{"canonical":"https://sealedbidder.com/opportunities/w912hv26ra009","key":"W912HV26RA009","url":"https://sealedbidder.com/opportunities/w912hv26ra009","title":"DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan","solicitation_number":"W912HV26RA009","notice_type":"o","open":true,"removed":false,"removed_at":null,"response_deadline":"2027-01-25T05:00:00Z","first_posted":"2026-07-14","last_posted":"2026-10-19","department":"DEPT OF DEFENSE","subagency":"DEPT OF THE ARMY","office":"W2SN ENDIST JAPAN","naics":"237120","psc":"Y1NA","set_aside":null,"place_state":null,"place_scope":"overseas","site":null,"place_state_source":null,"place_evidence":"RAGE TANKS PHASE II, YOKOTA AIR BASE, JAPAN","place_county":null,"place_county_name":null,"place_city":null,"place_city_name":null,"winner":null,"award_amount":null,"publications":[{"notice_id":"56f9c9e0e31d4fca980ffce5ce3f573d","title":"DESC2103C - Bulk Fuel Storage Tanks Phase II Yokota Air Base, Japan","solicitation_number":"W912HV26RA009","notice_type":"p","base_type":"r","posted":"2026-07-14","posted_at":"2026-07-14T04:30:35.022Z","due_at":"2026-08-31T05:00:00Z","due_date":"2026-08-31","cancelled":false,"archived":true,"archive_date":"2026-10-31","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/56f9c9e0e31d4fca980ffce5ce3f573d/view","enriched":true,"history":[{"index":4,"title":"DESC2103C - Bulk Fuel Storage Tanks Phase II Yokota Air Base, Japan","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-07-14T04:30:35.022Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"56f9c9e0e31d4fca980ffce5ce3f573d","solicitation_number":"W912HV26RA009","related_opportunity_id":"9dbe1aa766c143f1887b773e178609e6"},{"index":3,"title":"DESC2103C - Bulk Fuel Storage Tanks Phase II Yokota Air Base, Japan","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-10-21T01:46:06.995Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"9dbe1aa766c143f1887b773e178609e6","solicitation_number":"W912HV26Z0002"}]},{"notice_id":"761487975afc4707ad50d35148ffce0f","title":"DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan","solicitation_number":"W912HV26RA009","notice_type":"o","base_type":"o","posted":"2026-08-12","posted_at":"2026-08-13T02:07:17.837Z","due_at":"2027-01-25T05:00:00Z","due_date":"2027-01-25","cancelled":null,"archived":null,"archive_date":"2027-08-13","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/761487975afc4707ad50d35148ffce0f/view","enriched":true,"history":[{"index":4,"title":"DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-13T23:35:23.002Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7dbef03b804f4ec3b055eb15101df6e7","solicitation_number":"W912HV26RA009","parent_opportunity_id":"761487975afc4707ad50d35148ffce0f"},{"index":3,"title":"DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-10T01:47:41.756Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"722fdc916e5744dfb0d68fdd3d992fd3","solicitation_number":"W912HV26RA009","parent_opportunity_id":"761487975afc4707ad50d35148ffce0f"},{"index":2,"title":"DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-08-13T03:32:04.446Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"889164421a7648c68dad58bf1983be02","solicitation_number":"W912HV26RA009","parent_opportunity_id":"761487975afc4707ad50d35148ffce0f"},{"index":1,"title":"DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-08-13T02:07:17.837Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"761487975afc4707ad50d35148ffce0f","solicitation_number":"W912HV26RA009"}]},{"notice_id":"889164421a7648c68dad58bf1983be02","title":"DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan","solicitation_number":"W912HV26RA009","notice_type":"o","base_type":"o","posted":"2026-08-12","posted_at":"2026-08-13T03:32:04.446Z","due_at":"2027-01-25T05:00:00Z","due_date":"2027-01-25","cancelled":null,"archived":null,"archive_date":"2027-08-13","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/889164421a7648c68dad58bf1983be02/view","enriched":true,"history":[{"index":4,"title":"DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-13T23:35:23.002Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7dbef03b804f4ec3b055eb15101df6e7","solicitation_number":"W912HV26RA009","parent_opportunity_id":"761487975afc4707ad50d35148ffce0f"},{"index":3,"title":"DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-10T01:47:41.756Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"722fdc916e5744dfb0d68fdd3d992fd3","solicitation_number":"W912HV26RA009","parent_opportunity_id":"761487975afc4707ad50d35148ffce0f"},{"index":2,"title":"DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-08-13T03:32:04.446Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"889164421a7648c68dad58bf1983be02","solicitation_number":"W912HV26RA009","parent_opportunity_id":"761487975afc4707ad50d35148ffce0f"},{"index":1,"title":"DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-08-13T02:07:17.837Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"761487975afc4707ad50d35148ffce0f","solicitation_number":"W912HV26RA009"}]},{"notice_id":"722fdc916e5744dfb0d68fdd3d992fd3","title":"DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan","solicitation_number":"W912HV26RA009","notice_type":"o","base_type":"o","posted":"2026-09-09","posted_at":"2026-09-10T01:47:41.756Z","due_at":"2027-01-25T05:00:00Z","due_date":"2027-01-25","cancelled":null,"archived":null,"archive_date":"2027-08-13","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/722fdc916e5744dfb0d68fdd3d992fd3/view","enriched":true,"history":[{"index":4,"title":"DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-13T23:35:23.002Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7dbef03b804f4ec3b055eb15101df6e7","solicitation_number":"W912HV26RA009","parent_opportunity_id":"761487975afc4707ad50d35148ffce0f"},{"index":3,"title":"DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-10T01:47:41.756Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"722fdc916e5744dfb0d68fdd3d992fd3","solicitation_number":"W912HV26RA009","parent_opportunity_id":"761487975afc4707ad50d35148ffce0f"},{"index":2,"title":"DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-08-13T03:32:04.446Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"889164421a7648c68dad58bf1983be02","solicitation_number":"W912HV26RA009","parent_opportunity_id":"761487975afc4707ad50d35148ffce0f"},{"index":1,"title":"DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-08-13T02:07:17.837Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"761487975afc4707ad50d35148ffce0f","solicitation_number":"W912HV26RA009"}]},{"notice_id":"7dbef03b804f4ec3b055eb15101df6e7","title":"DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan","solicitation_number":"W912HV26RA009","notice_type":"o","base_type":"o","posted":"2026-09-13","posted_at":"2026-09-13T23:35:23.002Z","due_at":"2027-01-25T05:00:00Z","due_date":"2027-01-25","cancelled":null,"archived":null,"archive_date":"2027-08-13","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/7dbef03b804f4ec3b055eb15101df6e7/view","enriched":true,"history":[{"index":4,"title":"DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-13T23:35:23.002Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7dbef03b804f4ec3b055eb15101df6e7","solicitation_number":"W912HV26RA009","parent_opportunity_id":"761487975afc4707ad50d35148ffce0f"},{"index":3,"title":"DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-10T01:47:41.756Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"722fdc916e5744dfb0d68fdd3d992fd3","solicitation_number":"W912HV26RA009","parent_opportunity_id":"761487975afc4707ad50d35148ffce0f"},{"index":2,"title":"DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-08-13T03:32:04.446Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"889164421a7648c68dad58bf1983be02","solicitation_number":"W912HV26RA009","parent_opportunity_id":"761487975afc4707ad50d35148ffce0f"},{"index":1,"title":"DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-08-13T02:07:17.837Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"761487975afc4707ad50d35148ffce0f","solicitation_number":"W912HV26RA009"}]},{"notice_id":"80835a9ae0914837976f0009b5704550","title":"DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan","solicitation_number":"W912HV26RA009","notice_type":"o","base_type":"o","posted":"2026-09-25","posted_at":"2026-09-25T05:53:23.279Z","due_at":"2027-01-25T05:00:00Z","due_date":"2027-01-25","cancelled":false,"archived":false,"archive_date":"2027-08-13","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/80835a9ae0914837976f0009b5704550/view","enriched":true,"history":[{"index":5,"title":"DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-25T05:53:23.279Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"80835a9ae0914837976f0009b5704550","solicitation_number":"W912HV26RA009","parent_opportunity_id":"761487975afc4707ad50d35148ffce0f"},{"index":4,"title":"DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-13T23:35:23.002Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7dbef03b804f4ec3b055eb15101df6e7","solicitation_number":"W912HV26RA009","parent_opportunity_id":"761487975afc4707ad50d35148ffce0f"},{"index":3,"title":"DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-10T01:47:41.756Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"722fdc916e5744dfb0d68fdd3d992fd3","solicitation_number":"W912HV26RA009","parent_opportunity_id":"761487975afc4707ad50d35148ffce0f"},{"index":2,"title":"DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-08-13T03:32:04.446Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"889164421a7648c68dad58bf1983be02","solicitation_number":"W912HV26RA009","parent_opportunity_id":"761487975afc4707ad50d35148ffce0f"},{"index":1,"title":"DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-08-13T02:07:17.837Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"761487975afc4707ad50d35148ffce0f","solicitation_number":"W912HV26RA009"}]},{"notice_id":"7ef64bb9cda44e7ba9fac99f37d6c175","title":"DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan","solicitation_number":"W912HV26RA009","notice_type":"o","base_type":"o","posted":"2026-10-19","posted_at":"2026-10-19T05:44:58.220Z","due_at":"2027-01-25T05:00:00Z","due_date":"2027-01-25","cancelled":false,"archived":false,"archive_date":"2027-08-13","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/7ef64bb9cda44e7ba9fac99f37d6c175/view","enriched":true,"history":[{"index":6,"title":"DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-10-19T05:44:58.220Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7ef64bb9cda44e7ba9fac99f37d6c175","solicitation_number":"W912HV26RA009","parent_opportunity_id":"761487975afc4707ad50d35148ffce0f"},{"index":5,"title":"DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-25T05:53:23.279Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"80835a9ae0914837976f0009b5704550","solicitation_number":"W912HV26RA009","parent_opportunity_id":"761487975afc4707ad50d35148ffce0f"},{"index":4,"title":"DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-13T23:35:23.002Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7dbef03b804f4ec3b055eb15101df6e7","solicitation_number":"W912HV26RA009","parent_opportunity_id":"761487975afc4707ad50d35148ffce0f"},{"index":3,"title":"DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-10T01:47:41.756Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"722fdc916e5744dfb0d68fdd3d992fd3","solicitation_number":"W912HV26RA009","parent_opportunity_id":"761487975afc4707ad50d35148ffce0f"},{"index":2,"title":"DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-08-13T03:32:04.446Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"889164421a7648c68dad58bf1983be02","solicitation_number":"W912HV26RA009","parent_opportunity_id":"761487975afc4707ad50d35148ffce0f"},{"index":1,"title":"DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-08-13T02:07:17.837Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"761487975afc4707ad50d35148ffce0f","solicitation_number":"W912HV26RA009"}]}],"latest_notice_id":"7ef64bb9cda44e7ba9fac99f37d6c175","first_type":"p","notices":[{"dates":{"posted":"2026-07-14","posted_at":"2026-07-14T04:30:35.022Z","created_at":"2026-07-14T04:16:13.153Z","modified_at":"2026-07-14T04:30:35.024Z","response_deadline":{"raw":"2026-08-31T14:00:00+09:00","utc":"2026-08-31T05:00:00Z","date":"2026-08-31","time":"14:00:00","utc_offset_seconds":32400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/56f9c9e0e31d4fca980ffce5ce3f573d/view"},"naics":{"codes":["237120"],"primary":"237120"},"title":"DESC2103C - Bulk Fuel Storage Tanks Phase II Yokota Air Base, Japan","agency":{"office":{"code":"W912HV","name":"W2SN ENDIST JAPAN"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"96338-5010","city":"APO","state":"AP","country":"USA"},"organization_type":"OFFICE"},"status":{"active":true,"latest":true,"publication":"published","archive_date":"2026-10-31","archive_type":"auto_custom"},"history":[{"index":4,"title":"DESC2103C - Bulk Fuel Storage Tanks Phase II Yokota Air Base, Japan","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-07-14T04:30:35.022Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"56f9c9e0e31d4fca980ffce5ce3f573d","solicitation_number":"W912HV26RA009","related_opportunity_id":"9dbe1aa766c143f1887b773e178609e6"},{"index":3,"title":"DESC2103C - Bulk Fuel Storage Tanks Phase II Yokota Air Base, Japan","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-10-21T01:46:06.995Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"9dbe1aa766c143f1887b773e178609e6","solicitation_number":"W912HV26Z0002"}],"contacts":[{"name":"Jiro Miyairi","role":"primary","email":"jiro.miyairi@usace.army.mil"},{"name":"Ryan Marzetta","role":"secondary","email":"ryan.j.marzetta@usace.army.mil"}],"base_type":{"code":"r","label":"Sources Sought"},"notice_id":"56f9c9e0e31d4fca980ffce5ce3f573d","lineage_id":"9dbe1aa766c143f1887b773e178609e6","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-09-20T02:57:02.680889699Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"be5b55b19b729af7bdd453e30d78434d-26\"","fetched_at":"2026-10-06T03:48:34.605332942Z","row_sha256":"a5653a057303ee502d56c3858d8459b1868b1315dd0886e2c89e5f6606baafe8","last_modified":"2026-10-06T03:30:43Z"},"updated_at":"2026-10-06T03:48:34.605332942Z","first_seen_at":"2026-09-16T00:55:28.845070Z"},"description":{"html":"<p>The U.S. Army Corps of Engineers, Japan District (POJ) is providing a PRE-SOLICITATION notice for an upcoming Request for Proposal (RFP).&nbsp; This is not a solicitation.</p>\n\n<p><strong>PROJECT INFORMATION</strong></p>\n\n<p><strong>Project Title</strong>: DESC2103C - Bulk Fuel Storage Tanks Phase II</p>\n\n<p><strong>Project Location:</strong> Yokota Air Base, Japan</p>\n\n<p><strong>Project FSC</strong>: Y1NA - Construction of Fuel Supply Facilities</p>\n\n<p><strong>Project NAICS:</strong> 237120 - Oil and Gas Pipeline and Related Structures Construction</p>\n\n<p><strong>Project Magnitude</strong>: Between &yen;2,500,000,000 and &yen;10,000,000,000 (Japanese YEN)</p>\n\n<p><strong>Project Description:</strong><br />\nConstruct one 100,000-barrel cut-and-cover JP-8 storage tank.&nbsp; A pump house is to be provided on the top of the tank and contain four 600-gpm issue vertical turbine pumps and one 50-gpm water draw off vertical turbine pump.&nbsp; The new tank will include a high-level valve, independent level alarms, and the hardware necessary for the automatic tank gauging (ATG) system.&nbsp; The new tank includes piping, valves, vaults and appurtenances connecting to an existing filter separator building.</p>\n\n<p>The new control system of the new tank will be connected to the existing filter building that houses pump control Programmable Logic Controller (PLC) and Human Machine Interface (HMI), automatic tank gauge (ATG) reporting module capable of reporting inputs from all Eastside Fuel Facility tanks. A product saver tank is to be provided for the new bulk storage tank.</p>\n\n<p>The Pump House will be of reinforced concrete construction and site adapted to meet local conditions.</p>\n\n<p>The roof will be a low slope concrete roof with built-up roofing with overhangs over doorways.</p>\n\n<p>The tank is to be steel with concrete outer wall with a rolling cover for access to tank mounted equipment. The product recovery pump will return reclaimed fuel back through receipt filtration to the bulk storage tanks.</p>\n\n<p><strong>SOLICITATION INFORMATION:</strong></p>\n\n<ol>\n\t<li>Procurement Method: The Government will issue a Request for Proposal (RFP) Solicitation utilizing the Lowest Price Technically Acceptable source selection procedures.</li>\n\t<li>The Government anticipates issuing the solicitation in August 2026.&nbsp; The solicitation when issued, will identify the site visit date, RFI and proposal submission due date.&nbsp; All solicitation and amendment notices and updates will be posted to SAM.gov with a link to PIEE &ndash; solicitation module to download all RFP and amendment documents.&nbsp; It shall be the Offeror&rsquo;s responsibility to check the website for any amendments.&nbsp;</li>\n\t<li>The Government intends to award a firm-fixed-price construction contract as a result of the RFP. &nbsp;&nbsp;</li>\n\t<li>All interested companies shall be actively registered in the System for Award Management (SAM) database in order to be eligible for award of Government contracts.&nbsp; Information on registration and annual confirmation requirements may be found at http://www.sam.gov.&nbsp; For a Joint Venture, the Joint Venture as an independent entity must be registered in SAM as such.</li>\n\t<li><u>Only local sources will be considered under this solicitation. </u>&nbsp;<br />\n\tFirms which have not done business with U.S. Army Corps of Engineers, Japan Engineering District, are requested to visit the following website: https://www.poj.usace.army.mil/Business-With-Us/ for general information</li>\n</ol>\n\n<p class=\"sam-rich-text-editor-indent-c\">a.&nbsp; This contract will be performed in its entirety in the country of Japan and is intended only for local sources.&nbsp; Only local sources will be considered under this solicitation.&nbsp; Local sources are sources (e.g. corporations, partnerships, or Joint Ventures [For a Joint Venture, the Joint Venture as an independent entity must satisfy the local source requirements or, in the alternative, each member of the Joint Venture must individually satisfy the local source requirements]) that are physically located in Japan and authorized (i.e. licensed and registered) to perform construction in Japan. Specifically, a prospective offeror must be duly authorized to operate and conduct construction business in Japan and must fully comply with all applicable laws, decrees, labor standards, and regulations of Japan during the performance of the resulting contracts.</p>\n\n<p class=\"sam-rich-text-editor-indent-c\">b.