Skip to content

SealedBidder is a private company, not a government agency.

Sign upDashboard
  • 8,704 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell SealedBidder what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and SealedBidder tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $99 a month. See your matches before you pay.
See plans

Special notice, first published as sources sought

PLA Survey -Hydrant Area C Refueling Facilities, Fairchild Air Force Base (FAFB), Spokane, Washington (WA)

W912DW-26-R-4000

Department of the Army, W071 Endist Seattle. Oil and Gas Pipeline and Related Structures Construction.

Response deadline

December 19, 2025 at 7:00 PM EST

Closed 341 days ago. Posted December 3, 2025, first published December 3, 2025. Scheduled to archive January 2, 2026.

Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities

This one closed in 2025

5 like it are open now in oil and gas pipeline and related structures construction

All 5 open in oil and gas pipeline and related structures construction

Reading this notice

Worked out from the publications and the award on this page.

Kind of notice
Special notice. Industry days, draft requirements, program announcements and other notices that are not a solicitation. Glossary
What comes next
No solicitation was published under this number after the sources sought of December 3, 2025. An agency sometimes issues the solicitation under a new number.

Description

As published on SAM.gov.

Subject:   Hydrant Area C Refueling Facilities at Fairchild Air Force Base (FAFB), Spokane, Washington (WA)

NAICS Code:  237120- Oil and Gas Pipeline and Related Structure Construction.

Product Service Code: Y1NA, Construction of Fuel Supply Facilities

THIS IS A PROJECT LABOR AGREEMENT (PLA) SURVEY ONLY.

This is a SPECIAL NOTICE. No proposals are being requested or accepted with this notice. The U.S. Army Corps of Engineers Seattle District is soliciting comments from the construction community addressing use of a Project Labor Agreement (PLA) for an upcoming project for the Construction of the Hydrant Area C Refueling Facilities at Fairchild Air Force Base (FAFB), Spokane, Washington.

DESCRIPTION OF WORK:

The Construction of the Hydrant Area C Refueling Facilities at Fairchild Air Force Base (FAFB), Spokane, Washington (WA) consists of providing a new hydrant loop which will include hydrant pits, fuel piping, fuel equipment, and the removal and replacement of airfield pavement.

The loop will connect to a new pumphouse, which will include all necessary equipment including pumps, filter separators, fuel equipment control systems, product recovery tank, generator, and a leak detection system.  This project will provide operational fuel storage tanks with all associated appurtenances including secondary containment; construct truck offloading stations for fuel receipt and truck fill stands for fuel loading along with associated equipment canopies. Cybersecurity measures will be applied to facility related control systems in accordance with current DoD criteria.

This project will include the construction of site fuel piping to connect the pumphouse to the operational fuel storage tanks, truck offload stations, and truck fill stands.  It will provide a transfer fuel line to connect the new hydrant loop site to the existing bulk fuel storage facilities. Environmental mitigation addresses the excavation, handling, and disposal of soil contaminated with Pe- and polyfluoroalkyl substances (PFAS) as well as the treatment and filtering of similarly contaminated groundwater, to the extent necessary to accomplish construction work. Site improvement includes truck refueler parking, general pavement, fences, gates, fire protection, and lighting. Construct all necessary water, sewer, electric, and communication utility lines and connections. Site development includes general site clearing, leveling, and appropriate storm drainage infrastructure.

Period of Performance is anticipated to be approximately 1035 calendar days, with a construction award targeted for fiscal year 2027.   

MAGNITUDE:

In accordance with DFARS 236.204, the magnitude of the estimated cost of construction (ECC) range for this project is between $25,000,000 and $100,000,000.

FACTORS TO BE CONSIDERED:

Some of the factors that may be considered regarding PLA use are the following:

  1. The project will require multiple construction contractors and/or subcontractors employing workers in multiple crafts or trades.
  2. There is a shortage of skilled labor in the region in which the construction project will be sited.
  3. Completion of the project will require an extended period of time.
  4. PLAs have been used on comparable projects undertaken by Federal, State, municipal, or private entities in the geographic area of the project.
  5. A PLA will promote the agency’s long term program interests, such as facilitating the training of a skilled workforce to meet the agency’s future construction needs.
  6. Any other factors that the agency decides are appropriate.

