Sources sought
JBLM MDTF BLDGs 3223-3224 Construction Consolidation, Joint Base Lewis McChord, Washington
W912DW25R12MB
Department of the Army, W071 Endist Seattle. Commercial and Institutional Building Construction.
Response deadline
February 19, 2025 at 4:00 PM EST
Closed 645 days ago. Posted February 12, 2025. Scheduled to archive March 6, 2025.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed in 2025
193 like it are open now in commercial and institutional building construction
- $300M Indefinite Delivery / Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) for Facilities Sustainment, Restoration, and Modernization (FSRM) Program at Joint Base Lewis-McChord (JBLM)
Department of the Army, W071 Endist Seattle
Due in 5 daysDec 1 - Design-Build Modernization of the LPOE in Lynden, Washington Sources Sought
Public Buildings Service, PBS Capital Projects - Zones 5 & 6 Branch
Sources soughtNAICS 236220Lynden, WALPOE_LYNDEN_SSDue in 7 daysDec 3 - JOINT BASE LEWIS MCCHORD MULTI DOMAIN TASK FORCE BUILDINGS 3223-3224, WASHINGTON
Department of the Army, W071 Endist Seattle
Closes in 15 daysDec 11
All 193 open in commercial and institutional building construction
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Sources sought. Market research. The agency wants to know who could do the work before it decides how to compete it. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 236220 (commercial and institutional building construction), means no more than $45 million in average annual receipts, counted with affiliates. What a set-aside is
- What comes next
- No solicitation was published under this number after the sources sought of February 12, 2025. An agency sometimes issues the solicitation under a new number.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
General work will convert two (2) existing barrack buildings into operational facilities for 3 tier levels of command. These buildings in general are referred as “the Hammer Heads”. The Hammer Handles have three (3) floors with a crawl space at grade elevation. The Hammer Heads are single floor. The Basement area with a main utility mechanical & electrical room extends partially under both the Hammer Head and the Hammer Handle.
Project work will preserve existing columns, beams, floors, and roof structural framing.
The definitive removal / demolition work items for each building will require:
a) Hazardous material / debris abatement and removal mostly within the crawl space
b) Partial at ~ 75% removal / demolition of exterior building envelope, interior walls, etc,
c) Removal at ~ 90% removal of building mechanical – electrical systems
d) Removal of the existing roof EPDM system
(but not the roof framing structure)
The definitive repair / new work items for each building will require:
e) New exterior envelope
f) New building mechanical – electrical systems
g) New roof TPO system
Other considerations for site work coordination
a) New utility connections (mostly by other entities)
b) Shared construction boundaries with adjacent current and future projects
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- W912DW25R12MB-Sources Sought.pdf111 KB, February 12, 2025
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
February 12, 2025
Sources sought
Due February 19, 2025 at 4:00 PM EST. SAM.gov, notice da224054530a4671a14ba1b248adc86d
1 revision on SAM
- February 12, 2025: publish, sources sought
Points of contact
- Andrea JacksonAndrea.G.Jackson@usace.army.mil
- Cassandra Gonzalezcassandra.p.gonzalez@usace.army.mil2063163877