Award notice, total small business set-aside, first published as solicitation
CJD Inverter Replacement
W912DW24Q0011
Department of the Army, W071 Endist Seattle. All Other Miscellaneous Electrical Equipment and Component Manufacturing.
Awarded
$144,000.00 obligated so far on USAspending
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one was awarded in 2024
90 like it are open now in all other miscellaneous electrical equipment and component manufacturing
- CIRCUIT CARD ASSEMB
Department of the Navy, NAVSUP Weapon Systems Support Mech
SolicitationNAICS 335999Ship to the buyerN0010427QUA34Due tomorrowNov 27 - FIXTURE,LED LIGHT
Department of the Navy, NAVSUP Weapon Systems Support Mech
SolicitationNAICS 335999Ship to the buyerN0010427QBB10Due tomorrowNov 27 - AMPLIFIER,RADIO FRE
Department of the Navy, NAVSUP Weapon Systems Support Mech
SolicitationNAICS 335999Ship to the buyerN0010427QQA02Due tomorrowNov 27
All 90 open in all other miscellaneous electrical equipment and component manufacturing
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Award notice. Who won, when, and for how much. Glossary
- Who may compete
- Total small business set-aside. Only small businesses may compete. Small, under NAICS 335999 (all other miscellaneous electrical equipment and component manufacturing), means no more than 600 employees, counted with affiliates. Open Small business opportunities
- Time to respond
- Bidders had 14 days from the day the solicitation was posted, January 10, 2024, to the deadline.
- How it ended
- Awarded to United Sales Assoc Inc. on February 13, 2024, 20 days after offers were due. The contracting office reported 8 offers (competed under simplified acquisition procedures).
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov with the solicitation of January 10, 2024.
Chief Joseph Dam RTU Inverter Replacement MATERAILS REQUIRED: Materials will be inspected at the delivery point prior to acceptance. Contractor shall be responsible for maintaining the product’s condition as specified until the point of acceptance. Vendors shall supply the following items in the sizes and quantities specified to satisfy the requirements of this contract. New equipment only; no remanufactured or “gray market” items. All items must be covered by manufacturer’s warranty.
DELIVERY LOCATION: US Army Corps of Engineers Chief Joseph Dam Highway 17 and Pearl Hill Rd Bridgeport, WA 98813-1120 Note: All items shall be delivered FOB destination to Chief Joseph Dam within 150 days of contract award. No shipments are allowed other than normal business hours of Monday through Thursday 0700 – 1600, excluding federal holidays. Contractor shall supply eight (8) inverters to the specification below. All eight inverters shall be identical in make and model to each other.
INVERTER SPECIFICATIONS:
5kVA Inverter DC Input:
Voltage:
125VDC Nominal Low Voltage Cutoff:
105-110VDC High Voltage Cutoff:
140-150VDC DC Low Voltage Reset:
115VDC Current:
34-40A DC AC Line Input:
Voltage:
105-135 VAC, 120VAC Nominal Frequency:
58.5 – 61.5 Hz, 60 Hz Nominal Current:
30-50A AC Output:
Voltage:
120VAC Frequency:
60Hz Current: 30-50A AC Maximum Pad-lockable Circuit Breakers for both DC input and Bypass circuits. Cable Entry for the inverter shall be from the bottom.
PCB Conformal Coating Fungus and Moisture Proof Front Panel Display: Display shows at a minimum Model Number, Serial Number, KVA, Voltage (DC, AC, Bypass), Amperage (DC, AC, Bypass), Hertz, Date and Time Display has detailed indications showing critical information to the user, such as normal and abnormal conditions, faults, and troubleshooting information for the inverter.
Annunciation on the panel should contain the following (at a minimum): Bypass Source Failure Bypass Supplying Load Fan Failure – If manufacture recommends fan cooling. Inverter Failure Low DC Voltage DC Breaker Open High DC Voltage Ground Fault (with ability to disconnect if affecting plant ground fault detection) Overtemperature Low AC Output Voltage High AC Output Voltage Fuse Blown Overload Shutdown Annunciation shall have a test alarm function.
Communications - Modbus TCP Humidity: 0 to 95% with no condensation Inverters shall conform to UL 1778 and NEMA 250. The inverters steady state output voltage regulation shall not change more than +/- 2 percent under any of the following conditions: 0-100 percent and 100-0 percent load change Minimum to maximum DC bus voltage The harmonic distortion shall be less than 5 percent total harmonic distortion.
Overload Capability: The inverters shall, at a minimum, be capable of suppling loads up to 100 percent of the rated load continuously, 125 percent of the rated load for a minimum of 10 minutes without transfer to the bypass, 150 percent of the rated load for 1 minute without transfer to the bypass.
Over Temperature: Upon heat sink over temperature, the inverters shall automatically transfer the load to the bypass source. If the overtemperature occurs for more than 60 seconds, the DC/battery input breaker shall trip protecting the bridge from damage. Manual retransfer of the load onto the inverters shall be permitted only after the temperature returns to normal.
Cooling: The inverter shall be designed for ambient temperatures of 0 to 40 degrees Celsius, and forced air cooled if recommended by manufacture in those ambient temperatures. Audible noise at 1.5 meters shall be less than 72 dBA Each inverter efficiency shall be at least 85 percent at full load. The inverters shall include a high-speed, static transfer switch. It shall provide an automatic transfer of the load to the bypass if any of the following conditions occur: The inverter bridge fails.
The inverter overcurrent condition occurs. The inverter outputs an over/undervoltage +/- 10 percent for longer than 1 cycle. Low DC disconnect. The manual pushbutton is operated. Inverters shall have a manual bypass switch. The manual bypass switch for each inverter shall be an integral part of the inverter that is a make-before-break switch used to bypass the inverter and static transfer switch for maintenance purposes.
An indicator light shall be provided to indicate the following conditions (as a minimum): Bypass and normal source in-sync Bypass source available Normal source available There shall be a front cabinet accessible means for testing the indicating lights of each manual bypass switch. Each manual bypass switch shall have three (3) positions as follows:
Normal – Load fed from inverter. Test – Load fed from bypass source through manual bypass switch. Bypass – Load fed from bypass source, completely isolating the manual bypass switch and the inverter. Spare parts: At a minimum, provide two of each printed circuit board, spare fuses, spare fans, and provide spare consumables used for maintenance. Footprint mounting shall not exceed 36” x 36”. All software and licensing for inverters will be supplied. Inverters will come with two complete sets of Operation and Maintenance Manuals as well as Drawings for troubleshooting.
The contract, on USAspending
Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.
- Recipient
- United Sales Assoc Inc.
- UEI
- JTMGKVB84KB9
- CAGE
- 2Z053
- Vendor location
- Lake Oswego, OR
- Contract
- W912DW24P0014, purchase order
- Obligated
- $144,000.00
- Actions
- 2 between February 13, 2024 and July 10, 2024
- Competition
- Competed Under SAP, 8 offers received
- Set-aside reported
- Small Business Set Aside - Total
- Described as
- Rtu Power Inverter
- Match
- award number W912DW24P0014 equals the contract number; same awarding office W912DW (high confidence)
- Record
- USAspending award page
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
Points of contact
- Michael Houtsmichael.s.houts@usace.army.mil2063163009
- Alex R. Marcinkiewiczalex.marcinkiewcz@usace.army.mil