&nbsp; In addition, offerors must possess a Japanese civil construction (doboku isshiki koji) license or Japanese architectural construction (kenchiku isshiki koji) license by the proposal due date and time. The U.S. Government will verify that the offeror has the license through the Ministry of Land, Infrastructure, Transport and Tourism (MLIT) website at https://etsuran2.mlit.go.jp/TAKKEN. It is the responsibility of the offeror to ensure that it has the license (Japanese civil construction or Japanese architectural construction), and that it is accurately shown on the MLIT website, by the proposal due date and time.&nbsp; Failure to comply with this requirement will be cause for rejection of your offer.</p>\n\n<p class=\"sam-rich-text-editor-indent-c\">c.&nbsp; The U.S. Government will not offer &ldquo;United States Official Contractor&rdquo; status under Article XIV of the US-Japan Status of Forces Agreement (SOFA) to U.S. contractors normally resident in the United States; nor will the U.S. Government certify employees of such contractors as &ldquo;Members of the Civilian Component&rdquo; under Article I(b) of the SOFA.<br />\n&nbsp;</p>\n\n<p><strong>ELECTRONIC BID/PROPOSAL SUBMISSION</strong><br />\nThe US Army Corps of Engineers Japan District (POJ) has transitioned to Procurement Integrated Enterprise Environment (PIEE) Solicitation Module for bid/proposal submission (unless otherwise specified in the solicitation), to replace DOD SAFE.&nbsp; It is recommended that contractors create their PIEE Solicitation Module account as soon as possible and not wait till bid/proposal due date, as access may take time.&nbsp; The following information is provided for reference.</p>\n\n<p>Step 1: Complete vendor registration on https://piee.eb.mil/.&nbsp; Instructions for registration can be found through: https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf</p>\n\n<p>Step 2: Upload offer in the Solicitation Module through https://piee.eb.mil/ .&nbsp; Instructions for uploading an offer can be found through: https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/solicitation/proposals.xhtml</p>\n\n<p>U.S. Army Corps of Engineers, Japan District, Camp Zama, Japan</p>\n\n<p>Contracting Office Address:<br />\nUSACE District, Japan<br />\nAttn: CEPOJ-CT<br />\nUnit 45010<br />\nAPO, AP 96343-5010</p>\n\n<p>Primary:<br />\nJiro Miyairi<br />\nContract Specialist<br />\n046-407-8837<br />\njiro.miyairi@usace.army.mil</p>\n\n<p>Alternate:<br />\nRyan Marzetta<br />\nContracting Officer<br />\n046-407-8725<br />\nryan.j.marzetta@usace.army.mil</p>","text":"The U.S. Army Corps of Engineers, Japan District (POJ) is providing a PRE-SOLICITATION notice for an upcoming Request for Proposal (RFP). This is not a solicitation.\n\nPROJECT INFORMATION\n\nProject Title: DESC2103C - Bulk Fuel Storage Tanks Phase II\n\nProject Location: Yokota Air Base, Japan\n\nProject FSC: Y1NA - Construction of Fuel Supply Facilities\n\nProject NAICS: 237120 - Oil and Gas Pipeline and Related Structures Construction\n\nProject Magnitude: Between ¥2,500,000,000 and ¥10,000,000,000 (Japanese YEN)\n\nProject Description:\n\nConstruct one 100,000-barrel cut-and-cover JP-8 storage tank. A pump house is to be provided on the top of the tank and contain four 600-gpm issue vertical turbine pumps and one 50-gpm water draw off vertical turbine pump. The new tank will include a high-level valve, independent level alarms, and the hardware necessary for the automatic tank gauging (ATG) system. The new tank includes piping, valves, vaults and appurtenances connecting to an existing filter separator building.\n\nThe new control system of the new tank will be connected to the existing filter building that houses pump control Programmable Logic Controller (PLC) and Human Machine Interface (HMI), automatic tank gauge (ATG) reporting module capable of reporting inputs from all Eastside Fuel Facility tanks. A product saver tank is to be provided for the new bulk storage tank.\n\nThe Pump House will be of reinforced concrete construction and site adapted to meet local conditions.\n\nThe roof will be a low slope concrete roof with built-up roofing with overhangs over doorways.\n\nThe tank is to be steel with concrete outer wall with a rolling cover for access to tank mounted equipment. The product recovery pump will return reclaimed fuel back through receipt filtration to the bulk storage tanks.\n\nSOLICITATION INFORMATION:\n\n• Procurement Method: The Government will issue a Request for Proposal (RFP) Solicitation utilizing the Lowest Price Technically Acceptable source selection procedures.\n\n• The Government anticipates issuing the solicitation in August 2026. The solicitation when issued, will identify the site visit date, RFI and proposal submission due date. All solicitation and amendment notices and updates will be posted to SAM.gov with a link to PIEE – solicitation module to download all RFP and amendment documents. It shall be the Offeror’s responsibility to check the website for any amendments.\n\n• The Government intends to award a firm-fixed-price construction contract as a result of the RFP.\n\n• All interested companies shall be actively registered in the System for Award Management (SAM) database in order to be eligible for award of Government contracts. Information on registration and annual confirmation requirements may be found at http://www.sam.gov. For a Joint Venture, the Joint Venture as an independent entity must be registered in SAM as such.\n\n• Only local sources will be considered under this solicitation.\n\nFirms which have not done business with U.S. Army Corps of Engineers, Japan Engineering District, are requested to visit the following website: https://www.poj.usace.army.mil/Business-With-Us/ for general information\n\na. This contract will be performed in its entirety in the country of Japan and is intended only for local sources. Only local sources will be considered under this solicitation. Local sources are sources (e.g. corporations, partnerships, or Joint Ventures [For a Joint Venture, the Joint Venture as an independent entity must satisfy the local source requirements or, in the alternative, each member of the Joint Venture must individually satisfy the local source requirements]) that are physically located in Japan and authorized (i.e. licensed and registered) to perform construction in Japan. Specifically, a prospective offeror must be duly authorized to operate and conduct construction business in Japan and must fully comply with all applicable laws, decrees, labor standards, and regulations of Japan during the performance of the resulting contracts.\n\nb. In addition, offerors must possess a Japanese civil construction (doboku isshiki koji) license or Japanese architectural construction (kenchiku isshiki koji) license by the proposal due date and time. The U.S. Government will verify that the offeror has the license through the Ministry of Land, Infrastructure, Transport and Tourism (MLIT) website at https://etsuran2.mlit.go.jp/TAKKEN. It is the responsibility of the offeror to ensure that it has the license (Japanese civil construction or Japanese architectural construction), and that it is accurately shown on the MLIT website, by the proposal due date and time. Failure to comply with this requirement will be cause for rejection of your offer.\n\nc. The U.S. Government will not offer “United States Official Contractor” status under Article XIV of the US-Japan Status of Forces Agreement (SOFA) to U.S. contractors normally resident in the United States; nor will the U.S. Government certify employees of such contractors as “Members of the Civilian Component” under Article I(b) of the SOFA.\n\nELECTRONIC BID/PROPOSAL SUBMISSION\n\nThe US Army Corps of Engineers Japan District (POJ) has transitioned to Procurement Integrated Enterprise Environment (PIEE) Solicitation Module for bid/proposal submission (unless otherwise specified in the solicitation), to replace DOD SAFE. It is recommended that contractors create their PIEE Solicitation Module account as soon as possible and not wait till bid/proposal due date, as access may take time. The following information is provided for reference.