Skip to content

SealedBidder is a private company, not a government agency.

Sign upDashboard
  • 8,703 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell SealedBidder what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and SealedBidder tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans

Special notice

INDUSTRY DAY – Willapa Harbor Maintenance Dredging

W912DW25Z1AEL

Department of the Army, W071 Endist Seattle. Other Heavy and Civil Engineering Construction.

Response deadline

October 31, 2025 at 2:00 PM EDT

Closed 391 days ago. Posted September 22, 2025, first published August 12, 2025. Scheduled to archive November 15, 2025.

Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities

This one closed in 2025

143 like it are open now in other heavy and civil engineering construction

All 143 open in other heavy and civil engineering construction

Reading this notice

Worked out from the publications and the award on this page.

Kind of notice
Special notice. Industry days, draft requirements, program announcements and other notices that are not a solicitation. Glossary

Description

As published on SAM.gov.

INDUSTRY DAY – Willapa Harbor Maintenance Dredging  

LOCATION: Virtual - information provided below.

DATE: 27 August 2025

TIME: 11:00 AM to 12:00 PM PDT

DESCRIPTION:

The United States Army Corps of Engineers (USACE), Northwestern Division - Seattle District (NWS) is hosting a Virtual Industry Day on 27 AUGUST 2025 to provide additional information and gain feedback from industry on the upcoming Willapa Harbor Maintenance Dredging project in Willapa Harbor, Washington. The Government is seeking qualified, experienced sources capable of performing this type of project. 

The agency has been tasked to solicit for and award a construction contract to maintenance dredge the Bay Center, Nahcotta, and Tokeland Federal Navigation Channels to their authorized depths. Up to 180,000 CYis expected to be dredged across the three features via mechanical clamshell dredging. The minimum required dredging depth varies from -10 ft (Bay Center and Nahcotta) to -15 ft (Tokeland), MLLW, +2 ft overdepth at each location. In addition, dredging approximately 10,000 CY to a minimum depth of -9 ft MLLW (+1 ft overdepth) may be required in the Bay Center/Palix River Access Lane to ensure sufficient water depths for the dredge, scow, and tugboats to transit between Bay Center and the disposal sites. This amount has the potential to change due to the dynamic nature of the Palix River at its confluence with Willapa Bay.

Dredged material will be disposed via bottom dump scow at the Cape Shoalwater open-water dispersive disposal site or the South Channel open-water dispersive disposal site. Work is anticipated to begin in summer 2026. The work window varies by project features. For any given calendar year, the in-water work windows are as follows:

  • Bay Center/Palix River: 16 Jul through 30 Sep
  • Nahcotta: 16 Jul through 01 Feb
  • Tokeland: 16 Jul through 15 Feb

Willapa Bay presents significant navigational hazards due to its exposed Pacific Ocean entrance, unmaintained channels, shifting shoals, and unpredictable weather. This performance window includes the worst season for storm and marine conditions. The U.S. Coast Guard has removed aids-to-navigation at Willapa Bar because of unreliable conditions, and their Waterways Analysis notes over 50 unreported groundings annually. These hazards present serious safety concerns for contractors and local users, complicating mobilization and dredging operations throughout the project area.

In accordance with Federal Acquisition Regulation (FAR) Part 36, the estimated construction price range for this project is: Between $5,000,000 and $10,000,000. Estimated duration of the dredging activities is 3-7 months.

The VIRTUAL Industry Day Event will take place on 27 August 2025 at 11:00 AM PDT via Microsoft Teams. Below is the link to attend this webinar.

https://dod.teams.microsoft.us/dl/launcher/launcher.html?url=%2F_%23%2Fl%2Fmeetup-join%2F19%3Adod%3Ameeting_ff5464873ff6416fb1822488f8a5a2cd%40thread.v2%2F0%3Fcontext%3D%257b%2522Tid%2522%253a%2522fc4d76ba-f17c-4c50-b9a7-8f3163d27582%2522%252c%2522Oid%2522%253a%25225cb3aa4d-8770-4cff-98b2-d1a683592a19%2522%257d%26anon%3Dtrue&type=meetup-join&deeplinkId=addc7419-dc31-4a9f-97a2-192cb094757f&directDl=true&msLaunch=true&enableMobilePage=true&suppressPrompt=true

Meeting ID: 993 814 531 787

Passcode: oq6AP9Xb

Dial in by phone

+1 503-207-9433,,485835812# United States, Beaverton

Find a local number

Phone conference ID: 485 835 812#

Please send the following information via email to Geraldine L. Kemp, Contract Specialist, at Geraldine.L.Kemp@usace.army.mil  and Gabija Karosas, Project Manager, at Gabija.Karosas@usace.army.mil and reference the Virtual Willapa Bay Dredging in the subject line if you are interested in attending the virtual Industry Day.

Name of Company and Unique Entity ID (UEI)

Major Industry:

Prime or Sub

Small Business Program Inquiries:[GK7] [SB8] [GK9] 

Enshane Hill-Nomoto

https://www.nws.usace.army.mil/Business-With-Us/Small-Business/

Thank you for your interest in this USACE project.

Attachments

Links the agency listed on SAM.gov. They open the sites it named, not files on SAM.gov.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. August 12, 2025

    Special notice

    Due August 27, 2025 at 2:00 PM EDT. SAM.gov, notice cdc9abe07f9d4929abb9a0f863836f86

    3 revisions on SAM
    • September 22, 2025: publish, special notice
    • September 3, 2025: publish, special notice
    • August 12, 2025: publish, special notice
  2. September 3, 2025

    Special notice

    Due October 31, 2025 at 2:00 PM EDT. SAM.gov, notice b595afa18a2f4aca99ca070773219c54

    3 revisions on SAM
    • September 22, 2025: publish, special notice
    • September 3, 2025: publish, special notice
    • August 12, 2025: publish, special notice
  3. September 22, 2025

    Special notice

    Due October 31, 2025 at 2:00 PM EDT. SAM.gov, notice 45ac8931cb9d465f942e0191a6b2c756

    3 revisions on SAM
    • September 22, 2025: publish, special notice
    • September 3, 2025: publish, special notice
    • August 12, 2025: publish, special notice

Points of contact