{"canonical":"https://sealedbidder.com/opportunities/w912hy26x1b38","key":"W912HY26X1B38","url":"https://sealedbidder.com/opportunities/w912hy26x1b38","title":"FY26 Brazos Island Harbor (BIH) Texas, Entrance and Jetty Channel Hopper Maintenance Dredging, Cameron County, Texas","solicitation_number":"W912HY26X1B38","notice_type":"r","open":false,"removed":false,"removed_at":null,"response_deadline":"2026-02-04T16:00:00Z","first_posted":"2026-01-20","last_posted":"2026-01-20","department":"DEPT OF DEFENSE","subagency":"DEPT OF THE ARMY","office":"W076 ENDIST GALVESTON","naics":"237990","psc":"Z1KB","set_aside":null,"place_state":"TX","place_scope":"site","site":null,"place_state_source":null,"place_evidence":null,"place_county":"48061","place_county_name":"Cameron County","place_city":null,"place_city_name":null,"winner":null,"award_amount":null,"publications":[{"notice_id":"153c06c654c24ddcb37d5c148fdfa10f","title":"FY26 Brazos Island Harbor (BIH) Texas, Entrance and Jetty Channel Hopper Maintenance Dredging, Cameron County, Texas","solicitation_number":"W912HY26X1B38","notice_type":"r","base_type":"r","posted":"2026-01-20","posted_at":"2026-01-20T20:42:02.270Z","due_at":"2026-02-04T16:00:00Z","due_date":"2026-02-04","cancelled":false,"archived":true,"archive_date":"2026-02-19","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/153c06c654c24ddcb37d5c148fdfa10f/view","enriched":true,"history":[{"index":6,"title":"FY26 Brazos Island Harbor (BIH) Texas, Entrance and Jetty Channel Hopper Maintenance Dredging, Cameron County, Texas","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-05-12T15:03:03.456Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"7d1183e50cff4913bb46136535967ea9","solicitation_number":"W912HY26BA026","related_opportunity_id":"153c06c654c24ddcb37d5c148fdfa10f"},{"index":3,"title":"FY26 Brazos Island Harbor (BIH) Texas, Entrance and Jetty Channel Hopper Maintenance Dredging, Cameron County, Texas","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-20T20:42:02.270Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"153c06c654c24ddcb37d5c148fdfa10f","solicitation_number":"W912HY26X1B38"}]}],"latest_notice_id":"153c06c654c24ddcb37d5c148fdfa10f","first_type":"r","notices":[{"dates":{"posted":"2026-01-20","posted_at":"2026-01-20T20:42:02.270Z","created_at":"2026-01-20T20:12:48.396Z","modified_at":"2026-02-20T04:55:43.324Z","response_deadline":{"raw":"2026-02-04T10:00:00-06:00","utc":"2026-02-04T16:00:00Z","date":"2026-02-04","time":"10:00:00","timezone":"America/Chicago","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/153c06c654c24ddcb37d5c148fdfa10f/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"FY26 Brazos Island Harbor (BIH) Texas, Entrance and Jetty Channel Hopper Maintenance Dredging, Cameron County, Texas","agency":{"office":{"code":"W912HY","name":"W076 ENDIST GALVESTON"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"77550-1229","city":"GALVESTON","state":"TX","country":"USA"},"organization_id":"100221632","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-02-19","archive_type":"auto15"},"history":[{"index":6,"title":"FY26 Brazos Island Harbor (BIH) Texas, Entrance and Jetty Channel Hopper Maintenance Dredging, Cameron County, Texas","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-05-12T15:03:03.456Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"7d1183e50cff4913bb46136535967ea9","solicitation_number":"W912HY26BA026","related_opportunity_id":"153c06c654c24ddcb37d5c148fdfa10f"},{"index":3,"title":"FY26 Brazos Island Harbor (BIH) Texas, Entrance and Jetty Channel Hopper Maintenance Dredging, Cameron County, Texas","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-20T20:42:02.270Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"153c06c654c24ddcb37d5c148fdfa10f","solicitation_number":"W912HY26X1B38"}],"contacts":[{"name":"Lillie Johnson","role":"primary","email":"lillie.s.johnson@usace.army.mil","phone":"4047663963"},{"name":"Joycelyn Rodgers","role":"secondary","email":"Joycelyn.R.Rodgers@usace.army.mil"}],"base_type":{"code":"r","label":"Sources