\n\nStep 1: Complete vendor registration on https://piee.eb.mil/. Instructions for registration can be found through: https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf\n\nStep 2: Upload offer in the Solicitation Module through https://piee.eb.mil/ . Instructions for uploading an offer can be found through: https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/solicitation/proposals.xhtml\n\nU.S. Army Corps of Engineers, Japan District, Camp Zama, Japan\n\nContracting Office Address:\n\nUSACE District, Japan\n\nAttn: CEPOJ-CT\n\nUnit 45010\n\nAPO, AP 96343-5010\n\nPrimary:\n\nJiro Miyairi\n\nContract Specialist\n\n046-407-8837\n\njiro.miyairi@usace.army.mil\n\nAlternate:\n\nRyan Marzetta\n\nContracting Officer\n\n046-407-8725\n\nryan.j.marzetta@usace.army.mil","origin":"detail"},"notice_type":{"code":"p","label":"Presolicitation"},"schema_version":1,"solicitation_number":"W912HV26RA009","place_of_performance":{"country":{"code":"JPN"}},"product_service_code":"Y1NA"},{"dates":{"posted":"2026-08-12","posted_at":"2026-08-13T02:07:17.837Z","created_at":"2026-08-13T02:07:17.346Z","modified_at":"2026-08-13T03:32:04.446Z","response_deadline":{"raw":"2027-01-25T14:00:00+09:00","utc":"2027-01-25T05:00:00Z","date":"2027-01-25","time":"14:00:00","utc_offset_seconds":32400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/761487975afc4707ad50d35148ffce0f/view"},"naics":{"codes":["237120"],"primary":"237120"},"title":"DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan","agency":{"office":{"code":"W912HV","name":"W2SN ENDIST JAPAN"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"96338-5010","city":"APO","state":"AP","country":"USA"},"organization_type":"OFFICE"},"status":{"active":true,"latest":false,"publication":"published","archive_date":"2027-08-13","archive_type":"auto_custom"},"history":[{"index":4,"title":"DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-13T23:35:23.002Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7dbef03b804f4ec3b055eb15101df6e7","solicitation_number":"W912HV26RA009","parent_opportunity_id":"761487975afc4707ad50d35148ffce0f"},{"index":3,"title":"DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-10T01:47:41.756Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"722fdc916e5744dfb0d68fdd3d992fd3","solicitation_number":"W912HV26RA009","parent_opportunity_id":"761487975afc4707ad50d35148ffce0f"},{"index":2,"title":"DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-08-13T03:32:04.446Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"889164421a7648c68dad58bf1983be02","solicitation_number":"W912HV26RA009","parent_opportunity_id":"761487975afc4707ad50d35148ffce0f"},{"index":1,"title":"DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-08-13T02:07:17.837Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"761487975afc4707ad50d35148ffce0f","solicitation_number":"W912HV26RA009"}],"contacts":[{"name":"Jiro Miyairi","role":"primary","email":"jiro.miyairi@usace.army.mil","phone":"+81-46-407-8837"},{"name":"Ryan Marzetta","role":"secondary","email":"Ryan.J.Marzetta@usace.army.mil","phone":"+81-46-407-3398"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"761487975afc4707ad50d35148ffce0f","lineage_id":"761487975afc4707ad50d35148ffce0f","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-09-18T03:30:37.466370283Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"a45c5457667c44920ee9084ca280d260-27\"","fetched_at":"2026-11-06T04:42:59.950874882Z","row_sha256":"9fe8ab8f0daa193d77e5e6e2dd98f445a304272c3156c1fd498de11f50b5fdb7","last_modified":"2026-11-06T04:30:50Z"},"updated_at":"2026-11-06T04:42:59.950874882Z","first_seen_at":"2026-09-16T00:55:28.845070Z"},"description":{"html":"Project Title: DESC2103C - Bulk Fuel Storage Tanks Phase II.  Project Description: Construct one 100,000-barrel cut-and-cover JP-8 storage tank.  A pump house is to be provided on the top of the tank and contain four 600-gpm issue vertical turbine pumps and one 50-gpm water draw off vertical turbine pump.  The new tank will include a high-level valve, independent level alarms, and the hardware necessary for the automatic tank gauging (ATG) system.  The new tank includes piping, valves, vaults and appurtenances connecting to an existing filter separator building. The new control system of the new tank will be connected to the existing filter building that houses pump control Programmable Logic Controller (PLC) and Human Machine Interface (HMI), automatic tank gauge (ATG) reporting module capable of reporting inputs from all Eastside Fuel Facility tanks. A product saver tank is to be provided for the new bulk storage tank.  The Pump House will be of reinforced concrete construction and site adapted to meet local conditions. The roof will be a low slope concrete roof with built-up roofing with overhangs over doorways. The tank is to be steel with concrete outer wall with a rolling cover for access to tank mounted equipment. The product recovery pump will return reclaimed fuel back through receipt filtration to the bulk storage tanks.","text":"Project Title: DESC2103C - Bulk Fuel Storage Tanks Phase II. Project Description: Construct one 100,000-barrel cut-and-cover JP-8 storage tank. A pump house is to be provided on the top of the tank and contain four 600-gpm issue vertical turbine pumps and one 50-gpm water draw off vertical turbine pump. The new tank will include a high-level valve, independent level alarms, and the hardware necessary for the automatic tank gauging (ATG) system. The new tank includes piping, valves, vaults and appurtenances connecting to an existing filter separator building. The new control system of the new tank will be connected to the existing filter building that houses pump control Programmable Logic Controller (PLC) and Human Machine Interface (HMI), automatic tank gauge (ATG) reporting module capable of reporting inputs from all Eastside Fuel Facility tanks. A product saver tank is to be provided for the new bulk storage tank. The Pump House will be of reinforced concrete construction and site adapted to meet local conditions. The roof will be a low slope concrete roof with built-up roofing with overhangs over doorways. The tank is to be steel with concrete outer wall with a rolling cover for access to tank mounted equipment. The product recovery pump will return reclaimed fuel back through receipt filtration to the bulk storage tanks.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W912HV26RA009","place_of_performance":{"street":"Yokota Air Base, Japan"},"product_service_code":"Y1NA"},{"dates":{"posted":"2026-08-12","posted_at":"2026-08-13T03:32:04.446Z","created_at":"2026-08-13T03:29:39.001Z","modified_at":"2026-09-10T01:47:41.756Z","response_deadline":{"raw":"2027-01-25T14:00:00+09:00","utc":"2027-01-25T05:00:00Z","date":"2027-01-25","time":"14:00:00","utc_offset_seconds":32400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/889164421a7648c68dad58bf1983be02/view"},"naics":{"codes":["237120"],"primary":"237120"},"title":"DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan","agency":{"office":{"code":"W912HV","name":"W2SN ENDIST JAPAN"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"96338-5010","city":"APO","state":"AP","country":"USA"},"organization_type":"OFFICE"},"status":{"active":true,"latest":false,"publication":"published","archive_date":"2027-08-13","archive_type":"auto_custom"},"history":[{"index":4,"title":"DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-13T23:35:23.002Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7dbef03b804f4ec3b055eb15101df6e7","solicitation_number":"W912HV26RA009","parent_opportunity_id":"761487975afc4707ad50d35148ffce0f"},{"index":3,"title":"DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-10T01:47:41.756Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"722fdc916e5744dfb0d68fdd3d992fd3","solicitation_number":"W912HV26RA009","parent_opportunity_id":"761487975afc4707ad50d35148ffce0f"},{"index":2,"title":"DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-08-13T03:32:04.446Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"889164421a7648c68dad58bf1983be02","solicitation_number":"W912HV26RA009","parent_opportunity_id":"761487975afc4707ad50d35148ffce0f"},{"index":1,"title":"DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-08-13T02:07:17.837Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"761487975afc4707ad50d35148ffce0f","solicitation_number":"W912HV26RA009"}],"contacts":[{"name":"Jiro Miyairi","role":"primary","email":"jiro.miyairi@usace.army.mil","phone":"+81-46-407-8837"},{"name":"Ryan Marzetta","role":"secondary","email":"Ryan.J.Marzetta@usace.army.mil","phone":"+81-46-407-3398"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"889164421a7648c68dad58bf1983be02","lineage_id":"761487975afc4707ad50d35148ffce0f","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-09-18T03:32:36.926894585Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"a45c5457667c44920ee9084ca280d260-27\"","fetched_at":"2026-11-06T04:42:59.950874882Z","row_sha256":"e86fe428238565e5e247190eadaeb149f45cbfc0b61f70d4dc84a5619adc45de","last_modified":"2026-11-06T04:30:50Z"},"updated_at":"2026-11-06T04:42:59.950874882Z","first_seen_at":"2026-09-16T00:55:28.845070Z"},"description":{"html":"Project Title: DESC2103C - Bulk Fuel Storage Tanks Phase II.  Project Description: Construct one 100,000-barrel cut-and-cover JP-8 storage tank.  A pump house is to be provided on the top of the tank and contain four 600-gpm issue vertical turbine pumps and one 50-gpm water draw off vertical turbine pump.  The new tank will include a high-level valve, independent level alarms, and the hardware necessary for the automatic tank gauging (ATG) system.  The new tank includes piping, valves, vaults and appurtenances connecting to an existing filter separator building. The new control system of the new tank will be connected to the existing filter building that houses pump control Programmable Logic Controller (PLC) and Human Machine Interface (HMI), automatic tank gauge (ATG) reporting module capable of reporting inputs from all Eastside Fuel Facility tanks. A product saver tank is to be provided for the new bulk storage tank.  