Sources sought
LMA JFF Replacement HVAC System
W912EF25RSS21
Department of the Army, US Army Engineer District Walla Wal. Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing.
Response deadline
May 8, 2025 at 1:00 PM EDT
Closed 566 days ago. Posted April 24, 2025, first published April 18, 2025. Scheduled to archive May 23, 2025.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed in 2025
25 like it are open now in air-conditioning and warm air heating equipment and commercial and industrial refrigeration equipment manufacturing
- FILTER ELEMENT,AIR CON
Defense Logistics Agency, DLA Troop Support
Combined synopsis and solicitationSmall businessNAICS 333415Ship to the buyerSPE8E827Q0072Due tomorrowNov 25 - POWER,BREEZER
Defense Logistics Agency, DLA Troop Support
Combined synopsis and solicitationSmall businessNAICS 333415Ship to the buyerSPE8E727Q0025Due tomorrowNov 25 - FILTER ELEMENT,AIR CON
Defense Logistics Agency, DLA Troop Support
Combined synopsis and solicitationSmall businessNAICS 333415Ship to the buyerSPE8E827Q0071Due tomorrowNov 25
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Sources sought. Market research. The agency wants to know who could do the work before it decides how to compete it. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 333415 (air-conditioning and warm air heating equipment and commercial and industrial refrigeration equipment manufacturing), means no more than 1,250 employees, counted with affiliates. What a set-aside is
- What comes next
- No solicitation was published under this number after the sources sought of April 18, 2025. An agency sometimes issues the solicitation under a new number.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
W912EF - THIS IS A SOURCES SOUGHT NOTICE AND SHOULD NOT BE CONSTRUED AS A SOLICITATION ANNOUNCEMENT. THE SUBMISSION OF THIS INFORMATION IS FOR PLANNING PURPOSES ONLY. IT IS NOT TO BE CONSTRUED AS A COMMITMENT BY THE GOVERNMENT TO PROCURE ANY SUPPLIES OR TO AWARD A CONTRACT ON THE BASIS OF THIS REQUEST FOR INFORMATION.
The US Army Corps of Engineers (USACE), Walla Walla District is seeking sources for a supply project: LMA JFF Replacement HVAC System. This project involves the purchase, installation, and commissioning of two new electric HVAC systems along with removal and disposal of the existing HVAC systems for the first floor and second floor of the Juvenile Fish Facility at Lower Monumental Lock & Dam. The determination of the acquisition strategy for this procurement lies solely with the Government and will be based on market research and information available to the Government from other sources. A market survey is being conducted to determine if there are a reasonable number of firms, large or small businesses, including small-disadvantaged businesses, HUBZONE small businesses, woman-owned small businesses, or service-disabled veteran-owned small businesses interested in and technically capable of performing the scope-of-work in the specified location. If you are capable and interested in this work, please respond accordingly.
Responses to this sources sought announcement will be used by the Government to make appropriate acquisition decisions. The NAICS Code for this acquisition is 333415 Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing. The small Business size standard for this NAICS is 1,250 employees. NO SOLICITATION IS CURRENTLY AVAILABLE.
BACKGROUND AND PURPOSE:
For the purposes of market research, the U.S Army Corps of Engineers, Walla Walla District requests letters of interest from qualified supply/manufacturing contractors capable of supplying the two new HVAC systems for the following project:
Lower Monumental Dam, Kahlotus, WA.
PROJECT DESCRIPTION:
Provide two new HVAC systems which shall be electric split-type systems and shall include outdoor heat pump units, indoor ceiling-mounted air handler units with auxiliary electric heat, new thermostats, and all auxiliary piping, refrigerant, wiring, adapters, and other components needed to make the new systems function properly as a direct replacement of the existing systems. The new systems shall be brand new and shall be the latest version of its kind offered by the manufacturer. All new equipment supplied such as outdoor heat pump units, air handler units, electric heating coils, and thermostats shall be manufactured by the same company as much as possible. The new systems shall conform to the following salient characteristics. Consideration will be given to alternate designs, that meet design intent with variations to specifications, with justification for any variations. Any considerations and allowable specification variations shall be at the discretion of the Government.
