{"canonical":"https://sealedbidder.com/opportunities/w912dw26qa068","key":"W912DW26QA068","url":"https://sealedbidder.com/opportunities/w912dw26qa068","title":"Solicitation: Swinomish Eelgrass Survey w/ Amendment 0001","solicitation_number":"W912DW26QA068","notice_type":"o","open":false,"removed":false,"removed_at":null,"response_deadline":"2026-06-24T19:00:00Z","first_posted":"2026-06-10","last_posted":"2026-06-15","department":"DEPT OF DEFENSE","subagency":"DEPT OF THE ARMY","office":"W071 ENDIST SEATTLE","naics":"541620","psc":"B510","set_aside":null,"place_state":"WA","place_scope":"site","site":null,"place_state_source":null,"place_evidence":null,"place_county":"53057","place_county_name":"Skagit County","place_city":"5336780","place_city_name":"La Conner","winner":null,"award_amount":null,"publications":[{"notice_id":"1b87658467964dd98d1ec2bbca35cca1","title":"Swinomish Eelgrass Survey","solicitation_number":"W912DW26QA068","notice_type":"o","base_type":"o","posted":"2026-06-10","posted_at":"2026-06-10T21:52:41.309Z","due_at":"2026-06-24T19:00:00Z","due_date":"2026-06-24","cancelled":false,"archived":true,"archive_date":"2026-07-09","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/1b87658467964dd98d1ec2bbca35cca1/view","enriched":true,"history":[{"index":6,"title":"Solicitation: Swinomish Eelgrass Survey w/ Amendment 0001","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-15T20:57:18.159Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"fee554ddb6db45ebaf62d70cc344efab","solicitation_number":"W912DW26QA068","parent_opportunity_id":"c61d49f4a3dd43e0aaed4f2250323faf"},{"index":4,"title":"Solicitation: Swinomish Eelgrass Survey w/ Amendment 0001","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-15T18:43:24.457Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"54c89b81bfd643a1a6e0449311f67e7b","solicitation_number":"W912DW26QA068","parent_opportunity_id":"c61d49f4a3dd43e0aaed4f2250323faf"},{"index":3,"title":"Swinomish Eelgrass Survey","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-13T19:06:36.691Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5f7956d57eba46bc9e482b6b7ea7a4e6","solicitation_number":"W912DW26QA068","parent_opportunity_id":"c61d49f4a3dd43e0aaed4f2250323faf"},{"index":2,"title":"Swinomish Eelgrass Survey","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-10T21:52:41.309Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1b87658467964dd98d1ec2bbca35cca1","solicitation_number":"W912DW26QA068","parent_opportunity_id":"c61d49f4a3dd43e0aaed4f2250323faf"},{"index":1,"title":"Swinomish Eelgrass Survey","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-10T21:46:24.233Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"c61d49f4a3dd43e0aaed4f2250323faf","solicitation_number":"W912DW26QA068"}]},{"notice_id":"c61d49f4a3dd43e0aaed4f2250323faf","title":"Swinomish Eelgrass Survey","solicitation_number":"W912DW26QA068","notice_type":"o","base_type":"o","posted":"2026-06-10","posted_at":"2026-06-10T21:46:24.233Z","due_at":"2026-06-24T19:00:00Z","due_date":"2026-06-24","cancelled":false,"archived":true,"archive_date":"2026-07-09","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/c61d49f4a3dd43e0aaed4f2250323faf/view","enriched":true,"history":[{"index":6,"title":"Solicitation: Swinomish Eelgrass Survey w/ Amendment 0001","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-15T20:57:18.159Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"fee554ddb6db45ebaf62d70cc344efab","solicitation_number":"W912DW26QA068","parent_opportunity_id":"c61d49f4a3dd43e0aaed4f2250323faf"},{"index":4,"title":"Solicitation: Swinomish Eelgrass Survey w/ Amendment 0001","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-15T18:43:24.457Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"54c89b81bfd643a1a6e0449311f67e7b","solicitation_number":"W912DW26QA068","parent_opportunity_id":"c61d49f4a3dd43e0aaed4f2250323faf"},{"index":3,"title":"Swinomish Eelgrass Survey","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-13T19:06:36.691Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5f7956d57eba46bc9e482b6b7ea7a4e6","solicitation_number":"W912DW26QA068","parent_opportunity_id":"c61d49f4a3dd43e0aaed4f2250323faf"},{"index":2,"title":"Swinomish Eelgrass Survey","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-10T21:52:41.309Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1b87658467964dd98d1ec2bbca35cca1","solicitation_number":"W912DW26QA068","parent_opportunity_id":"c61d49f4a3dd43e0aaed4f2250323faf"},{"index":1,"title":"Swinomish Eelgrass Survey","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-10T21:46:24.233Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"c61d49f4a3dd43e0aaed4f2250323faf","solicitation_number":"W912DW26QA068"}]},{"notice_id":"5f7956d57eba46bc9e482b6b7ea7a4e6","title":"Swinomish Eelgrass Survey","solicitation_number":"W912DW26QA068","notice_type":"o","base_type":"o","posted":"2026-06-13","posted_at":"2026-06-13T19:06:36.691Z","due_at":"2026-06-24T19:00:00Z","due_date":"2026-06-24","cancelled":false,"archived":true,"archive_date":"2026-07-09","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/5f7956d57eba46bc9e482b6b7ea7a4e6/view","enriched":true,"history":[{"index":6,"title":"Solicitation: Swinomish Eelgrass Survey w/ Amendment 0001","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-15T20:57:18.159Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"fee554ddb6db45ebaf62d70cc344efab","solicitation_number":"W912DW26QA068","parent_opportunity_id":"c61d49f4a3dd43e0aaed4f2250323faf"},{"index":4,"title":"Solicitation: Swinomish Eelgrass Survey w/ Amendment 0001","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-15T18:43:24.457Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"54c89b81bfd643a1a6e0449311f67e7b","solicitation_number":"W912DW26QA068","parent_opportunity_id":"c61d49f4a3dd43e0aaed4f2250323faf"},{"index":3,"title":"Swinomish Eelgrass Survey","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-13T19:06:36.691Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5f7956d57eba46bc9e482b6b7ea7a4e6","solicitation_number":"W912DW26QA068","parent_opportunity_id":"c61d49f4a3dd43e0aaed4f2250323faf"},{"index":2,"title":"Swinomish Eelgrass Survey","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-10T21:52:41.309Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1b87658467964dd98d1ec2bbca35cca1","solicitation_number":"W912DW26QA068","parent_opportunity_id":"c61d49f4a3dd43e0aaed4f2250323faf"},{"index":1,"title":"Swinomish Eelgrass Survey","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-10T21:46:24.233Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"c61d49f4a3dd43e0aaed4f2250323faf","solicitation_number":"W912DW26QA068"}]},{"notice_id":"54c89b81bfd643a1a6e0449311f67e7b","title":"Solicitation: Swinomish Eelgrass Survey w/ Amendment 0001","solicitation_number":"W912DW26QA068","notice_type":"o","base_type":"o","posted":"2026-06-15","posted_at":"2026-06-15T18:43:24.457Z","due_at":"2026-06-24T19:00:00Z","due_date":"2026-06-24","cancelled":false,"archived":true,"archive_date":"2026-07-09","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/54c89b81bfd643a1a6e0449311f67e7b/view","enriched":true,"history":[{"index":6,"title":"Solicitation: Swinomish Eelgrass Survey w/ Amendment 0001","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-15T20:57:18.159Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"fee554ddb6db45ebaf62d70cc344efab","solicitation_number":"W912DW26QA068","parent_opportunity_id":"c61d49f4a3dd43e0aaed4f2250323faf"},{"index":4,"title":"Solicitation: Swinomish Eelgrass Survey w/ Amendment 0001","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-15T18:43:24.457Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"54c89b81bfd643a1a6e0449311f67e7b","solicitation_number":"W912DW26QA068","parent_opportunity_id":"c61d49f4a3dd43e0aaed4f2250323faf"},{"index":3,"title":"Swinomish Eelgrass Survey","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-13T19:06:36.691Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5f7956d57eba46bc9e482b6b7ea7a4e6","solicitation_number":"W912DW26QA068","parent_opportunity_id":"c61d49f4a3dd43e0aaed4f2250323faf"},{"index":2,"title":"Swinomish Eelgrass Survey","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-10T21:52:41.309Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1b87658467964dd98d1ec2bbca35cca1","solicitation_number":"W912DW26QA068","parent_opportunity_id":"c61d49f4a3dd43e0aaed4f2250323faf"},{"index":1,"title":"Swinomish Eelgrass Survey","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-10T21:46:24.233Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"c61d49f4a3dd43e0aaed4f2250323faf","solicitation_number":"W912DW26QA068"}]},{"notice_id":"fee554ddb6db45ebaf62d70cc344efab","title":"Solicitation: Swinomish Eelgrass Survey w/ Amendment 0001","solicitation_number":"W912DW26QA068","notice_type":"o","base_type":"o","posted":"2026-06-15","posted_at":"2026-06-15T20:57:18.159Z","due_at":"2026-06-24T19:00:00Z","due_date":"2026-06-24","cancelled":false,"archived":true,"archive_date":"2026-07-09","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/fee554ddb6db45ebaf62d70cc344efab/view","enriched":true,"history":[{"index":6,"title":"Solicitation: Swinomish Eelgrass Survey w/ Amendment 0001","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-15T20:57:18.159Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"fee554ddb6db45ebaf62d70cc344efab","solicitation_number":"W912DW26QA068","parent_opportunity_id":"c61d49f4a3dd43e0aaed4f2250323faf"},{"index":4,"title":"Solicitation: Swinomish Eelgrass Survey w/ Amendment 0001","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-15T18:43:24.457Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"54c89b81bfd643a1a6e0449311f67e7b","solicitation_number":"W912DW26QA068","parent_opportunity_id":"c61d49f4a3dd43e0aaed4f2250323faf"},{"index":3,"title":"Swinomish Eelgrass Survey","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-13T19:06:36.691Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5f7956d57eba46bc9e482b6b7ea7a4e6","solicitation_number":"W912DW26QA068","parent_opportunity_id":"c61d49f4a3dd43e0aaed4f2250323faf"},{"index":2,"title":"Swinomish Eelgrass Survey","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-10T21:52:41.309Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1b87658467964dd98d1ec2bbca35cca1","solicitation_number":"W912DW26QA068","parent_opportunity_id":"c61d49f4a3dd43e0aaed4f2250323faf"},{"index":1,"title":"Swinomish Eelgrass Survey","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-10T21:46:24.233Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"c61d49f4a3dd43e0aaed4f2250323faf","solicitation_number":"W912DW26QA068"}]}],"latest_notice_id":"fee554ddb6db45ebaf62d70cc344efab","first_type":"o","notices":[{"dates":{"posted":"2026-06-10","posted_at":"2026-06-10T21:52:41.309Z","created_at":"2026-06-10T21:48:58.701Z","modified_at":"2026-07-10T03:55:48.790Z","response_deadline":{"raw":"2026-06-24T12:00:00-07:00","utc":"2026-06-24T19:00:00Z","date":"2026-06-24","time":"12:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/1b87658467964dd98d1ec2bbca35cca1/view"},"naics":{"codes":["541620"],"primary":"541620"},"title":"Swinomish Eelgrass Survey","agency":{"office":{"code":"W912DW","name":"W071 ENDIST SEATTLE"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"98134-2329","city":"SEATTLE","state":"WA","country":"USA"},"organization_id":"100221304","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-07-09","archive_type":"auto15"},"history":[{"index":6,"title":"Solicitation: Swinomish Eelgrass Survey w/ Amendment 0001","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-15T20:57:18.159Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"fee554ddb6db45ebaf62d70cc344efab","solicitation_number":"W912DW26QA068","parent_opportunity_id":"c61d49f4a3dd43e0aaed4f2250323faf"},{"index":4,"title":"Solicitation: Swinomish Eelgrass Survey w/ Amendment 0001","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-15T18:43:24.457Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"54c89b81bfd643a1a6e0449311f67e7b","solicitation_number":"W912DW26QA068","parent_opportunity_id":"c61d49f4a3dd43e0aaed4f2250323faf"},{"index":3,"title":"Swinomish Eelgrass Survey","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-13T19:06:36.691Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5f7956d57eba46bc9e482b6b7ea7a4e6","solicitation_number":"W912DW26QA068","parent_opportunity_id":"c61d49f4a3dd43e0aaed4f2250323faf"},{"index":2,"title":"Swinomish Eelgrass Survey","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-10T21:52:41.309Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1b87658467964dd98d1ec2bbca35cca1","solicitation_number":"W912DW26QA068","parent_opportunity_id":"c61d49f4a3dd43e0aaed4f2250323faf"},{"index":1,"title":"Swinomish Eelgrass Survey","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-10T21:46:24.233Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"c61d49f4a3dd43e0aaed4f2250323faf","solicitation_number":"W912DW26QA068"}],"contacts":[{"name":"Della S. Overton","role":"primary","email":"della.s.overton@usace.army.mil","phone":"2067646170"},{"name":"Shemekia McMillan","role":"secondary","email":"Shemekia.R.Mcmillan@usace.army.mil"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"1b87658467964dd98d1ec2bbca35cca1","lineage_id":"c61d49f4a3dd43e0aaed4f2250323faf","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-02T11:05:42.472919467Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T16:22:53.920682Z","row_sha256":"79c9015542c1900eca5524fd3a038f09b4e01874d26778d50b552b9c261886d7","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-02T11:05:42.472919467Z","first_seen_at":"2026-09-16T16:22:53.920682Z"},"description":{"html":"<p><strong>PART 1 &ndash; GENERAL INFORMATION</strong></p>\n\n<p>This is a non-personnel services contract to provide technical services for an eelgrass survey at and next to the Swinomish Federal Navigation Channel (&ldquo;Swinomish Channel&rdquo;) near La Conner, WA (Figure 1). The U.S. Army Corps of Engineers (USACE) will not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers will be accountable solely to the Contractor who, in turn, is responsible to the USACE.</p>\n\n<p><strong>1.1 DESCRIPTION OF SERVICES / INTRODUCTION</strong><br />\nProvide all personnel, equipment, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform the tasks for an eelgrass survey as defined in this Performance Work Statement (PWS). Perform to the standards in this contract.</p>\n\n<p><strong>1.2 BACKGROUND</strong><br />\nCongress authorized the Swinomish Channel in the Rivers and Harbors Acts of 1892 and 1935. The channel has an authorized depth of -12 ft Mean Lower Low Water (MLLW) and has three jetties at its southern entrance. Periodic dredging is required to maintain authorized depth. Maintenance dredging historically occurs every four to six years. The most recent maintenance dredging event was completed in January 2025.</p>\n\n<p>The USACE is planning to perform two (2) feet of advance maintenance dredging (AMD) (to -14 ft MLLW + 2 ft overdepth) in the channel during future dredging events. The deeper dredging cut associated with AMD is expected to disturb a larger project footprint, disturbing approximately four (4) additional feet of width on either side of the existing area impacted by dredging. Side-slopes are 2H:1V (horizontal: vertical).