Sources sought, total small business set-aside
Repair of Dam Spillway Gates at Lake Hartwell, GA.
W912HN-24-R-50SM
Department of the Army, W074 Endist Savannah. Other Heavy and Civil Engineering Construction.
Response deadline
February 8, 2024 at 1:00 PM EST
Closed 1022 days ago. Posted January 12, 2024. Scheduled to archive February 23, 2024.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed in 2024
143 like it are open now in other heavy and civil engineering construction
- Dredged Material Containment Area (DMCA) O&M Construction IDC
Department of the Army, W074 Endist Savannah
Sources soughtNAICS 237990Savannah, GAW912HN27RA006Due tomorrowNov 27 - Tybee Island Shoreline Protection Project
Department of the Army, W074 Endist Savannah
SolicitationNAICS 237990Tybee Island, GAW912HN27BA001Closes in 14 daysDec 10 - United States Air Force Academy (USAFA) Varsity Baseball Stadium
Department of the Army, W071 Endist Omaha
PresolicitationSmall businessNAICS 237990ColoradoNAF128F27B0001Due tomorrowNov 27
All 143 open in other heavy and civil engineering construction
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Sources sought. Market research. The agency wants to know who could do the work before it decides how to compete it. Glossary
- Who may compete
- Total small business set-aside. Only small businesses may compete. Small, under NAICS 237990 (other heavy and civil engineering construction), means no more than $45 million in average annual receipts, counted with affiliates. Open Small business opportunities
- What comes next
- No solicitation was published under this number after the sources sought of January 12, 2024. An agency sometimes issues the solicitation under a new number.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
This is a Sources Sought/Request for Information only. This is not a Solicitation Announcement, nor is it a Request for Proposal does not obligate the government in any contract award. The U.S. Army Corps of Engineers, Savannah District, is conducting preliminary research to determine the market capabilities of potential contractors to perform corrosion preventive maintenance of 12 tainter (spillway) gates, associated stop logs, hoisting machinery, and replacement of deteriorated J-seals and bolts (3 J-seals and approximately 300 bolts per gate).
Technical Details: COATING REQUIREMENTS. The contractor shall clean all surfaces in accordance with SSPC-SP 5- WHITE METAL TO MEET PAINT MANUFACTURER REQUIREMENTS. ABRASIVE blasting is the preferred method of preparation, but alternative paint removal systems will be considered, and evaluated based on their ability to provide a surface condition which meets the paint manufacturer’s specifications, meet environmental requirements and perform satisfactorily in the opinion of the Government.
Combinations of systems such as water blast for cleanliness/paint removal and grit blasting for surface profile would also be considered. Blast medium shall have a low chloride concentration and be so noted on the packaging. Immediately prior to application of the coating, the surface shall be randomly examined for soluble salts in accordance with the Bressler Sampling Method. No area shall exceed a value of 12 micro siemens.
The Contractor shall apply VINYL 5-EZ paint System, see UFGS 09 97 02 – Paint Hydraulic Structures, to all parts of the upstream side of the gate. Paint shall be applied to an average dry film thickness of a minimum of 7.0 mils for the completed system, and the thickness at any point shall not be less than 5.5 mils.
Specific Paints: Surface Preparation Approaching white metal 1st Coat White Vinyl V766e (double spray coat) 2nd Coat Gray Vinyl V766e (double spray coat) 3rd Coat White Vinyl V766e (double spray coat) 4th Coat Gray Vinyl V766e (double spray coat) Background Corrosion can occur at any location on a gate; however, certain areas are more susceptible than others.
Sensitivity to corrosion is enhanced at crevices, locations of dissimilar metals, areas subject to erosion, and areas where ponding water or debris may accumulate. Other areas that are susceptible to corrosion include where it is difficult to adequately apply a protective coating, such as at sharp corners, edges, intermittent welds, and locations of bolts.
Corrosion-susceptible locations on tainter gates include trunnions with dissimilar metals, seal connection plates and rib-girder connections (crevice corrosion and dissimilar metals), locations of bolts (crevice corrosion), drain holes, and general areas where sharp corners, edges, and intermittent welds are located. Other areas where corrosion is likely to occur is where heaters are located and at the normal water line.
All interested firms with 237990 as an approved NAICS code shall submit the following information: 1.Name and Address of your Firm 2.Point of Contact (name/phone/email) 3.Company website 4.Commercial and Government Entity (CAGE) code (http://www.dlis.dla.mil/cage_welcome.asp) 5.Business Size, according to the specified NAICS code 237990, to include designation as HUBZone, 8(a), Service-Disabled Veteran Owned Small Business, Small Disadvantaged Business, WomanOwned Business, and Large Business.
The Government must be able to verify SBA certification of HUBZone, 8(a), and SDB via the System for Award Management (SAM) (http://www.sam.gov/) 6.Please provide a capability statement addressing the following:
7.Evidence of capabilities to perform comparable work on three recent projects (not more than five years old). Include project name and key/salient features of the project, completion date, total contract value, and your company's level of involvement in the project. Please provide at least one point of contact (with email address and phone number) for each project's validation. 8.Firm's capability to perform, to include geographic location, project size, equipment list and equipment capability.
9.What suggestions do you have that would make this requirement more competitive? 10.What contract type would you recommend for this project in the future? Firm Fixed Price (FFP), Cost Reimbursement, or Hybrid Firm Fixed Price - Cost Reimbursement. Why would this contract type be most appropriate?
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
January 12, 2024
Sources sought
Due February 8, 2024 at 1:00 PM EST. SAM.gov, notice 023353456321415992ed736d82b18ef8
Points of contact
- Shermaine MaloneShermaine.D.Malone@usace.army.mil9125615165
- Glenda Cantyglenda.a.canty@usace.army.mil9126525030