3.1 FIRST FLOOR HVAC SYSTEM REQUIREMENTS
- Type: Electric split-type heat pump system
- Electric:
- Condenser: 208V, 3-phase, 60Hz, 30A Breaker
- Air Handler: 208V, 3-phase, 60Hz, 50A Breaker
- SEER: 14
- Size: 4 ton
- Refrigerant: R454B Freon
- Cooling Performance:
- 47,000 BTU/hr total capacity
- 33,500 BTU/hr sensible capacity
- Entering DB/WB temp: 80F/67F @ 95F ambient air temp
- Heat Pump Performance:
- High: 46,000 BTU/hr;
- Low: 29,000 BTU/hr @ design
- Heat Rise: 19.9F @ design
- Electric Auxiliary Heat Coil: 11.3 kW
- Ventilation:
- Main supply fan: 1 HP, ECM Multi-speed Constant Torque
- 1300 – 1500 CFM
- 0.5 – 0.6 in WC air resistance
- Orientation: Horizontal
- Heavy gauge galvanized steel cabinet
- Dimensions:
- Condenser:
- Match as closely as possible to existing unit.
- Not to exceed 35 in x 35 in x 40 in
- Air Handler:
- Match as closely as possible to existing unit
- Not to exceed 55 in x 22 in x 22 in
- Condenser:
- Other Accessories/Features:
- High capacity drier factory-installed in liquid line
- Crankcase heater
- Check and expansion valve factory installed
3.2 SECOND FLOOR HVAC SYSTEM REQUIREMENTS
- Type: Electric split-type heat pump system
- Electric:
- Condenser: 208V, 3-phase, 60Hz, 20A Breaker
- Air Handler: 230V, 1-phase, 60Hz, 60A Breaker
- SEER: 15
- Size: 3 ton
- Refrigerant: R454B Freon
- Cooling Performance:
- 34,000 BTU/hr total capacity
- 25,800 BTU/hr sensible capacity
- Entering DB/WB temp: 80F/67F @ 95F ambient air temp
- Heat Pump Performance:
- High: 30,800 BTU/hr;
- Low: 19,600 BTU/hr @ design
- Heat Rise: 17.3F @ design
- Electric Auxiliary Heat Coil: 10 kW
- Ventilation:
- Main supply fan: 0.50 HP, ECM Variable Speed Constant Volume
- 1000 – 1200 CFM
- 0.5 – 0.6 in WC air resistance
- Orientation: Horizontal
- Heavy gauge galvanized steel cabinet
- Dimensions:
- Condenser:
- Match as closely as possible to existing unit.
- Not to exceed 35 in x 35 in x 40 in
- Air Handler:
- Match as closely as possible to existing unit
- Not to exceed 55 in x 22 in x 22 in
- Condenser:
- Other Accessories/Features:
- High capacity drier factory-installed in liquid line
- Crankcase heater
- Check and expansion valve factory installed
- Variable speed direct driver blower motor
Interested firms should submit a capabilities package, to include the following:
1. Firm's name, address, point of contact, phone number, and email address.
2. CAGE code and UEI.
3. Firm's interest in participating in the solicitation, if issued.
4. Business classification: Small Business (SB), Small Disadvantaged Business (SDB),Woman Owned Small Business (WOSB), Service-Disabled Veteran Owned Small Business (SDVOSB), Historically Underutilized Business Zone Small Business (HUBZone), 8(a), or Other than Small Business (Large Business).
5. Firm's joint venture information (if applicable).
6. Interested parties who believe they can meet the requirements are invited to submit, in writing, complete information describing their interest and capability to meet all requirements stated above. At least one (1) project/capability statement should be provided to demonstrate competency and experience in the required area of supply. Narratives shall be no longer than ten pages.
Submit the above information to Chandra Crow, Contract Specialist, via email to Chandra.d.crow@usace.army.mil. Your response to the notice must be received on or before 10:00 am, Pacific Daylight Time on Friday 08 May 2025.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
April 18, 2025
Sources sought
MNA JFF Replacement HVAC System
Due May 2, 2025 at 1:00 PM EDT. SAM.gov, notice f0e3319312504c1ea14dc637d6687caa
2 revisions on SAM
- April 24, 2025: publish, sources sought
- April 18, 2025: publish, sources sought
April 24, 2025
Sources sought
Due May 8, 2025 at 1:00 PM EDT. SAM.gov, notice 773f9109ed2b4f62ab3ef61937e8b518
3 revisions on SAM
- June 4, 2025: publish, presolicitation
- April 24, 2025: publish, sources sought
- April 18, 2025: publish, sources sought
Points of contact
- Chandra D. Crowchandra.d.crow@usace.army.mil5095277202
- Kristin Hernandezkristin.a.hernandez@usace.army.mil