</p>\n\n<p>The USACE is also planning a major maintenance project to repair and modify the south entrance jetties. The Major Maintenance Project requires dredging a temporary access lane between the navigation channel and the McGlinn Island Jetty so that equipment and materials can be barged to the jetty. The project area is shown in Figure 6.</p>\n\n<p>This PWS outlines tasks for the Contractor to assess the extent and abundance of submerged aquatic vegetation, particularly eelgrass (Zostera marina), that may be impacted by advance maintenance dredging and the major maintenance project.</p>\n\n<p><strong>1.3 SITE DESCRIPTION</strong><br />\nThe Swinomish Channel is an approximately 13-mile waterway connecting Skagit Bay and Padilla Bay in Skagit County, near La Conner, Washington (Figure 1). The channel features three jetties at its southern entrance: North Jetty, Goat Island Jetty, and the McGlinn Island Jetty. The authorized channel width is 100 feet with larger widths at turning basins and bends to facilitate safe vessel navigation, in accordance with Section 110 of the Rivers and Harbors Act of 1958.</p>\n\n<p>Figures 2, 3, 4, and 5 show inset areas of the Swinomish Channel.</p>\n\n<p>The McGlinn Island Jetty access lane project area (Figure 6) is a shallow mudflat bisected by a natural channel approximately 600 ft in length between the east McGlinn Island Jetty and the federal channel. Much of the project area is exposed at lower water levels; water depths are insufficient to allow all but shallow draft vessel access at high tide. Partially buried remnant logs are visible along the natural channel at low tides due to the area&rsquo;s historical use as a temporary log storage area.<br />\n<br />\n<strong>1.4 OBJECTIVES</strong><br />\nThe objectives for this contract are as follows:<br />\n&bull; Conduct a Zostera marina eelgrass survey in the study areas to document and delineate the extent of eelgrass (areal coverage);<br />\n&bull; Quantify Zostera marina eelgrass abundance (characterize the density of eelgrass meadows) within the study areas;<br />\n&bull; Provide high-quality spatial and tabular data suitable for impact assessment, regulatory agency review, and mitigation planning; and<br />\n&bull; Prepare a comprehensive data report that documents all survey methods, data, and findings in accordance with USACE guidance.</p>\n\n<p><strong>1.5 SCOPE</strong><br />\nPerform an eelgrass survey in and around the Swinomish Channel. The services required under this contract are detailed in Part 5 &ndash; Specific Tasks.</p>\n\n<p><strong>1.6 PERIOD OF PERFORMANCE (POP)</strong><br />\nThe Period of Performance shall be nine (9) months (270 days) from time of award to contract completion. Field survey activities shall be conducted between July 1 and August 30, when eelgrass is at peak biomass in Washington.</p>\n\n<p><strong>1.7 GENERAL INFORMATION</strong></p>\n\n<p><strong>1.7.1 Quality Control Plan</strong><br />\nDevelop and maintain an effective Quality Control Plan (QCP) to ensure services are performed in accordance with this PWS. Prepare and submit the QCP in accordance with Part 5 Specific Tasks.</p>\n\n<p><strong>1.7.2 Quality Assurance</strong><br />\nThe USACE will evaluate the Contractor&rsquo;s performance under this contract in accordance with the Performance Requirements Summary (See Section 7.2). The Performance Requirements Summary defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).</p>\n\n<p>On the request of the Contracting Officer&rsquo;s Representative (COR) or any inspector, provide the use of boats, boatmen, laborers, and material forming a part of the ordinary and usual equipment of the sampling team as may be reasonably necessary to inspect the sampling work.</p>\n\n<p><strong>1.7.3 Schedule</strong><br />\nSubmit a project schedule within ten (10) business days after the date of award. The schedule should target sampling with sufficient time for completion of all CLINs. Update the project schedule, at minimum, monthly. Include an updated schedule in all Pay Requests.</p>\n\n<p><strong>1.7.3.1 USACE Review</strong><br />\nInclude two (2) weeks for USACE review of any and all contract deliverables.</p>\n\n<p><strong>1.7.3.2 Recognized Holidays</strong><br />\nThe Contractor is not required to work on Federal Holidays:<br />\nNew Year&rsquo;s Day<br />\nMartin Luther King Jr.&rsquo;s Birthday<br />\nPresident&rsquo;s Day<br />\nMemorial Day<br />\nIndependence Day<br />\nJuneteenth<br />\nLabor Day<br />\nIndigenous Peoples Day (Columbus Day)<br />\nVeterans Day<br />\nThanksgiving Day<br />\nChristmas Day</p>\n\n<p><strong>1.7.3.3 Hours of Operation</strong><br />\nThe Contractor is responsible for being responsive to communication from USACE between the hours of 8:00 a.m. and 4:00 p.m. Pacific Time, Monday through Friday, except Federal holidays or when the USACE facility is closed due to local or national emergencies, administrative closings, or similar USACE-directed facility closings.</p>\n\n<p><strong>1.7.4 Place of Performance</strong><br />\nThe services described in this PWS will be performed in and around the Swinomish Channel and at the Contractor&rsquo;s offices.</p>\n\n<p><strong>1.7.5 Type of Contract</strong><br />\nThe USACE will award a performance-based Firm Fixed Price Contract.</p>\n\n<p><strong>1.7.6 Security Requirements</strong><br />\nThere are no special security requirements. Work will not be conducted at a federal facility of any kind; will not involve the use of USACE equipment or vessels; and will not require access to USACE automated information systems. Refer to Section 1.7.11 for required pre-screening procedures for Contractor key personnel.</p>\n\n<p><u><strong>PLEASE SEE ATTACHED PWS, EVALUATION CRITERIA, &amp; WAGE DETERMINATION for specific information and criteria for this acquisition.&nbsp;</strong></u></p>","text":"PART 1 – GENERAL INFORMATION\n\nThis is a non-personnel services contract to provide technical services for an eelgrass survey at and next to the Swinomish Federal Navigation Channel (“Swinomish Channel”) near La Conner, WA (Figure 1). The U.S. Army Corps of Engineers (USACE) will not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers will be accountable solely to the Contractor who, in turn, is responsible to the USACE.\n\n1.1 DESCRIPTION OF SERVICES / INTRODUCTION\n\nProvide all personnel, equipment, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform the tasks for an eelgrass survey as defined in this Performance Work Statement (PWS). Perform to the standards in this contract.\n\n1.2 BACKGROUND\n\nCongress authorized the Swinomish Channel in the Rivers and Harbors Acts of 1892 and 1935. The channel has an authorized depth of -12 ft Mean Lower Low Water (MLLW) and has three jetties at its southern entrance. Periodic dredging is required to maintain authorized depth. Maintenance dredging historically occurs every four to six years. The most recent maintenance dredging event was completed in January 2025.\n\nThe USACE is planning to perform two (2) feet of advance maintenance dredging (AMD) (to -14 ft MLLW + 2 ft overdepth) in the channel during future dredging events. The deeper dredging cut associated with AMD is expected to disturb a larger project footprint, disturbing approximately four (4) additional feet of width on either side of the existing area impacted by dredging. Side-slopes are 2H:1V (horizontal: vertical).\n\nThe USACE is also planning a major maintenance project to repair and modify the south entrance jetties. The Major Maintenance Project requires dredging a temporary access lane between the navigation channel and the McGlinn Island Jetty so that equipment and materials can be barged to the jetty. The project area is shown in Figure 6.\n\nThis PWS outlines tasks for the Contractor to assess the extent and abundance of submerged aquatic vegetation, particularly eelgrass (Zostera marina), that may be impacted by advance maintenance dredging and the major maintenance project.\n\n1.3 SITE DESCRIPTION\n\nThe Swinomish Channel is an approximately 13-mile waterway connecting Skagit Bay and Padilla Bay in Skagit County, near La Conner, Washington (Figure 1). The channel features three jetties at its southern entrance: North Jetty, Goat Island Jetty, and the McGlinn Island Jetty. The authorized channel width is 100 feet with larger widths at turning basins and bends to facilitate safe vessel navigation, in accordance with Section 110 of the Rivers and Harbors Act of 1958.\n\nFigures 2, 3, 4, and 5 show inset areas of the Swinomish Channel.\n\nThe McGlinn Island Jetty access lane project area (Figure 6) is a shallow mudflat bisected by a natural channel approximately 600 ft in length between the east McGlinn Island Jetty and the federal channel. Much of the project area is exposed at lower water levels; water depths are insufficient to allow all but shallow draft vessel access at high tide. Partially buried remnant logs are visible along the natural channel at low tides due to the area’s historical use as a temporary log storage area.\n\n1.4 OBJECTIVES\n\nThe objectives for this contract are as follows:\n\n• Conduct a Zostera marina eelgrass survey in the study areas to document and delineate the extent of eelgrass (areal coverage);\n\n• Quantify Zostera marina eelgrass abundance (characterize the density of eelgrass meadows) within the study areas;\n\n• Provide high-quality spatial and tabular data suitable for impact assessment, regulatory agency review, and mitigation planning; and\n\n• Prepare a comprehensive data report that documents all survey methods, data, and findings in accordance with USACE guidance.\n\n1.5 SCOPE\n\nPerform an eelgrass survey in and around the Swinomish Channel. The services required under this contract are detailed in Part 5 – Specific Tasks.\n\n1.6 PERIOD OF PERFORMANCE (POP)\n\nThe Period of Performance shall be nine (9) months (270 days) from time of award to contract completion. Field survey activities shall be conducted between July 1 and August 30, when eelgrass is at peak biomass in Washington.\n\n1.7 GENERAL INFORMATION\n\n1.7.1 Quality Control Plan\n\nDevelop and maintain an effective Quality Control Plan (QCP) to ensure services are performed in accordance with this PWS. Prepare and submit the QCP in accordance with Part 5 Specific Tasks.\n\n1.7.2 Quality Assurance\n\nThe USACE will evaluate the Contractor’s performance under this contract in accordance with the Performance Requirements Summary (See Section 7.2). The Performance Requirements Summary defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).\n\nOn the request of the Contracting Officer’s Representative (COR) or any inspector, provide the use of boats, boatmen, laborers, and material forming a part of the ordinary and usual equipment of the sampling team as may be reasonably necessary to inspect the sampling work.\n\n1.7.3 Schedule\n\nSubmit a project schedule within ten (10) business days after the date of award. The schedule should target sampling with sufficient time for completion of all CLINs. Update the project schedule, at minimum, monthly. Include an updated schedule in all Pay Requests.\n\n1.7.3.1 USACE Review\n\nInclude two (2) weeks for USACE review of any and all contract deliverables.\n\n1.7.3.2 Recognized Holidays\n\nThe Contractor is not required to work on Federal Holidays:\n\nNew Year’s Day\n\nMartin Luther King Jr.’s Birthday\n\nPresident’s Day\n\nMemorial Day\n\nIndependence Day\n\nJuneteenth\n\nLabor Day\n\nIndigenous Peoples Day (Columbus Day)\n\nVeterans Day\n\nThanksgiving Day\n\nChristmas Day\n\n1.7.3.3 Hours of Operation\n\nThe Contractor is responsible for being responsive to communication from USACE between the hours of 8:00 a.m. and 4:00 p.m. Pacific Time, Monday through Friday, except Federal holidays or when the USACE facility is closed due to local or national emergencies, administrative closings, or similar USACE-directed facility closings.\n\n1.7.4 Place of Performance\n\nThe services described in this PWS will be performed in and around the Swinomish Channel and at the Contractor’s offices.\n\n1.7.5 Type of Contract\n\nThe USACE will award a performance-based Firm Fixed Price Contract.\n\n1.7.6 Security Requirements\n\nThere are no special security requirements. Work will not be conducted at a federal facility of any kind; will not involve the use of USACE equipment or vessels; and will not require access to USACE automated information systems. Refer to Section 1.7.11 for required pre-screening procedures for Contractor key personnel.\n\nPLEASE SEE ATTACHED PWS, EVALUATION CRITERIA, & WAGE DETERMINATION for specific information and criteria for this acquisition.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W912DW26QA068","place_of_performance":{"city":{"code":"36780","name":"La Conner"},"state":{"code":"WA","name":"Washington"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"B510"},{"dates":{"posted":"2026-06-10","posted_at":"2026-06-10T21:46:24.233Z","created_at":"2026-06-10T21:15:24.067Z","modified_at":"2026-07-10T03:55:48.790Z","response_deadline":{"raw":"2026-06-24T12:00:00-07:00","utc":"2026-06-24T19:00:00Z","date":"2026-06-24","time":"12:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/c61d49f4a3dd43e0aaed4f2250323faf/view"},"naics":{"codes":["541620"],"primary":"541620"},"title":"Swinomish Eelgrass Survey","agency":{"office":{"code":"W912DW","name":"W071 ENDIST SEATTLE"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"98134-2329","city":"SEATTLE","state":"WA","country":"USA"},"organization_id":"100221304","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-07-09","archive_type":"auto15"},"history":[{"index":6,"title":"Solicitation: Swinomish Eelgrass Survey w/ Amendment 0001","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-15T20:57:18.159Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"fee554ddb6db45ebaf62d70cc344efab","solicitation_number":"W912DW26QA068","parent_opportunity_id":"c61d49f4a3dd43e0aaed4f2250323faf"},{"index":4,"title":"Solicitation: Swinomish Eelgrass Survey w/ Amendment 0001","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-15T18:43:24.457Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"54c89b81bfd643a1a6e0449311f67e7b","solicitation_number":"W912DW26QA068","parent_opportunity_id":"c61d49f4a3dd43e0aaed4f2250323faf"},{"index":3,"title":"Swinomish Eelgrass Survey","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-13T19:06:36.691Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5f7956d57eba46bc9e482b6b7ea7a4e6","solicitation_number":"W912DW26QA068","parent_opportunity_id":"c61d49f4a3dd43e0aaed4f2250323faf"},{"index":2,"title":"Swinomish Eelgrass Survey","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-10T21:52:41.309Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1b87658467964dd98d1ec2bbca35cca1","solicitation_number":"W912DW26QA068","parent_opportunity_id":"c61d49f4a3dd43e0aaed4f2250323faf"},{"index":1,"title":"Swinomish Eelgrass Survey","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-10T21:46:24.233Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"c61d49f4a3dd43e0aaed4f2250323faf","solicitation_number":"W912DW26QA068"}],"contacts":[{"name":"Della S. Overton","role":"primary","email":"della.s.overton@usace.army.mil","phone":"2067646170"},{"name":"Shemekia McMillan","role":"secondary","email":"Shemekia.R.Mcmillan@usace.army.mil"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"c61d49f4a3dd43e0aaed4f2250323faf","lineage_id":"c61d49f4a3dd43e0aaed4f2250323faf","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-02T12:04:43.595998249Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T16:22:53.920682Z","row_sha256":"b136e07f6b6b96f4c65e7a8f039a0dd6f369722e76cc1cc86e61dc4aeec3bf28","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-02T12:04:43.595998249Z","first_seen_at":"2026-09-16T16:22:53.920682Z"},"description":{"html":"<p><strong>PART 1 &ndash; GENERAL INFORMATION</strong></p>\n\n<p>This is a non-personnel services contract to provide technical services for an eelgrass survey at and next to the Swinomish Federal Navigation Channel (&ldquo;Swinomish Channel&rdquo;) near La Conner, WA (Figure 1). The U.S. Army Corps of Engineers (USACE) will not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers will be accountable solely to the Contractor who, in turn, is responsible to the USACE.