Sources sought
Pajaro River FRM Reach 6 - Division 0
W912P725S0007
Department of the Army, W075 Endist San Fran. Other Heavy and Civil Engineering Construction.
Response deadline
April 21, 2025 at 6:00 PM EDT
Closed 584 days ago. Posted March 31, 2025. Scheduled to archive May 6, 2025.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed in 2025
143 like it are open now in other heavy and civil engineering construction
- FWS - Pixley NWR Water Recirculation Design-Build
Departmental Offices, FWS Contracting Activity
Combined synopsis and solicitationSmall businessNAICS 237990California140FF027R0003Due in 4 daysNov 30 - FY27 San Francisco District Maintenance Dredging
Department of the Army, W075 Endist San Fran
Sources soughtNAICS 237990San Francisco, CAW912P727S0002Closes in 8 daysDec 4 - USACE SPK DBB Construction - LAR C3B North - Sacramento, CA
Department of the Army, W075 Endist Sacramento
SolicitationSmall businessNAICS 237990Sacramento, CAW9123827BA001Closes in 22 daysDec 18
All 143 open in other heavy and civil engineering construction
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Sources sought. Market research. The agency wants to know who could do the work before it decides how to compete it. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 237990 (other heavy and civil engineering construction), means no more than $45 million in average annual receipts, counted with affiliates. What a set-aside is
- What comes next
- No solicitation was published under this number after the sources sought of March 31, 2025. An agency sometimes issues the solicitation under a new number.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
PROJECT DESCRIPTION:
This project is for the Reach 6 levee and floodwall construction along the Corralitos Creek, a tributary of the Pajaro River Levee System in the City of Watsonville, County of Santa Cruz. The Project consisting of 2.6 miles of flood risk management levees with approximately 111,600 compacted cubic yards (cy) of fill, and 1,500 ft of floodwalls. The Pajaro FRM Project consists of from Reach 2 to Reach 6 of the Pajaro flood control system. This 1TB is for Reach 6 of the Pajaro FRM Project. The project area is located within the lower Pajaro River watershed. It encompasses an area of approximately 10,000 acres, which includes the stream channels, active floodplains, and terraces along the Pajaro River and the Salsipuedes and Corralitos Creeks. The area is divided by the Pajaro River, which serves as a border for two counties. Santa Cruz County lies to the north of the Pajaro River, and Monterey County lies to the south. The Salsipuedes and Corralitos Creeks, which join just north of the Pajaro River in Santa Cruz County, are tributaries of the Pajaro River. The engineered levees have a crest elevation of ranging from 2 to 8 feet, a minimum crest width of 20 feet, and 3H:1V side slopes. The access road, on top of the levee, will be surfaced with a minimum of 8 inches of CalTrans Class 2 Aggregate Base. Structural features included in the contract include 1,500 LF of 6 ft to 9 ft high floodwall walls. The Highway 152 Bridge will be raised approximately 6 ft and it is a separate project. The first 100 ft from boarding the bridge are left for future construction with the bridge. Construction for Reach 6 is likely to be performed across the at two construction seasons. See Attachment 1 for Site Map. There are two side channels designed to enhance eco-system restoration in the Project. The material excavated from the channels is not suitable to be used for the engineered levee along. Suited soil will be imported offsite to blend with the excavated soil for levee fill. The site has limited access. Some of the ingress/egress are through unpaved dirt roads in farm fields. Attachment 2 shows permanent easements, staging area and hauling routes. Material from excavation will be stockpiled and mixed with imported soil onsite.
REQUEST INPUT:
The Government seeks input from interested companies to better understand socio-economic capability, inform participation, and address engineering, acquisition considerations. If your company is interested in this project, please submit a response to include the following information:
1. Company Name
2. Company Point of Contact
3. Company Size
4. Company Experience
5. Company Bonding Limit
Please submit no more than 2 projects for your experience (similar in scope, complexity, and magnitude of this project), within the last 10 years, indicating your company's role in the execution of the work (prime or subcontractor). The information provided by your company will not be disclosed without your prior consent.
Please answer the following questions in your submission:
1. What challenges (reservations) do you have about this project?
2. The Government contemplates utilizing a lump sum or job pricing approach for the work and does not plan to include a line item for the estimated quantity and cost per cubic yard of fill. Given this approach, what are your concerns, if any?
Please submit your responses no later than April 21, 2025 3:00 PM PST. Limit submissions to 10 pages. All interested companies must be registered in the System for Award (SAM) to be eligible for a federal contract award. Please email responses to logan.champlin@usace.army.mil. Please send your responses via email, and use subject line: "Sources Sought Response
to W912P725S0007 - Pajaro River FRM Reach 6".
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Attachment 2 Reach 6.pdf5.9 MB, March 31, 2025
- Attachment 1 Location Map.pdf427 KB, March 31, 2025
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
March 31, 2025
Sources sought
Due April 21, 2025 at 6:00 PM EDT. SAM.gov, notice 26845c97cac24f92982ae19f7f4ca598
1 revision on SAM
- March 31, 2025: publish, sources sought
Points of contact
- Logan Champlinlogan.champlin@usace.army.mil4155036953