{"canonical":"https://sealedbidder.com/opportunities/w912pp25q0017","key":"W912PP25Q0017","url":"https://sealedbidder.com/opportunities/w912pp25q0017","title":"Building 419 Repair Restrooms & Breakroom","solicitation_number":"W912PP25Q0017","notice_type":"a","open":false,"removed":false,"removed_at":null,"response_deadline":null,"first_posted":"2025-06-09","last_posted":"2025-06-09","department":"DEPT OF DEFENSE","subagency":"DEPT OF THE ARMY","office":"W075 ENDIST ALBUQUERQUE","naics":"236220","psc":"Y1AZ","set_aside":"8AN","place_state":"NM","place_scope":"site","site":null,"place_state_source":null,"place_evidence":null,"place_county":"35001","place_county_name":"Bernalillo County","place_city":"3536300","place_city_name":"Kirtland AFB","winner":"L & R COMM & CONSTRUCTION INC","award_amount":"212491.00","publications":[{"notice_id":"4ea73f483b2f4f8eb9c80640d57ce253","title":"Building 419 Repair Restrooms & Breakroom","solicitation_number":"W912PP25Q0017","notice_type":"a","base_type":"a","posted":"2025-06-09","posted_at":"2025-06-09T15:50:46.943Z","due_at":null,"due_date":null,"cancelled":false,"archived":true,"archive_date":"2025-06-20","removed_at":null,"award_number":"W912PP25P0005","awardee_name":"L & R COMM & CONSTRUCTION INC","amount":"212491.00","link_sam":"https://sam.gov/workspace/contract/opp/4ea73f483b2f4f8eb9c80640d57ce253/view","enriched":true,"history":[{"index":3,"title":"Building 419 Repair Restrooms & Breakroom","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-09T15:50:46.943Z","notice_type":{"code":"a","label":"Award Notice"},"request_type":"submit","opportunity_id":"4ea73f483b2f4f8eb9c80640d57ce253","solicitation_number":"W912PP25Q0017"}]}],"latest_notice_id":"4ea73f483b2f4f8eb9c80640d57ce253","first_type":"a","notices":[{"award":{"date":"2025-06-05","amount":"212491.00","number":"W912PP25P0005","awardee":{"raw":"L & R COMM & CONSTRUCTION INC Los Lunas NM 87031 USA","uei":"DLFCLTSCE9Y3","cage":"6MDF6","name":"L & R COMM & CONSTRUCTION INC","location":{"zip":"87031","city":{"code":"43370","name":"Los Lunas"},"state":{"code":"NM","name":"New Mexico"},"country":{"code":"USA","name":"UNITED STATES"}}}},"dates":{"posted":"2025-06-09","posted_at":"2025-06-09T15:50:46.943Z","award_date":"2025-06-05","created_at":"2025-06-09T15:41:19.890Z","modified_at":"2025-06-20T04:04:31.666Z"},"links":{"sam":"https://sam.gov/workspace/contract/opp/4ea73f483b2f4f8eb9c80640d57ce253/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Building 419 Repair Restrooms & Breakroom","agency":{"office":{"code":"W912PP","name":"W075 ENDIST ALBUQUERQUE"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"87109-3435","city":"ALBUQUERQUE","state":"NM","country":"USA"},"organization_id":"100221490","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-06-20","archive_type":"auto15"},"history":[{"index":3,"title":"Building 419 Repair Restrooms & Breakroom","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-09T15:50:46.943Z","notice_type":{"code":"a","label":"Award Notice"},"request_type":"submit","opportunity_id":"4ea73f483b2f4f8eb9c80640d57ce253","solicitation_number":"W912PP25Q0017"}],"contacts":[{"name":"GLENDA KOHLIEBER","role":"primary","email":"Glenda.D.Kohlieber@usace.army.mil","phone":"5754796095x102"}],"base_type":{"code":"a","label":"Award Notice"},"notice_id":"4ea73f483b2f4f8eb9c80640d57ce253","set_aside":{"code":"8AN","label":"8(a) Sole Source (FAR 19.8)"},"lineage_id":"4ea73f483b2f4f8eb9c80640d57ce253","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-13T02:06:13.569694180Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"d9b37eacc25988a14f23e46737cb28e906a9504fb86e5bf813e99caaaa250526","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-13T02:06:13.569694180Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>This action was awarded as an 8(a) Sole Source Set-Aside under the authority of section 8(a) of the Small Business Act.</p>\n\n<p>The contractor shall furnish all parts, material, labor, equipment and supervision necessary to complete the work for Building 419 Repair Restrooms and Breakroom-&nbsp;</p>\n\n<ol>\n\t<li>Demolition\n\t<ol>\n\t\t<li>Contractor shall demo existing flooring and sawcut existing slab as indicated on the not for construction drawings.