</p>\n\n<p><strong>1.1 DESCRIPTION OF SERVICES / INTRODUCTION</strong><br />\nProvide all personnel, equipment, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform the tasks for an eelgrass survey as defined in this Performance Work Statement (PWS). Perform to the standards in this contract.</p>\n\n<p><strong>1.2 BACKGROUND</strong><br />\nCongress authorized the Swinomish Channel in the Rivers and Harbors Acts of 1892 and 1935. The channel has an authorized depth of -12 ft Mean Lower Low Water (MLLW) and has three jetties at its southern entrance. Periodic dredging is required to maintain authorized depth. Maintenance dredging historically occurs every four to six years. The most recent maintenance dredging event was completed in January 2025.</p>\n\n<p>The USACE is planning to perform two (2) feet of advance maintenance dredging (AMD) (to -14 ft MLLW + 2 ft overdepth) in the channel during future dredging events. The deeper dredging cut associated with AMD is expected to disturb a larger project footprint, disturbing approximately four (4) additional feet of width on either side of the existing area impacted by dredging. Side-slopes are 2H:1V (horizontal: vertical).</p>\n\n<p>The USACE is also planning a major maintenance project to repair and modify the south entrance jetties. The Major Maintenance Project requires dredging a temporary access lane between the navigation channel and the McGlinn Island Jetty so that equipment and materials can be barged to the jetty. The project area is shown in Figure 6.</p>\n\n<p>This PWS outlines tasks for the Contractor to assess the extent and abundance of submerged aquatic vegetation, particularly eelgrass (Zostera marina), that may be impacted by advance maintenance dredging and the major maintenance project.</p>\n\n<p><strong>1.3 SITE DESCRIPTION</strong><br />\nThe Swinomish Channel is an approximately 13-mile waterway connecting Skagit Bay and Padilla Bay in Skagit County, near La Conner, Washington (Figure 1). The channel features three jetties at its southern entrance: North Jetty, Goat Island Jetty, and the McGlinn Island Jetty. The authorized channel width is 100 feet with larger widths at turning basins and bends to facilitate safe vessel navigation, in accordance with Section 110 of the Rivers and Harbors Act of 1958.</p>\n\n<p>Figures 2, 3, 4, and 5 show inset areas of the Swinomish Channel.</p>\n\n<p>The McGlinn Island Jetty access lane project area (Figure 6) is a shallow mudflat bisected by a natural channel approximately 600 ft in length between the east McGlinn Island Jetty and the federal channel. Much of the project area is exposed at lower water levels; water depths are insufficient to allow all but shallow draft vessel access at high tide. Partially buried remnant logs are visible along the natural channel at low tides due to the area&rsquo;s historical use as a temporary log storage area.<br />\n<br />\n<strong>1.4 OBJECTIVES</strong><br />\nThe objectives for this contract are as follows:<br />\n&bull; Conduct a Zostera marina eelgrass survey in the study areas to document and delineate the extent of eelgrass (areal coverage);<br />\n&bull; Quantify Zostera marina eelgrass abundance (characterize the density of eelgrass meadows) within the study areas;<br />\n&bull; Provide high-quality spatial and tabular data suitable for impact assessment, regulatory agency review, and mitigation planning; and<br />\n&bull; Prepare a comprehensive data report that documents all survey methods, data, and findings in accordance with USACE guidance.</p>\n\n<p><strong>1.5 SCOPE</strong><br />\nPerform an eelgrass survey in and around the Swinomish Channel. The services required under this contract are detailed in Part 5 &ndash; Specific Tasks.</p>\n\n<p><strong>1.6 PERIOD OF PERFORMANCE (POP)</strong><br />\nThe Period of Performance shall be nine (9) months (270 days) from time of award to contract completion. Field survey activities shall be conducted between July 1 and August 30, when eelgrass is at peak biomass in Washington.</p>\n\n<p><strong>1.7 GENERAL INFORMATION</strong></p>\n\n<p><strong>1.7.1 Quality Control Plan</strong><br />\nDevelop and maintain an effective Quality Control Plan (QCP) to ensure services are performed in accordance with this PWS. Prepare and submit the QCP in accordance with Part 5 Specific Tasks.</p>\n\n<p><strong>1.7.2 Quality Assurance</strong><br />\nThe USACE will evaluate the Contractor&rsquo;s performance under this contract in accordance with the Performance Requirements Summary (See Section 7.2). The Performance Requirements Summary defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).</p>\n\n<p>On the request of the Contracting Officer&rsquo;s Representative (COR) or any inspector, provide the use of boats, boatmen, laborers, and material forming a part of the ordinary and usual equipment of the sampling team as may be reasonably necessary to inspect the sampling work.</p>\n\n<p><strong>1.7.3 Schedule</strong><br />\nSubmit a project schedule within ten (10) business days after the date of award. The schedule should target sampling with sufficient time for completion of all CLINs. Update the project schedule, at minimum, monthly. Include an updated schedule in all Pay Requests.</p>\n\n<p><strong>1.7.3.1 USACE Review</strong><br />\nInclude two (2) weeks for USACE review of any and all contract deliverables.</p>\n\n<p><strong>1.7.3.2 Recognized Holidays</strong><br />\nThe Contractor is not required to work on Federal Holidays:<br />\nNew Year&rsquo;s Day<br />\nMartin Luther King Jr.&rsquo;s Birthday<br />\nPresident&rsquo;s Day<br />\nMemorial Day<br />\nIndependence Day<br />\nJuneteenth<br />\nLabor Day<br />\nIndigenous Peoples Day (Columbus Day)<br />\nVeterans Day<br />\nThanksgiving Day<br />\nChristmas Day</p>\n\n<p><strong>1.7.3.3 Hours of Operation</strong><br />\nThe Contractor is responsible for being responsive to communication from USACE between the hours of 8:00 a.m. and 4:00 p.m. Pacific Time, Monday through Friday, except Federal holidays or when the USACE facility is closed due to local or national emergencies, administrative closings, or similar USACE-directed facility closings.</p>\n\n<p><strong>1.7.4 Place of Performance</strong><br />\nThe services described in this PWS will be performed in and around the Swinomish Channel and at the Contractor&rsquo;s offices.</p>\n\n<p><strong>1.7.5 Type of Contract</strong><br />\nThe USACE will award a performance-based Firm Fixed Price Contract.</p>\n\n<p><strong>1.7.6 Security Requirements</strong><br />\nThere are no special security requirements. Work will not be conducted at a federal facility of any kind; will not involve the use of USACE equipment or vessels; and will not require access to USACE automated information systems. Refer to Section 1.7.11 for required pre-screening procedures for Contractor key personnel.</p>\n\n<p><u><strong>PLEASE SEE ATTACHED PWS, EVALUATION CRITERIA, &amp; WAGE DETERMINATION for specific information and criteria for this acquisition.&nbsp;</strong></u></p>","text":"PART 1 – GENERAL INFORMATION\n\nThis is a non-personnel services contract to provide technical services for an eelgrass survey at and next to the Swinomish Federal Navigation Channel (“Swinomish Channel”) near La Conner, WA (Figure 1). The U.S. Army Corps of Engineers (USACE) will not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers will be accountable solely to the Contractor who, in turn, is responsible to the USACE.\n\n1.1 DESCRIPTION OF SERVICES / INTRODUCTION\n\nProvide all personnel, equipment, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform the tasks for an eelgrass survey as defined in this Performance Work Statement (PWS). Perform to the standards in this contract.\n\n1.2 BACKGROUND\n\nCongress authorized the Swinomish Channel in the Rivers and Harbors Acts of 1892 and 1935. The channel has an authorized depth of -12 ft Mean Lower Low Water (MLLW) and has three jetties at its southern entrance. Periodic dredging is required to maintain authorized depth. Maintenance dredging historically occurs every four to six years. The most recent maintenance dredging event was completed in January 2025.\n\nThe USACE is planning to perform two (2) feet of advance maintenance dredging (AMD) (to -14 ft MLLW + 2 ft overdepth) in the channel during future dredging events. The deeper dredging cut associated with AMD is expected to disturb a larger project footprint, disturbing approximately four (4) additional feet of width on either side of the existing area impacted by dredging. Side-slopes are 2H:1V (horizontal: vertical).\n\nThe USACE is also planning a major maintenance project to repair and modify the south entrance jetties. The Major Maintenance Project requires dredging a temporary access lane between the navigation channel and the McGlinn Island Jetty so that equipment and materials can be barged to the jetty. The project area is shown in Figure 6.\n\nThis PWS outlines tasks for the Contractor to assess the extent and abundance of submerged aquatic vegetation, particularly eelgrass (Zostera marina), that may be impacted by advance maintenance dredging and the major maintenance project.\n\n1.3 SITE DESCRIPTION\n\nThe Swinomish Channel is an approximately 13-mile waterway connecting Skagit Bay and Padilla Bay in Skagit County, near La Conner, Washington (Figure 1). The channel features three jetties at its southern entrance: North Jetty, Goat Island Jetty, and the McGlinn Island Jetty. The authorized channel width is 100 feet with larger widths at turning basins and bends to facilitate safe vessel navigation, in accordance with Section 110 of the Rivers and Harbors Act of 1958.\n\nFigures 2, 3, 4, and 5 show inset areas of the Swinomish Channel.\n\nThe McGlinn Island Jetty access lane project area (Figure 6) is a shallow mudflat bisected by a natural channel approximately 600 ft in length between the east McGlinn Island Jetty and the federal channel. Much of the project area is exposed at lower water levels; water depths are insufficient to allow all but shallow draft vessel access at high tide. Partially buried remnant logs are visible along the natural channel at low tides due to the area’s historical use as a temporary log storage area.\n\n1.4 OBJECTIVES\n\nThe objectives for this contract are as follows:\n\n• Conduct a Zostera marina eelgrass survey in the study areas to document and delineate the extent of eelgrass (areal coverage);\n\n• Quantify Zostera marina eelgrass abundance (characterize the density of eelgrass meadows) within the study areas;\n\n• Provide high-quality spatial and tabular data suitable for impact assessment, regulatory agency review, and mitigation planning; and\n\n• Prepare a comprehensive data report that documents all survey methods, data, and findings in accordance with USACE guidance.\n\n1.5 SCOPE\n\nPerform an eelgrass survey in and around the Swinomish Channel. The services required under this contract are detailed in Part 5 – Specific Tasks.\n\n1.6 PERIOD OF PERFORMANCE (POP)\n\nThe Period of Performance shall be nine (9) months (270 days) from time of award to contract completion. Field survey activities shall be conducted between July 1 and August 30, when eelgrass is at peak biomass in Washington.\n\n1.7 GENERAL INFORMATION\n\n1.7.1 Quality Control Plan\n\nDevelop and maintain an effective Quality Control Plan (QCP) to ensure services are performed in accordance with this PWS. Prepare and submit the QCP in accordance with Part 5 Specific Tasks.\n\n1.7.2 Quality Assurance\n\nThe USACE will evaluate the Contractor’s performance under this contract in accordance with the Performance Requirements Summary (See Section 7.2). The Performance Requirements Summary defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).\n\nOn the request of the Contracting Officer’s Representative (COR) or any inspector, provide the use of boats, boatmen, laborers, and material forming a part of the ordinary and usual equipment of the sampling team as may be reasonably necessary to inspect the sampling work.\n\n1.7.3 Schedule\n\nSubmit a project schedule within ten (10) business days after the date of award. The schedule should target sampling with sufficient time for completion of all CLINs. Update the project schedule, at minimum, monthly. Include an updated schedule in all Pay Requests.\n\n1.7.3.1 USACE Review\n\nInclude two (2) weeks for USACE review of any and all contract deliverables.\n\n1.7.3.2 Recognized Holidays\n\nThe Contractor is not required to work on Federal Holidays:\n\nNew Year’s Day\n\nMartin Luther King Jr.’s Birthday\n\nPresident’s Day\n\nMemorial Day\n\nIndependence Day\n\nJuneteenth\n\nLabor Day\n\nIndigenous Peoples Day (Columbus Day)\n\nVeterans Day\n\nThanksgiving Day\n\nChristmas Day\n\n1.7.3.3 Hours of Operation\n\nThe Contractor is responsible for being responsive to communication from USACE between the hours of 8:00 a.m. and 4:00 p.m. Pacific Time, Monday through Friday, except Federal holidays or when the USACE facility is closed due to local or national emergencies, administrative closings, or similar USACE-directed facility closings.\n\n1.7.4 Place of Performance\n\nThe services described in this PWS will be performed in and around the Swinomish Channel and at the Contractor’s offices.\n\n1.7.5 Type of Contract\n\nThe USACE will award a performance-based Firm Fixed Price Contract.\n\n1.7.6 Security Requirements\n\nThere are no special security requirements. Work will not be conducted at a federal facility of any kind; will not involve the use of USACE equipment or vessels; and will not require access to USACE automated information systems. Refer to Section 1.7.11 for required pre-screening procedures for Contractor key personnel.\n\nPLEASE SEE ATTACHED PWS, EVALUATION CRITERIA, & WAGE DETERMINATION for specific information and criteria for this acquisition.