The Pump House will be of reinforced concrete construction and site adapted to meet local conditions. The roof will be a low slope concrete roof with built-up roofing with overhangs over doorways. The tank is to be steel with concrete outer wall with a rolling cover for access to tank mounted equipment. The product recovery pump will return reclaimed fuel back through receipt filtration to the bulk storage tanks.","text":"Project Title: DESC2103C - Bulk Fuel Storage Tanks Phase II. Project Description: Construct one 100,000-barrel cut-and-cover JP-8 storage tank. A pump house is to be provided on the top of the tank and contain four 600-gpm issue vertical turbine pumps and one 50-gpm water draw off vertical turbine pump. The new tank will include a high-level valve, independent level alarms, and the hardware necessary for the automatic tank gauging (ATG) system. The new tank includes piping, valves, vaults and appurtenances connecting to an existing filter separator building. The new control system of the new tank will be connected to the existing filter building that houses pump control Programmable Logic Controller (PLC) and Human Machine Interface (HMI), automatic tank gauge (ATG) reporting module capable of reporting inputs from all Eastside Fuel Facility tanks. A product saver tank is to be provided for the new bulk storage tank. The Pump House will be of reinforced concrete construction and site adapted to meet local conditions. The roof will be a low slope concrete roof with built-up roofing with overhangs over doorways. The tank is to be steel with concrete outer wall with a rolling cover for access to tank mounted equipment. The product recovery pump will return reclaimed fuel back through receipt filtration to the bulk storage tanks.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W912HV26RA009","place_of_performance":{"street":"Yokota Air Base, Japan"},"product_service_code":"Y1NA"},{"dates":{"posted":"2026-09-09","posted_at":"2026-09-10T01:47:41.756Z","created_at":"2026-09-10T01:42:13.556Z","modified_at":"2026-09-13T23:35:23.002Z","response_deadline":{"raw":"2027-01-25T14:00:00+09:00","utc":"2027-01-25T05:00:00Z","date":"2027-01-25","time":"14:00:00","utc_offset_seconds":32400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/722fdc916e5744dfb0d68fdd3d992fd3/view"},"naics":{"codes":["237120"],"primary":"237120"},"title":"DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan","agency":{"office":{"code":"W912HV","name":"W2SN ENDIST JAPAN"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"96338-5010","city":"APO","state":"AP","country":"USA"},"organization_type":"OFFICE"},"status":{"active":true,"latest":false,"publication":"published","archive_date":"2027-08-13","archive_type":"auto_custom"},"history":[{"index":4,"title":"DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-13T23:35:23.002Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7dbef03b804f4ec3b055eb15101df6e7","solicitation_number":"W912HV26RA009","parent_opportunity_id":"761487975afc4707ad50d35148ffce0f"},{"index":3,"title":"DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-10T01:47:41.756Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"722fdc916e5744dfb0d68fdd3d992fd3","solicitation_number":"W912HV26RA009","parent_opportunity_id":"761487975afc4707ad50d35148ffce0f"},{"index":2,"title":"DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-08-13T03:32:04.446Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"889164421a7648c68dad58bf1983be02","solicitation_number":"W912HV26RA009","parent_opportunity_id":"761487975afc4707ad50d35148ffce0f"},{"index":1,"title":"DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-08-13T02:07:17.837Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"761487975afc4707ad50d35148ffce0f","solicitation_number":"W912HV26RA009"}],"contacts":[{"name":"Jiro Miyairi","role":"primary","email":"jiro.miyairi@usace.army.mil","phone":"+81-46-407-8837"},{"name":"Ryan Marzetta","role":"secondary","email":"Ryan.J.Marzetta@usace.army.mil","phone":"+81-46-407-3398"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"722fdc916e5744dfb0d68fdd3d992fd3","lineage_id":"761487975afc4707ad50d35148ffce0f","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-09-16T13:05:06.517375034Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"a45c5457667c44920ee9084ca280d260-27\"","fetched_at":"2026-11-06T04:42:59.950874882Z","row_sha256":"7d7bf2a964ab595f6d69fa2fc4fccba3d825d2af6f6e8ed381210ad56e933462","last_modified":"2026-11-06T04:30:50Z"},"updated_at":"2026-11-06T04:42:59.950874882Z","first_seen_at":"2026-09-15T22:52:52.472456Z"},"description":{"html":"<p><strong>Update 10 September 2026:&nbsp;</strong>Attached Pre-Proposal Conference Slides.<br />\n<br />\nProject Title: DESC2103C - Bulk Fuel Storage Tanks Phase II. Project Description: Construct one 100,000-barrel cut-and-cover JP-8 storage tank. A pump house is to be provided on the top of the tank and contain four 600-gpm issue vertical turbine pumps and one 50-gpm water draw off vertical turbine pump. The new tank will include a high-level valve, independent level alarms, and the hardware necessary for the automatic tank gauging (ATG) system. The new tank includes piping, valves, vaults and appurtenances connecting to an existing filter separator building. The new control system of the new tank will be connected to the existing filter building that houses pump control Programmable Logic Controller (PLC) and Human Machine Interface (HMI), automatic tank gauge (ATG) reporting module capable of reporting inputs from all Eastside Fuel Facility tanks. A product saver tank is to be provided for the new bulk storage tank. The Pump House will be of reinforced concrete construction and site adapted to meet local conditions. The roof will be a low slope concrete roof with built-up roofing with overhangs over doorways. The tank is to be steel with concrete outer wall with a rolling cover for access to tank mounted equipment. The product recovery pump will return reclaimed fuel back through receipt filtration to the bulk storage tanks.</p>","text":"Update 10 September 2026: Attached Pre-Proposal Conference Slides.\n\nProject Title: DESC2103C - Bulk Fuel Storage Tanks Phase II. Project Description: Construct one 100,000-barrel cut-and-cover JP-8 storage tank. A pump house is to be provided on the top of the tank and contain four 600-gpm issue vertical turbine pumps and one 50-gpm water draw off vertical turbine pump. The new tank will include a high-level valve, independent level alarms, and the hardware necessary for the automatic tank gauging (ATG) system. The new tank includes piping, valves, vaults and appurtenances connecting to an existing filter separator building. The new control system of the new tank will be connected to the existing filter building that houses pump control Programmable Logic Controller (PLC) and Human Machine Interface (HMI), automatic tank gauge (ATG) reporting module capable of reporting inputs from all Eastside Fuel Facility tanks. A product saver tank is to be provided for the new bulk storage tank. The Pump House will be of reinforced concrete construction and site adapted to meet local conditions. The roof will be a low slope concrete roof with built-up roofing with overhangs over doorways. The tank is to be steel with concrete outer wall with a rolling cover for access to tank mounted equipment. The product recovery pump will return reclaimed fuel back through receipt filtration to the bulk storage tanks.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W912HV26RA009","place_of_performance":{"street":"Yokota Air Base, Japan"},"product_service_code":"Y1NA"},{"dates":{"posted":"2026-09-13","posted_at":"2026-09-13T23:35:23.002Z","created_at":"2026-09-13T23:28:47.979Z","modified_at":"2026-09-13T23:35:23.010Z","response_deadline":{"raw":"2027-01-25T14:00:00+09:00","utc":"2027-01-25T05:00:00Z","date":"2027-01-25","time":"14:00:00","utc_offset_seconds":32400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/7dbef03b804f4ec3b055eb15101df6e7/view"},"naics":{"codes":["237120"],"primary":"237120"},"title":"DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan","agency":{"office":{"code":"W912HV","name":"W2SN ENDIST JAPAN"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"96338-5010","city":"APO","state":"AP","country":"USA"},"organization_type":"OFFICE"},"status":{"active":true,"latest":true,"publication":"published","archive_date":"2027-08-13","archive_type":"auto_custom"},"history":[{"index":4,"title":"DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-13T23:35:23.002Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7dbef03b804f4ec3b055eb15101df6e7","solicitation_number":"W912HV26RA009","parent_opportunity_id":"761487975afc4707ad50d35148ffce0f"},{"index":3,"title":"DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-10T01:47:41.756Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"722fdc916e5744dfb0d68fdd3d992fd3","solicitation_number":"W912HV26RA009","parent_opportunity_id":"761487975afc4707ad50d35148ffce0f"},{"index":2,"title":"DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-08-13T03:32:04.446Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"889164421a7648c68dad58bf1983be02","solicitation_number":"W912HV26RA009","parent_opportunity_id":"761487975afc4707ad50d35148ffce0f"},{"index":1,"title":"DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-08-13T02:07:17.837Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"761487975afc4707ad50d35148ffce0f","solicitation_number":"W912HV26RA009"}],"contacts":[{"name":"Jiro Miyairi","role":"primary","email":"jiro.miyairi@usace.army.mil","phone":"+81-46-407-8837"},{"name":"Ryan Marzetta","role":"secondary","email":"Ryan.J.Marzetta@usace.army.mil","phone":"+81-46-407-3398"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"7dbef03b804f4ec3b055eb15101df6e7","lineage_id":"761487975afc4707ad50d35148ffce0f","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-09-16T09:54:05.296046485Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"a45c5457667c44920ee9084ca280d260-27\"","fetched_at":"2026-11-06T04:42:59.950874882Z","row_sha256":"077367904010270928b55b718afdb629623f3385c02e1737ef066beb4ec02730","last_modified":"2026-11-06T04:30:50Z"},"updated_at":"2026-11-06T04:42:59.950874882Z","first_seen_at":"2026-09-15T22:52:52.472456Z"},"description":{"html":"<p><strong>Update 14 September 2026:&nbsp;</strong>Attached Site Visit Roster.