{"canonical":"https://sealedbidder.com/opportunities/w912ef26rss029","key":"W912EF26RSS029","url":"https://sealedbidder.com/opportunities/w912ef26rss029","title":"Heise Roberts Levee Rehab","solicitation_number":"W912EF26RSS029","notice_type":"r","open":false,"removed":false,"removed_at":null,"response_deadline":"2026-06-04T23:00:00Z","first_posted":"2026-05-28","last_posted":"2026-05-28","department":"DEPT OF DEFENSE","subagency":"DEPT OF THE ARMY","office":"US ARMY ENGINEER DISTRICT WALLA WAL","naics":"237990","psc":null,"set_aside":null,"place_state":null,"place_scope":"unknown","site":null,"place_state_source":null,"place_evidence":null,"place_county":null,"place_county_name":null,"place_city":null,"place_city_name":null,"winner":null,"award_amount":null,"publications":[{"notice_id":"4a74217e01a1457e8b95522fb0aaa3cb","title":"Heise Roberts Levee Rehab","solicitation_number":"W912EF26RSS029","notice_type":"r","base_type":"r","posted":"2026-05-28","posted_at":"2026-05-28T12:55:30.034Z","due_at":"2026-06-04T23:00:00Z","due_date":"2026-06-04","cancelled":false,"archived":false,"archive_date":"2027-05-28","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/4a74217e01a1457e8b95522fb0aaa3cb/view","enriched":true,"history":[{"index":2,"title":"Heise Roberts Levee Rehab","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-05-28T12:55:30.034Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"modify","opportunity_id":"4a74217e01a1457e8b95522fb0aaa3cb","solicitation_number":"W912EF26RSS029","parent_opportunity_id":"a47e3d0bcd064fdb8b1d7096abef29ec"},{"index":1,"title":"Heise Roberts Levee Rehab","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-05-28T12:52:47.598Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"a47e3d0bcd064fdb8b1d7096abef29ec","solicitation_number":"W912EF26RSS029"}]},{"notice_id":"a47e3d0bcd064fdb8b1d7096abef29ec","title":"Heise Roberts Levee Rehab","solicitation_number":"W912EF26RSS029","notice_type":"r","base_type":"r","posted":"2026-05-28","posted_at":"2026-05-28T12:52:47.598Z","due_at":"2026-06-04T23:00:00Z","due_date":"2026-06-04","cancelled":false,"archived":false,"archive_date":"2027-05-28","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/a47e3d0bcd064fdb8b1d7096abef29ec/view","enriched":true,"history":[{"index":2,"title":"Heise Roberts Levee Rehab","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-05-28T12:55:30.034Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"modify","opportunity_id":"4a74217e01a1457e8b95522fb0aaa3cb","solicitation_number":"W912EF26RSS029","parent_opportunity_id":"a47e3d0bcd064fdb8b1d7096abef29ec"},{"index":1,"title":"Heise Roberts Levee Rehab","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-05-28T12:52:47.598Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"a47e3d0bcd064fdb8b1d7096abef29ec","solicitation_number":"W912EF26RSS029"}]}],"latest_notice_id":"a47e3d0bcd064fdb8b1d7096abef29ec","first_type":"r","notices":[{"dates":{"posted":"2026-05-28","posted_at":"2026-05-28T12:55:30.034Z","created_at":"2026-05-28T12:54:54.713Z","modified_at":"2026-05-28T12:55:30.039Z","response_deadline":{"raw":"2026-06-04T15:00:00-08:00","utc":"2026-06-04T23:00:00Z","date":"2026-06-04","time":"15:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-28800}},"links":{"sam":"https://sam.gov/workspace/contract/opp/4a74217e01a1457e8b95522fb0aaa3cb/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Heise Roberts Levee Rehab","agency":{"office":{"code":"W912EF","name":"US ARMY ENGINEER DISTRICT WALLA WAL"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"99362-1876","city":"WALLA WALLA","state":"WA","country":"USA"},"organization_id":"100255267","organization_type":"OFFICE"},"status":{"active":true,"latest":true,"deleted":false,"archived":false,"cancelled":false,"publication":"published","archive_date":"2027-05-28","archive_type":"auto_custom"},"history":[{"index":2,"title":"Heise Roberts Levee Rehab","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-05-28T12:55:30.034Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"modify","opportunity_id":"4a74217e01a1457e8b95522fb0aaa3cb","solicitation_number":"W912EF26RSS029","parent_opportunity_id":"a47e3d0bcd064fdb8b1d7096abef29ec"},{"index":1,"title":"Heise Roberts Levee Rehab","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-05-28T12:52:47.598Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"a47e3d0bcd064fdb8b1d7096abef29ec","solicitation_number":"W912EF26RSS029"}],"contacts":[{"name":"Richard