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W912DW26QA068","place_of_performance":{"city":{"code":"36780","name":"La Conner"},"state":{"code":"WA","name":"Washington"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"B510"},{"dates":{"posted":"2026-06-13","posted_at":"2026-06-13T19:06:36.691Z","created_at":"2026-06-13T19:00:07.779Z","modified_at":"2026-07-10T03:55:48.790Z","response_deadline":{"raw":"2026-06-24T12:00:00-07:00","utc":"2026-06-24T19:00:00Z","date":"2026-06-24","time":"12:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/5f7956d57eba46bc9e482b6b7ea7a4e6/view"},"naics":{"codes":["541620"],"primary":"541620"},"title":"Swinomish Eelgrass Survey","agency":{"office":{"code":"W912DW","name":"W071 ENDIST SEATTLE"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"98134-2329","city":"SEATTLE","state":"WA","country":"USA"},"organization_id":"100221304","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-07-09","archive_type":"auto15"},"history":[{"index":6,"title":"Solicitation: Swinomish Eelgrass Survey w/ Amendment 0001","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-15T20:57:18.159Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"fee554ddb6db45ebaf62d70cc344efab","solicitation_number":"W912DW26QA068","parent_opportunity_id":"c61d49f4a3dd43e0aaed4f2250323faf"},{"index":4,"title":"Solicitation: Swinomish Eelgrass Survey w/ Amendment 0001","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-15T18:43:24.457Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"54c89b81bfd643a1a6e0449311f67e7b","solicitation_number":"W912DW26QA068","parent_opportunity_id":"c61d49f4a3dd43e0aaed4f2250323faf"},{"index":3,"title":"Swinomish Eelgrass Survey","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-13T19:06:36.691Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5f7956d57eba46bc9e482b6b7ea7a4e6","solicitation_number":"W912DW26QA068","parent_opportunity_id":"c61d49f4a3dd43e0aaed4f2250323faf"},{"index":2,"title":"Swinomish Eelgrass Survey","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-10T21:52:41.309Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1b87658467964dd98d1ec2bbca35cca1","solicitation_number":"W912DW26QA068","parent_opportunity_id":"c61d49f4a3dd43e0aaed4f2250323faf"},{"index":1,"title":"Swinomish Eelgrass Survey","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-10T21:46:24.233Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"c61d49f4a3dd43e0aaed4f2250323faf","solicitation_number":"W912DW26QA068"}],"contacts":[{"name":"Della S. Overton","role":"primary","email":"della.s.overton@usace.army.mil","phone":"2067646170"},{"name":"Shemekia McMillan","role":"secondary","email":"Shemekia.R.Mcmillan@usace.army.mil"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"5f7956d57eba46bc9e482b6b7ea7a4e6","lineage_id":"c61d49f4a3dd43e0aaed4f2250323faf","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-02T08:40:15.477542706Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T16:22:53.920682Z","row_sha256":"42340ff4c3706f7cfe273be8b8d1ef2b708c1382fa91a134275fa07bcb861ade","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-02T08:40:15.477542706Z","first_seen_at":"2026-09-16T16:22:53.920682Z"},"description":{"html":"<p><strong>UPDATED EVALUATION CRITERIA PUBLISHED ON 13 June 2026 (In Updated Solicitation and Evaluation Criteria)</strong></p>\n\n<p><strong>PART 1 &ndash; GENERAL INFORMATION</strong></p>\n\n<p>This is a non-personnel services contract to provide technical services for an eelgrass survey at and next to the Swinomish Federal Navigation Channel (&ldquo;Swinomish Channel&rdquo;) near La Conner, WA (Figure 1). The U.S. Army Corps of Engineers (USACE) will not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers will be accountable solely to the Contractor who, in turn, is responsible to the USACE.</p>\n\n<p><strong>1.1 DESCRIPTION OF SERVICES / INTRODUCTION</strong><br />\nProvide all personnel, equipment, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform the tasks for an eelgrass survey as defined in this Performance Work Statement (PWS). Perform to the standards in this contract.</p>\n\n<p><strong>1.2 BACKGROUND</strong><br />\nCongress authorized the Swinomish Channel in the Rivers and Harbors Acts of 1892 and 1935. The channel has an authorized depth of -12 ft Mean Lower Low Water (MLLW) and has three jetties at its southern entrance. Periodic dredging is required to maintain authorized depth. Maintenance dredging historically occurs every four to six years. The most recent maintenance dredging event was completed in January 2025.</p>\n\n<p>The USACE is planning to perform two (2) feet of advance maintenance dredging (AMD) (to -14 ft MLLW + 2 ft overdepth) in the channel during future dredging events. The deeper dredging cut associated with AMD is expected to disturb a larger project footprint, disturbing approximately four (4) additional feet of width on either side of the existing area impacted by dredging. Side-slopes are 2H:1V (horizontal: vertical).</p>\n\n<p>The USACE is also planning a major maintenance project to repair and modify the south entrance jetties. The Major Maintenance Project requires dredging a temporary access lane between the navigation channel and the McGlinn Island Jetty so that equipment and materials can be barged to the jetty. The project area is shown in Figure 6.</p>\n\n<p>This PWS outlines tasks for the Contractor to assess the extent and abundance of submerged aquatic vegetation, particularly eelgrass (Zostera marina), that may be impacted by advance maintenance dredging and the major maintenance project.</p>\n\n<p><strong>1.3 SITE DESCRIPTION</strong><br />\nThe Swinomish Channel is an approximately 13-mile waterway connecting Skagit Bay and Padilla Bay in Skagit County, near La Conner, Washington (Figure 1). The channel features three jetties at its southern entrance: North Jetty, Goat Island Jetty, and the McGlinn Island Jetty. The authorized channel width is 100 feet with larger widths at turning basins and bends to facilitate safe vessel navigation, in accordance with Section 110 of the Rivers and Harbors Act of 1958.</p>\n\n<p>Figures 2, 3, 4, and 5 show inset areas of the Swinomish Channel.</p>\n\n<p>The McGlinn Island Jetty access lane project area (Figure 6) is a shallow mudflat bisected by a natural channel approximately 600 ft in length between the east McGlinn Island Jetty and the federal channel. Much of the project area is exposed at lower water levels; water depths are insufficient to allow all but shallow draft vessel access at high tide. Partially buried remnant logs are visible along the natural channel at low tides due to the area&rsquo;s historical use as a temporary log storage area.<br />\n<br />\n<strong>1.4 OBJECTIVES</strong><br />\nThe objectives for this contract are as follows:<br />\n&bull; Conduct a Zostera marina eelgrass survey in the study areas to document and delineate the extent of eelgrass (areal coverage);<br />\n&bull; Quantify Zostera marina eelgrass abundance (characterize the density of eelgrass meadows) within the study areas;<br />\n&bull; Provide high-quality spatial and tabular data suitable for impact assessment, regulatory agency review, and mitigation planning; and<br />\n&bull; Prepare a comprehensive data report that documents all survey methods, data, and findings in accordance with USACE guidance.</p>\n\n<p><strong>1.5 SCOPE</strong><br />\nPerform an eelgrass survey in and around the Swinomish Channel. The services required under this contract are detailed in Part 5 &ndash; Specific Tasks.</p>\n\n<p><strong>1.6 PERIOD OF PERFORMANCE (POP)</strong><br />\nThe Period of Performance shall be nine (9) months (270 days) from time of award to contract completion. Field survey activities shall be conducted between July 1 and August 30, when eelgrass is at peak biomass in Washington.</p>\n\n<p><strong>1.7 GENERAL INFORMATION</strong></p>\n\n<p><strong>1.7.1 Quality Control Plan</strong><br />\nDevelop and maintain an effective Quality Control Plan (QCP) to ensure services are performed in accordance with this PWS. Prepare and submit the QCP in accordance with Part 5 Specific Tasks.</p>\n\n<p><strong>1.7.2 Quality Assurance</strong><br />\nThe USACE will evaluate the Contractor&rsquo;s performance under this contract in accordance with the Performance Requirements Summary (See Section 7.2). The Performance Requirements Summary defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).</p>\n\n<p>On the request of the Contracting Officer&rsquo;s Representative (COR) or any inspector, provide the use of boats, boatmen, laborers, and material forming a part of the ordinary and usual equipment of the sampling team as may be reasonably necessary to inspect the sampling work.</p>\n\n<p><strong>1.7.3 Schedule</strong><br />\nSubmit a project schedule within ten (10) business days after the date of award. The schedule should target sampling with sufficient time for completion of all CLINs. Update the project schedule, at minimum, monthly. Include an updated schedule in all Pay Requests.</p>\n\n<p><strong>1.7.3.1 USACE Review</strong><br />\nInclude two (2) weeks for USACE review of any and all contract deliverables.</p>\n\n<p><strong>1.7.3.2 Recognized Holidays</strong><br />\nThe Contractor is not required to work on Federal Holidays:<br />\nNew Year&rsquo;s Day<br />\nMartin Luther King Jr.&rsquo;s Birthday<br />\nPresident&rsquo;s Day<br />\nMemorial Day<br />\nIndependence Day<br />\nJuneteenth<br />\nLabor Day<br />\nIndigenous Peoples Day (Columbus Day)<br />\nVeterans Day<br />\nThanksgiving Day<br />\nChristmas Day</p>\n\n<p><strong>1.7.3.3 Hours of Operation</strong><br />\nThe Contractor is responsible for being responsive to communication from USACE between the hours of 8:00 a.m. and 4:00 p.m. Pacific Time, Monday through Friday, except Federal holidays or when the USACE facility is closed due to local or national emergencies, administrative closings, or similar USACE-directed facility closings.</p>\n\n<p><strong>1.7.4 Place of Performance</strong><br />\nThe services described in this PWS will be performed in and around the Swinomish Channel and at the Contractor&rsquo;s offices.</p>\n\n<p><strong>1.7.5 Type of Contract</strong><br />\nThe USACE will award a performance-based Firm Fixed Price Contract.</p>\n\n<p><strong>1.7.6 Security Requirements</strong><br />\nThere are no special security requirements. Work will not be conducted at a federal facility of any kind; will not involve the use of USACE equipment or vessels; and will not require access to USACE automated information systems. Refer to Section 1.7.11 for required pre-screening procedures for Contractor key personnel.</p>\n\n<p><u><strong>PLEASE SEE ATTACHED PWS, EVALUATION CRITERIA, &amp; WAGE DETERMINATION for specific information and criteria for this acquisition.&nbsp;</strong></u></p>","text":"UPDATED EVALUATION CRITERIA PUBLISHED ON 13 June 2026 (In Updated Solicitation and Evaluation Criteria)\n\nPART 1 – GENERAL INFORMATION\n\nThis is a non-personnel services contract to provide technical services for an eelgrass survey at and next to the Swinomish Federal Navigation Channel (“Swinomish Channel”) near La Conner, WA (Figure 1). The U.S. Army Corps of Engineers (USACE) will not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers will be accountable solely to the Contractor who, in turn, is responsible to the USACE.\n\n1.1 DESCRIPTION OF SERVICES / INTRODUCTION\n\nProvide all personnel, equipment, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform the tasks for an eelgrass survey as defined in this Performance Work Statement (PWS). Perform to the standards in this contract.\n\n1.2 BACKGROUND\n\nCongress authorized the Swinomish Channel in the Rivers and Harbors Acts of 1892 and 1935. The channel has an authorized depth of -12 ft Mean Lower Low Water (MLLW) and has three jetties at its southern entrance. Periodic dredging is required to maintain authorized depth. Maintenance dredging historically occurs every four to six years. The most recent maintenance dredging event was completed in January 2025.\n\nThe USACE is planning to perform two (2) feet of advance maintenance dredging (AMD) (to -14 ft MLLW + 2 ft overdepth) in the channel during future dredging events. The deeper dredging cut associated with AMD is expected to disturb a larger project footprint, disturbing approximately four (4) additional feet of width on either side of the existing area impacted by dredging. Side-slopes are 2H:1V (horizontal: vertical).\n\nThe USACE is also planning a major maintenance project to repair and modify the south entrance jetties. The Major Maintenance Project requires dredging a temporary access lane between the navigation channel and the McGlinn Island Jetty so that equipment and materials can be barged to the jetty. The project area is shown in Figure 6.\n\nThis PWS outlines tasks for the Contractor to assess the extent and abundance of submerged aquatic vegetation, particularly eelgrass (Zostera marina), that may be impacted by advance maintenance dredging and the major maintenance project.\n\n1.3 SITE DESCRIPTION\n\nThe Swinomish Channel is an approximately 13-mile waterway connecting Skagit Bay and Padilla Bay in Skagit County, near La Conner, Washington (Figure 1). The channel features three jetties at its southern entrance: North Jetty, Goat Island Jetty, and the McGlinn Island Jetty. The authorized channel width is 100 feet with larger widths at turning basins and bends to facilitate safe vessel navigation, in accordance with Section 110 of the Rivers and Harbors Act of 1958.\n\nFigures 2, 3, 4, and 5 show inset areas of the Swinomish Channel.\n\nThe McGlinn Island Jetty access lane project area (Figure 6) is a shallow mudflat bisected by a natural channel approximately 600 ft in length between the east McGlinn Island Jetty and the federal channel. Much of the project area is exposed at lower water levels; water depths are insufficient to allow all but shallow draft vessel access at high tide. Partially buried remnant logs are visible along the natural channel at low tides due to the area’s historical use as a temporary log storage area.\n\n1.4 OBJECTIVES\n\nThe objectives for this contract are as follows:\n\n• Conduct a Zostera marina eelgrass survey in the study areas to document and delineate the extent of eelgrass (areal coverage);\n\n• Quantify Zostera marina eelgrass abundance (characterize the density of eelgrass meadows) within the study areas;\n\n• Provide high-quality spatial and tabular data suitable for impact assessment, regulatory agency review, and mitigation planning; and\n\n• Prepare a comprehensive data report that documents all survey methods, data, and findings in accordance with USACE guidance.\n\n1.5 SCOPE\n\nPerform an eelgrass survey in and around the Swinomish Channel. The services required under this contract are detailed in Part 5 – Specific Tasks.\n\n1.6 PERIOD OF PERFORMANCE (POP)\n\nThe Period of Performance shall be nine (9) months (270 days) from time of award to contract completion. Field survey activities shall be conducted between July 1 and August 30, when eelgrass is at peak biomass in Washington.\n\n1.7 GENERAL INFORMATION\n\n1.7.1 Quality Control Plan\n\nDevelop and maintain an effective Quality Control Plan (QCP) to ensure services are performed in accordance with this PWS. Prepare and submit the QCP in accordance with Part 5 Specific Tasks.