&nbsp; &nbsp;</li>\n\t\t<li>Contractor shall remove existing doors, frames, and hardware as indicated on the not for construction drawings.</li>\n\t\t<li>Contractor shall remove existing walls, electrical and comm. as indicated on the not for construction drawings.</li>\n\t\t<li>Contractor shall remove existing ceiling tiles, grid, light fixtures and HVAC register as indicated on the not for construction drawings.&nbsp;</li>\n\t\t<li>Contractor shall remove existing countertop and bracing in the existing space.</li>\n\t\t<li>Contractor shall not address the drain and water connection located on the Northwestern location of the space.</li>\n\t\t<li>Existing fire strobe to be left in place on the Eastern wall.</li>\n\t\t<li>Contractor to protect the sprinkler heads and heat detectors in the space during the demolition process.&nbsp; Contractor shall reinstall the detectors in the new suspended ceiling. &nbsp;</li>\n\t</ol>\n\t</li>\n\t<li>Construction\n\t<ol>\n\t\t<li>Contractor must provide &amp; install new wastewater drain line and connect to existing sanitary sewer line located on the South exterior of the facility.</li>\n\t\t<li>Contractor will be required to verify the location of the exterior gas line, that may be in line with sanitary sewer line location.</li>\n\t\t<li>Contractor must provide &amp; install new concrete infill at Sawcut.</li>\n\t\t<li>Contractor must provide &amp; install new metal stud walls (3-5/8&rdquo;) with sound batt insulation and 5/8&rdquo; gyp. board. on both sides, tape, texture and paint.</li>\n\t\t<li>Contractor must provide &amp; install new breakroom casework &ndash; upper &amp; lower cabinets &amp; hardware.</li>\n\t\t<li>Contractor must provide &amp; install new solid surface countertops &amp; backsplash.</li>\n\t\t<li>Contractor must provide &amp; install new breakroom sink &amp; faucet.</li>\n\t\t<li>Contractor must provide &amp; install new water line and electrical for Government furnished refrigerator.</li>\n\t\t<li>Contractor must provide &amp; install new bar height solid surface counter &amp; bracing at south &amp; west perimeter wall as shown on the not for construction drawings.&nbsp; Height to be finalized during construction.&nbsp; Include holes &amp; gromets in counter near existing wall power outlets.</li>\n\t\t<li>Contractor must provide &amp; install new restroom doors, frames, privacy hardware and restroom door signage.</li>\n\t\t<li>Contractor must provide &amp; install new tile flooring &amp; rubber wall base.</li>\n\t\t<li>Contractor must provide &amp; install new tile backsplash.</li>\n\t\t<li>Contractor must provide &amp; install new restroom plumbing fixtures to include toilet and urinal and backing in the wall.</li>\n\t\t<li>Contractor must provide &amp; install new restroom mirrors and grab bars and backing in the wall.</li>\n\t\t<li>Contractor must install gov&rsquo;t provided restroom accessories: tissue dispensers, soap dispensers, and towel dispensers and backing in the wall.</li>\n\t\t<li>Contractor shall install a bottle filler water fountain with backing in the wall to include electrical and water.</li>\n\t\t<li>Contractor must provide &amp; install new hard lid gyp. Board ceiling in the restrooms.</li>\n\t\t<li>Contractor must provide &amp; install new acoustic ceiling tile &amp; grid as shown on the not for construction drawings.</li>\n\t\t<li>Contractor must provide &amp; install new lay-in light fixtures, &amp; wiring. Connect to existing switch</li>\n\t\t<li>Contractor must provide &amp; install new surface mount light fixtures, wiring &amp; switch with stainless steel cover plate.</li>\n\t\t<li>Contractor must provide &amp; install new restroom vent fans.&nbsp; Contractor will need to core drill the roof as well as coordinate with the roof warranty contractor prior to the penetration.</li>\n\t\t<li>Contractor must provide and install new receptacles with stainless steel cover plates in the restroom as shown on the not for construction drawings.</li>\n\t\t<li>Contractor must provide &amp; install new horn &amp; strobe devices in restrooms.</li>\n\t\t<li>Contractor must provide &amp; install new HVAC supply &amp; return register.