Skip to content

SealedBidder is a private company, not a government agency.

Sign upDashboard
  • 8,678 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell SealedBidder what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and SealedBidder tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans

Sources sought

Sources Sought Notice for Sole Source Market Research for the PN096278 FY26MCA Electrical Switching Station-North project at Watervliet Arsenal (WVA), New York.

W912DS26S0033

Department of the Army, W2SD Endist New York. Commercial and Institutional Building Construction.

Response deadline

June 12, 2026 at 2:00 PM EDT

Closed 167 days ago. Posted May 28, 2026. Scheduled to archive June 27, 2026.

Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities

This one closed in 2026

191 like it are open now in commercial and institutional building construction

All 191 open in commercial and institutional building construction

Reading this notice

Worked out from the publications and the award on this page.

Kind of notice
Sources sought. Market research. The agency wants to know who could do the work before it decides how to compete it. Glossary
Who may compete
SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 236220 (commercial and institutional building construction), means no more than $45 million in average annual receipts, counted with affiliates. What a set-aside is
What comes next
No solicitation was published under this number after the sources sought of May 28, 2026. An agency sometimes issues the solicitation under a new number.

Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.

Description

As published on SAM.gov.

The New York District plans to solicit and award a construction contract for subject project in FY26. The scope of the project is:

To construct a generator connection terminal to provide backup power to the Arsenal in the event of a long-term power outage from the facility’s Main Substation. The primary scope includes electric manholes, duct bank, grounding cable, fencing, switchgear, transfer switches, cables, generator procurement and installation, splices and connections. Supporting facilities include paving, walks, curbs, gutters, and utilities testing and commissioning.

This project will construct a switching station capable of feeding 4MW of power into the existing WVA distribution network and constructing a facility capable of 8MW of power generation needed to power the WVA during an emergency loss of power. The facilities will increase the existing switching station capacity from 4MW to the full 8MW needed for powering the installation fully while also providing the means of that power generation. The project also includes the construction of all necessary utility interconnections to bring fuel to the power generation facility and to connect the switching station to the existing electrical distribution network. The installation of controls for the auto start of this power generation and distribution switch are also included in this project.

1. This notification serves three (3) purposes:

a. To notify potential bidders of the Government’s intent to solicit a brand name(s) only component for this project.

b. To identify potential sources that can provide an equivalent to the brand name only item(s).

c. Notification of the Army’s intent to solicit brand name components as described below.

2. The items described below, under summary of requirements, are embedded in the construction project. The contract will be issued as a one-step negotiated procurement. Only the components described below will be sole sourced, if no other sources are identified that can provide an equivalent system. In the event no equivalent sources are found, the brand name only justification will be issued pursuant to FAR Part 6.302-1, Only One Responsible Source. A subsequent market survey will not be published in support of a Justification and Approval for sole sourcing. Supplies of the brand name component will be provided directly to the Contractor(s) and not to the Government.

3. Summary of Requirements:

a. Mechanical Controls System

The requirement is to sole-source a requirement for brand-name Johnson Controls Inc. (JCI) Metasys components, programming, and engineering modifications to support the installation of the sitewide electrical switching project. The purpose of this acquisition is to integrate new control equipment into the existing-to-remain Building Automation System (BAS) infrastructure. Currently, WVA relies heavily on proprietary JCI Metasys controllers and software to monitor and control facility systems. Utilizing OEM-compatible JCI Metasys equipment is technically necessary to ensure full compatibility with the existing base-wide Metasys server and associated field devices, while following the guidelines outlined in Unified Facilities Guide Specifications (UFGS) 25 10 10. Proprietary control system appliances are required to achieve synchronization of telemetry signals with the remainder of the facility, leveraging the existing Metasys network as the primary communications backbone for remote monitoring and electrical switching commands.

After careful review of the necessary project scope, the Government has determined that maintaining compatibility with the existing software infrastructure used for building servicing is essential. Therefore, the decision has been made to continue using the JCI Metasys product line for these new controls. This choice is driven by the strict requirement to ensure seamless integration and operation within the current system without impairing its existing cybersecurity posture or reliability. The Utility Monitoring and Control System (UMCS) modifications must be delivered as a complete, networked architecture that provides real-time, point-to-point telemetry reporting to the local supervisory engines, which in turn report directly to the central Metasys front-end server. Because the existing facility infrastructure is standardized on this platform, utilizing proprietary JCI components is the only way to ensure the uninterrupted, reliable control necessary for this critical mission-support infrastructure

4. Any vendor that wishes to provide an alternate source to the brand names above that is compatible with the above must provide a response with data supporting the claim within 15 business days of this announcement to New York District Corps of Engineering, Contracting Division.

This is a market survey and notification of intent only. This is not a request to respond to a solicitation. This requirement will be solicited at a future date.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. May 28, 2026

    Sources sought

    Due June 12, 2026 at 2:00 PM EDT. SAM.gov, notice 13da56d1746f452d9bd6c50806b398aa

    1 revision on SAM
    • May 28, 2026: publish, sources sought

Points of contact