\n\n1.7.2 Quality Assurance\n\nThe USACE will evaluate the Contractor’s performance under this contract in accordance with the Performance Requirements Summary (See Section 7.2). The Performance Requirements Summary defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).\n\nOn the request of the Contracting Officer’s Representative (COR) or any inspector, provide the use of boats, boatmen, laborers, and material forming a part of the ordinary and usual equipment of the sampling team as may be reasonably necessary to inspect the sampling work.\n\n1.7.3 Schedule\n\nSubmit a project schedule within ten (10) business days after the date of award. The schedule should target sampling with sufficient time for completion of all CLINs. Update the project schedule, at minimum, monthly. Include an updated schedule in all Pay Requests.\n\n1.7.3.1 USACE Review\n\nInclude two (2) weeks for USACE review of any and all contract deliverables.\n\n1.7.3.2 Recognized Holidays\n\nThe Contractor is not required to work on Federal Holidays:\n\nNew Year’s Day\n\nMartin Luther King Jr.’s Birthday\n\nPresident’s Day\n\nMemorial Day\n\nIndependence Day\n\nJuneteenth\n\nLabor Day\n\nIndigenous Peoples Day (Columbus Day)\n\nVeterans Day\n\nThanksgiving Day\n\nChristmas Day\n\n1.7.3.3 Hours of Operation\n\nThe Contractor is responsible for being responsive to communication from USACE between the hours of 8:00 a.m. and 4:00 p.m. Pacific Time, Monday through Friday, except Federal holidays or when the USACE facility is closed due to local or national emergencies, administrative closings, or similar USACE-directed facility closings.\n\n1.7.4 Place of Performance\n\nThe services described in this PWS will be performed in and around the Swinomish Channel and at the Contractor’s offices.\n\n1.7.5 Type of Contract\n\nThe USACE will award a performance-based Firm Fixed Price Contract.\n\n1.7.6 Security Requirements\n\nThere are no special security requirements. Work will not be conducted at a federal facility of any kind; will not involve the use of USACE equipment or vessels; and will not require access to USACE automated information systems. Refer to Section 1.7.11 for required pre-screening procedures for Contractor key personnel.\n\nPLEASE SEE ATTACHED PWS, EVALUATION CRITERIA, & WAGE DETERMINATION for specific information and criteria for this acquisition.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W912DW26QA068","place_of_performance":{"city":{"code":"36780","name":"La Conner"},"state":{"code":"WA","name":"Washington"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"B510"},{"dates":{"posted":"2026-06-15","posted_at":"2026-06-15T18:43:24.457Z","created_at":"2026-06-15T18:39:03.352Z","modified_at":"2026-07-10T03:55:48.790Z","response_deadline":{"raw":"2026-06-24T12:00:00-07:00","utc":"2026-06-24T19:00:00Z","date":"2026-06-24","time":"12:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/54c89b81bfd643a1a6e0449311f67e7b/view"},"naics":{"codes":["541620"],"primary":"541620"},"title":"Solicitation: Swinomish Eelgrass Survey w/ Amendment 0001","agency":{"office":{"code":"W912DW","name":"W071 ENDIST SEATTLE"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"98134-2329","city":"SEATTLE","state":"WA","country":"USA"},"organization_id":"100221304","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-07-09","archive_type":"auto15"},"history":[{"index":6,"title":"Solicitation: Swinomish Eelgrass Survey w/ Amendment 0001","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-15T20:57:18.159Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"fee554ddb6db45ebaf62d70cc344efab","solicitation_number":"W912DW26QA068","parent_opportunity_id":"c61d49f4a3dd43e0aaed4f2250323faf"},{"index":4,"title":"Solicitation: Swinomish Eelgrass Survey w/ Amendment 0001","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-15T18:43:24.457Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"54c89b81bfd643a1a6e0449311f67e7b","solicitation_number":"W912DW26QA068","parent_opportunity_id":"c61d49f4a3dd43e0aaed4f2250323faf"},{"index":3,"title":"Swinomish Eelgrass Survey","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-13T19:06:36.691Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5f7956d57eba46bc9e482b6b7ea7a4e6","solicitation_number":"W912DW26QA068","parent_opportunity_id":"c61d49f4a3dd43e0aaed4f2250323faf"},{"index":2,"title":"Swinomish Eelgrass Survey","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-10T21:52:41.309Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1b87658467964dd98d1ec2bbca35cca1","solicitation_number":"W912DW26QA068","parent_opportunity_id":"c61d49f4a3dd43e0aaed4f2250323faf"},{"index":1,"title":"Swinomish Eelgrass Survey","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-10T21:46:24.233Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"c61d49f4a3dd43e0aaed4f2250323faf","solicitation_number":"W912DW26QA068"}],"contacts":[{"name":"Della S. Overton","role":"primary","email":"della.s.overton@usace.army.mil","phone":"2067646170"},{"name":"Shemekia McMillan","role":"secondary","email":"Shemekia.R.Mcmillan@usace.army.mil"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"54c89b81bfd643a1a6e0449311f67e7b","lineage_id":"c61d49f4a3dd43e0aaed4f2250323faf","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-02T04:01:38.213423050Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T16:22:53.920682Z","row_sha256":"264043ace9ed6d0dea9368776173bf01480a4ea7995da1b9b557609af536ed33","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-02T04:01:38.213423050Z","first_seen_at":"2026-09-16T16:22:53.920682Z"},"description":{"html":"<p><strong>UPDATED EVALUATION CRITERIA PUBLISHED ON 15 June 2026 (In Updated Solicitation and Evaluation Criteria) - Please ensure that you acknowledge and sign Amendment 0001 when submitting your quote.</strong></p>\n\n<p><strong>PART 1 &ndash; GENERAL INFORMATION</strong></p>\n\n<p>This is a non-personnel services contract to provide technical services for an eelgrass survey at and next to the Swinomish Federal Navigation Channel (&ldquo;Swinomish Channel&rdquo;) near La Conner, WA (Figure 1). The U.S. Army Corps of Engineers (USACE) will not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers will be accountable solely to the Contractor who, in turn, is responsible to the USACE.</p>\n\n<p><strong>1.1 DESCRIPTION OF SERVICES / INTRODUCTION</strong><br />\nProvide all personnel, equipment, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform the tasks for an eelgrass survey as defined in this Performance Work Statement (PWS). Perform to the standards in this contract.</p>\n\n<p><strong>1.2 BACKGROUND</strong><br />\nCongress authorized the Swinomish Channel in the Rivers and Harbors Acts of 1892 and 1935. The channel has an authorized depth of -12 ft Mean Lower Low Water (MLLW) and has three jetties at its southern entrance. Periodic dredging is required to maintain authorized depth. Maintenance dredging historically occurs every four to six years. The most recent maintenance dredging event was completed in January 2025.</p>\n\n<p>The USACE is planning to perform two (2) feet of advance maintenance dredging (AMD) (to -14 ft MLLW + 2 ft overdepth) in the channel during future dredging events. The deeper dredging cut associated with AMD is expected to disturb a larger project footprint, disturbing approximately four (4) additional feet of width on either side of the existing area impacted by dredging. Side-slopes are 2H:1V (horizontal: vertical).</p>\n\n<p>The USACE is also planning a major maintenance project to repair and modify the south entrance jetties. The Major Maintenance Project requires dredging a temporary access lane between the navigation channel and the McGlinn Island Jetty so that equipment and materials can be barged to the jetty. The project area is shown in Figure 6.</p>\n\n<p>This PWS outlines tasks for the Contractor to assess the extent and abundance of submerged aquatic vegetation, particularly eelgrass (Zostera marina), that may be impacted by advance maintenance dredging and the major maintenance project.</p>\n\n<p><strong>1.3 SITE DESCRIPTION</strong><br />\nThe Swinomish Channel is an approximately 13-mile waterway connecting Skagit Bay and Padilla Bay in Skagit County, near La Conner, Washington (Figure 1). The channel features three jetties at its southern entrance: North Jetty, Goat Island Jetty, and the McGlinn Island Jetty. The authorized channel width is 100 feet with larger widths at turning basins and bends to facilitate safe vessel navigation, in accordance with Section 110 of the Rivers and Harbors Act of 1958.</p>\n\n<p>Figures 2, 3, 4, and 5 show inset areas of the Swinomish Channel.</p>\n\n<p>The McGlinn Island Jetty access lane project area (Figure 6) is a shallow mudflat bisected by a natural channel approximately 600 ft in length between the east McGlinn Island Jetty and the federal channel. Much of the project area is exposed at lower water levels; water depths are insufficient to allow all but shallow draft vessel access at high tide. Partially buried remnant logs are visible along the natural channel at low tides due to the area&rsquo;s historical use as a temporary log storage area.<br />\n<br />\n<strong>1.4 OBJECTIVES</strong><br />\nThe objectives for this contract are as follows:<br />\n&bull; Conduct a Zostera marina eelgrass survey in the study areas to document and delineate the extent of eelgrass (areal coverage);<br />\n&bull; Quantify Zostera marina eelgrass abundance (characterize the density of eelgrass meadows) within the study areas;<br />\n&bull; Provide high-quality spatial and tabular data suitable for impact assessment, regulatory agency review, and mitigation planning; and<br />\n&bull; Prepare a comprehensive data report that documents all survey methods, data, and findings in accordance with USACE guidance.</p>\n\n<p><strong>1.5 SCOPE</strong><br />\nPerform an eelgrass survey in and around the Swinomish Channel. The services required under this contract are detailed in Part 5 &ndash; Specific Tasks.</p>\n\n<p><strong>1.6 PERIOD OF PERFORMANCE (POP)</strong><br />\nThe Period of Performance shall be nine (9) months (270 days) from time of award to contract completion. Field survey activities shall be conducted between July 1 and August 30, when eelgrass is at peak biomass in Washington.</p>\n\n<p><strong>1.7 GENERAL INFORMATION</strong></p>\n\n<p><strong>1.7.1 Quality Control Plan</strong><br />\nDevelop and maintain an effective Quality Control Plan (QCP) to ensure services are performed in accordance with this PWS. Prepare and submit the QCP in accordance with Part 5 Specific Tasks.</p>\n\n<p><strong>1.7.2 Quality Assurance</strong><br />\nThe USACE will evaluate the Contractor&rsquo;s performance under this contract in accordance with the Performance Requirements Summary (See Section 7.2). The Performance Requirements Summary defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).</p>\n\n<p>On the request of the Contracting Officer&rsquo;s Representative (COR) or any inspector, provide the use of boats, boatmen, laborers, and material forming a part of the ordinary and usual equipment of the sampling team as may be reasonably necessary to inspect the sampling work.</p>\n\n<p><strong>1.7.3 Schedule</strong><br />\nSubmit a project schedule within ten (10) business days after the date of award. The schedule should target sampling with sufficient time for completion of all CLINs. Update the project schedule, at minimum, monthly. Include an updated schedule in all Pay Requests.</p>\n\n<p><strong>1.7.3.1 USACE Review</strong><br />\nInclude two (2) weeks for USACE review of any and all contract deliverables.</p>\n\n<p><strong>1.7.3.2 Recognized Holidays</strong><br />\nThe Contractor is not required to work on Federal Holidays:<br />\nNew Year&rsquo;s Day<br />\nMartin Luther King Jr.&rsquo;s Birthday<br />\nPresident&rsquo;s Day<br />\nMemorial Day<br />\nIndependence Day<br />\nJuneteenth<br />\nLabor Day<br />\nIndigenous Peoples Day (Columbus Day)<br />\nVeterans Day<br />\nThanksgiving Day<br />\nChristmas Day</p>\n\n<p><strong>1.7.3.3 Hours of Operation</strong><br />\nThe Contractor is responsible for being responsive to communication from USACE between the hours of 8:00 a.m. and 4:00 p.m. Pacific Time, Monday through Friday, except Federal holidays or when the USACE facility is closed due to local or national emergencies, administrative closings, or similar USACE-directed facility closings.</p>\n\n<p><strong>1.7.4 Place of Performance</strong><br />\nThe services described in this PWS will be performed in and around the Swinomish Channel and at the Contractor&rsquo;s offices.</p>\n\n<p><strong>1.7.5 Type of Contract</strong><br />\nThe USACE will award a performance-based Firm Fixed Price Contract.</p>\n\n<p><strong>1.7.6 Security Requirements</strong><br />\nThere are no special security requirements. Work will not be conducted at a federal facility of any kind; will not involve the use of USACE equipment or vessels; and will not require access to USACE automated information systems. Refer to Section 1.7.11 for required pre-screening procedures for Contractor key personnel.</p>\n\n<p><u><strong>PLEASE SEE ATTACHED PWS, EVALUATION CRITERIA, &amp; WAGE DETERMINATION for specific information and criteria for this acquisition.&nbsp;</strong></u></p>","text":"UPDATED EVALUATION CRITERIA PUBLISHED ON 15 June 2026 (In Updated Solicitation and Evaluation Criteria) - Please ensure that you acknowledge and sign Amendment 0001 when submitting your quote.\n\nPART 1 – GENERAL INFORMATION\n\nThis is a non-personnel services contract to provide technical services for an eelgrass survey at and next to the Swinomish Federal Navigation Channel (“Swinomish Channel”) near La Conner, WA (Figure 1). The U.S. Army Corps of Engineers (USACE) will not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers will be accountable solely to the Contractor who, in turn, is responsible to the USACE.\n\n1.1 DESCRIPTION OF SERVICES / INTRODUCTION\n\nProvide all personnel, equipment, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform the tasks for an eelgrass survey as defined in this Performance Work Statement (PWS). Perform to the standards in this contract.\n\n1.2 BACKGROUND\n\nCongress authorized the Swinomish Channel in the Rivers and Harbors Acts of 1892 and 1935. The channel has an authorized depth of -12 ft Mean Lower Low Water (MLLW) and has three jetties at its southern entrance. Periodic dredging is required to maintain authorized depth. Maintenance dredging historically occurs every four to six years. The most recent maintenance dredging event was completed in January 2025.\n\nThe USACE is planning to perform two (2) feet of advance maintenance dredging (AMD) (to -14 ft MLLW + 2 ft overdepth) in the channel during future dredging events. The deeper dredging cut associated with AMD is expected to disturb a larger project footprint, disturbing approximately four (4) additional feet of width on either side of the existing area impacted by dredging. Side-slopes are 2H:1V (horizontal: vertical).\n\nThe USACE is also planning a major maintenance project to repair and modify the south entrance jetties. The Major Maintenance Project requires dredging a temporary access lane between the navigation channel and the McGlinn Island Jetty so that equipment and materials can be barged to the jetty. The project area is shown in Figure 6.