Solicitation, first published as presolicitation
Maintenance Dredging Fort Pierce Harbor 28-Foot and 30-Foot Projects and Shore Protection Project Fort Pierce Beach Renourishment 2025, St. Lucie County, Florida
W912EP25B0001
Department of the Army, W074 Endist Jacksnvlle. Other Heavy and Civil Engineering Construction.
Response deadline
October 31, 2024 at 1:11 PM EDT
Closed 756 days ago. Posted November 20, 2024, first published September 6, 2024. Scheduled to archive November 21, 2024.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed in 2024
142 like it are open now in other heavy and civil engineering construction
- REFRESH SOUTH ATLANTIC DIVISION SMALL BUSINESS REGIONAL INDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ), MULTIPLE AWARD TASK ORDER CONTRACT (MATOC) FOR MAINTENANCE DREDGING
Department of the Army, W074 Endist Jacksnvlle
Sources soughtNAICS 237990Jacksonville, FLW912EP27X1CYUDue in 4 daysNov 30 - KC-46A ADAL Apron and Hydrant Fueling Pits
Department of the Army, W074 Endist Mobile
SolicitationNAICS 237990FloridaW9127825RA068Closes in 9 daysDec 5 - Jacksonville Harbor Maintenance Dredging
Department of the Army, W074 Endist Wilmington
SolicitationNAICS 237990FloridaW912PM27BA003Closes in 15 daysDec 11
All 142 open in other heavy and civil engineering construction
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 237990 (other heavy and civil engineering construction), means no more than $45 million in average annual receipts, counted with affiliates. What a set-aside is
- Time to respond
- Bidders had 35 days from the day the solicitation was posted, September 26, 2024, to the deadline.
- Before the solicitation
- The agency published a presolicitation on September 6, 2024, 20 days before the solicitation.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
Project work includes maintenance dredging within Fort Pierce Harbor. Beach compatible material will be placed into the Fort Pierce Beach project area identified below, while all non-beach compatible material will be placed into the Fort Pierce Ocean Dredge Material Disposal Site (ODMDS), located five nautical miles southeast of the Fort Pierce Harbor entrance.
Project work also includes construction of a beach berm along approximately 7,000 feet of shoreline immediately south of Fort Pierce Inlet between Florida Department of Environmental Protection (FDEP) Range Monuments R-34 and T-41. Remaining beach compatible sand for the Fort Pierce Beach portion of the project will be dredged from Capron Shoal, located approximately four miles southeast of the project site. Work on the beach must be completed by May 15 between R-37 and T-41 and by May 30 between R-34 to R-37.
Due to the extensive hardbottom areas located offshore of the fill area, offshore pipeline access to the beach site is prohibited. Offloading to the beach will be done inside Fort Pierce Inlet just north of the South Jetty. A staging area and beach access to the beach placement area is located at the end of Seaway Drive and near the south jetty offloading area.
Work also includes but is not limited to environmental species monitoring, sea turtle trawl sweeping (hopper dredges only), turbidity monitoring, beach tilling, munitions and explosives of concern construction support (offshore dredging only), and vibration control and monitoring.The project will have an estimated period of performance of 210 calendar days after receipt of the Notice to Proceed (NTP).
The stated time is inclusive of 60 calendar days to commence work and will be divided into base work and one option as follows:Base (including commencement and demobilization): 195 calendar days.Option A: 15 calendar days.Option A work consists of dredging 100,000 cubic yards of material from the Capron Shoal with placement on the beach between R-39A and R-41.
Option A work also includes screening, beach tilling, remediation of noncompliant material, transportation and disposal of noncompliant material, vibration controls and monitoring, sea turtle non-capture trawl sweeping and stand by time.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
September 6, 2024
Presolicitation, originally sources sought
MAINTENANCE DREDGING FORT PIERCE HARBOR 28-FOOT AND 30-FOOT PROJECTS & SHORE PROTECTION PROJECT FORT PIERCE BEACH RENOURISHMENT 2025, ST. LUCIE COUNTY, FLORIDA
Due October 31, 2024 at 1:00 PM EDT. SAM.gov, notice 8b2a0f6e299f4cfaa6b7667521dfc5cd
September 26, 2024
Solicitation
Due October 31, 2024 at 2:00 PM EDT. SAM.gov, notice 269ab76c00934832bf7af7bc1982c3fc
September 26, 2024
Solicitation
Due October 31, 2024 at 2:00 PM EDT. SAM.gov, notice 99962b9bf23c4861902ce2b4791d9756
October 2, 2024
Presolicitation
MAINTENANCE DREDGING FORT PIERCE HARBOR 28-FOOT AND 30-FOOT PROJECTS & SHORE PROTECTION PROJECT FORT PIERCE BEACH RENOURISHMENT 2025, ST. LUCIE COUNTY, FLORIDA
Due October 31, 2024 at 1:00 PM EDT. SAM.gov, notice 7a481efd310142c7bd8434c992d2cf06
October 21, 2024
Solicitation
Due October 31, 2024 at 2:00 PM EDT. SAM.gov, notice f3fcf6a5411744f787cf09152c6e7c74
October 31, 2024
Solicitation
Due October 31, 2024 at 1:11 PM EDT. SAM.gov, notice 9852cb99fa7c483392ec586f979ce5dc
November 20, 2024
Solicitation
Due October 31, 2024 at 1:11 PM EDT. SAM.gov, notice 0ed70566b21a440f98900ef7349d3531
November 20, 2024
Solicitation
Due October 31, 2024 at 1:11 PM EDT. SAM.gov, notice dd1bd3fba78a46f4a2c9eda0fc1bb860
Points of contact
- Guesley Legerguesley.leger@usace.army.mil9783188269
- NICOLE BATISTA-CRUZnicole.m.batista-cruz@usace.army.mil9042323275