permits, both local, state, and federal at no expense to the government. All design, material, and work shall be in strict accordance with the specification in this contract and comply with all applicable Federal, State and Local laws and regulations. Please note, all distances and measurements provided are approximate.
It is the contractor?s responsibility to field verify all measurements and calculations. Access to the site and coordination for construction is through the USACE Rough River Lake office. See section 8 Technical Points of Contact and Project Representatives for contact information. It is incumbent upon the contractor to attend the pre-bid meeting and visit the site to work out details of equipment storage and staging of materials with the TPOC, Maintenance Leader, and/or Lake Manager.
Work under this contract will begin within 10 calendar days of Notice to Proceed (NTP) and complete within 120 calendar days after receiving the NTP. Hours of Work will be 6:30 a.m. ? 4:00 p.m., Monday thru Friday. Exceptions to these hours may be arranged in advance.
The contractor will be required to restore all areas disturbed by contractor?s actions to its original condition.Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on View FFP Contract Changes Playbook Here
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
August 13, 2024
Solicitation
Due September 3, 2024 at 11:00 AM EDT. SAM.gov, notice ede5b9014cfc44cead291f4b244357e8
August 13, 2024
Solicitation
Due September 3, 2024 at 10:00 AM EDT. SAM.gov, notice ff0d0514ede64c13a14bc00727c0b461
August 14, 2024
Solicitation
Due September 3, 2024 at 11:00 AM EDT. SAM.gov, notice 5aab94b7d8364a4ebfbf921eebe29270
August 14, 2024
Solicitation
Due September 3, 2024 at 11:00 AM EDT. SAM.gov, notice fb9de64153634ae38a3a6611bbf77a5a
August 21, 2024
Solicitation
Due September 3, 2024 at 11:00 AM EDT. SAM.gov, notice 60b9e0d7f77f456ca8536dafc687fff4
August 27, 2024
Solicitation
Due September 3, 2024 at 11:00 AM EDT. SAM.gov, notice 5d0b1516b939453ca4dd81a050a353f7
August 30, 2024
Solicitation
Due September 6, 2024 at 10:00 AM EDT. SAM.gov, notice 31c2d65303a641e6a28de3f1b0860475
August 30, 2024
Solicitation
Due September 6, 2024 at 12:00 PM EDT. SAM.gov, notice a03eac78aeba44858c341fc84a4730cc
Points of contact
- Joel Hubermanjoel.huberman@usace.army.mil5023157409
- Matthew JuddMatthew.p.judd@usace.army.mil5023157425