</p>\n\n<p><strong>Update 10 September 2026:&nbsp;</strong>Attached Pre-Proposal Conference Slides.<br />\n<br />\nProject Title: DESC2103C - Bulk Fuel Storage Tanks Phase II. Project Description: Construct one 100,000-barrel cut-and-cover JP-8 storage tank. A pump house is to be provided on the top of the tank and contain four 600-gpm issue vertical turbine pumps and one 50-gpm water draw off vertical turbine pump. The new tank will include a high-level valve, independent level alarms, and the hardware necessary for the automatic tank gauging (ATG) system. The new tank includes piping, valves, vaults and appurtenances connecting to an existing filter separator building. The new control system of the new tank will be connected to the existing filter building that houses pump control Programmable Logic Controller (PLC) and Human Machine Interface (HMI), automatic tank gauge (ATG) reporting module capable of reporting inputs from all Eastside Fuel Facility tanks. A product saver tank is to be provided for the new bulk storage tank. The Pump House will be of reinforced concrete construction and site adapted to meet local conditions. The roof will be a low slope concrete roof with built-up roofing with overhangs over doorways. The tank is to be steel with concrete outer wall with a rolling cover for access to tank mounted equipment. The product recovery pump will return reclaimed fuel back through receipt filtration to the bulk storage tanks.</p>","text":"Update 14 September 2026: Attached Site Visit Roster.\n\nUpdate 10 September 2026: Attached Pre-Proposal Conference Slides.\n\nProject Title: DESC2103C - Bulk Fuel Storage Tanks Phase II. Project Description: Construct one 100,000-barrel cut-and-cover JP-8 storage tank. A pump house is to be provided on the top of the tank and contain four 600-gpm issue vertical turbine pumps and one 50-gpm water draw off vertical turbine pump. The new tank will include a high-level valve, independent level alarms, and the hardware necessary for the automatic tank gauging (ATG) system. The new tank includes piping, valves, vaults and appurtenances connecting to an existing filter separator building. The new control system of the new tank will be connected to the existing filter building that houses pump control Programmable Logic Controller (PLC) and Human Machine Interface (HMI), automatic tank gauge (ATG) reporting module capable of reporting inputs from all Eastside Fuel Facility tanks. A product saver tank is to be provided for the new bulk storage tank. The Pump House will be of reinforced concrete construction and site adapted to meet local conditions. The roof will be a low slope concrete roof with built-up roofing with overhangs over doorways. The tank is to be steel with concrete outer wall with a rolling cover for access to tank mounted equipment. The product recovery pump will return reclaimed fuel back through receipt filtration to the bulk storage tanks.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W912HV26RA009","place_of_performance":{"street":"Yokota Air Base, Japan"},"product_service_code":"Y1NA"},{"dates":{"posted":"2026-09-25","posted_at":"2026-09-25T05:53:23.279Z","created_at":"2026-09-25T05:48:19.200Z","modified_at":"2026-09-25T05:53:23.282Z","response_deadline":{"raw":"2027-01-25T14:00:00+09:00","utc":"2027-01-25T05:00:00Z","date":"2027-01-25","time":"14:00:00","utc_offset_seconds":32400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/80835a9ae0914837976f0009b5704550/view"},"naics":{"codes":["237120"],"primary":"237120"},"title":"DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan","agency":{"office":{"code":"W912HV","name":"W2SN ENDIST JAPAN"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"96338-5010","city":"APO","state":"AP","country":"USA"},"organization_type":"OFFICE"},"status":{"active":true,"latest":true,"deleted":false,"archived":false,"cancelled":false,"publication":"published","archive_date":"2027-08-13","archive_type":"auto_custom"},"history":[{"index":5,"title":"DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-25T05:53:23.279Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"80835a9ae0914837976f0009b5704550","solicitation_number":"W912HV26RA009","parent_opportunity_id":"761487975afc4707ad50d35148ffce0f"},{"index":4,"title":"DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-13T23:35:23.002Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7dbef03b804f4ec3b055eb15101df6e7","solicitation_number":"W912HV26RA009","parent_opportunity_id":"761487975afc4707ad50d35148ffce0f"},{"index":3,"title":"DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-10T01:47:41.756Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"722fdc916e5744dfb0d68fdd3d992fd3","solicitation_number":"W912HV26RA009","parent_opportunity_id":"761487975afc4707ad50d35148ffce0f"},{"index":2,"title":"DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-08-13T03:32:04.446Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"889164421a7648c68dad58bf1983be02","solicitation_number":"W912HV26RA009","parent_opportunity_id":"761487975afc4707ad50d35148ffce0f"},{"index":1,"title":"DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-08-13T02:07:17.837Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"761487975afc4707ad50d35148ffce0f","solicitation_number":"W912HV26RA009"}],"contacts":[{"name":"Jiro Miyairi","role":"primary","email":"jiro.miyairi@usace.army.mil","phone":"+81-46-407-8837"},{"name":"Ryan Marzetta","role":"secondary","email":"Ryan.J.Marzetta@usace.army.mil","phone":"+81-46-407-3398"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"80835a9ae0914837976f0009b5704550","lineage_id":"761487975afc4707ad50d35148ffce0f","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-09-26T04:12:03.020519237Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"a45c5457667c44920ee9084ca280d260-27\"","fetched_at":"2026-11-06T04:42:59.950874882Z","row_sha256":"f180112b4200df38ff364d9cdd46b41226d4456125724697fc6640d14cc0beb3","last_modified":"2026-11-06T04:30:50Z"},"updated_at":"2026-11-06T04:42:59.950874882Z","first_seen_at":"2026-09-26T03:45:49.441710488Z"},"description":{"html":"<p><strong>Update 25 September 2026</strong>: Preliminary RFI Response Report has been posted to PIEE.</p>\n\n<p><strong>Update 14 September 2026:&nbsp;</strong>Attached Site Visit Roster.</p>\n\n<p><strong>Update 10 September 2026:&nbsp;</strong>Attached Pre-Proposal Conference Slides.<br />\n<br />\nProject Title: DESC2103C - Bulk Fuel Storage Tanks Phase II. Project Description: Construct one 100,000-barrel cut-and-cover JP-8 storage tank. A pump house is to be provided on the top of the tank and contain four 600-gpm issue vertical turbine pumps and one 50-gpm water draw off vertical turbine pump. The new tank will include a high-level valve, independent level alarms, and the hardware necessary for the automatic tank gauging (ATG) system. The new tank includes piping, valves, vaults and appurtenances connecting to an existing filter separator building. The new control system of the new tank will be connected to the existing filter building that houses pump control Programmable Logic Controller (PLC) and Human Machine Interface (HMI), automatic tank gauge (ATG) reporting module capable of reporting inputs from all Eastside Fuel Facility tanks. A product saver tank is to be provided for the new bulk storage tank. The Pump House will be of reinforced concrete construction and site adapted to meet local conditions. The roof will be a low slope concrete roof with built-up roofing with overhangs over doorways. The tank is to be steel with concrete outer wall with a rolling cover for access to tank mounted equipment. The product recovery pump will return reclaimed fuel back through receipt filtration to the bulk storage tanks.</p>","text":"Update 25 September 2026: Preliminary RFI Response Report has been posted to PIEE.\n\nUpdate 14 September 2026: Attached Site Visit Roster.\n\nUpdate 10 September 2026: Attached Pre-Proposal Conference Slides.\n\nProject Title: DESC2103C - Bulk Fuel Storage Tanks Phase II. Project Description: Construct one 100,000-barrel cut-and-cover JP-8 storage tank. A pump house is to be provided on the top of the tank and contain four 600-gpm issue vertical turbine pumps and one 50-gpm water draw off vertical turbine pump. The new tank will include a high-level valve, independent level alarms, and the hardware necessary for the automatic tank gauging (ATG) system. The new tank includes piping, valves, vaults and appurtenances connecting to an existing filter separator building. The new control system of the new tank will be connected to the existing filter building that houses pump control Programmable Logic Controller (PLC) and Human Machine Interface (HMI), automatic tank gauge (ATG) reporting module capable of reporting inputs from all Eastside Fuel Facility tanks. A product saver tank is to be provided for the new bulk storage tank. The Pump House will be of reinforced concrete construction and site adapted to meet local conditions. The roof will be a low slope concrete roof with built-up roofing with overhangs over doorways. The tank is to be steel with concrete outer wall with a rolling cover for access to tank mounted equipment. The product recovery pump will return reclaimed fuel back through receipt filtration to the bulk storage tanks.