Sources Sought - Mud Mountain Dam Bridge Repair
W912DW26R1ASE
Department of the Army, W071 Endist Seattle. Other Heavy and Civil Engineering Construction.
Response deadline
October 31, 2025 at 2:00 PM EDT
Closed 391 days ago. Posted October 11, 2025. Scheduled to archive November 15, 2025.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed in 2025
143 like it are open now in other heavy and civil engineering construction
- Shipyard Infrastructure Optimization Program Multi-Mission Dry Dock, Multiple Award Construction Contract
Department of the Navy, Navfacsyscom Northwest
SolicitationNAICS 237990Bremerton, WAN4425526R0005Due in 5 daysDec 1 - Mill Creek Section 205 Flood Risk Management Improvements
Department of the Army, US Army Engineer District Walla Wal
Sources soughtNAICS 237990WashingtonW912EF-27-R-SS02Closes in 11 daysDec 7 - NAVIGATION LOCK TAINTER VALVE (TV) REPAIR, TV1
Department of the Army, W071 Endist Portland
SolicitationNAICS 237990WashingtonW9127N27BA010Closes in 13 daysDec 9
All 143 open in other heavy and civil engineering construction
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Sources sought. Market research. The agency wants to know who could do the work before it decides how to compete it. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 237990 (other heavy and civil engineering construction), means no more than $45 million in average annual receipts, counted with affiliates. What a set-aside is
- What comes next
- No solicitation was published under this number after the sources sought of October 11, 2025. An agency sometimes issues the solicitation under a new number.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
This is a SOURCES SOUGHT ANNOUNCEMENT and is for informational and market research purposes only. THIS IS NOT A REQUEST FOR PROPOSALS, QUOTATIONS, OR BIDS, NOR A SYNOPSIS OF A PROPOSED CONTRACT ACTION UNDER FAR SUBPART 5.2. The proposed action will be a construction project with a firm-fixed price contract. The type of solicitation to be issued will depend upon information received in response to this sources sought announcement. No reimbursement will be made for any costs associated with providing information in response to this sources sought announcement or any follow-up information.
Responses to this sources sought announcement will be used by the Government to make appropriate acquisition decisions. NO SOLICITATION IS CURRENTLY AVAILABLE. This is not a request to be placed on a solicitation mailing list and is not to be construed as a commitment by the Government. The results of this survey will be considered to be in effect for a period of one year from the date of this notice. The purpose of this sources sought announcement is to gain knowledge of potentially qualified Small Business, 8(a), Woman Owned Small Business, Service-Disabled Veteran Owned Small Business, and HUBZone contractor sources; as well as their size classifications relative to the NAICS code 237990 (Other Heavy and Civil Engineering Construction), FSC code Y1PZ (Construction of Other Non-Building Facilities), and a Small Business Size Standard of $45.0 Million. Depending upon the responses associated with the business categories listed above, the solicitation will either be set aside in one of those categories or be issued as unrestricted and open to both small and large businesses. After review of the responses to this announcement and if the Government still plans to proceed with this project; a separate solicitation announcement will be published on ww.sam.gov. Responses to this announcement are not an adequate response to any future solicitation announcement.
PROJECT DETAILS:
The purpose of this project is to provide a repair to the Mud Mountain
Dam Bridge Pier located at the outlet of the 9 ft tunnel. The scope includes the design of the
bridge pier repair, completion of environmental consultation, award of a construction
contract, construction oversight and contract closeout.
The MM05 Outlet Works Bridge at Mud Mountain Dam is a two-span bridge that carries
equipment and personnel over the discharge of the 9 ft tunnel for access to the 23 ft tunnel.
Each span has two prestressed concrete girders with a CIP concrete deck. These spans are
supported by reinforced concrete abutments at the ends and a single reinforced concrete
column at the center pier. Over time, the sediment-laden flow from the 9 ft tunnel has
destroyed the stainless-steel pier nose guard and has eroded the concrete pier to a point where
the rebar cage in the blast zone is fully exposed and undermined. The current estimate is that
rebar is exposed/undermined along 65% of the pier’s perimeter over a height of 10-15 feet.
The bridge was red tagged by the Bridge Safety team in 2022, disallowing use of the bridge
to vehicle and foot traffic. Risk of a bridge collapse exists and increases with each year the
repairs are not made.
The magnitude of construction is expected to be $3.7 Million to $4.3 Million. Main cost
drivers being the in-water work, complexity of the project, and the remoteness of the site.
REQUIREMENTS:
Interested firms should submit a capabilities package, to include the following:
1. Firm's name, address, point of contact, phone number, and email address.
2. CAGE code and UEI number.
3. Firm's interest in bidding on the solicitation if issued.
4. Business classification: Small Business (SB), Small Disadvantaged Business (SDB), Woman Owned Small Business (WOSB), Veteran Owned Small Business (VOSB), Service-Disabled Veteran Owned Small Business (SDVOSB), Historically Underutilized Business Zone Small Business (HUBZone), 8(a) Program, Other Than Small Business (Large Business).
5. Firm's joint venture information (if interested in being treated as a joint venture the say “YES, we are a interested Joint Venture. Include the JV UEI#, and ensure the projects provided are JV projects).
6. Bonding information (provide bonding limits on the bonding company's letterhead):
a. Single bond
b. Aggregate
c. Point of contact for the bonding company
7. Submit (2) projects similar in scope, and complexity to the project described above, which demonstrates relevant experience in any of the following:
- Projects involving civil construction in water under a bridge repair either in a river, lake, or coastline.
- Projects exceeding $2. Million in repair cost
- Projects with construction new or repair concrete bridge pier
All interested parties who believe they can meet the requirements are invited to submit, in writing, complete information describing their interest and ability to meet all requirements stated above. Prior Government contract work is not required for submitting a response to this announcement.
Submit responses to: Charles Idle, Contract Specialist, via email at charles.d.idle@usace.army.mil Responses should be sent as soon as possible, but no later than 11:00 AM PST, 31 October 2025. Please use “FY26 MMD Bridge Pier Repair - Sources Sought Response” in the email subject line.
All interested firms must be registered in the System for Award Management (www.SAM.gov) and remain active for the duration of the contract to be eligible for Government contracts.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- DRAFT SOW.docx5.3 MB, October 11, 2025
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
October 11, 2025
Sources sought, originally special notice
Due October 31, 2025 at 2:00 PM EDT. SAM.gov, notice 4287fc1698174407a66815d586c22c6b
2 revisions on SAM
- October 11, 2025: publish, sources sought
- August 11, 2025: publish, special notice
Points of contact
- Charles Idlecharles.d.idle@usace.army.mil2063163998