Sought"},"notice_id":"153c06c654c24ddcb37d5c148fdfa10f","lineage_id":"153c06c654c24ddcb37d5c148fdfa10f","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-15T03:15:15.584370217Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T16:22:53.920682Z","row_sha256":"188bc5bc96a2903a2be5e1c08330d7d5ee82180409cae832e7ebee4a3b5f52bc","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-15T03:15:15.584370217Z","first_seen_at":"2026-09-16T16:22:53.920682Z"},"description":{"html":"<p>&nbsp;The scope of the FY26 Brazos Island Harbor (BIH) Entrance and Jetty Channel maintenance dredging job will consist of dredging approximately 450,000 cubic yards of the Brazos Island Harbor, with five projected (5) options that relate to trail suction dredging and beach placement on South Padre Island.</p>\n\n<p></p>\n\n<p>Schedule No. 1, Hopper dredging of BIH Entrance Channel station -13+000 to station -6+00; estimated volume; 125,000 CY. And Hopper dredging of BIH Jetty Channel station -6+000 to 0+000; estimated volume: 225,000 CY.</p>\n\n<p></p>\n\n<p>Placement Area: Near Shore Feeder Berm 1A/1B</p>\n\n<p></p>\n\n<p></p>\n\n<p>Options 1-3: Sea Turtle Trawling 15 days each. No additional time added to contract duration if awarded.<strong> </strong></p>\n\n<p></p>\n\n<p>Option 4: Beach Placement at two locations on South Padre Island in lieu of Near Shore Feeder Berm 1A/1B. If awarded, additional time of 14 calendar days will be added to contract duration.</p>\n\n<p></p>\n\n<p>Option 5: Sea Turtle Trawling 15 days. No additional time added to contract duration if awarded. &nbsp;</p>\n\n<p></p>\n\n<p>Dredging and beach placement option are subject to environmental windows for swimming and nesting sea turtles.</p>\n\n<p></p>\n\n<p>Period of Performance: Complete the entire work ready for use not later than 120 calendar days after the date the Contractor receives the Notice to Proceed. Completion time for Options 1-5 is 14 calendar days.</p>\n\n<p></p>","text":"The scope of the FY26 Brazos Island Harbor (BIH) Entrance and Jetty Channel maintenance dredging job will consist of dredging approximately 450,000 cubic yards of the Brazos Island Harbor, with five projected (5) options that relate to trail suction dredging and beach placement on South Padre Island.\n\nSchedule No. 1, Hopper dredging of BIH Entrance Channel station -13+000 to station -6+00; estimated volume; 125,000 CY. And Hopper dredging of BIH Jetty Channel station -6+000 to 0+000; estimated volume: 225,000 CY.\n\nPlacement Area: Near Shore Feeder Berm 1A/1B\n\nOptions 1-3: Sea Turtle Trawling 15 days each. No additional time added to contract duration if awarded.\n\nOption 4: Beach Placement at two locations on South Padre Island in lieu of Near Shore Feeder Berm 1A/1B. If awarded, additional time of 14 calendar days will be added to contract duration.\n\nOption 5: Sea Turtle Trawling 15 days. No additional time added to contract duration if awarded.\n\nDredging and beach placement option are subject to environmental windows for swimming and nesting sea turtles.\n\nPeriod of Performance: Complete the entire work ready for use not later than 120 calendar days after the date the Contractor receives the Notice to Proceed. Completion time for Options 1-5 is 14 calendar days.","origin":"detail"},"notice_type":{"code":"r","label":"Sources Sought"},"schema_version":1,"solicitation_number":"W912HY26X1B38","place_of_performance":{"zip":"78597","state":{"code":"TX","name":"Texas"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z1KB"}],"due_at":"2026-02-04T16:00:00Z","due_date":"2026-02-04","closes_at":"2026-02-04T16:00:00Z","awardable":true,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912HY","office_name":"W076 ENDIST GALVESTON","state":"TX","county":"48061","county_name":"Cameron County","city":null,"city_name":null,"country":"USA","state_source":null,"state_evidence":null,"site_key":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":true,"updated_at":"2026-10-15T03:36:10.198954Z","principal_notice_id":"153c06c654c24ddcb37d5c148fdfa10f","description":{"text":"The scope of the FY26 Brazos Island Harbor (BIH) Entrance and Jetty Channel maintenance dredging job will consist of dredging approximately 450,000 cubic yards of the Brazos Island Harbor, with five projected (5) options that relate to trail suction dredging and beach placement on South Padre Island.