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W912HV26RA009","place_of_performance":{"street":"Yokota Air Base, Japan"},"product_service_code":"Y1NA"},{"dates":{"posted":"2026-10-19","posted_at":"2026-10-19T05:44:58.220Z","created_at":"2026-10-19T05:43:37.554Z","modified_at":"2026-10-19T05:44:58.228Z","response_deadline":{"raw":"2027-01-25T14:00:00+09:00","utc":"2027-01-25T05:00:00Z","date":"2027-01-25","time":"14:00:00","timezone":"Asia/Tokyo","utc_offset_seconds":32400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/7ef64bb9cda44e7ba9fac99f37d6c175/view"},"naics":{"codes":["237120"],"primary":"237120"},"title":"DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan","agency":{"office":{"code":"W912HV","name":"W2SN ENDIST JAPAN"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"96338-5010","city":"APO","state":"AP","country":"USA"},"organization_id":"500039119","organization_type":"OFFICE"},"status":{"active":true,"latest":true,"deleted":false,"archived":false,"cancelled":false,"publication":"published","archive_date":"2027-08-13","archive_type":"auto_custom"},"history":[{"index":6,"title":"DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-10-19T05:44:58.220Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7ef64bb9cda44e7ba9fac99f37d6c175","solicitation_number":"W912HV26RA009","parent_opportunity_id":"761487975afc4707ad50d35148ffce0f"},{"index":5,"title":"DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-25T05:53:23.279Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"80835a9ae0914837976f0009b5704550","solicitation_number":"W912HV26RA009","parent_opportunity_id":"761487975afc4707ad50d35148ffce0f"},{"index":4,"title":"DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-13T23:35:23.002Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7dbef03b804f4ec3b055eb15101df6e7","solicitation_number":"W912HV26RA009","parent_opportunity_id":"761487975afc4707ad50d35148ffce0f"},{"index":3,"title":"DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-09-10T01:47:41.756Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"722fdc916e5744dfb0d68fdd3d992fd3","solicitation_number":"W912HV26RA009","parent_opportunity_id":"761487975afc4707ad50d35148ffce0f"},{"index":2,"title":"DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-08-13T03:32:04.446Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"889164421a7648c68dad58bf1983be02","solicitation_number":"W912HV26RA009","parent_opportunity_id":"761487975afc4707ad50d35148ffce0f"},{"index":1,"title":"DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-08-13T02:07:17.837Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"761487975afc4707ad50d35148ffce0f","solicitation_number":"W912HV26RA009"}],"contacts":[{"name":"Jiro Miyairi","role":"primary","email":"jiro.miyairi@usace.army.mil","phone":"+81-46-407-8837"},{"name":"Ryan Marzetta","role":"secondary","email":"Ryan.J.Marzetta@usace.army.mil","phone":"+81-46-407-3398"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"7ef64bb9cda44e7ba9fac99f37d6c175","lineage_id":"761487975afc4707ad50d35148ffce0f","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-12T09:56:37.401787959Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"a45c5457667c44920ee9084ca280d260-27\"","fetched_at":"2026-11-06T04:42:59.950874882Z","row_sha256":"56a47264d1be199db551ff8994f0c663fb1892ec4d2a191cc8a37d5736224e1e","last_modified":"2026-11-06T04:30:50Z"},"updated_at":"2026-11-12T09:56:37.401787959Z","first_seen_at":"2026-10-20T03:47:26.591392148Z"},"description":{"html":"<p><strong>Update 19 October 2026:&nbsp;</strong>Updated RFI Response Report has been posted to PIEE.</p>\n\n<p><strong>Update 25 September 2026</strong>: Preliminary RFI Response Report has been posted to PIEE.</p>\n\n<p><strong>Update 14 September 2026:&nbsp;</strong>Attached Site Visit Roster.</p>\n\n<p><strong>Update 10 September 2026:&nbsp;</strong>Attached Pre-Proposal Conference Slides.<br />\n<br />\nProject Title: DESC2103C - Bulk Fuel Storage Tanks Phase II. Project Description: Construct one 100,000-barrel cut-and-cover JP-8 storage tank. A pump house is to be provided on the top of the tank and contain four 600-gpm issue vertical turbine pumps and one 50-gpm water draw off vertical turbine pump. The new tank will include a high-level valve, independent level alarms, and the hardware necessary for the automatic tank gauging (ATG) system. The new tank includes piping, valves, vaults and appurtenances connecting to an existing filter separator building. The new control system of the new tank will be connected to the existing filter building that houses pump control Programmable Logic Controller (PLC) and Human Machine Interface (HMI), automatic tank gauge (ATG) reporting module capable of reporting inputs from all Eastside Fuel Facility tanks. A product saver tank is to be provided for the new bulk storage tank. The Pump House will be of reinforced concrete construction and site adapted to meet local conditions. The roof will be a low slope concrete roof with built-up roofing with overhangs over doorways. The tank is to be steel with concrete outer wall with a rolling cover for access to tank mounted equipment. The product recovery pump will return reclaimed fuel back through receipt filtration to the bulk storage tanks.</p>","text":"Update 19 October 2026: Updated RFI Response Report has been posted to PIEE.\n\nUpdate 25 September 2026: Preliminary RFI Response Report has been posted to PIEE.\n\nUpdate 14 September 2026: Attached Site Visit Roster.\n\nUpdate 10 September 2026: Attached Pre-Proposal Conference Slides.\n\nProject Title: DESC2103C - Bulk Fuel Storage Tanks Phase II. Project Description: Construct one 100,000-barrel cut-and-cover JP-8 storage tank. A pump house is to be provided on the top of the tank and contain four 600-gpm issue vertical turbine pumps and one 50-gpm water draw off vertical turbine pump. The new tank will include a high-level valve, independent level alarms, and the hardware necessary for the automatic tank gauging (ATG) system. The new tank includes piping, valves, vaults and appurtenances connecting to an existing filter separator building. The new control system of the new tank will be connected to the existing filter building that houses pump control Programmable Logic Controller (PLC) and Human Machine Interface (HMI), automatic tank gauge (ATG) reporting module capable of reporting inputs from all Eastside Fuel Facility tanks. A product saver tank is to be provided for the new bulk storage tank. The Pump House will be of reinforced concrete construction and site adapted to meet local conditions. The roof will be a low slope concrete roof with built-up roofing with overhangs over doorways. The tank is to be steel with concrete outer wall with a rolling cover for access to tank mounted equipment. The product recovery pump will return reclaimed fuel back through receipt filtration to the bulk storage tanks.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W912HV26RA009","place_of_performance":{"street":"Yokota Air Base, Japan"},"product_service_code":"Y1NA"}],"due_at":"2027-01-25T05:00:00Z","due_date":"2027-01-25","closes_at":"2027-01-25T05:00:00Z","awardable":true,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912HV","office_name":"W2SN ENDIST JAPAN","state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":"JPN","state_source":null,"state_evidence":"RAGE TANKS PHASE II, YOKOTA AIR BASE, JAPAN","site_key":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-10-20T03:49:45.611939Z","principal_notice_id":"7ef64bb9cda44e7ba9fac99f37d6c175","description":{"text":"Update 19 October 2026: Updated RFI Response Report has been posted to PIEE.\n\nUpdate 25 September 2026: Preliminary RFI Response Report has been posted to PIEE.\n\nUpdate 14 September 2026: Attached Site Visit Roster.\n\nUpdate 10 September 2026: Attached Pre-Proposal Conference Slides.\n\nProject Title: DESC2103C - Bulk Fuel Storage Tanks Phase II. Project Description: Construct one 100,000-barrel cut-and-cover JP-8 storage tank. A pump house is to be provided on the top of the tank and contain four 600-gpm issue vertical turbine pumps and one 50-gpm water draw off vertical turbine pump. The new tank will include a high-level valve, independent level alarms, and the hardware necessary for the automatic tank gauging (ATG) system. The new tank includes piping, valves, vaults and appurtenances connecting to an existing filter separator building. The new control system of the new tank will be connected to the existing filter building that houses pump control Programmable Logic Controller (PLC) and Human Machine Interface (HMI), automatic tank gauge (ATG) reporting module capable of reporting inputs from all Eastside Fuel Facility tanks. A product saver tank is to be provided for the new bulk storage tank. The Pump House will be of reinforced concrete construction and site adapted to meet local conditions. The roof will be a low slope concrete roof with built-up roofing with overhangs over doorways. The tank is to be steel with concrete outer wall with a rolling cover for access to tank mounted equipment. The product recovery pump will return reclaimed fuel back through receipt filtration to the bulk storage tanks.","html":"<p><strong>Update 19 October 2026:&nbsp;</strong>Updated RFI Response Report has been posted to PIEE.</p>\n\n<p><strong>Update 25 September 2026</strong>: Preliminary RFI Response Report has been posted to PIEE.</p>\n\n<p><strong>Update 14 September 2026:&nbsp;</strong>Attached Site Visit Roster.