Presolicitation
Renovation of Building 99 at Pituffik Space Base, Greenland.
W912DS24R0002
Department of the Army, W2SD Endist New York. Commercial and Institutional Building Construction.
Response deadline
October 25, 2025 at 2:00 PM EDT
Closed 397 days ago. Posted October 10, 2024. Scheduled to archive November 9, 2025.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed in 2025
193 like it are open now in commercial and institutional building construction
- FY27 NRM - VISN Base Modernize Nurse Call - 539-23-101
Department of Veterans Affairs, 250-Network Contract Office 10
PresolicitationSDVOSBNAICS 236220Location not published36C25027B0009Due in 4 daysNov 30 - FY27 NRM - VISN Base Install Roof Equipment Railings - 539-22-206
Department of Veterans Affairs, 250-Network Contract Office 10
PresolicitationSDVOSBNAICS 236220Location not published36C25027B0008Due in 4 daysNov 30 - N4008426R7500 DB RMAC FACILITY IMPROVEMENT AT NETDC, SAN ANTONIO, ZAMBALES, PHILIPPINES
Department of the Navy, Navfacsyscom FAR East
SolicitationNAICS 236220Outside the USN4008426R7500Due in 5 daysDec 1
All 193 open in commercial and institutional building construction
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Presolicitation. Advance notice that a solicitation is coming, usually within a few weeks. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 236220 (commercial and institutional building construction), means no more than $45 million in average annual receipts, counted with affiliates. What a set-aside is
- What comes next
- No solicitation was published under this number after the presolicitation of October 10, 2024. An agency sometimes issues the solicitation under a new number.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
ADVANCE NOTICE FOR Renovation of Building 99 at Pituffik Space Base, Greenland. The New York District of the U.S. Army Corps of Engineers (USACE) intends to issue a solicitation package seeking to award a Firm Fixed Price (FFP) contract to for the Renovation of Building 99 at Pituffik Space Base, Greenland. This will be a competitive, 2-Step Best Value Trade-Off Solicitation.
General Conditions at Pituffik Space Base: The location of Thule Air Base limits exterior work to the months of June through September, although work is sometimes possible in May and/or October. Additionally, Thule's location demands that all supplies/personnel must be shipped /transported in/out via air/sealift. Pituffik Space Base is not a commercial air/seaport and there is no other access. Shipping schedules are dictated by Defense contracts, and materials and labor are not available locally.
The region is glaciated, and the existing soil is generally permafrost, which exists from 1 to 6 feet below the surface to a measured depth of 1,600 feet. Winter temperatures average between 20 -30 degrees F below zero while average summer temperatures are between 40-50 degrees F above zero. One annual military cargo sealift departs from Norfolk, Virginia to Thule AB, on or about 1 July. There are two sealifts that leave from Copenhagen, Denmark to Thule AB, one in July & one in August.
Airlifting any materials or equipment via military aircraft is very expensive and only normally allowed on an emergency-need basis. SUMMARY OF WORK Prepare design/build construction documents and provide construction Facility recapitalization of existing three-story dormitory at Pituffik Space Base. Repair work involves site work, utilities, repair of standing seam metal roof and exterior enclosure features, and the complete renovation of interior finishes and fixtures.
Room configurations will remain single room with a partially shared bathroom between two bedrooms per module to accommodate U.S. military personnel E5-E6 (AMN-NCO). Each floor will have renovated common and laundry areas. Mechanical, electrical and control systems will beupdated; fire suppression and keyless entry will be installed. Building 99 was constructed in 1959 and requires life cycle replacement of finishes and systems.
The facility remains to have inadequate living quarters for quality of life and it is unsafe with no fire suppression. The current interior layout is in a 2+2 configuration with shared bathroom and kitchens. Existing room finishes and equipment are nearing the end of their useful life, and facility lacks fire suppression. The 2018 Air Force Dormitory Master Plan (DMP) recommends renovation of this dormitory to allow personnel to vacate flattop dormitories, which are no longer suitable to occupy.
The work is estimated to cost between Between $25,000,000 and $100,000,000. It is the intention of the Government to award 1st or 2nd Quarter of Fiscal Year 2025 and the proposed work is anticipated to take place over approximately 3 years. Liquidated Damages of approximately $5,000.00 per calendar day of delay will be assessed to the contractor until all work under the contract is accepted as complete. This procurement is restricted to Danish and Greenlandic Firms only.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
October 10, 2024
Presolicitation
Due October 25, 2025 at 2:00 PM EDT. SAM.gov, notice ab9aa30ad45743c9b989fefd85997852
Points of contact
- Mohenda R. Suragemohenda.r.surage@usace.army.mil9179408013