Bonnell","role":"primary","email":"Richard.W.Bonnell@usace.army.mil","phone":"210-332-0448"}],"base_type":{"code":"r","label":"Sources Sought"},"notice_id":"4a74217e01a1457e8b95522fb0aaa3cb","lineage_id":"a47e3d0bcd064fdb8b1d7096abef29ec","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-09-21T02:08:17.758698734Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"3f59209463433eba6899e195a597c64d-29\"","fetched_at":"2026-09-16T16:22:40.277975Z","row_sha256":"112edefb094a3596c92db6370e9eaea169570a3ec6ef82a6dfdd1505933ef754","last_modified":"2026-09-16T03:30:52Z"},"updated_at":"2026-09-21T02:08:17.758698734Z","first_seen_at":"2026-09-16T16:22:40.277975Z"},"description":{"html":"<p>Heise-Roberts Right Bank Upper System Damage Site # 1 ? This site is located on the right bank levee system approximately 1 mile upstream of Lorenzo Bridge. At this levee segment, the river is eroding the streambank to the point of encroaching on the toe of the levee. This levee segment is not armored with riprap. The levee needs riprap revetment to protect the toe and slope of the levee prior to the next flood event. Excavating down approximately 8? to the toe of the levee and armoring the levee with riprap on the riverside side of the levee is necessary to protect the levee from eroding. This site is approximately 600 linear feet in length.Heise-Roberts Right Bank Upper System Damage Site # 2 ? This site is located on the right bank levee near Lorenzo Bridge. At this levee segment the large, dumped stone upstream of the railroad bridge abutment has been undercut and washed downstream. Additional riprap is needed to key in the remaining riprap and protect the toe of the levee and areas of erosion on the slope of the levee. This site is approximately 600 linear feet in length.Heise-Roberts Right Bank Lower System Damage Site # 3 ? This site is located on the right bank levee system near Roberts Bridge. This site has experienced erosion at the toe of slope, and the riprap has slid down the slope of the levee, leaving the upper levee exposed to erosion. Riprap revetment would need to be keyed in with existing riprap to protect the upper part of the levee and existing riprap needs to be keyed in to create a stable toe. This site is approximately 300 linear feet in length.Heise-Roberts Left Bank Levee System Damage Site # 4 - This site is located on the left bank levee system, approximately 1.5 miles downstream of Lorenzo Bridge. This site is at an impingement point that eroded a large amount of riverbank that was repaired during a flood fight. A Riprap toe bench needs to be placed and keyed in with the existing slope riprap revetment placed during previous flood fight conditions. This site is approximately 600 linear feet in length.</p>","text":"Heise-Roberts Right Bank Upper System Damage Site # 1 ? This site is located on the right bank levee system approximately 1 mile upstream of Lorenzo Bridge. At this levee segment, the river is eroding the streambank to the point of encroaching on the toe of the levee. This levee segment is not armored with riprap. The levee needs riprap revetment to protect the toe and slope of the levee prior to the next flood event. Excavating down approximately 8? to the toe of the levee and armoring the levee with riprap on the riverside side of the levee is necessary to protect the levee from eroding. This site is approximately 600 linear feet in length.Heise-Roberts Right Bank Upper System Damage Site # 2 ? This site is located on the right bank levee near Lorenzo Bridge. At this levee segment the large, dumped stone upstream of the railroad bridge abutment has been undercut and washed downstream. Additional riprap is needed to key in the remaining riprap and protect the toe of the levee and areas of erosion on the slope of the levee. This site is approximately 600 linear feet in length.Heise-Roberts Right Bank Lower System Damage Site # 3 ? This site is located on the right bank levee system near Roberts Bridge. This site has experienced erosion at the toe of slope, and the riprap has slid down the slope of the levee, leaving the upper levee exposed to erosion. Riprap revetment would need to be keyed in with existing riprap to protect the upper part of the levee and existing riprap needs to be keyed in to create a stable toe. This site is approximately 300 linear feet in length.Heise-Roberts Left Bank Levee System Damage Site # 4 - This site is located on the left bank levee