Presolicitation
Advance Notice: Maintenance Dredging of New York Harbor, Sandy Hook Federal Navigation Channel
W912DS26BA018
Department of the Army, W2SD Endist New York. Other Heavy and Civil Engineering Construction.
Response deadline
May 14, 2026 at 5:00 PM EDT
Closed 195 days ago. Posted July 17, 2026, first published May 1, 2026. Scheduled to archive May 29, 2026.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed in 2026
144 like it are open now in other heavy and civil engineering construction
- Sources Sought Notice: Cape May Railroad Dredged Material Placement Facility (DMPF) Maintenance Repairs
Department of the Army, W2SD Endist Philadelphia
Sources soughtSmall businessNAICS 237990New JerseyW912BU27BA009Due in 7 daysDec 2 - CONS: 807CM3026 Crown Hill NC - Stormwater Infrastructure Improvements (VA-26-00082593)
Department of Veterans Affairs, National Cemetery Admin
PresolicitationSDVOSBNAICS 237990Indianapolis, IN36C78626B0031Due todayNov 25 - FAIR Route 3 - 96-inch CMP Replacement Project
Bureau of Indian Affairs, Bureau of Indian Affairs
Combined synopsis and solicitationIndian small businessNAICS 237990Location not published140A1627Q0105Due todayNov 25
All 144 open in other heavy and civil engineering construction
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Presolicitation. Advance notice that a solicitation is coming, usually within a few weeks. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 237990 (other heavy and civil engineering construction), means no more than $45 million in average annual receipts, counted with affiliates. What a set-aside is
- What comes next
- No solicitation has been published under this number yet. The presolicitation of May 1, 2026 is the earliest notice of the purchase.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
Proposed Dredging - Maintenance Dredging of Sandy Hook Channel, New York Harbor, Federal Navigation Project.
Background Information
The New York District of the U.S. Army Corps of Engineers (USACE) proposes to perform maintenance dredging of the New York Harbor, Sandy Hook Federal Navigation Channel. The dredged material would be dredged and subsequently transported to and placed at the Sea Bright Offshore Borrow Area (SBOBA), 5 miles southeast of Sandy Hook Point, NJ. The proposed maintenance dredging would remove approximately 190,000 cubic yards of selected critical shoals from the Sandy Hook Channel. Dredging would be required to a depth of -35 feet Mean Lower Low Water (MLLW) plus 2 feet of allowable overdepth. The dredged material is expected to consist primarily of sand and gravel.
The purpose of the proposed work is to alleviate the effects of shoaling and restore the authorized project dimensions, thereby providing safe and economical use of Sandy Hook Channel by military, commercial and recreational boating interests while providing future beneficial use of the dredged material.
Based on past dredging cycles, it is recommended that the proposed work only be performed by utilizing a mechanical dredge with a clamshell bucket. Additionally, multiple ocean-going barges, tug boats and ancillary equipment will be needed to perform the dredging, transport and placement activities. The entire channel will generally not require maintenance dredging; only areas where shoaling has reduced the depth of the channel will require dredging. The dredged material would be required to meet all federal, state, and local criteria required by the government agencies having jurisdiction where the placement site is located.
The Contractor will be required to commence work within five (5) calendar days after the date of receipt of the notice to proceed, and to prosecute said work diligently and to complete all basic work ready for use not later than ninety (60) calendar days after the receipt by him of the notice to proceed (NTP). The contractor is required to maintain an integrated production of at least 8,000 cubic yards per calendar day.
The work is estimated to cost between $1,000,000 and $5,000,000. Solicitation for the subject project is expected to be available in June 2026, with bid opening in July 2026. It is the intention of the government to award in August 2026 and issue the NTP within fourteen (14) calendar days of the award date.
Liquidated Damages of $3,260.00 per calendar day of delay will be assessed to the contractor until all work under the contract is accepted as complete.
This is an unrestricted Procurement.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Advance Notice - Synopsis FY 26 Sandy Hook Maintenance Dredging.pdf89 KB, May 1, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
May 1, 2026
Presolicitation, originally sources sought
Due May 14, 2026 at 5:00 PM EDT. SAM.gov, notice 211b614094034fd6a408224b89eda269
3 revisions on SAM
- July 17, 2026: publish, presolicitation
- May 1, 2026: publish, presolicitation
- March 17, 2025: publish, sources sought
July 17, 2026
Presolicitation
Due May 14, 2026 at 5:00 PM EDT. SAM.gov, notice c3a26298d4734f6ca5dc25819ca51426
4 revisions on SAM
- July 17, 2026: publish, presolicitation
- July 17, 2026: publish, solicitation
- May 1, 2026: publish, presolicitation
- March 17, 2025: publish, sources sought
Points of contact
- Brian Wintersbrian.h.winters@usace.army.mil
- Nicholas P. Emanuelnicholas.p.emanuel@usace.army.mil9177908069