\n\nSchedule No. 1, Hopper dredging of BIH Entrance Channel station -13+000 to station -6+00; estimated volume; 125,000 CY. And Hopper dredging of BIH Jetty Channel station -6+000 to 0+000; estimated volume: 225,000 CY.\n\nPlacement Area: Near Shore Feeder Berm 1A/1B\n\nOptions 1-3: Sea Turtle Trawling 15 days each. No additional time added to contract duration if awarded.\n\nOption 4: Beach Placement at two locations on South Padre Island in lieu of Near Shore Feeder Berm 1A/1B. If awarded, additional time of 14 calendar days will be added to contract duration.\n\nOption 5: Sea Turtle Trawling 15 days. No additional time added to contract duration if awarded.\n\nDredging and beach placement option are subject to environmental windows for swimming and nesting sea turtles.\n\nPeriod of Performance: Complete the entire work ready for use not later than 120 calendar days after the date the Contractor receives the Notice to Proceed. Completion time for Options 1-5 is 14 calendar days.","html":"<p>&nbsp;The scope of the FY26 Brazos Island Harbor (BIH) Entrance and Jetty Channel maintenance dredging job will consist of dredging approximately 450,000 cubic yards of the Brazos Island Harbor, with five projected (5) options that relate to trail suction dredging and beach placement on South Padre Island.</p>\n\n<p></p>\n\n<p>Schedule No. 1, Hopper dredging of BIH Entrance Channel station -13+000 to station -6+00; estimated volume; 125,000 CY. And Hopper dredging of BIH Jetty Channel station -6+000 to 0+000; estimated volume: 225,000 CY.</p>\n\n<p></p>\n\n<p>Placement Area: Near Shore Feeder Berm 1A/1B</p>\n\n<p></p>\n\n<p></p>\n\n<p>Options 1-3: Sea Turtle Trawling 15 days each. No additional time added to contract duration if awarded.<strong> </strong></p>\n\n<p></p>\n\n<p>Option 4: Beach Placement at two locations on South Padre Island in lieu of Near Shore Feeder Berm 1A/1B. If awarded, additional time of 14 calendar days will be added to contract duration.</p>\n\n<p></p>\n\n<p>Option 5: Sea Turtle Trawling 15 days. No additional time added to contract duration if awarded. &nbsp;</p>\n\n<p></p>\n\n<p>Dredging and beach placement option are subject to environmental windows for swimming and nesting sea turtles.</p>\n\n<p></p>\n\n<p>Period of Performance: Complete the entire work ready for use not later than 120 calendar days after the date the Contractor receives the Notice to Proceed. Completion time for Options 1-5 is 14 calendar days.</p>\n\n<p></p>","origin":"detail"},"contacts":[{"name":"Lillie Johnson","role":"primary","email":"lillie.s.johnson@usace.army.mil","phone":"4047663963"},{"name":"Joycelyn Rodgers","role":"secondary","email":"Joycelyn.R.Rodgers@usace.army.mil"}],"place_of_performance":{"zip":"78597","state":{"code":"TX","name":"Texas"},"country":{"code":"USA","name":"UNITED STATES"}},"office_address":{"zip":"77550-1229","city":"GALVESTON","state":"TX","country":"USA"},"naics_codes":["237990"],"award":null,"attachments":[{"resource_id":"eb6257599eaf4c7f953fdced2de7bb0d","name":"Attachment 1 - Sources Sought Notice_BIH_W912HY26X1B38_20 Jan 2026.pdf","kind":"file","mime_type":".pdf","size_bytes":116427,"posted_at":"2026-01-20T20:42:02.270Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/eb6257599eaf4c7f953fdced2de7bb0d/download","mirrored":false}],"awards":[],"related":[{"key":"W912HY27RA001","latest_notice_id":"2145e5cdeca0404db67d1f6c12adf421","title":"Houston Ship Channel (HSC) Expansion Channel Improvement Project (ECIP) 11, Package 9, Segment 4 Boggy Bayou to Sims Bayou","solicitation_number":"W912HY27RA001","notice_type":"o","first_type":"p","first_posted":"2026-09-24","last_posted":"2026-11-20","notices":7,"due_at":"2026-12-01T20:00:00Z","due_date":"2026-12-01","closes_at":"2026-12-01T20:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912HY","office_name":"W076 ENDIST GALVESTON","naics":"237990","psc":"Y1KF","set_aside":null,"state":"TX","county":null,"county_name":null,"city":"4835000","city_name":"Houston","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-21T05:30:25.727497Z"},{"key":"W912HY27BA011","latest_notice_id":"da9c761959444224b83793316e2f7f36","title":"FY27 