system, approximately 1.5 miles downstream of Lorenzo Bridge. This site is at an impingement point that eroded a large amount of riverbank that was repaired during a flood fight. A Riprap toe bench needs to be placed and keyed in with the existing slope riprap revetment placed during previous flood fight conditions. This site is approximately 600 linear feet in length.","origin":"detail"},"notice_type":{"code":"r","label":"Sources Sought"},"schema_version":1,"solicitation_number":"W912EF26RSS029"},{"dates":{"posted":"2026-05-28","posted_at":"2026-05-28T12:52:47.598Z","created_at":"2026-05-28T12:52:47.567Z","modified_at":"2026-05-28T12:55:30.034Z","response_deadline":{"raw":"2026-06-04T15:00:00-08:00","utc":"2026-06-04T23:00:00Z","date":"2026-06-04","time":"15:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-28800}},"links":{"sam":"https://sam.gov/workspace/contract/opp/a47e3d0bcd064fdb8b1d7096abef29ec/view"},"naics":{"codes":["237990"],"primary":"237990"},"title":"Heise Roberts Levee Rehab","agency":{"office":{"code":"W912EF","name":"US ARMY ENGINEER DISTRICT WALLA WAL"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"99362-1876","city":"WALLA WALLA","state":"WA","country":"USA"},"organization_id":"100255267","organization_type":"OFFICE"},"status":{"active":true,"latest":false,"deleted":false,"archived":false,"cancelled":false,"publication":"published","archive_date":"2027-05-28","archive_type":"auto_custom"},"history":[{"index":2,"title":"Heise Roberts Levee Rehab","action":"publish","latest":true,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-05-28T12:55:30.034Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"modify","opportunity_id":"4a74217e01a1457e8b95522fb0aaa3cb","solicitation_number":"W912EF26RSS029","parent_opportunity_id":"a47e3d0bcd064fdb8b1d7096abef29ec"},{"index":1,"title":"Heise Roberts Levee Rehab","action":"publish","latest":false,"deleted":false,"archived":false,"cancelled":false,"posted_at":"2026-05-28T12:52:47.598Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"a47e3d0bcd064fdb8b1d7096abef29ec","solicitation_number":"W912EF26RSS029"}],"contacts":[{"name":"Richard Bonnell","role":"primary","email":"Richard.W.Bonnell@usace.army.mil","phone":"210-332-0448"}],"base_type":{"code":"r","label":"Sources Sought"},"notice_id":"a47e3d0bcd064fdb8b1d7096abef29ec","lineage_id":"a47e3d0bcd064fdb8b1d7096abef29ec","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-09-21T02:08:32.757600528Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/datagov/ContractOpportunitiesFullCSV.csv","etag":"\"3f59209463433eba6899e195a597c64d-29\"","fetched_at":"2026-09-16T16:22:40.277975Z","row_sha256":"3647ead778cc85bc0a8e5c1ed445baf862a9d81c8527880156b4438dad7a7644","last_modified":"2026-09-16T03:30:52Z"},"updated_at":"2026-09-21T02:08:32.757600528Z","first_seen_at":"2026-09-16T16:22:40.277975Z"},"description":{"html":"Heise-Roberts Right Bank Upper System Damage Site # 1 ? This site is located on the right bank levee system approximately 1 mile upstream of Lorenzo Bridge. At this levee segment, the river is eroding the streambank to the point of encroaching on the toe of the levee. This levee segment is not armored with riprap. The levee needs riprap revetment to protect the toe and slope of the levee prior to the next flood event. Excavating down approximately 8? to the toe of the levee and armoring the levee with riprap on the riverside side of the levee is necessary to protect the levee from eroding. This site is approximately 600 linear feet in length.Heise-Roberts Right Bank Upper System Damage Site # 2 ? This site is located on the right bank levee near Lorenzo Bridge. At this levee segment the large, dumped stone upstream of the railroad bridge abutment has been undercut and washed downstream. Additional riprap is needed to key in the remaining riprap and protect the toe of the levee and areas of erosion on the slope of the levee. This site is approximately 600 linear feet in length.Heise-Roberts Right Bank Lower System Damage Site # 3 ? This site is located on the right bank levee system near Roberts Bridge. This site has experienced erosion at the toe of slope, and the riprap has slid down the slope of the levee, leaving the upper levee exposed to erosion. Riprap revetment would need to be keyed in with existing riprap to protect the upper part of the levee and existing riprap needs to be keyed in to create a stable toe. This site is approximately 300 linear feet in length.Heise-Roberts