\n\nThis PWS outlines tasks for the Contractor to assess the extent and abundance of submerged aquatic vegetation, particularly eelgrass (Zostera marina), that may be impacted by advance maintenance dredging and the major maintenance project.\n\n1.3 SITE DESCRIPTION\n\nThe Swinomish Channel is an approximately 13-mile waterway connecting Skagit Bay and Padilla Bay in Skagit County, near La Conner, Washington (Figure 1). The channel features three jetties at its southern entrance: North Jetty, Goat Island Jetty, and the McGlinn Island Jetty. The authorized channel width is 100 feet with larger widths at turning basins and bends to facilitate safe vessel navigation, in accordance with Section 110 of the Rivers and Harbors Act of 1958.\n\nFigures 2, 3, 4, and 5 show inset areas of the Swinomish Channel.\n\nThe McGlinn Island Jetty access lane project area (Figure 6) is a shallow mudflat bisected by a natural channel approximately 600 ft in length between the east McGlinn Island Jetty and the federal channel. Much of the project area is exposed at lower water levels; water depths are insufficient to allow all but shallow draft vessel access at high tide. Partially buried remnant logs are visible along the natural channel at low tides due to the area’s historical use as a temporary log storage area.\n\n1.4 OBJECTIVES\n\nThe objectives for this contract are as follows:\n\n• Conduct a Zostera marina eelgrass survey in the study areas to document and delineate the extent of eelgrass (areal coverage);\n\n• Quantify Zostera marina eelgrass abundance (characterize the density of eelgrass meadows) within the study areas;\n\n• Provide high-quality spatial and tabular data suitable for impact assessment, regulatory agency review, and mitigation planning; and\n\n• Prepare a comprehensive data report that documents all survey methods, data, and findings in accordance with USACE guidance.\n\n1.5 SCOPE\n\nPerform an eelgrass survey in and around the Swinomish Channel. The services required under this contract are detailed in Part 5 – Specific Tasks.\n\n1.6 PERIOD OF PERFORMANCE (POP)\n\nThe Period of Performance shall be nine (9) months (270 days) from time of award to contract completion. Field survey activities shall be conducted between July 1 and August 30, when eelgrass is at peak biomass in Washington.\n\n1.7 GENERAL INFORMATION\n\n1.7.1 Quality Control Plan\n\nDevelop and maintain an effective Quality Control Plan (QCP) to ensure services are performed in accordance with this PWS. Prepare and submit the QCP in accordance with Part 5 Specific Tasks.\n\n1.7.2 Quality Assurance\n\nThe USACE will evaluate the Contractor’s performance under this contract in accordance with the Performance Requirements Summary (See Section 7.2). The Performance Requirements Summary defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).\n\nOn the request of the Contracting Officer’s Representative (COR) or any inspector, provide the use of boats, boatmen, laborers, and material forming a part of the ordinary and usual equipment of the sampling team as may be reasonably necessary to inspect the sampling work.\n\n1.7.3 Schedule\n\nSubmit a project schedule within ten (10) business days after the date of award. The schedule should target sampling with sufficient time for completion of all CLINs. Update the project schedule, at minimum, monthly. Include an updated schedule in all Pay Requests.\n\n1.7.3.1 USACE Review\n\nInclude two (2) weeks for USACE review of any and all contract deliverables.\n\n1.7.3.2 Recognized Holidays\n\nThe Contractor is not required to work on Federal Holidays:\n\nNew Year’s Day\n\nMartin Luther King Jr.’s Birthday\n\nPresident’s Day\n\nMemorial Day\n\nIndependence Day\n\nJuneteenth\n\nLabor Day\n\nIndigenous Peoples Day (Columbus Day)\n\nVeterans Day\n\nThanksgiving Day\n\nChristmas Day\n\n1.7.3.3 Hours of Operation\n\nThe Contractor is responsible for being responsive to communication from USACE between the hours of 8:00 a.m. and 4:00 p.m. Pacific Time, Monday through Friday, except Federal holidays or when the USACE facility is closed due to local or national emergencies, administrative closings, or similar USACE-directed facility closings.\n\n1.7.4 Place of Performance\n\nThe services described in this PWS will be performed in and around the Swinomish Channel and at the Contractor’s offices.\n\n1.7.5 Type of Contract\n\nThe USACE will award a performance-based Firm Fixed Price Contract.\n\n1.7.6 Security Requirements\n\nThere are no special security requirements. Work will not be conducted at a federal facility of any kind; will not involve the use of USACE equipment or vessels; and will not require access to USACE automated information systems. Refer to Section 1.7.11 for required pre-screening procedures for Contractor key personnel.\n\nPLEASE SEE ATTACHED PWS, EVALUATION CRITERIA, & WAGE DETERMINATION for specific information and criteria for this acquisition.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W912DW26QA068","place_of_performance":{"city":{"code":"36780","name":"La Conner"},"state":{"code":"WA","name":"Washington"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"B510"},{"dates":{"posted":"2026-06-15","posted_at":"2026-06-15T20:57:18.159Z","created_at":"2026-06-15T20:55:26.767Z","modified_at":"2026-07-10T03:55:48.790Z","response_deadline":{"raw":"2026-06-24T12:00:00-07:00","utc":"2026-06-24T19:00:00Z","date":"2026-06-24","time":"12:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/fee554ddb6db45ebaf62d70cc344efab/view"},"naics":{"codes":["541620"],"primary":"541620"},"title":"Solicitation: Swinomish Eelgrass Survey w/ Amendment 0001","agency":{"office":{"code":"W912DW","name":"W071 ENDIST SEATTLE"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"98134-2329","city":"SEATTLE","state":"WA","country":"USA"},"organization_id":"100221304","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-07-09","archive_type":"auto15"},"history":[{"index":6,"title":"Solicitation: Swinomish Eelgrass Survey w/ Amendment 0001","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-15T20:57:18.159Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"fee554ddb6db45ebaf62d70cc344efab","solicitation_number":"W912DW26QA068","parent_opportunity_id":"c61d49f4a3dd43e0aaed4f2250323faf"},{"index":4,"title":"Solicitation: Swinomish Eelgrass Survey w/ Amendment 0001","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-15T18:43:24.457Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"54c89b81bfd643a1a6e0449311f67e7b","solicitation_number":"W912DW26QA068","parent_opportunity_id":"c61d49f4a3dd43e0aaed4f2250323faf"},{"index":3,"title":"Swinomish Eelgrass Survey","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-13T19:06:36.691Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5f7956d57eba46bc9e482b6b7ea7a4e6","solicitation_number":"W912DW26QA068","parent_opportunity_id":"c61d49f4a3dd43e0aaed4f2250323faf"},{"index":2,"title":"Swinomish Eelgrass Survey","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-10T21:52:41.309Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1b87658467964dd98d1ec2bbca35cca1","solicitation_number":"W912DW26QA068","parent_opportunity_id":"c61d49f4a3dd43e0aaed4f2250323faf"},{"index":1,"title":"Swinomish Eelgrass Survey","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-10T21:46:24.233Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"c61d49f4a3dd43e0aaed4f2250323faf","solicitation_number":"W912DW26QA068"}],"contacts":[{"name":"Della S. Overton","role":"primary","email":"della.s.overton@usace.army.mil","phone":"2067646170"},{"name":"Shemekia McMillan","role":"secondary","email":"Shemekia.R.Mcmillan@usace.army.mil"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"fee554ddb6db45ebaf62d70cc344efab","lineage_id":"c61d49f4a3dd43e0aaed4f2250323faf","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-02T08:05:44.281779764Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T16:22:53.920682Z","row_sha256":"5e1b5e9732b158ad78db2a1325172c478855b8eeb375d3a30f18d49610ad990a","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-02T08:05:44.281779764Z","first_seen_at":"2026-09-16T16:22:53.920682Z"},"description":{"html":"<p><strong>UPDATED EVALUATION CRITERIA PUBLISHED ON 15 June 2026 (In Updated Solicitation and Evaluation Criteria) - Please ensure that you acknowledge and sign Amendment 0001 when submitting your quote.</strong></p>\n\n<p><strong>PART 1 &ndash; GENERAL INFORMATION</strong></p>\n\n<p>This is a non-personnel services contract to provide technical services for an eelgrass survey at and next to the Swinomish Federal Navigation Channel (&ldquo;Swinomish Channel&rdquo;) near La Conner, WA (Figure 1). The U.S. Army Corps of Engineers (USACE) will not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers will be accountable solely to the Contractor who, in turn, is responsible to the USACE.</p>\n\n<p><strong>1.1 DESCRIPTION OF SERVICES / INTRODUCTION</strong><br />\nProvide all personnel, equipment, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform the tasks for an eelgrass survey as defined in this Performance Work Statement (PWS). Perform to the standards in this contract.</p>\n\n<p><strong>1.2 BACKGROUND</strong><br />\nCongress authorized the Swinomish Channel in the Rivers and Harbors Acts of 1892 and 1935. The channel has an authorized depth of -12 ft Mean Lower Low Water (MLLW) and has three jetties at its southern entrance. Periodic dredging is required to maintain authorized depth. Maintenance dredging historically occurs every four to six years. The most recent maintenance dredging event was completed in January 2025.</p>\n\n<p>The USACE is planning to perform two (2) feet of advance maintenance dredging (AMD) (to -14 ft MLLW + 2 ft overdepth) in the channel during future dredging events. The deeper dredging cut associated with AMD is expected to disturb a larger project footprint, disturbing approximately four (4) additional feet of width on either side of the existing area impacted by dredging. Side-slopes are 2H:1V (horizontal: vertical).</p>\n\n<p>The USACE is also planning a major maintenance project to repair and modify the south entrance jetties. The Major Maintenance Project requires dredging a temporary access lane between the navigation channel and the McGlinn Island Jetty so that equipment and materials can be barged to the jetty. The project area is shown in Figure 6.</p>\n\n<p>This PWS outlines tasks for the Contractor to assess the extent and abundance of submerged aquatic vegetation, particularly eelgrass (Zostera marina), that may be impacted by advance maintenance dredging and the major maintenance project.</p>\n\n<p><strong>1.3 SITE DESCRIPTION</strong><br />\nThe Swinomish Channel is an approximately 13-mile waterway connecting Skagit Bay and Padilla Bay in Skagit County, near La Conner, Washington (Figure 1). The channel features three jetties at its southern entrance: North Jetty, Goat Island Jetty, and the McGlinn Island Jetty. The authorized channel width is 100 feet with larger widths at turning basins and bends to facilitate safe vessel navigation, in accordance with Section 110 of the Rivers and Harbors Act of 1958.</p>\n\n<p>Figures 2, 3, 4, and 5 show inset areas of the Swinomish Channel.</p>\n\n<p>The McGlinn Island Jetty access lane project area (Figure 6) is a shallow mudflat bisected by a natural channel approximately 600 ft in length between the east McGlinn Island Jetty and the federal channel. Much of the project area is exposed at lower water levels; water depths are insufficient to allow all but shallow draft vessel access at high tide. Partially buried remnant logs are visible along the natural channel at low tides due to the area&rsquo;s historical use as a temporary log storage area.<br />\n<br />\n<strong>1.4 OBJECTIVES</strong><br />\nThe objectives for this contract are as follows:<br />\n&bull; Conduct a Zostera marina eelgrass survey in the study areas to document and delineate the extent of eelgrass (areal coverage);<br />\n&bull; Quantify Zostera marina eelgrass abundance (characterize the density of eelgrass meadows) within the study areas;<br />\n&bull; Provide high-quality spatial and tabular data suitable for impact assessment, regulatory agency review, and mitigation planning; and<br />\n&bull; Prepare a comprehensive data report that documents all survey methods, data, and findings in accordance with USACE guidance.</p>\n\n<p><strong>1.5 SCOPE</strong><br />\nPerform an eelgrass survey in and around the Swinomish Channel. The services required under this contract are detailed in Part 5 &ndash; Specific Tasks.</p>\n\n<p><strong>1.6 PERIOD OF PERFORMANCE (POP)</strong><br />\nThe Period of Performance shall be nine (9) months (270 days) from time of award to contract completion. Field survey activities shall be conducted between July 1 and August 30, when eelgrass is at peak biomass in Washington.</p>\n\n<p><strong>1.7 GENERAL INFORMATION</strong></p>\n\n<p><strong>1.7.1 Quality Control Plan</strong><br />\nDevelop and maintain an effective Quality Control Plan (QCP) to ensure services are performed in accordance with this PWS. Prepare and submit the QCP in accordance with Part 5 Specific Tasks.</p>\n\n<p><strong>1.7.2 Quality Assurance</strong><br />\nThe USACE will evaluate the Contractor&rsquo;s performance under this contract in accordance with the Performance Requirements Summary (See Section 7.2). The Performance Requirements Summary defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).</p>\n\n<p>On the request of the Contracting Officer&rsquo;s Representative (COR) or any inspector, provide the use of boats, boatmen, laborers, and material forming a part of the ordinary and usual equipment of the sampling team as may be reasonably necessary to inspect the sampling work.</p>\n\n<p><strong>1.7.3 Schedule</strong><br />\nSubmit a project schedule within ten (10) business days after the date of award. The schedule should target sampling with sufficient time for completion of all CLINs. Update the project schedule, at minimum, monthly. Include an updated schedule in all Pay Requests.</p>\n\n<p><strong>1.7.3.1 USACE Review</strong><br />\nInclude two (2) weeks for USACE review of any and all contract deliverables.</p>\n\n<p><strong>1.7.3.2 Recognized Holidays</strong><br />\nThe Contractor is not required to work on Federal Holidays:<br />\nNew Year&rsquo;s Day<br />\nMartin Luther King Jr.&rsquo;s Birthday<br />\nPresident&rsquo;s Day<br />\nMemorial Day<br />\nIndependence Day<br />\nJuneteenth<br />\nLabor Day<br />\nIndigenous Peoples Day (Columbus Day)<br />\nVeterans Day<br />\nThanksgiving Day<br />\nChristmas Day</p>\n\n<p><strong>1.7.3.3 Hours of Operation</strong><br />\nThe Contractor is responsible for being responsive to communication from USACE between the hours of 8:00 a.m. and 4:00 p.m. Pacific Time, Monday through Friday, except Federal holidays or when the USACE facility is closed due to local or national emergencies, administrative closings, or similar USACE-directed facility closings.</p>\n\n<p><strong>1.7.4 Place of Performance</strong><br />\nThe services described in this PWS will be performed in and around the Swinomish Channel and at the Contractor&rsquo;s offices.