Skip to content

SealedBidder is a private company, not a government agency.

Sign upDashboard
  • 8,718 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell SealedBidder what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and SealedBidder tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $99 a month. See your matches before you pay.
See plans

Presolicitation

North Myrtle Beach Ocean Outfall (17 Ave S)

W912HP25RA028

Department of the Army, W074 Endist Charleston. Other Heavy and Civil Engineering Construction.

Response deadline

October 31, 2025 at 12:00 PM EDT

Closed 391 days ago. Posted September 8, 2025. Scheduled to archive September 8, 2026.

Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities

This one closed in 2025

143 like it are open now in other heavy and civil engineering construction

All 143 open in other heavy and civil engineering construction

Reading this notice

Worked out from the publications and the award on this page.

Kind of notice
Presolicitation. Advance notice that a solicitation is coming, usually within a few weeks. Glossary
Who may compete
SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 237990 (other heavy and civil engineering construction), means no more than $45 million in average annual receipts, counted with affiliates. What a set-aside is
What comes next
No solicitation was published under this number after the presolicitation of September 8, 2025. An agency sometimes issues the solicitation under a new number.

Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.

Description

As published on SAM.gov.

PURPOSE OF THIS ANNOUNCEMENT: This announcement constitutes a pre-solicitation announcement of a proposed contract action pursuant to FAR 5.204. This is not a solicitation. No response is requested at this time. A formal solicitation will follow this announcement with full details, including a response deadline, the complete price proposal schedule, the construction plans and specifications, instructions to offerors, and the evaluation factors/basis for award .OFFERORS ARE RESPONSIBLE FOR MONITORING THIS WEBSITE FOR CHANGES TO THIS NOTICE AND THE FORMAL SOLICITATION ANNOUNCEMENT. PLANNED SOLICITATION: The final Solicitation for this project will be announced anytime between 15 and 30 days after the posting of this pre-solicitation. The contract type will be firm-fixed-price. DESCRIPTION OF WORK: The Stormwater Ocean Outfall project is to upgrade the stormwater collection and conveyance system in a coastal urban area of North Myrtle Beach, South Carolina. This project is one part of a larger effort of similar projects by the city to upgrade stormwater infrastructure along the coast and direct runoff to outfall offshore in locations underwater and away from the beach. This will allow the city to remove hazardous and unappealing concrete pipes that are exposed on the beach. This project will begin at a stormwater quality treatment structure near the intersection of 17th Avenue South and South Ocean Boulevard. The stormwater ocean outfall will consist of a large diameter prestressed concrete cylinder pipe, with the size determined during design, laid beneath the existing benthic seabed underwater. It will extend approximately 1,200 feet from the stormwater quality structure and be supported by bedding stone, anchored by large armor stone, and topped with sand. There will also be an outlet with a nozzle armored by rock. Construction is expected to involve the use of marine piling and a temporary pier. In addition, the work will need to adhere to environmental regulations, such as restrictions on the beach during sea turtle nesting season (May 1 to October 31), as only limited work will be allowed on the beach. Although very minimal to no impacts to right whales are expected due to the proximity to shore, this restriction may impact the construction schedule. All necessary permitting shall be approved and obtained by the contractor prior to construction. The outfall will convey stormwater runoff from the landward urban areas out to the Atlantic Ocean in order to improve water quality and control flooding. This stormwater ocean outfall will be designed and constructed by the same contractor on one design-build contract. It will be coordinated in tandem with a separately contracted project to upgrade the landward portion of the stormwater system that will consolidate and reroute drainage inlets and pipes along the street and other open areas. The stormwater quality structure is not included in this project; it is part of landward contract and will be the beginning point of this project. This project is located in Horry County, South Carolina. MAGNITUDE OF WORK: $25,000,000 TO $50,000,000 The contractor must be registered in WWW.SAM.GOV prior to award of the solicitation.

Attachments

Links the agency listed on SAM.gov. They open the sites it named, not files on SAM.gov.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. September 8, 2025

    Presolicitation

    Due October 31, 2025 at 12:00 PM EDT. SAM.gov, notice c6a8fcd75afd413fad7ea0a29cbf5272

    1 revision on SAM
    • September 8, 2025: publish, presolicitation

Points of contact