&nbsp; Connect to existing HVAC and perform balancing of the existing system. &nbsp;&nbsp;&nbsp;</li>\n\t\t<li>Contractor must provide &amp; install new undercounter hot water heater.&nbsp; Refer to the not for construction drawings.</li>\n\t\t<li>&nbsp;Contractor will need to place the comm wires on the south side of the room in wire mold. &nbsp;</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p></p>","text":"This action was awarded as an 8(a) Sole Source Set-Aside under the authority of section 8(a) of the Small Business Act.\n\nThe contractor shall furnish all parts, material, labor, equipment and supervision necessary to complete the work for Building 419 Repair Restrooms and Breakroom-\n\n• Demolition\n\n• Contractor shall demo existing flooring and sawcut existing slab as indicated on the not for construction drawings.\n\n• Contractor shall remove existing doors, frames, and hardware as indicated on the not for construction drawings.\n\n• Contractor shall remove existing walls, electrical and comm. as indicated on the not for construction drawings.\n\n• Contractor shall remove existing ceiling tiles, grid, light fixtures and HVAC register as indicated on the not for construction drawings.\n\n• Contractor shall remove existing countertop and bracing in the existing space.\n\n• Contractor shall not address the drain and water connection located on the Northwestern location of the space.\n\n• Existing fire strobe to be left in place on the Eastern wall.\n\n• Contractor to protect the sprinkler heads and heat detectors in the space during the demolition process. Contractor shall reinstall the detectors in the new suspended ceiling.\n\n• Construction\n\n• Contractor must provide & install new wastewater drain line and connect to existing sanitary sewer line located on the South exterior of the facility.\n\n• Contractor will be required to verify the location of the exterior gas line, that may be in line with sanitary sewer line location.\n\n• Contractor must provide & install new concrete infill at Sawcut.\n\n• Contractor must provide & install new metal stud walls (3-5/8”) with sound batt insulation and 5/8” gyp. board. on both sides, tape, texture and paint.\n\n• Contractor must provide & install new breakroom casework – upper & lower cabinets & hardware.\n\n• Contractor must provide & install new solid surface countertops & backsplash.\n\n• Contractor must provide & install new breakroom sink & faucet.\n\n• Contractor must provide & install new water line and electrical for Government furnished refrigerator.\n\n• Contractor must provide & install new bar height solid surface counter & bracing at south & west perimeter wall as shown on the not for construction drawings. Height to be finalized during construction. Include holes & gromets in counter near existing wall power outlets.\n\n• Contractor must provide & install new restroom doors, frames, privacy hardware and restroom door signage.\n\n• Contractor must provide & install new tile flooring & rubber wall base.\n\n• Contractor must provide & install new tile backsplash.\n\n• Contractor must provide & install new restroom plumbing fixtures to include toilet and urinal and backing in the wall.\n\n• Contractor must provide & install new restroom mirrors and grab bars and backing in the wall.\n\n• Contractor must install gov’t provided restroom accessories: tissue dispensers, soap dispensers, and towel dispensers and backing in the wall.\n\n• Contractor shall install a bottle filler water fountain with backing in the wall to include electrical and water.\n\n• Contractor must provide & install new hard lid gyp. Board ceiling in the restrooms.\n\n• Contractor must provide & install new acoustic ceiling tile & grid as shown on the not for construction drawings.\n\n• Contractor must provide & install new lay-in light fixtures, & wiring. Connect to existing switch\n\n• Contractor must provide & install new surface mount light fixtures, wiring & switch with stainless steel cover plate.\n\n• Contractor must provide & install new restroom vent fans. Contractor will need to core drill the roof as well as coordinate with the roof warranty contractor prior to the penetration.