FEDERAL ACQUISITION REGUATIONS (FAR) 22.502 DEFINITIONS:

Project labor agreement means a pre-hire collective bargaining agreement with one or more labor organizations that establishes the terms and conditions of employment for a specific construction project and is an agreement described in 29 U. S.C. 158(f).

FAR 22.503 – POLICY:

a. PLA are a tool that agencies may use to promote economy and efficiency in Federal procurement. Pursuant to Executive Order 13502, agencies are encouraged to consider requiring the use of PLAs in connection with large-scale construction projects.

b. An agency may, if appropriate, require that every contractor and subcontractor engaged in construction on the project agree, for that project, to negotiate or become a party to a PLA with one or more labor organizations if the agency decides that the use of PLAs will:

  1. Advance the Federal Governments interest in achieving economy and efficiency in Federal procurement, producing labor-management stability, and ensuring compliance with laws and regulations governing safety and health, equal employment opportunity, labor and employment standards, and other matters; and;
  2. Be consistent with law. (Refer also to FAR 52.222-33 Notice of Requirement for PLA and FAR 52.222-34 PLA).

INDUSTRY COMMENTS:

The construction community is invited to comment on the use of PLAs using the following questions:

  1. If a PLA requirement is included in the solicitation, will your company submit a bid/proposal?  

 __ Yes

 __ No

2. If a PLA requirement is not included in the solicitation, will your company submit a bid/proposal?

 __ Yes

 __ No

3. Do you have knowledge that a PLA has been used in the local area on projects of this kind? If so, please provide supporting documentation.

4. Are you aware of skilled labor shortages in the area for those crafts that will be needed to complete the referenced project? If so, please elaborate and provide supporting documentation where possible.

5. Are you aware of time sensitive issues/scheduling requirements that would affect the rate at which the referenced project should be completed? If so, please elaborate and provide supporting documentation where possible.

6. Identify specific reasons why or how you believe a PLA would advance the Federal Government’s interest in achieving economy and efficiency in Federal procurement.

7. Identify specific reasons why you do not believe a PLA would advance the Federal Government’s interest in achieving economy and efficiency in Federal procurement.

8. Identify any additional information you believe should be considered on the use of a PLA on the referenced project.

9. What are the likely cost impacts, if any, to your bid/proposal price if a PLA requirement is included in the solicitations? Please provide as much detail as possible regarding any anticipated cost impacts (positive or negative) of the inclusion of a PLA requirement, including any information you can provide about the magnitude of the anticipated impact.  

(ii) The information gathered in this exercise should include the following information on projects completed in the last 2-5 years (or other timeframe, as appropriate):

  • Project Name and Location
  • Detailed Project Description
  • Initial Cost Estimate vs. Actual Final Cost
  • Was the project completed on time?
  • Number of craft trades present on the project
  • Was a PLA used?
  • Were there any challenges experienced during the project?

THIS IS NOT A SOLICITATION FOR PROPOSALS AND DOES NOT CONSTITUTE

ANY COMMITMENT BY THE GOVERNMENT. Responses to this PLA market survey will be used by the Government to make appropriate acquisition decisions. All interested sources must respond to future solicitations announcements separately from responses to this market survey.

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. December 3, 2025

    Sources sought

    Hydrant Area C Refueling Facilities

    Due December 19, 2025 at 7:00 PM EST. SAM.gov, notice 787a6211258e44eb8bee9a92e18fee05

    1 revision on SAM
    • December 3, 2025: publish, sources sought
  2. December 3, 2025

    Special notice

    Due December 18, 2025 at 7:00 PM EST. SAM.gov, notice 8dfea93536804cbf9bc909fe8726cf76

    1 revision on SAM
    • December 3, 2025: publish, special notice

Points of contact