Left Bank Levee System Damage Site # 4 - This site is located on the left bank levee system, approximately 1.5 miles downstream of Lorenzo Bridge. This site is at an impingement point that eroded a large amount of riverbank that was repaired during a flood fight. A Riprap toe bench needs to be placed and keyed in with the existing slope riprap revetment placed during previous flood fight conditions. This site is approximately 600 linear feet in length.","text":"Heise-Roberts Right Bank Upper System Damage Site # 1 ? This site is located on the right bank levee system approximately 1 mile upstream of Lorenzo Bridge. At this levee segment, the river is eroding the streambank to the point of encroaching on the toe of the levee. This levee segment is not armored with riprap. The levee needs riprap revetment to protect the toe and slope of the levee prior to the next flood event. Excavating down approximately 8? to the toe of the levee and armoring the levee with riprap on the riverside side of the levee is necessary to protect the levee from eroding. This site is approximately 600 linear feet in length.Heise-Roberts Right Bank Upper System Damage Site # 2 ? This site is located on the right bank levee near Lorenzo Bridge. At this levee segment the large, dumped stone upstream of the railroad bridge abutment has been undercut and washed downstream. Additional riprap is needed to key in the remaining riprap and protect the toe of the levee and areas of erosion on the slope of the levee. This site is approximately 600 linear feet in length.Heise-Roberts Right Bank Lower System Damage Site # 3 ? This site is located on the right bank levee system near Roberts Bridge. This site has experienced erosion at the toe of slope, and the riprap has slid down the slope of the levee, leaving the upper levee exposed to erosion. Riprap revetment would need to be keyed in with existing riprap to protect the upper part of the levee and existing riprap needs to be keyed in to create a stable toe. This site is approximately 300 linear feet in length.Heise-Roberts Left Bank Levee System Damage Site # 4 - This site is located on the left bank levee system, approximately 1.5 miles downstream of Lorenzo Bridge. This site is at an impingement point that eroded a large amount of riverbank that was repaired during a flood fight. A Riprap toe bench needs to be placed and keyed in with the existing slope riprap revetment placed during previous flood fight conditions. This site is approximately 600 linear feet in length.","origin":"detail"},"notice_type":{"code":"r","label":"Sources Sought"},"schema_version":1,"solicitation_number":"W912EF26RSS029"}],"due_at":"2026-06-04T23:00:00Z","due_date":"2026-06-04","closes_at":"2026-06-04T23:00:00Z","awardable":true,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912EF","office_name":"US ARMY ENGINEER DISTRICT WALLA WAL","state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"state_source":null,"state_evidence":null,"site_key":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-24T03:25:58.922164Z","principal_notice_id":"a47e3d0bcd064fdb8b1d7096abef29ec","description":{"text":"Heise-Roberts Right Bank Upper System Damage Site # 1 ? This site is located on the right bank levee system approximately 1 mile upstream of Lorenzo Bridge. At this levee segment, the river is eroding the streambank to the point of encroaching on the toe of the levee. This levee segment is not armored with riprap. The levee needs riprap revetment to protect the toe and slope of the levee prior to the next flood event. Excavating down approximately 8? to the toe of the levee and armoring the levee with riprap on the riverside side of the levee is necessary to protect the levee from eroding. This site is approximately 600 linear feet in length.Heise-Roberts Right Bank Upper System Damage Site # 2 ? This site is located on the right bank levee near Lorenzo Bridge. At this levee segment the large, dumped stone upstream of the railroad bridge abutment has been undercut and washed downstream. Additional riprap is needed to key in the remaining riprap and protect the toe of the levee and areas of erosion on the slope of the levee. This site is approximately 600 linear feet in length.Heise-Roberts Right Bank Lower System Damage Site # 3 ? This site is located on the right bank levee system near Roberts Bridge. This site has experienced erosion at the toe of slope, and the riprap has slid down the slope of the