\n\n• Contractor must provide and install new receptacles with stainless steel cover plates in the restroom as shown on the not for construction drawings.\n\n• Contractor must provide & install new horn & strobe devices in restrooms.\n\n• Contractor must provide & install new HVAC supply & return register. Connect to existing HVAC and perform balancing of the existing system.\n\n• Contractor must provide & install new undercounter hot water heater. Refer to the not for construction drawings.\n\n• Contractor will need to place the comm wires on the south side of the room in wire mold.","origin":"detail"},"notice_type":{"code":"a","label":"Award Notice"},"schema_version":1,"solicitation_number":"W912PP25Q0017","place_of_performance":{"zip":"87117","city":{"code":"0","name":"Kirtland AFB"},"state":{"code":"NM","name":"New Mexico"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1AZ"}],"due_at":null,"due_date":null,"closes_at":null,"awardable":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912PP","office_name":"W075 ENDIST ALBUQUERQUE","state":"NM","county":"35001","county_name":"Bernalillo County","city":"3536300","city_name":"Kirtland AFB","country":"USA","state_source":null,"state_evidence":null,"site_key":null,"winner_key":"DLFCLTSCE9Y3","amount":"212491.00","linked_awards":1,"cancelled":false,"archived":true,"updated_at":"2026-11-13T02:19:37.924363Z","principal_notice_id":"4ea73f483b2f4f8eb9c80640d57ce253","description":{"text":"This action was awarded as an 8(a) Sole Source Set-Aside under the authority of section 8(a) of the Small Business Act.\n\nThe contractor shall furnish all parts, material, labor, equipment and supervision necessary to complete the work for Building 419 Repair Restrooms and Breakroom-\n\n• Demolition\n\n• Contractor shall demo existing flooring and sawcut existing slab as indicated on the not for construction drawings.\n\n• Contractor shall remove existing doors, frames, and hardware as indicated on the not for construction drawings.\n\n• Contractor shall remove existing walls, electrical and comm. as indicated on the not for construction drawings.\n\n• Contractor shall remove existing ceiling tiles, grid, light fixtures and HVAC register as indicated on the not for construction drawings.\n\n• Contractor shall remove existing countertop and bracing in the existing space.\n\n• Contractor shall not address the drain and water connection located on the Northwestern location of the space.\n\n• Existing fire strobe to be left in place on the Eastern wall.\n\n• Contractor to protect the sprinkler heads and heat detectors in the space during the demolition process. Contractor shall reinstall the detectors in the new suspended ceiling.\n\n• Construction\n\n• Contractor must provide & install new wastewater drain line and connect to existing sanitary sewer line located on the South exterior of the facility.\n\n• Contractor will be required to verify the location of the exterior gas line, that may be in line with sanitary sewer line location.\n\n• Contractor must provide & install new concrete infill at Sawcut.\n\n• Contractor must provide & install new metal stud walls (3-5/8”) with sound batt insulation and 5/8” gyp. board. on both sides, tape, texture and paint.\n\n• Contractor must provide & install new breakroom casework – upper & lower cabinets & hardware.\n\n• Contractor must provide & install new solid surface countertops & backsplash.\n\n• Contractor must provide & install new breakroom sink & faucet.\n\n• Contractor must provide & install new water line and electrical for Government furnished refrigerator.\n\n• Contractor must provide & install new bar height solid surface counter & bracing at south & west perimeter wall as shown on the not for construction drawings. Height to be finalized during construction. Include holes & gromets in counter near existing wall power outlets.\n\n• Contractor must provide & install new restroom doors, frames, privacy hardware and restroom door signage.\n\n• Contractor must provide & install new tile flooring & rubber wall base.\n\n• Contractor must provide & install new tile backsplash.\n\n• Contractor must provide & install new restroom plumbing fixtures to include toilet and urinal and backing in the wall.