</p>\n\n<p><strong>1.7.5 Type of Contract</strong><br />\nThe USACE will award a performance-based Firm Fixed Price Contract.</p>\n\n<p><strong>1.7.6 Security Requirements</strong><br />\nThere are no special security requirements. Work will not be conducted at a federal facility of any kind; will not involve the use of USACE equipment or vessels; and will not require access to USACE automated information systems. Refer to Section 1.7.11 for required pre-screening procedures for Contractor key personnel.</p>\n\n<p><u><strong>PLEASE SEE ATTACHED PWS, EVALUATION CRITERIA, &amp; WAGE DETERMINATION for specific information and criteria for this acquisition.&nbsp;</strong></u></p>","text":"UPDATED EVALUATION CRITERIA PUBLISHED ON 15 June 2026 (In Updated Solicitation and Evaluation Criteria) - Please ensure that you acknowledge and sign Amendment 0001 when submitting your quote.\n\nPART 1 – GENERAL INFORMATION\n\nThis is a non-personnel services contract to provide technical services for an eelgrass survey at and next to the Swinomish Federal Navigation Channel (“Swinomish Channel”) near La Conner, WA (Figure 1). The U.S. Army Corps of Engineers (USACE) will not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers will be accountable solely to the Contractor who, in turn, is responsible to the USACE.\n\n1.1 DESCRIPTION OF SERVICES / INTRODUCTION\n\nProvide all personnel, equipment, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform the tasks for an eelgrass survey as defined in this Performance Work Statement (PWS). Perform to the standards in this contract.\n\n1.2 BACKGROUND\n\nCongress authorized the Swinomish Channel in the Rivers and Harbors Acts of 1892 and 1935. The channel has an authorized depth of -12 ft Mean Lower Low Water (MLLW) and has three jetties at its southern entrance. Periodic dredging is required to maintain authorized depth. Maintenance dredging historically occurs every four to six years. The most recent maintenance dredging event was completed in January 2025.\n\nThe USACE is planning to perform two (2) feet of advance maintenance dredging (AMD) (to -14 ft MLLW + 2 ft overdepth) in the channel during future dredging events. The deeper dredging cut associated with AMD is expected to disturb a larger project footprint, disturbing approximately four (4) additional feet of width on either side of the existing area impacted by dredging. Side-slopes are 2H:1V (horizontal: vertical).\n\nThe USACE is also planning a major maintenance project to repair and modify the south entrance jetties. The Major Maintenance Project requires dredging a temporary access lane between the navigation channel and the McGlinn Island Jetty so that equipment and materials can be barged to the jetty. The project area is shown in Figure 6.\n\nThis PWS outlines tasks for the Contractor to assess the extent and abundance of submerged aquatic vegetation, particularly eelgrass (Zostera marina), that may be impacted by advance maintenance dredging and the major maintenance project.\n\n1.3 SITE DESCRIPTION\n\nThe Swinomish Channel is an approximately 13-mile waterway connecting Skagit Bay and Padilla Bay in Skagit County, near La Conner, Washington (Figure 1). The channel features three jetties at its southern entrance: North Jetty, Goat Island Jetty, and the McGlinn Island Jetty. The authorized channel width is 100 feet with larger widths at turning basins and bends to facilitate safe vessel navigation, in accordance with Section 110 of the Rivers and Harbors Act of 1958.\n\nFigures 2, 3, 4, and 5 show inset areas of the Swinomish Channel.\n\nThe McGlinn Island Jetty access lane project area (Figure 6) is a shallow mudflat bisected by a natural channel approximately 600 ft in length between the east McGlinn Island Jetty and the federal channel. Much of the project area is exposed at lower water levels; water depths are insufficient to allow all but shallow draft vessel access at high tide. Partially buried remnant logs are visible along the natural channel at low tides due to the area’s historical use as a temporary log storage area.\n\n1.4 OBJECTIVES\n\nThe objectives for this contract are as follows:\n\n• Conduct a Zostera marina eelgrass survey in the study areas to document and delineate the extent of eelgrass (areal coverage);\n\n• Quantify Zostera marina eelgrass abundance (characterize the density of eelgrass meadows) within the study areas;\n\n• Provide high-quality spatial and tabular data suitable for impact assessment, regulatory agency review, and mitigation planning; and\n\n• Prepare a comprehensive data report that documents all survey methods, data, and findings in accordance with USACE guidance.\n\n1.5 SCOPE\n\nPerform an eelgrass survey in and around the Swinomish Channel. The services required under this contract are detailed in Part 5 – Specific Tasks.\n\n1.6 PERIOD OF PERFORMANCE (POP)\n\nThe Period of Performance shall be nine (9) months (270 days) from time of award to contract completion. Field survey activities shall be conducted between July 1 and August 30, when eelgrass is at peak biomass in Washington.\n\n1.7 GENERAL INFORMATION\n\n1.7.1 Quality Control Plan\n\nDevelop and maintain an effective Quality Control Plan (QCP) to ensure services are performed in accordance with this PWS. Prepare and submit the QCP in accordance with Part 5 Specific Tasks.\n\n1.7.2 Quality Assurance\n\nThe USACE will evaluate the Contractor’s performance under this contract in accordance with the Performance Requirements Summary (See Section 7.2). The Performance Requirements Summary defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).\n\nOn the request of the Contracting Officer’s Representative (COR) or any inspector, provide the use of boats, boatmen, laborers, and material forming a part of the ordinary and usual equipment of the sampling team as may be reasonably necessary to inspect the sampling work.\n\n1.7.3 Schedule\n\nSubmit a project schedule within ten (10) business days after the date of award. The schedule should target sampling with sufficient time for completion of all CLINs. Update the project schedule, at minimum, monthly. Include an updated schedule in all Pay Requests.\n\n1.7.3.1 USACE Review\n\nInclude two (2) weeks for USACE review of any and all contract deliverables.\n\n1.7.3.2 Recognized Holidays\n\nThe Contractor is not required to work on Federal Holidays:\n\nNew Year’s Day\n\nMartin Luther King Jr.’s Birthday\n\nPresident’s Day\n\nMemorial Day\n\nIndependence Day\n\nJuneteenth\n\nLabor Day\n\nIndigenous Peoples Day (Columbus Day)\n\nVeterans Day\n\nThanksgiving Day\n\nChristmas Day\n\n1.7.3.3 Hours of Operation\n\nThe Contractor is responsible for being responsive to communication from USACE between the hours of 8:00 a.m. and 4:00 p.m. Pacific Time, Monday through Friday, except Federal holidays or when the USACE facility is closed due to local or national emergencies, administrative closings, or similar USACE-directed facility closings.\n\n1.7.4 Place of Performance\n\nThe services described in this PWS will be performed in and around the Swinomish Channel and at the Contractor’s offices.\n\n1.7.5 Type of Contract\n\nThe USACE will award a performance-based Firm Fixed Price Contract.\n\n1.7.6 Security Requirements\n\nThere are no special security requirements. Work will not be conducted at a federal facility of any kind; will not involve the use of USACE equipment or vessels; and will not require access to USACE automated information systems. Refer to Section 1.7.11 for required pre-screening procedures for Contractor key personnel.\n\nPLEASE SEE ATTACHED PWS, EVALUATION CRITERIA, & WAGE DETERMINATION for specific information and criteria for this acquisition.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W912DW26QA068","place_of_performance":{"city":{"code":"36780","name":"La Conner"},"state":{"code":"WA","name":"Washington"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"B510"}],"due_at":"2026-06-24T19:00:00Z","due_date":"2026-06-24","closes_at":"2026-06-24T19:00:00Z","awardable":true,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912DW","office_name":"W071 ENDIST SEATTLE","state":"WA","county":"53057","county_name":"Skagit County","city":"5336780","city_name":"La Conner","country":"USA","state_source":null,"state_evidence":null,"site_key":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":true,"updated_at":"2026-10-02T08:08:23.148393Z","principal_notice_id":"fee554ddb6db45ebaf62d70cc344efab","description":{"text":"UPDATED EVALUATION CRITERIA PUBLISHED ON 15 June 2026 (In Updated Solicitation and Evaluation Criteria) - Please ensure that you acknowledge and sign Amendment 0001 when submitting your quote.\n\nPART 1 – GENERAL INFORMATION\n\nThis is a non-personnel services contract to provide technical services for an eelgrass survey at and next to the Swinomish Federal Navigation Channel (“Swinomish Channel”) near La Conner, WA (Figure 1). The U.S. Army Corps of Engineers (USACE) will not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers will be accountable solely to the Contractor who, in turn, is responsible to the USACE.\n\n1.1 DESCRIPTION OF SERVICES / INTRODUCTION\n\nProvide all personnel, equipment, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform the tasks for an eelgrass survey as defined in this Performance Work Statement (PWS). Perform to the standards in this contract.\n\n1.2 BACKGROUND\n\nCongress authorized the Swinomish Channel in the Rivers and Harbors Acts of 1892 and 1935. The channel has an authorized depth of -12 ft Mean Lower Low Water (MLLW) and has three jetties at its southern entrance. Periodic dredging is required to maintain authorized depth. Maintenance dredging historically occurs every four to six years. The most recent maintenance dredging event was completed in January 2025.\n\nThe USACE is planning to perform two (2) feet of advance maintenance dredging (AMD) (to -14 ft MLLW + 2 ft overdepth) in the channel during future dredging events. The deeper dredging cut associated with AMD is expected to disturb a larger project footprint, disturbing approximately four (4) additional feet of width on either side of the existing area impacted by dredging. Side-slopes are 2H:1V (horizontal: vertical).\n\nThe USACE is also planning a major maintenance project to repair and modify the south entrance jetties. The Major Maintenance Project requires dredging a temporary access lane between the navigation channel and the McGlinn Island Jetty so that equipment and materials can be barged to the jetty. The project area is shown in Figure 6.\n\nThis PWS outlines tasks for the Contractor to assess the extent and abundance of submerged aquatic vegetation, particularly eelgrass (Zostera marina), that may be impacted by advance maintenance dredging and the major maintenance project.\n\n1.3 SITE DESCRIPTION\n\nThe Swinomish Channel is an approximately 13-mile waterway connecting Skagit Bay and Padilla Bay in Skagit County, near La Conner, Washington (Figure 1). The channel features three jetties at its southern entrance: North Jetty, Goat Island Jetty, and the McGlinn Island Jetty. The authorized channel width is 100 feet with larger widths at turning basins and bends to facilitate safe vessel navigation, in accordance with Section 110 of the Rivers and Harbors Act of 1958.\n\nFigures 2, 3, 4, and 5 show inset areas of the Swinomish Channel.\n\nThe McGlinn Island Jetty access lane project area (Figure 6) is a shallow mudflat bisected by a natural channel approximately 600 ft in length between the east McGlinn Island Jetty and the federal channel. Much of the project area is exposed at lower water levels; water depths are insufficient to allow all but shallow draft vessel access at high tide. Partially buried remnant logs are visible along the natural channel at low tides due to the area’s historical use as a temporary log storage area.\n\n1.4 OBJECTIVES\n\nThe objectives for this contract are as follows:\n\n• Conduct a Zostera marina eelgrass survey in the study areas to document and delineate the extent of eelgrass (areal coverage);\n\n• Quantify Zostera marina eelgrass abundance (characterize the density of eelgrass meadows) within the study areas;\n\n• Provide high-quality spatial and tabular data suitable for impact assessment, regulatory agency review, and mitigation planning; and\n\n• Prepare a comprehensive data report that documents all survey methods, data, and findings in accordance with USACE guidance.\n\n1.5 SCOPE\n\nPerform an eelgrass survey in and around the Swinomish Channel. The services required under this contract are detailed in Part 5 – Specific Tasks.\n\n1.6 PERIOD OF PERFORMANCE (POP)\n\nThe Period of Performance shall be nine (9) months (270 days) from time of award to contract completion. Field survey activities shall be conducted between July 1 and August 30, when eelgrass is at peak biomass in Washington.\n\n1.7 GENERAL INFORMATION\n\n1.7.1 Quality Control Plan\n\nDevelop and maintain an effective Quality Control Plan (QCP) to ensure services are performed in accordance with this PWS. Prepare and submit the QCP in accordance with Part 5 Specific Tasks.\n\n1.7.2 Quality Assurance\n\nThe USACE will evaluate the Contractor’s performance under this contract in accordance with the Performance Requirements Summary (See Section 7.2). The Performance Requirements Summary defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).\n\nOn the request of the Contracting Officer’s Representative (COR) or any inspector, provide the use of boats, boatmen, laborers, and material forming a part of the ordinary and usual equipment of the sampling team as may be reasonably necessary to inspect the sampling work.\n\n1.7.3 Schedule\n\nSubmit a project schedule within ten (10) business days after the date of award. The schedule should target sampling with sufficient time for completion of all CLINs. Update the project schedule, at minimum, monthly. Include an updated schedule in all Pay Requests.\n\n1.7.3.1 USACE Review\n\nInclude two (2) weeks for USACE review of any and all contract deliverables.\n\n1.7.3.2 Recognized Holidays\n\nThe Contractor is not required to work on Federal Holidays:\n\nNew Year’s Day\n\nMartin Luther King Jr.’s Birthday\n\nPresident’s Day\n\nMemorial Day\n\nIndependence Day\n\nJuneteenth\n\nLabor Day\n\nIndigenous Peoples Day (Columbus Day)\n\nVeterans Day\n\nThanksgiving Day\n\nChristmas Day\n\n1.7.3.3 Hours of Operation\n\nThe Contractor is responsible for being responsive to communication from USACE between the hours of 8:00 a.m. and 4:00 p.m. Pacific Time, Monday through Friday, except Federal holidays or when the USACE facility is closed due to local or national emergencies, administrative closings, or similar USACE-directed facility closings.\n\n1.7.4 Place of Performance\n\nThe services described in this PWS will be performed in and around the Swinomish Channel and at the Contractor’s offices.\n\n1.7.5 Type of Contract\n\nThe USACE will award a performance-based Firm Fixed Price Contract.\n\n1.7.6 Security Requirements\n\nThere are no special security requirements. Work will not be conducted at a federal facility of any kind; will not involve the use of USACE equipment or vessels; and will not require access to USACE automated information systems. Refer to Section 1.7.11 for required pre-screening procedures for Contractor key personnel.