levee, leaving the upper levee exposed to erosion. Riprap revetment would need to be keyed in with existing riprap to protect the upper part of the levee and existing riprap needs to be keyed in to create a stable toe. This site is approximately 300 linear feet in length.Heise-Roberts Left Bank Levee System Damage Site # 4 - This site is located on the left bank levee system, approximately 1.5 miles downstream of Lorenzo Bridge. This site is at an impingement point that eroded a large amount of riverbank that was repaired during a flood fight. A Riprap toe bench needs to be placed and keyed in with the existing slope riprap revetment placed during previous flood fight conditions. This site is approximately 600 linear feet in length.","html":"Heise-Roberts Right Bank Upper System Damage Site # 1 ? This site is located on the right bank levee system approximately 1 mile upstream of Lorenzo Bridge. At this levee segment, the river is eroding the streambank to the point of encroaching on the toe of the levee. This levee segment is not armored with riprap. The levee needs riprap revetment to protect the toe and slope of the levee prior to the next flood event. Excavating down approximately 8? to the toe of the levee and armoring the levee with riprap on the riverside side of the levee is necessary to protect the levee from eroding. This site is approximately 600 linear feet in length.Heise-Roberts Right Bank Upper System Damage Site # 2 ? This site is located on the right bank levee near Lorenzo Bridge. At this levee segment the large, dumped stone upstream of the railroad bridge abutment has been undercut and washed downstream. Additional riprap is needed to key in the remaining riprap and protect the toe of the levee and areas of erosion on the slope of the levee. This site is approximately 600 linear feet in length.Heise-Roberts Right Bank Lower System Damage Site # 3 ? This site is located on the right bank levee system near Roberts Bridge. This site has experienced erosion at the toe of slope, and the riprap has slid down the slope of the levee, leaving the upper levee exposed to erosion. Riprap revetment would need to be keyed in with existing riprap to protect the upper part of the levee and existing riprap needs to be keyed in to create a stable toe. This site is approximately 300 linear feet in length.Heise-Roberts Left Bank Levee System Damage Site # 4 - This site is located on the left bank levee system, approximately 1.5 miles downstream of Lorenzo Bridge. This site is at an impingement point that eroded a large amount of riverbank that was repaired during a flood fight. A Riprap toe bench needs to be placed and keyed in with the existing slope riprap revetment placed during previous flood fight conditions. This site is approximately 600 linear feet in length.","origin":"detail"},"contacts":[{"name":"Richard Bonnell","role":"primary","email":"Richard.W.Bonnell@usace.army.mil","phone":"210-332-0448"}],"place_of_performance":null,"office_address":{"zip":"99362-1876","city":"WALLA WALLA","state":"WA","country":"USA"},"naics_codes":["237990"],"award":null,"attachments":[{"resource_id":"3dea64d03d594bc0b8a4b3df0000c021","name":"W912EF26RSS29 Sources Sought Hsise Roberts Levee Rehab.pdf","kind":"file","mime_type":".pdf","size_bytes":380596,"posted_at":"2026-05-28T12:55:30.034Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/3dea64d03d594bc0b8a4b3df0000c021/download","mirrored":false},{"resource_id":"d709d27544f94d0981e14ef7250dcd32","name":"dodprocurementtoolbox.com","kind":"link","mime_type":null,"size_bytes":null,"posted_at":"2026-05-28T12:52:47.598Z","export_controlled":false,"sha256":null,"url":"https://dodprocurementtoolbox.com/","mirrored":false}],"awards":[],"related":[{"key":"W912EF27QA006","latest_notice_id":"7c3b9228948945cbab4a7f0b98539397","title":"LLA Fish Pump - Motor Rewind","solicitation_number":"W912EF27QA006","notice_type":"k","first_type":"k","first_posted":"2026-10-22","last_posted":"2026-11-20","notices":2,"due_at":"2026-11-30T19:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T19:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912EF","office_name":"US ARMY ENGINEER DISTRICT WALLA WAL","naics":"811310","psc":"J043","set_aside":null,"state":"WA","county":"53023","county_name":"Garfield County","city":"5355120","city_name":"Pomeroy","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-21T05:30:25.727497Z"},{"key":"W912EF27RSS02","latest_notice_id":"757d4f987a464793972064f25e16232c","title":"Mill