</p>\n\n<p><strong>Update 10 September 2026:&nbsp;</strong>Attached Pre-Proposal Conference Slides.<br />\n<br />\nProject Title: DESC2103C - Bulk Fuel Storage Tanks Phase II. Project Description: Construct one 100,000-barrel cut-and-cover JP-8 storage tank. A pump house is to be provided on the top of the tank and contain four 600-gpm issue vertical turbine pumps and one 50-gpm water draw off vertical turbine pump. The new tank will include a high-level valve, independent level alarms, and the hardware necessary for the automatic tank gauging (ATG) system. The new tank includes piping, valves, vaults and appurtenances connecting to an existing filter separator building. The new control system of the new tank will be connected to the existing filter building that houses pump control Programmable Logic Controller (PLC) and Human Machine Interface (HMI), automatic tank gauge (ATG) reporting module capable of reporting inputs from all Eastside Fuel Facility tanks. A product saver tank is to be provided for the new bulk storage tank. The Pump House will be of reinforced concrete construction and site adapted to meet local conditions. The roof will be a low slope concrete roof with built-up roofing with overhangs over doorways. The tank is to be steel with concrete outer wall with a rolling cover for access to tank mounted equipment. The product recovery pump will return reclaimed fuel back through receipt filtration to the bulk storage tanks.</p>","origin":"detail"},"contacts":[{"name":"Jiro Miyairi","role":"primary","email":"jiro.miyairi@usace.army.mil","phone":"+81-46-407-8837"},{"name":"Ryan Marzetta","role":"secondary","email":"Ryan.J.Marzetta@usace.army.mil","phone":"+81-46-407-3398"}],"place_of_performance":{"street":"Yokota Air Base, Japan"},"office_address":{"zip":"96338-5010","city":"APO","state":"AP","country":"USA"},"naics_codes":["237120"],"award":null,"attachments":[{"resource_id":"a4d146a540384970b93f3d91c1d00fec","name":"Department of Defense Procurement Toolbox","kind":"link","mime_type":null,"size_bytes":null,"posted_at":"2026-08-13T02:07:17.837Z","export_controlled":false,"sha256":null,"url":"https://dodprocurementtoolbox.com/","mirrored":false},{"resource_id":"2218e4c872194441805829b905dd2ad8","name":"Preproposal Conf Slides_W912HV26RA009 DESC2103C Fuel Tank.pdf","kind":"file","mime_type":".pdf","size_bytes":2586135,"posted_at":"2026-09-10T01:47:41.756Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/2218e4c872194441805829b905dd2ad8/download","mirrored":false},{"resource_id":"1d446f4bab6a44d184a55a2edbfd81f4","name":"Registration Instructions for the PIEE Solicitation Module","kind":"link","mime_type":null,"size_bytes":null,"posted_at":"2026-08-13T02:07:17.837Z","export_controlled":false,"sha256":null,"url":"https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf","mirrored":false},{"resource_id":"355d00817dea413a84d2c2694aa5d1e1","name":"Site Visit Roster W912HV26RA009.pdf","kind":"file","mime_type":".pdf","size_bytes":80454,"posted_at":"2026-09-13T23:35:23.002Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/355d00817dea413a84d2c2694aa5d1e1/download","mirrored":false},{"resource_id":"1266146820f54efb82f33af3afa3f399","name":"Web Based Training for the PIEE Solicitation Module","kind":"link","mime_type":null,"size_bytes":null,"posted_at":"2026-08-13T02:07:17.837Z","export_controlled":false,"sha256":null,"url":"https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml","mirrored":false},{"resource_id":"c00da083c8c04beca0bdc027fc0a978e","name":"PIEE Solicitation Module Link for W912HV26RA009","kind":"link","mime_type":null,"size_bytes":null,"posted_at":"2026-08-13T02:07:17.837Z","export_controlled":false,"sha256":null,"url":"https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W912HV26RA009&noticeType=SolicitationNotice","mirrored":false}],"awards":[],"related":[{"key":"W912HV26BA009","latest_notice_id":"4acfcfc831684e89b40c8b71b33d02e8","title":"RENOVATE MILITARY FAMILY HOUSING TOWER 4511, CAMP COURTNEY","solicitation_number":"W912HV26BA009","notice_type":"o","first_type":"o","first_posted":"2026-06-01","last_posted":"2026-11-20","notices":9,"due_at":"2026-12-10T04:45:00Z","due_date":"2026-12-10","closes_at":"2026-12-10T04:45:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912HV","office_name":"W2SN ENDIST JAPAN","naics":"236118","psc":"Y1FA","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"unknown","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-21T05:30:25.727497Z"},{"key":"W912HV26BA019","latest_notice_id":"fcd1a09ee76a485483a658ea7848ba35","title":"AFHC Repair Quarters 82 and 86, Camp Zama, Japan","solicitation_number":"W912HV26BA019","notice_type":"o","first_type":"p","first_posted":"2026-06-16","last_posted":"2026-11-19","notices":14,"due_at":"2026-12-11T05:00:00Z","due_date":"2026-12-11","closes_at":"2026-12-11T05:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912HV","office_name":"W2SN ENDIST JAPAN","naics":"236118","psc":"Y1FA","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":"JPN","place_scope":"overseas","state_source":null,"state_evidence":"REPAIR QUARTERS 82 AND 86, CAMP ZAMA, JAPAN","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-21T05:30:25.727497Z"},{"key":"W912HV27Z0002","latest_notice_id":"29c3ca3500084b549344c86608cdfd32","title":"DLA DWCF B1907 Backup Power Generator, Yokosuka, Japan","solicitation_number":"W912HV27Z0002","notice_type":"r","first_type":"r","first_posted":"2026-11-12","last_posted":"2026-11-12","notices":1,"due_at":"2026-12-11T14:59:00Z","due_date":"2026-12-11","closes_at":"2026-12-11T14:59:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912HV","office_name":"W2SN ENDIST JAPAN","naics":"237130","psc":"Y1MZ","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":"JPN","place_scope":"overseas","state_source":null,"state_evidence":"JAPAN","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-13T05:18:31.697344Z"},{"key":"W912HV27ZOTA1","latest_notice_id":"ba493d6aa0d14ac290c14031e8ddeff0","title":"MARKET INTELLIGENCE NOTICE / REQUEST FOR INFORMATION (RFI)","solicitation_number":"W912HV27ZOTA1","notice_type":"r","first_type":"r","first_posted":"2026-11-23","last_posted":"2026-11-23","notices":1,"due_at":"2026-12-17T05:00:00Z","due_date":"2026-12-17","closes_at":"2026-12-17T05:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912HV","office_name":"W2SN ENDIST JAPAN","naics":"236220","psc":null,"set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":"JPN","place_scope":"overseas","state_source":null,"state_evidence":"JAPAN","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-24T04:44:58.053639Z"},{"key":"W912HV26BA007","latest_notice_id":"97265cfe5c2d400d879b1529f58b3657","title":"FY26 MCN P309, School Age Care Centers Replacement, Camp Foster and McTureous, Okinawa, Japan","solicitation_number":"W912HV26BA007","notice_type":"o","first_type":"p","first_posted":"2026-05-28","last_posted":"2026-08-18","notices":6,"due_at":"2027-01-08T04:45:00Z","due_date":"2027-01-08","closes_at":"2027-01-08T04:45:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912HV","office_name":"W2SN ENDIST JAPAN","naics":"236220","psc":"Y1AZ","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":"JPN","place_scope":"overseas","state_source":null,"state_evidence":"PLACEMENT, CAMP FOSTER AND MCTUREOUS, OKINAWA","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-09-24T03:25:58.922164Z"}],"similar_open":[{"key":"W9128F27RA054","latest_notice_id":"d83960f9dc674f0b9a03bdb7907af48e","title":"WH Ford RTC Fueling System Repairs","solicitation_number":"W9128F27RA054","notice_type":"o","first_type":"o","first_posted":"2026-10-20","last_posted":"2026-11-16","notices":3,"due_at":"2026-12-21T20:00:00Z","due_date":"2026-12-21","closes_at":"2026-12-21T20:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W9128F","office_name":"W071 ENDIST OMAHA","naics":"237120","psc":"Y1GC","set_aside":"SBA","state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"unknown","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-17T04:42:47.571825Z"},{"key":"W9128F27RA053PN","latest_notice_id":"15591f13cee9414a874f30579573c570","title":"Savannah ANG Repairs Pre-Solicitation Notice","solicitation_number":"W9128F27RA053PN","notice_type":"p","first_type":"p","first_posted":"2026-11-20","last_posted":"2026-11-20","notices":1,"due_at":"2026-12-04T20:00:00Z","due_date":"2026-12-04","closes_at":"2026-12-04T20:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W9128F","office_name":"W071 ENDIST OMAHA","naics":"237120","psc":"Y1NA","set_aside":"SBA","state":"GA","county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"site","state_source":"sam_street","state_evidence":"SAVANNAH, GA","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-21T05:30:25.727497Z"},{"key":"PANNWD26P028176","latest_notice_id":"452af9c15328427693d5f2465bd08059","title":"Mather Fueling System Repairs","solicitation_number":"PANNWD26P028176","notice_type":"o","first_type":"o","first_posted":"2026-10-22","last_posted":"2026-11-25","notices":7,"due_at":"2026-12-18T20:00:00Z","due_date":"2026-12-18","closes_at":"2026-12-18T20:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W9128F","office_name":"W071 ENDIST OMAHA","naics":"237120","psc":"Y1GC","set_aside":"SBA","state":"CA","county":"06067","county_name":"Sacramento County","city":"0646226","city_name":"Mather","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-26T04:43:42.403930Z"}],"similar_open_total":4,"indexable":false}