\n\nPLEASE SEE ATTACHED PWS, EVALUATION CRITERIA, & WAGE DETERMINATION for specific information and criteria for this acquisition.","html":"<p><strong>UPDATED EVALUATION CRITERIA PUBLISHED ON 15 June 2026 (In Updated Solicitation and Evaluation Criteria) - Please ensure that you acknowledge and sign Amendment 0001 when submitting your quote.</strong></p>\n\n<p><strong>PART 1 &ndash; GENERAL INFORMATION</strong></p>\n\n<p>This is a non-personnel services contract to provide technical services for an eelgrass survey at and next to the Swinomish Federal Navigation Channel (&ldquo;Swinomish Channel&rdquo;) near La Conner, WA (Figure 1). The U.S. Army Corps of Engineers (USACE) will not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers will be accountable solely to the Contractor who, in turn, is responsible to the USACE.</p>\n\n<p><strong>1.1 DESCRIPTION OF SERVICES / INTRODUCTION</strong><br />\nProvide all personnel, equipment, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform the tasks for an eelgrass survey as defined in this Performance Work Statement (PWS). Perform to the standards in this contract.</p>\n\n<p><strong>1.2 BACKGROUND</strong><br />\nCongress authorized the Swinomish Channel in the Rivers and Harbors Acts of 1892 and 1935. The channel has an authorized depth of -12 ft Mean Lower Low Water (MLLW) and has three jetties at its southern entrance. Periodic dredging is required to maintain authorized depth. Maintenance dredging historically occurs every four to six years. The most recent maintenance dredging event was completed in January 2025.</p>\n\n<p>The USACE is planning to perform two (2) feet of advance maintenance dredging (AMD) (to -14 ft MLLW + 2 ft overdepth) in the channel during future dredging events. The deeper dredging cut associated with AMD is expected to disturb a larger project footprint, disturbing approximately four (4) additional feet of width on either side of the existing area impacted by dredging. Side-slopes are 2H:1V (horizontal: vertical).</p>\n\n<p>The USACE is also planning a major maintenance project to repair and modify the south entrance jetties. The Major Maintenance Project requires dredging a temporary access lane between the navigation channel and the McGlinn Island Jetty so that equipment and materials can be barged to the jetty. The project area is shown in Figure 6.</p>\n\n<p>This PWS outlines tasks for the Contractor to assess the extent and abundance of submerged aquatic vegetation, particularly eelgrass (Zostera marina), that may be impacted by advance maintenance dredging and the major maintenance project.</p>\n\n<p><strong>1.3 SITE DESCRIPTION</strong><br />\nThe Swinomish Channel is an approximately 13-mile waterway connecting Skagit Bay and Padilla Bay in Skagit County, near La Conner, Washington (Figure 1). The channel features three jetties at its southern entrance: North Jetty, Goat Island Jetty, and the McGlinn Island Jetty. The authorized channel width is 100 feet with larger widths at turning basins and bends to facilitate safe vessel navigation, in accordance with Section 110 of the Rivers and Harbors Act of 1958.</p>\n\n<p>Figures 2, 3, 4, and 5 show inset areas of the Swinomish Channel.</p>\n\n<p>The McGlinn Island Jetty access lane project area (Figure 6) is a shallow mudflat bisected by a natural channel approximately 600 ft in length between the east McGlinn Island Jetty and the federal channel. Much of the project area is exposed at lower water levels; water depths are insufficient to allow all but shallow draft vessel access at high tide. Partially buried remnant logs are visible along the natural channel at low tides due to the area&rsquo;s historical use as a temporary log storage area.<br />\n<br />\n<strong>1.4 OBJECTIVES</strong><br />\nThe objectives for this contract are as follows:<br />\n&bull; Conduct a Zostera marina eelgrass survey in the study areas to document and delineate the extent of eelgrass (areal coverage);<br />\n&bull; Quantify Zostera marina eelgrass abundance (characterize the density of eelgrass meadows) within the study areas;<br />\n&bull; Provide high-quality spatial and tabular data suitable for impact assessment, regulatory agency review, and mitigation planning; and<br />\n&bull; Prepare a comprehensive data report that documents all survey methods, data, and findings in accordance with USACE guidance.</p>\n\n<p><strong>1.5 SCOPE</strong><br />\nPerform an eelgrass survey in and around the Swinomish Channel. The services required under this contract are detailed in Part 5 &ndash; Specific Tasks.</p>\n\n<p><strong>1.6 PERIOD OF PERFORMANCE (POP)</strong><br />\nThe Period of Performance shall be nine (9) months (270 days) from time of award to contract completion. Field survey activities shall be conducted between July 1 and August 30, when eelgrass is at peak biomass in Washington.</p>\n\n<p><strong>1.7 GENERAL INFORMATION</strong></p>\n\n<p><strong>1.7.1 Quality Control Plan</strong><br />\nDevelop and maintain an effective Quality Control Plan (QCP) to ensure services are performed in accordance with this PWS. Prepare and submit the QCP in accordance with Part 5 Specific Tasks.</p>\n\n<p><strong>1.7.2 Quality Assurance</strong><br />\nThe USACE will evaluate the Contractor&rsquo;s performance under this contract in accordance with the Performance Requirements Summary (See Section 7.2). The Performance Requirements Summary defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).</p>\n\n<p>On the request of the Contracting Officer&rsquo;s Representative (COR) or any inspector, provide the use of boats, boatmen, laborers, and material forming a part of the ordinary and usual equipment of the sampling team as may be reasonably necessary to inspect the sampling work.</p>\n\n<p><strong>1.7.3 Schedule</strong><br />\nSubmit a project schedule within ten (10) business days after the date of award. The schedule should target sampling with sufficient time for completion of all CLINs. Update the project schedule, at minimum, monthly. Include an updated schedule in all Pay Requests.</p>\n\n<p><strong>1.7.3.1 USACE Review</strong><br />\nInclude two (2) weeks for USACE review of any and all contract deliverables.</p>\n\n<p><strong>1.7.3.2 Recognized Holidays</strong><br />\nThe Contractor is not required to work on Federal Holidays:<br />\nNew Year&rsquo;s Day<br />\nMartin Luther King Jr.&rsquo;s Birthday<br />\nPresident&rsquo;s Day<br />\nMemorial Day<br />\nIndependence Day<br />\nJuneteenth<br />\nLabor Day<br />\nIndigenous Peoples Day (Columbus Day)<br />\nVeterans Day<br />\nThanksgiving Day<br />\nChristmas Day</p>\n\n<p><strong>1.7.3.3 Hours of Operation</strong><br />\nThe Contractor is responsible for being responsive to communication from USACE between the hours of 8:00 a.m. and 4:00 p.m. Pacific Time, Monday through Friday, except Federal holidays or when the USACE facility is closed due to local or national emergencies, administrative closings, or similar USACE-directed facility closings.</p>\n\n<p><strong>1.7.4 Place of Performance</strong><br />\nThe services described in this PWS will be performed in and around the Swinomish Channel and at the Contractor&rsquo;s offices.</p>\n\n<p><strong>1.7.5 Type of Contract</strong><br />\nThe USACE will award a performance-based Firm Fixed Price Contract.</p>\n\n<p><strong>1.7.6 Security Requirements</strong><br />\nThere are no special security requirements. Work will not be conducted at a federal facility of any kind; will not involve the use of USACE equipment or vessels; and will not require access to USACE automated information systems. Refer to Section 1.7.11 for required pre-screening procedures for Contractor key personnel.</p>\n\n<p><u><strong>PLEASE SEE ATTACHED PWS, EVALUATION CRITERIA, &amp; WAGE DETERMINATION for specific information and criteria for this acquisition.&nbsp;</strong></u></p>","origin":"detail"},"contacts":[{"name":"Della S. Overton","role":"primary","email":"della.s.overton@usace.army.mil","phone":"2067646170"},{"name":"Shemekia McMillan","role":"secondary","email":"Shemekia.R.Mcmillan@usace.army.mil"}],"place_of_performance":{"city":{"code":"36780","name":"La Conner"},"state":{"code":"WA","name":"Washington"},"country":{"code":"USA","name":"UNITED STATES"}},"office_address":{"zip":"98134-2329","city":"SEATTLE","state":"WA","country":"USA"},"naics_codes":["541620"],"award":null,"attachments":[{"resource_id":"a6cdf4d3c485472895a044be3e54865c","name":"B.04 Wage Determination 2015-5531 REV 27 - 03Dec25 - 14March2026.pdf","kind":"file","mime_type":".pdf","size_bytes":4812780,"posted_at":"2026-06-10T21:46:24.233Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/a6cdf4d3c485472895a044be3e54865c/download","mirrored":false}],"awards":[],"related":[{"key":"W912DW27RA009","latest_notice_id":"484c94f05a504ed69a612be437e0d2ec","title":"Albeni Falls Dam Breakroom Upgrade","solicitation_number":"W912DW27RA009","notice_type":"o","first_type":"o","first_posted":"2026-10-26","last_posted":"2026-10-26","notices":1,"due_at":"2026-11-30T20:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T20:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912DW","office_name":"W071 ENDIST SEATTLE","naics":"237990","psc":"Z2JZ","set_aside":null,"state":"ID","county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"site","state_source":"sam_street","state_evidence":"ALBENI FALLS DAM POWERHOUSE 2376 E. HIGHWAY 2, OLDTOWN, ID 83822","site":"Albeni Falls Dam","site_key":"albeni-falls-dam-id","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":true,"removed_at":null,"updated_at":"2026-10-28T04:57:21.121242Z"},{"key":"W912DW27QA006","latest_notice_id":"d79427ee4ca2483697db671e9a692aa4","title":"Mud Mountain Dam Sewage Lagoon Repair","solicitation_number":"W912DW27QA006","notice_type":"k","first_type":"k","first_posted":"2026-11-09","last_posted":"2026-11-23","notices":3,"due_at":"2026-12-01T18:00:00Z","due_date":"2026-12-01","closes_at":"2026-12-01T18:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912DW","office_name":"W071 ENDIST SEATTLE","naics":"237110","psc":"Z2ND","set_aside":"SBA","state":"WA","county":"53033","county_name":"King County","city":"5322045","city_name":"Enumclaw","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-24T04:44:58.053639Z"},{"key":"W912DW27RA011","latest_notice_id":"6b9f6a0ddd3b49e9ac62b28b95e89f26","title":"$300M Indefinite Delivery / Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) for Facilities Sustainment, Restoration, and Modernization (FSRM) Program at Joint Base Lewis-McChord (JBLM)","solicitation_number":"W912DW27RA011","notice_type":"r","first_type":"r","first_posted":"2026-08-26","last_posted":"2026-11-17","notices":4,"due_at":"2026-12-01T22:00:00Z","due_date":"2026-12-01","closes_at":"2026-12-01T22:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912DW","office_name":"W071 ENDIST SEATTLE","naics":"236220","psc":"Y1JZ","set_aside":null,"state":"WA","county":"53053","county_name":"Pierce County","city":null,"city_name":null,"country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":"Joint Base Lewis-McChord","site_key":"joint-base-lewis-mcchord-wa","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-18T05:19:57.406887Z"},{"key":"W912DW27RA014","latest_notice_id":"365a0af20ef74105bf6b4bcde03def94","title":"JOINT BASE LEWIS MCCHORD MULTI DOMAIN TASK FORCE BUILDINGS 3223-3224, WASHINGTON","solicitation_number":"W912DW27RA014","notice_type":"o","first_type":"p","first_posted":"2026-09-16","last_posted":"2026-11-06","notices":6,"due_at":"2026-12-11T19:00:00Z","due_date":"2026-12-11","closes_at":"2026-12-11T19:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912DW","office_name":"W071 ENDIST SEATTLE","naics":"236220","psc":"Y1AZ","set_aside":"SBA","state":"WA","county":null,"county_name":null,"city":null,"city_name":null,"country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":"Joint Base Lewis-McChord","site_key":"joint-base-lewis-mcchord-wa","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-07T04:54:53.607561Z"},{"key":"DACA675270004100","latest_notice_id":"49c305eeee174fe19d0f4f0775dbebbf","title":"DACA675270004100 - United States Army Corps of Engineers (USACE) seeks to lease approximately 628 square feet of retail space in Aberdeen, WA for an Armed Forces Career Center","solicitation_number":"DACA675270004100","notice_type":"o","first_type":"o","first_posted":"2026-11-24","last_posted":"2026-11-24","notices":1,"due_at":"2026-12-15T07:59:00Z","due_date":"2026-12-14","closes_at":"2026-12-15T07:59:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912DW","office_name":"W071 ENDIST SEATTLE","naics":"531120","psc":"X1AA","set_aside":null,"state":"WA","county":"53027","county_name":"Grays Harbor County","city":"5300100","city_name":"Aberdeen","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-25T05:14:59.249783Z"}],"similar_open":[{"key":"W912HY27X1CX7","latest_notice_id":"4778725f3c034c92aa12e5e7d30ffd0c","title":"USACE - SWG Environmental Services for Evaluation of Dredged Material","solicitation_number":"W912HY27X1CX7","notice_type":"r","first_type":"r","first_posted":"2026-11-10","last_posted":"2026-11-12","notices":2,"due_at":"2026-11-25T20:00:00Z","due_date":"2026-11-25","closes_at":"2026-11-25T20:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912HY","office_name":"W076 ENDIST GALVESTON","naics":"541620","psc":"B510","set_aside":null,"state":"TX","county":"48167","county_name":"Galveston County","city":"4828068","city_name":"Galveston","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-13T05:18:31.697344Z"},{"key":"W9128A27Z1CVM","latest_notice_id":"ac6ea778bef840589122d595377d6a8f","title":"Fence-To-Fence Environmental Services for Hickam Air Force Base, Hawaii, Air Force Civil","solicitation_number":"W9128A27Z1CVM","notice_type":"r","first_type":"r","first_posted":"2026-11-05","last_posted":"2026-11-05","notices":1,"due_at":"2026-11-25T22:00:00Z","due_date":"2026-11-25","closes_at":"2026-11-25T22:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W9128A","office_name":"W2SN ENDIST HONOLULU","naics":"541620","psc":"F999","set_aside":null,"state":"HI","county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"site","state_source":"title","state_evidence":"ENCE ENVIRONMENTAL SERVICES FOR HICKAM AIR FORCE BASE, HAWAII","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-06T04:46:59.158685Z"},{"key":"FA468627CULTURALRESOURCE","latest_notice_id":"5b37835faa314ebdb219206f05db7df5","title":"SR-71 Cultural Resource Management Service","solicitation_number":"FA468627CulturalResource","notice_type":"r","first_type":"r","first_posted":"2026-11-23","last_posted":"2026-11-23","notices":1,"due_at":"2026-11-27T18:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T18:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-057","dept_name":"DEPT OF DEFENSE","sub_key":"s-5700","sub_name":"DEPT OF THE AIR FORCE","office_key":"o-FA4686","office_name":"FA4686 9 CONS PK","naics":"541620","psc":"B503","set_aside":"SBA","state":"CA","county":"06115","county_name":"Yuba County","city":"0604576","city_name":"Beale AFB","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-24T04:44:58.053639Z"}],"similar_open_total":17,"indexable":false}