Creek Section 205 Flood Risk Management Improvements","solicitation_number":"W912EF-27-R-SS02","notice_type":"r","first_type":"r","first_posted":"2026-11-05","last_posted":"2026-11-05","notices":3,"due_at":"2026-12-07T23:00:00Z","due_date":"2026-12-07","closes_at":"2026-12-07T23:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912EF","office_name":"US ARMY ENGINEER DISTRICT WALLA WAL","naics":"237990","psc":"Y1PC","set_aside":null,"state":"WA","county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"site","state_source":"sam_street","state_evidence":"MILL CREEK FLOOD CONTROL CHANNELWALLA WALLA, WA 99362WALLA WALLA COUNTY","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-06T04:46:59.158685Z"},{"key":"W912EF27BA001","latest_notice_id":"fc507c18cf2a4d029644e5739049d530","title":"Dworshak Powerhouse Roof Replacement","solicitation_number":"W912EF27BA001","notice_type":"o","first_type":"p","first_posted":"2026-09-25","last_posted":"2026-11-24","notices":3,"due_at":"2027-01-04T22:30:00Z","due_date":"2027-01-04","closes_at":"2027-01-04T22:30:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912EF","office_name":"US ARMY ENGINEER DISTRICT WALLA WAL","naics":"238160","psc":"Z2KA","set_aside":null,"state":"ID","county":"16035","county_name":"Clearwater County","city":null,"city_name":null,"country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-25T05:14:59.249783Z"},{"key":"W912EF27RA001","latest_notice_id":"95f19f7196b744beb9bf99128a86a419","title":"Northwest Division Powerhouse Life Safety Upgrades Stage 1","solicitation_number":"W912EF27RA001","notice_type":"p","first_type":"p","first_posted":"2026-11-13","last_posted":"2026-11-13","notices":2,"due_at":"2027-01-08T20:00:00Z","due_date":"2027-01-08","closes_at":"2027-01-08T20:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912EF","office_name":"US ARMY ENGINEER DISTRICT WALLA WAL","naics":"237990","psc":"Z2KA","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"multi_state","state_source":null,"state_evidence":"THE PRIMARY AREA OF PERFORMANCE IS ANTICIPATED TO INCLUDE USACE WALLA WALLA DISTRICT PROJECTS AT MCNARY, ICE HARBOR, LOWER MONUMENTAL, LITTLE GOOSE, LOWER GRANI","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-14T05:16:40.707321Z"}],"similar_open":[{"key":"W912EK27T0003","latest_notice_id":"7a2e2b8876ef4a91bc5caa0548992dde","title":"Sources Sought PL84-99 Flood Repair Coal Creek 2026 Event","solicitation_number":"W912EK27T0003","notice_type":"r","first_type":"r","first_posted":"2026-11-18","last_posted":"2026-11-18","notices":1,"due_at":"2026-12-02T17:00:00Z","due_date":"2026-12-02","closes_at":"2026-12-02T17:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912EK","office_name":"W07V ENDIST ROCK ISLAND","naics":"237990","psc":"Y1QA","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"unknown","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-19T04:41:36.780616Z"},{"key":"W912EK27T0002","latest_notice_id":"e4af7a7e78074728bb24f0a73b41dc62","title":"UPPER MISSISSIPPI RIVER RESTORATION (UMRR) POOL 12 FLOODPLAIN FOREST STAGE ONE (1) - HABITAT REHABILITATION AND ENHANCEMENT PROJECT (HREP)","solicitation_number":"W912EK27T0002","notice_type":"r","first_type":"r","first_posted":"2026-11-02","last_posted":"2026-11-02","notices":1,"due_at":"2026-12-02T17:00:00Z","due_date":"2026-12-02","closes_at":"2026-12-02T17:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912EK","office_name":"W07V ENDIST ROCK ISLAND","naics":"237990","psc":"Y1QA","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"multi_state","state_source":null,"state_evidence":"MISSISSIPPI RIVER BASIN POOL 12, FROM LOCK AND DAM 12 NEAR BELLEVUE, IOWA, TO LOCK AND DAM 11 IN DUBUQUE, IOWA AND JO DAVIES COUNTY, ILLINOIS","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-03T04:52:39.433634Z"},{"key":"W912BV27RKT01","latest_notice_id":"5885b7e86a6e4771998a4b03888b29cf","title":"Denison Valve Replacement","solicitation_number":"W912BV27RKT01","notice_type":"r","first_type":"r","first_posted":"2026-11-05","last_posted":"2026-11-05","notices":1,"due_at":"2026-12-03T17:00:00Z","due_date":"2026-12-03","closes_at":"2026-12-03T17:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912BV","office_name":"W076 ENDIST TULSA","naics":"237990","psc":"N048","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"unknown","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-06T04:46:59.158685Z"}],"similar_open_total":143,"indexable":false}