\n\n• Contractor must provide & install new restroom mirrors and grab bars and backing in the wall.\n\n• Contractor must install gov’t provided restroom accessories: tissue dispensers, soap dispensers, and towel dispensers and backing in the wall.\n\n• Contractor shall install a bottle filler water fountain with backing in the wall to include electrical and water.\n\n• Contractor must provide & install new hard lid gyp. Board ceiling in the restrooms.\n\n• Contractor must provide & install new acoustic ceiling tile & grid as shown on the not for construction drawings.\n\n• Contractor must provide & install new lay-in light fixtures, & wiring. Connect to existing switch\n\n• Contractor must provide & install new surface mount light fixtures, wiring & switch with stainless steel cover plate.\n\n• Contractor must provide & install new restroom vent fans. Contractor will need to core drill the roof as well as coordinate with the roof warranty contractor prior to the penetration.\n\n• Contractor must provide and install new receptacles with stainless steel cover plates in the restroom as shown on the not for construction drawings.\n\n• Contractor must provide & install new horn & strobe devices in restrooms.\n\n• Contractor must provide & install new HVAC supply & return register. Connect to existing HVAC and perform balancing of the existing system.\n\n• Contractor must provide & install new undercounter hot water heater. Refer to the not for construction drawings.\n\n• Contractor will need to place the comm wires on the south side of the room in wire mold.","html":"<p>This action was awarded as an 8(a) Sole Source Set-Aside under the authority of section 8(a) of the Small Business Act.</p>\n\n<p>The contractor shall furnish all parts, material, labor, equipment and supervision necessary to complete the work for Building 419 Repair Restrooms and Breakroom-&nbsp;</p>\n\n<ol>\n\t<li>Demolition\n\t<ol>\n\t\t<li>Contractor shall demo existing flooring and sawcut existing slab as indicated on the not for construction drawings.&nbsp; &nbsp;</li>\n\t\t<li>Contractor shall remove existing doors, frames, and hardware as indicated on the not for construction drawings.</li>\n\t\t<li>Contractor shall remove existing walls, electrical and comm. as indicated on the not for construction drawings.</li>\n\t\t<li>Contractor shall remove existing ceiling tiles, grid, light fixtures and HVAC register as indicated on the not for construction drawings.&nbsp;</li>\n\t\t<li>Contractor shall remove existing countertop and bracing in the existing space.</li>\n\t\t<li>Contractor shall not address the drain and water connection located on the Northwestern location of the space.</li>\n\t\t<li>Existing fire strobe to be left in place on the Eastern wall.</li>\n\t\t<li>Contractor to protect the sprinkler heads and heat detectors in the space during the demolition process.&nbsp; Contractor shall reinstall the detectors in the new suspended ceiling. &nbsp;</li>\n\t</ol>\n\t</li>\n\t<li>Construction\n\t<ol>\n\t\t<li>Contractor must provide &amp; install new wastewater drain line and connect to existing sanitary sewer line located on the South exterior of the facility.</li>\n\t\t<li>Contractor will be required to verify the location of the exterior gas line, that may be in line with sanitary sewer line location.</li>\n\t\t<li>Contractor must provide &amp; install new concrete infill at Sawcut.</li>\n\t\t<li>Contractor must provide &amp; install new metal stud walls (3-5/8&rdquo;) with sound batt insulation and 5/8&rdquo; gyp. board. on both sides, tape, texture and paint.</li>\n\t\t<li>Contractor must provide &amp; install new breakroom casework &ndash; upper &amp; lower cabinets &amp; hardware.</li>\n\t\t<li>Contractor must provide &amp; install new solid surface countertops &amp; backsplash.</li>\n\t\t<li>Contractor must provide &amp; install new breakroom sink &amp; faucet.</li>\n\t\t<li>Contractor must provide &amp; install new water line and electrical for Government furnished refrigerator.</li>\n\t\t<li>Contractor must provide &amp; install new bar height solid surface counter &amp; bracing at south &amp; west perimeter wall as shown on the not for construction drawings.