Sources sought
MARKET INTELLIGENCE NOTICE / REQUEST FOR INFORMATION (RFI)
W912HV27ZOTA1
Department of the Army, W2SN Endist Japan. Commercial and Institutional Building Construction.
Offers due
December 17, 2026 at 12:00 AM EST
21 days from now. Posted November 23, 2026.
Get an email when this is amended, when the deadline moves and when it is awarded.Watch it
Next from this buyer
- RENOVATE MILITARY FAMILY HOUSING TOWER 4511, CAMP COURTNEYSolicitationNAICS 236118Location not publishedW912HV26BA009Closes in 14 daysDec 10
- AFHC Repair Quarters 82 and 86, Camp Zama, JapanSolicitationNAICS 236118Outside the USW912HV26BA019Closes in 15 daysDec 11
- DLA DWCF B1907 Backup Power Generator, Yokosuka, JapanSources soughtNAICS 237130Outside the USW912HV27Z0002Closes in 15 daysDec 11
Similar, open now
- FY27 NRM - VISN Base Modernize Nurse Call - 539-23-101
Department of Veterans Affairs, 250-Network Contract Office 10
PresolicitationSDVOSBNAICS 236220Location not published36C25027B0009Due in 4 daysNov 30 - FY27 NRM - VISN Base Install Roof Equipment Railings - 539-22-206
Department of Veterans Affairs, 250-Network Contract Office 10
PresolicitationSDVOSBNAICS 236220Location not published36C25027B0008Due in 4 daysNov 30 - N4008426R7500 DB RMAC FACILITY IMPROVEMENT AT NETDC, SAN ANTONIO, ZAMBALES, PHILIPPINES
Department of the Navy, Navfacsyscom FAR East
SolicitationNAICS 236220Outside the USN4008426R7500Due in 5 daysDec 1
All 190 open in commercial and institutional building construction
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Sources sought. Market research. The agency wants to know who could do the work before it decides how to compete it. A business that could do the work answers with a short capability statement. Answering does not commit it to bid, and the answers decide whether the purchase is set aside for small businesses. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 236220 (commercial and institutional building construction), means no more than $45 million in average annual receipts, counted with affiliates. What a set-aside is
- What comes next
- No solicitation has been published under this number yet. The sources sought of November 23, 2026 is the earliest notice of the purchase.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
USACE Japan District
Contracting Division POCs:
- H. Christine Allen (email: heather.c.allen@usace.army.mil)
- Erica J. Stiner (email: erica.j.stiner@usace.army.mil)
Notice: This is a Market Intelligence Notice/ Request for Information (RFI) and is for informational purposes only. This announcement does not constitute a Solicitation or a Request for Proposal (RFP), and no solicitation is currently available. Participation in this RFI is strictly voluntary. The Government will not be obligated to award any agreement or contract because of this RFI, nor will it reimburse respondents for any costs associated with the preparation or submission of information. Submitting a response will not affect a firm’s ability to submit a proposal should a formal solicitation be issued in the future.
Acquisition Approach & Delivery Method: The Government anticipates soliciting these requirements under one or more Other Transaction Authority (OTA) agreements pursuant to 10 U.S.C. § 2808a, utilizing a Construction Manager at Risk (CM@R) delivery model. Under this collaborative framework, the Government intends to engage a construction manager early during preconstruction (Phase 1) to actively influence the design alongside the Architect-Engineer Firm by providing constructability reviews, value engineering, schedule optimization, and open-book cost modeling prior to negotiating price for construction execution (Phase 2).
Cybersecurity Maturity Model Certification: CMMC Level 1 Anticipated
NAICS Code: 236220 – Commercial and Institutional Building Construction
(Note: While Other Transaction Authority is not subject to FAR-based small business regulations, this NAICS code is provided for market research to help the Government understand the size and demographics of the interested industrial base.)
______________________________________________________________________
Project Overview: The U.S. Army Corps of Engineers (USACE), in partnership with the United States Marine Corps (USMC), is conducting market research to formulate an acquisition strategy for a five-project portfolio under the Energy Resilience and Conservation Investment Program (ERCIP). These projects establish islanded, cybersecure microgrids and decentralized power generation to guarantee 14+ days of continuous mission operations without commercial grid power across key operational hubs in Japan.
Total Estimated Acquisition Magnitude: Between $380,000,000 - $600,000,000.
_______________________________________________________________________
Anticipated Project Profiles:
1. Project P-904: Microgrid and Backup Power -- CATC Camp Fuji (Shizuoka Prefecture)
Target Budget: $30M to $50M
Key Generation & Storage Assets:
- 400 kW Solar Photovoltaic (PV) System
- 800 kW Electric Peaker Plant (Gas Peaker / BESS)
- 400 kW Standby Diesel Generator Plant
Key Supporting Works: Install onsite generation including storage equipment from a solar photovoltaic system, peaker generation plant and/or battery storage assets, and diesel-fired standby generator. This work includes all required electrical, mechanical, plumbing, and controls work associated with each install. A microgrid controller will be installed, and generation assets will be connected to the microgrid. The controls and microgrid will be cyber-secured. The system will be commissioned.
Mission Mandate: Support III Marine Expeditionary Force (III MEF) combined arms live-fire training. Removes vulnerability as the end-of-the-line consumer on the commercial utility.
2. Project P-1016: Power Generation and Microgrid -- MCAS Iwakuni (Yamaguchi Prefecture)
Target Budget: $100M to $150M
Key Generation & Storage Assets:
- 12,500 kW Diesel Power Plant
- 6,000 kW Solar Photovoltaic (PV) System
- 2.4 MW Battery Energy Storage System (BESS)
Key Supporting Works: Construct a resilient microgrid with diverse energy sources to include natural gas and diesel generators to maximize resilience, PV system, and a BESS. Work to include utility interconnects, microgrid and other controls, commissioning, and cybersecurity.