HARLINGEN PLACEMENT AREA (PA)13 AND 10 IMPROVEMENTS","solicitation_number":"W912HY27BA011","notice_type":"o","first_type":"o","first_posted":"2026-11-05","last_posted":"2026-11-20","notices":2,"due_at":"2026-12-07T20:00:00Z","due_date":"2026-12-07","closes_at":"2026-12-07T20:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912HY","office_name":"W076 ENDIST GALVESTON","naics":"237990","psc":"Z1KF","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"unknown","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-21T05:30:25.727497Z"},{"key":"W912HY26S1AX4","latest_notice_id":"2d6854a966894dcfa100ac6821550aa9","title":"FY26 Harlingen Placement Area (PA)13 and 10 Improvements","solicitation_number":"W912HY-26-S-1AX4","notice_type":"r","first_type":"r","first_posted":"2025-12-03","last_posted":"2025-12-03","notices":1,"due_at":"2026-12-17T16:00:00Z","due_date":"2026-12-17","closes_at":"2026-12-17T16:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912HY","office_name":"W076 ENDIST GALVESTON","naics":"237990","psc":"Z1KF","set_aside":null,"state":"TX","county":"48061","county_name":"Cameron County","city":"4832372","city_name":"Harlingen","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-09-24T03:25:58.922164Z"},{"key":"W912HY27QA001","latest_notice_id":"7ac952fe769342e3a7fdd79c10bf6d4a","title":"USACE, FY27 POSMV Wavemaster IMU IP68","solicitation_number":"W912HY27QA001","notice_type":"o","first_type":"o","first_posted":"2026-11-20","last_posted":"2026-11-20","notices":1,"due_at":"2026-12-21T17:00:00Z","due_date":"2026-12-21","closes_at":"2026-12-21T17:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912HY","office_name":"W076 ENDIST GALVESTON","naics":"541370","psc":"6635","set_aside":"SBA","state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 6635)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-21T05:30:25.727497Z"}],"similar_open":[{"key":"W912HY27RA001","latest_notice_id":"2145e5cdeca0404db67d1f6c12adf421","title":"Houston Ship Channel (HSC) Expansion Channel Improvement Project (ECIP) 11, Package 9, Segment 4 Boggy Bayou to Sims Bayou","solicitation_number":"W912HY27RA001","notice_type":"o","first_type":"p","first_posted":"2026-09-24","last_posted":"2026-11-20","notices":7,"due_at":"2026-12-01T20:00:00Z","due_date":"2026-12-01","closes_at":"2026-12-01T20:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912HY","office_name":"W076 ENDIST GALVESTON","naics":"237990","psc":"Y1KF","set_aside":null,"state":"TX","county":null,"county_name":null,"city":"4835000","city_name":"Houston","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-21T05:30:25.727497Z"},{"key":"W912PM27RA008","latest_notice_id":"f58c89ded61c4886a1a945a6db824702","title":"Enterprise Dredge Delivery Center (EDDC) Scope Dredge to Budget (SDtB) Shallow Draft Maintenance Dredging - Galveston District","solicitation_number":"W912PM27RA008","notice_type":"o","first_type":"s","first_posted":"2026-10-22","last_posted":"2026-11-25","notices":6,"due_at":"2026-12-14T18:00:00Z","due_date":"2026-12-14","closes_at":"2026-12-14T18:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912PM","office_name":"W074 ENDIST WILMINGTON","naics":"237990","psc":"Z1KF","set_aside":"SBA","state":"TX","county":null,"county_name":null,"city":null,"city_name":null,"country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-26T04:43:42.403930Z"},{"key":"W912HY26S1AX4","latest_notice_id":"2d6854a966894dcfa100ac6821550aa9","title":"FY26 Harlingen Placement Area (PA)13 and 10 Improvements","solicitation_number":"W912HY-26-S-1AX4","notice_type":"r","first_type":"r","first_posted":"2025-12-03","last_posted":"2025-12-03","notices":1,"due_at":"2026-12-17T16:00:00Z","due_date":"2026-12-17","closes_at":"2026-12-17T16:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912HY","office_name":"W076 ENDIST GALVESTON","naics":"237990","psc":"Z1KF","set_aside":null,"state":"TX","county":"48061","county_name":"Cameron County","city":"4832372","city_name":"Harlingen","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-09-24T03:25:58.922164Z"}],"similar_open_total":143,"indexable":false}