&nbsp; Height to be finalized during construction.&nbsp; Include holes &amp; gromets in counter near existing wall power outlets.</li>\n\t\t<li>Contractor must provide &amp; install new restroom doors, frames, privacy hardware and restroom door signage.</li>\n\t\t<li>Contractor must provide &amp; install new tile flooring &amp; rubber wall base.</li>\n\t\t<li>Contractor must provide &amp; install new tile backsplash.</li>\n\t\t<li>Contractor must provide &amp; install new restroom plumbing fixtures to include toilet and urinal and backing in the wall.</li>\n\t\t<li>Contractor must provide &amp; install new restroom mirrors and grab bars and backing in the wall.</li>\n\t\t<li>Contractor must install gov&rsquo;t provided restroom accessories: tissue dispensers, soap dispensers, and towel dispensers and backing in the wall.</li>\n\t\t<li>Contractor shall install a bottle filler water fountain with backing in the wall to include electrical and water.</li>\n\t\t<li>Contractor must provide &amp; install new hard lid gyp. Board ceiling in the restrooms.</li>\n\t\t<li>Contractor must provide &amp; install new acoustic ceiling tile &amp; grid as shown on the not for construction drawings.</li>\n\t\t<li>Contractor must provide &amp; install new lay-in light fixtures, &amp; wiring. Connect to existing switch</li>\n\t\t<li>Contractor must provide &amp; install new surface mount light fixtures, wiring &amp; switch with stainless steel cover plate.</li>\n\t\t<li>Contractor must provide &amp; install new restroom vent fans.&nbsp; Contractor will need to core drill the roof as well as coordinate with the roof warranty contractor prior to the penetration.</li>\n\t\t<li>Contractor must provide and install new receptacles with stainless steel cover plates in the restroom as shown on the not for construction drawings.</li>\n\t\t<li>Contractor must provide &amp; install new horn &amp; strobe devices in restrooms.</li>\n\t\t<li>Contractor must provide &amp; install new HVAC supply &amp; return register.&nbsp; Connect to existing HVAC and perform balancing of the existing system. &nbsp;&nbsp;&nbsp;</li>\n\t\t<li>Contractor must provide &amp; install new undercounter hot water heater.&nbsp; Refer to the not for construction drawings.</li>\n\t\t<li>&nbsp;Contractor will need to place the comm wires on the south side of the room in wire mold. &nbsp;</li>\n\t</ol>\n\t</li>\n</ol>\n\n<p></p>","origin":"detail"},"contacts":[{"name":"GLENDA KOHLIEBER","role":"primary","email":"Glenda.D.Kohlieber@usace.army.mil","phone":"5754796095x102"}],"place_of_performance":{"zip":"87117","city":{"code":"0","name":"Kirtland AFB"},"state":{"code":"NM","name":"New Mexico"},"country":{"code":"USA","name":"UNITED STATES"}},"office_address":{"zip":"87109-3435","city":"ALBUQUERQUE","state":"NM","country":"USA"},"naics_codes":["236220"],"award":{"date":"2025-06-05","amount":"212491.00","number":"W912PP25P0005","awardee":{"raw":"L & R COMM & CONSTRUCTION INC Los Lunas NM 87031 USA","uei":"DLFCLTSCE9Y3","cage":"6MDF6","name":"L & R COMM & CONSTRUCTION INC","location":{"zip":"87031","city":{"code":"43370","name":"Los Lunas"},"state":{"code":"NM","name":"New Mexico"},"country":{"code":"USA","name":"UNITED STATES"}}}},"attachments":[],"awards":[{"award_key":"CONT_AWD_W912PP25P0005_9700_-NONE-_-NONE-","permalink":"https://www.usaspending.gov/award/CONT_AWD_W912PP25P0005_9700_-NONE-_-NONE-/","piid":"W912PP25P0005","parent_piid":null,"award_type":"PURCHASE ORDER","vendor_key":"DLFCLTSCE9Y3","recipient_name":"L & R COMM & CONSTRUCTION INC","recipient_uei":"DLFCLTSCE9Y3","recipient_cage":"6MDF6","recipient_city":"LOS LUNAS","recipient_state":"NM","sub_name":"Department of the Army","office_name":"W075 ENDIST ALBUQUERQUE","office_key":"o-W912PP","first_action_date":"2025-06-05","last_action_date":"2026-01-14","actions":3,"obligated":"236437.30","current_total_value":"236437.30","potential_total_value":"236437.30","naics":"236220","psc":"Y1AZ","extent_competed":"NOT COMPETED UNDER SAP","set_aside":"8(A) SOLE SOURCE","offers_received":1,"description":"BLDG. 419 REPAIR RESTROOMS & BREAKROOM","method":"piid","confidence":"high","evidence":["award number W912PP25P0005 equals the contract number","same awarding