Mission Mandate: Maintain continuous flightline and mission operations for Carrier Air Wing Five (CVW-5) and Marine Aircraft Group 12 (MAG-12), with a goal of zero downtime for Pacific Air Mobility and tactical air sorties.
3. Project P-312: Power Generation and Microgrid -- Camp Foster (Okinawa)
Target Budget: $100M to $150M
Key Generation & Storage Assets:
- 3,000 kW Gas Turbine Power Plant
- 4,500 kW Diesel Power Plant
- 2,100 kW Solar Photovoltaic (PV) System
- 979 kW Battery Energy Storage System (BESS)
Key Supporting Works: A PV system, onsite gas and diesel generation to maximize resilience, and a BESS. This project will also include utility interconnections, microgrid and other controls, commissioning, and cybersecurity.
Mission Mandate: Support Major Subordinate Command headquarters (MCIPAC, 1st Marine Aircraft Wing and the U.S. Naval Hospital Okinawa. Goal is 14+ days of islanded operations.
4. Project P-625: Microgrid and Backup Power -- Camp Hansen (Okinawa)
Target Budget: $100M to $150M
Key Generation & Storage Assets:
- 10,000 kW Standby Diesel Generator Plant
- 1,148 kW Solar Photovoltaic (PV) System
- 2,400 kW (4-Hour) Battery Energy Storage System (BESS)
Key Supporting Works: Install centralized diesel generation, ground/roof solar PV arrays, and a 4-hour BESS to support microgrid stability and contingency operations. Electrical scope includes medium-voltage switchgear, generator interconnections, and integration of all generation and storage assets into a centralized, cybersecure microgrid controller. Supporting scope includes civil site preparation and grading, utility interconnection modernization, communications network enhancements, full system commissioning, and RMF cybersecurity authorization.
Mission Mandate: Support the III MEF Information Group (MIG) and the 31st Marine Expeditionary Unit (31st MEU) across critical facilities. Eliminates points of failure and fuel logistics constraints to deliver 100% critical load capability in island mode for 14+ days.
5. Project P-406: Microgrid and Backup Power -- Camp Courtney (Okinawa)
Target Budget: $50M to $100M
Key Generation & Storage Assets:
- 5,000 kW Standby Diesel Electric Power Plant (two generator sets)
- 1,685 kW Solar Photovoltaic (PV) System
- 2,400 kW (4-Hour) Battery Energy Storage System (BESS)
- 4,000 SF Standby Generator Enclosure/Facility
Key Supporting Works: Construct a 4,000 SF facility to house the standby generator sets and install solar PV alongside a 4-hour BESS for microgrid stability and ride-through capability. Work includes medium-voltage distribution integration, site civil grading and paving, utility interconnection upgrades, communications improvements, mechanical work for solar racking, full functional commissioning, and Risk Management Framework (RMF) cybersecurity accreditation.
Mission Mandate: Support III Marine Expeditionary Force (III MEF), 3rd Marine Division, and 3D Marine Expeditionary Brigade (MEB) Headquarters across mission-critical facilities. Ensures continuous command and control capabilities with a goal of 14+ days of islanded operations during commercial grid disruptions and severe weather events.
Industry Questionnaire
Submission Instructions: Please see the attached Market Intelligence Questionnaire document and email your response to Christine Allen (heather.c.allen@usace.army.mil) and Erica Stiner (erica.j.stiner@usace.army.mil) by 17 December 2026 at 14:00 Japan Standard Time.
Purpose: The Government is seeking industry insight to identify potential delivery methods, evaluate commercial capabilities, understand host-nation supply chain dynamics, and determine whether these requirements should be executed via standard Federal Acquisition Regulation (FAR) contracts or through Other Transaction Authority (OTA) under 10 U.S.C. § 2808a using Construction Manager at Risk (CM@R).
Planned Acquisition Strategy: Other Transaction Authority (OTA) with Construction Manager at Risk (CM@R)
USACE Japan District is conducting market intelligence to assess industry capability and interest in supporting this effort utilizing an Other Transaction (OT) Agreement under the authority of 10 U.S.C. § 2808a, Facility Construction or Repair: Transactions Other Than Contracts and Grants. This authority is distinct from the Department of Defense prototype OT authorities commonly associated with 10 U.S.C. § 4021 and 4022. This authority is intended for military construction projects that involve testing and experimentation associated with new and emergent construction technologies to achieve potential benefits such as enhanced mission resilience, improved installation support, or cost and schedule reduction.
- Phase 1: Pre-Construction Services - The OT Awardee shall assist the Government collaboratively in achieving its goals with respect to the project’s scope, constructability, budget, quality, schedule, and in coordination with the Designer of Record.
- Phase 2: Final Design and Construction - Upon reaching an agreed-upon level of design (e.g., 95 to 100%), the Awardee will propose a Guaranteed Maximum Price (GMP). If the GMP is accepted, the Government will exercise construction execution. If a GMP cannot be agreed upon, the Government retains the right to "off-ramp" the contractor in order to complete the construction of the facility via alternative methods.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- OTA with CMaR Project Overview Japan ERCIP Microgrids.pdf1.5 MB, November 24, 2026
- Industry Questions OTA_CMatR Japan ERCIP Microgrids.docx64 KB, November 24, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
November 24, 2026
Sources sought
Due December 17, 2026 at 12:00 AM EST. SAM.gov, notice ba493d6aa0d14ac290c14031e8ddeff0
1 revision on SAM
- November 24, 2026: publish, sources sought
Points of contact
- H. Christine Allenheather.c.allen@usace.army.mil
- Erica Stinererica.j.stiner@usace.army.mil