# North East River Maintenance Dredging, Cecil County, MD

Canonical: https://sealedbidder.com/opportunities/w912dr26ba007

- Solicitation number: W912DR26BA007
- Notice type: Presolicitation (first published as sources sought)
- Status: Closed. Deadline was June 30, 2026 at 11:00 AM EDT
- Department: Department of the Army
- Agency: Department of the Army
- Contracting office: W2SD Endist Baltimore (W912DR)
- NAICS: 237990 Other Heavy and Civil Engineering Construction
- Product or service code: Z1KF Maintenance Of Dredging Facilities
- Set-aside: Total small business set-aside
- Small business size standard: $45 million in average annual receipts (13 CFR 121.201, NAICS 237990)
- County: Cecil County (FIPS 24015). https://sealedbidder.com/counties/cecil-county-md-24015
- City: North East. https://sealedbidder.com/cities/north-east-md-2456450
- First posted: April 30, 2026
- Last posted: June 15, 2026
- SAM.gov: https://sam.gov/workspace/contract/opp/0dc1aa6bfb86429e98ab07aa6ce22322/view

## Reading this notice

- Kind of notice: Presolicitation. Advance notice that a solicitation is coming, usually within a few weeks.
- Who may compete: Total small business set-aside. Only small businesses may compete. Small, under NAICS 237990 (other heavy and civil engineering construction), means no more than $45 million in average annual receipts, counted with affiliates.
- What comes next: No solicitation has been published under this number yet. The sources sought of April 30, 2026 is the earliest notice of the purchase.

## Description

The project consists of using a hydraulic cutterhead pipeline dredge in North East River to remove material to its authorized depth of 7 feet (plus two feet of allowable over depth). Up to 100,000 cubic yards of silty to sandy material are to be dredged. Material will be transported via pipeline to the existing upland placement site. Pipeline distance will be approximately 6 miles from the furthest dredging location. The pipeline will travel through the North East River, up Stony Run creek, and over tidal and nontidal wetlands to reach the existing upland placement site. The dredging window is from 16 October 2026 to 15 February 2027; this is the only period of time dredging is allowed in the North East River. The estimated magnitude of construction is between $1,000,000.00 and $5,000,000.00. The construction duration will be  approximately 120 calendar days from the Notice to Proceed.

## Attachments

- [dodprocurementtoolbox.com](https://dodprocurementtoolbox.com/) (link)

## Open now in the same industry

143 open in NAICS 237990.

- Mid-Bay James Island Restoration Phase 2 (W912DR27BA001), due December 14, 2026 at 11:00 AM EST. https://sealedbidder.com/opportunities/w912dr27ba001
- FAIR Route 3 - 96-inch CMP Replacement Project (140A1627Q0105), due November 25, 2026 at 5:00 PM EST. https://sealedbidder.com/opportunities/140a1627q0105
- United States Air Force Academy (USAFA) Varsity Baseball Stadium (NAF128F27B0001), due November 27, 2026 at 3:00 AM EST. https://sealedbidder.com/opportunities/naf128f27b0001

## Publications

- April 30, 2026: Sources sought, due May 15, 2026 at 11:00 AM EDT. Notice 5766f4a1aeaf4eca8fa7cd2a9dbc44c2. https://sam.gov/workspace/contract/opp/5766f4a1aeaf4eca8fa7cd2a9dbc44c2/view
- May 19, 2026: Sources sought, due May 26, 2026 at 11:00 AM EDT. Notice 8e1d28c0ea2e49f5a3e41e401430555f. https://sam.gov/workspace/contract/opp/8e1d28c0ea2e49f5a3e41e401430555f/view
- June 15, 2026: Presolicitation, due June 30, 2026 at 11:00 AM EDT. Notice 0dc1aa6bfb86429e98ab07aa6ce22322. https://sam.gov/workspace/contract/opp/0dc1aa6bfb86429e98ab07aa6ce22322/view

## Points of contact

- Lauren Elamenuel, lauren.n.elamenuel@usace.army.mil, 4109625137

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://sealedbidder.com/opportunities/w912dr26ba007.