office W912PP"],"opportunity_key":null,"opportunity_title":null}],"related":[{"key":"W912PP279A001","latest_notice_id":"5427721451f74ee78305f575a8013667","title":"Progressive Design-Build (PDB) Other Transaction (OT) for FY28 High Speed Test Track (HSTT), Holloman Air Force Base, Otero County, New Mexico (NM)","solicitation_number":"W912PP279A001","notice_type":"o","first_type":"o","first_posted":"2026-11-23","last_posted":"2026-11-24","notices":3,"due_at":"2026-12-05T00:00:00Z","due_date":"2026-12-04","closes_at":"2026-12-05T00:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912PP","office_name":"W075 ENDIST ALBUQUERQUE","naics":"237990","psc":"Y1BZ","set_aside":null,"state":"NM","county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"site","state_source":"title","state_evidence":"(HSTT), HOLLOMAN AIR FORCE BASE, OTERO COUNTY, NEW MEXICO","site":"Holloman Air Force Base","site_key":"holloman-air-force-base-nm","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-25T05:14:59.249783Z"},{"key":"W912PP27QA003","latest_notice_id":"e5ed7e119a88433d98cb29d2f154e2cf","title":"Santa Rosa Dam Elevator Maintenance Service, Guadalupe County, New Mexico","solicitation_number":"W912PP27QA003","notice_type":"o","first_type":"o","first_posted":"2026-11-23","last_posted":"2026-11-24","notices":2,"due_at":"2026-12-10T00:00:00Z","due_date":"2026-12-09","closes_at":"2026-12-10T00:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912PP","office_name":"W075 ENDIST ALBUQUERQUE","naics":"238290","psc":"J035","set_aside":"SBA","state":"NM","county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"site","state_source":"sam_street","state_evidence":"2528 JOE AND LOUIE PAGE RD, SANTA ROSA, NEW MEXICO 88435","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-25T05:14:59.249783Z"}],"similar_open":[{"key":"36C24726R0134","latest_notice_id":"8f0c90b43099494cb8a8201cd475406f","title":"Y1DA | 521-24-102 | Renovate Wards 2K and 2B for Optometry/Ophthalmology Clinical Use","solicitation_number":"36C24726R0134","notice_type":"o","first_type":"p","first_posted":"2026-09-25","last_posted":"2026-11-18","notices":7,"due_at":"2026-11-26T18:00:00Z","due_date":"2026-11-26","closes_at":"2026-11-26T18:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C247","office_name":"247-NETWORK CONTRACT OFFICE 7 (36C247)","naics":"236220","psc":"Y1DA","set_aside":"SDVOSBC","state":"AL","county":"01073","county_name":"Jefferson County","city":null,"city_name":null,"country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-19T04:41:36.780616Z"},{"key":"36C77627B00031","latest_notice_id":"f4ea125ebcfe45ffb023ffe066a36f10","title":"614-326 Construct Parking Garage West Lot Addition Minor Construction","solicitation_number":"36C77627B0003_1","notice_type":"p","first_type":"p","first_posted":"2026-11-12","last_posted":"2026-11-12","notices":1,"due_at":"2026-11-26T18:00:00Z","due_date":"2026-11-26","closes_at":"2026-11-26T18:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C776","office_name":"PCAC (36C776)","naics":"236220","psc":"Z2LZ","set_aside":"SDVOSBC","state":"TN","county":"47157","county_name":"Shelby County","city":"4748000","city_name":"Memphis","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":true,"removed_at":null,"updated_at":"2026-11-23T06:19:14.199153Z"},{"key":"HARBSS202701","latest_notice_id":"22963d82312349a99befea586884297c","title":"Outdoor Fitness Facility, Building 389— Supply, Delivery, and Limited Installation Support","solicitation_number":"HARBSS-2027-01","notice_type":"r","first_type":"r","first_posted":"2026-11-12","last_posted":"2026-11-24","notices":5,"due_at":"2026-11-27T17:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T17:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-057","dept_name":"DEPT OF DEFENSE","sub_key":"s-5700","sub_name":"DEPT OF THE AIR FORCE","office_key":"o-FA6648","office_name":"FA6648 482 LSS LGC","naics":"236220","psc":"5670","set_aside":null,"state":"FL","county":"12086","county_name":"Miami-Dade County","city":"1232275","city_name":"Homestead","country":"USA","place_scope":"nationwide","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-25T05:14:59.249783Z"}],"similar_open_total":184,"indexable":false}