Sources sought
Total Building Commissioning Services - John Cochran VA Hospital
W912DQ26SS4000
Department of the Army, W071 Endist Kansas City. Engineering Services.
Response deadline
May 26, 2026 at 5:00 PM EDT
Closed 184 days ago. Posted May 18, 2026. Scheduled to archive June 10, 2026.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed in 2026
98 like it are open now in engineering services
- 589-27-108, Correct Electrical Deficiencies in Building 26 KCVA (ME) FY27 NRM VISN Base - AE (VA-27-00021035)
Department of Veterans Affairs, 255-Network Contract Office 15
Sources soughtEDWOSBNAICS 541330Kansas City, MO36C25527Q0057Due in 5 daysDec 1 - 589-27-108, Correct Electrical Deficiencies in Building 26 KCVA (ME) FY27 NRM VISN Base - AE (VA-27-00021035)
Department of Veterans Affairs, 255-Network Contract Office 15
Sources soughtSDVOSBNAICS 541330Kansas City, MO36C25527Q0057_1Due in 5 daysDec 1 - IDIQ Contract for Architect-Engineer (A-E) Services for Ship Homeporting and Related Operational Issues for Various Locations Throughout the Naval Facilities Engineering Systems Command Atlantic Area of Responsibility and Worldwide
Department of the Navy, Navfacsyscom Atlantic
Sources soughtNAICS 541330Norfolk, VAN62470-27-R-0009Due tomorrowNov 27
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Sources sought. Market research. The agency wants to know who could do the work before it decides how to compete it. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 541330 (engineering services), means no more than $25.5 million in average annual receipts, counted with affiliates. What a set-aside is
- What comes next
- No solicitation was published under this number after the sources sought of May 18, 2026. An agency sometimes issues the solicitation under a new number.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
This announcement is to seek market research information on businesses with the capability of providing the services described in the below scope of work. This is not a Request for Quote (RFQ) or Request for Proposal (RFP). THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT SHALL BE AWARDED FROM THIS SOURCES SOUGHT. No reimbursement will be made for any costs associated with providing information in response to this sources sought or any follow up information requests. This notice is a market research tool used for planning purposes only to determine the availability of capable contractors able to do the following:
The Government is anticipating one indefinite delivery contract (IDC) will be negotiated and awarded, with a base ordering period of five years and one option for five additional years. The total value of all task orders issued under this contract will not exceed $9,500,000. The anticipated contract, when solicited, will be procured in accordance with 40 U.S.C Chapter 11 – Selection of Architects and Engineers as implemented in FAR subpart 36.202 and its supplements. A Firm will be selected for negotiation based on demonstrated competence and qualifications for all of the required work. Award of a proposed contract is anticipated by March 2027.
The U.S. Army Corps of Engineers (USACE), Kansas City District (NWK) seeks qualified Commissioning (Cx) firms interested and capable of providing Total Building Commissioning services for the Department of Veteran’s Affairs (DVA) Major Project “657-309 St. Louis JC, Replace Bed Tower, Clinical Building Expansion and Parking Garage.” The commissioning services will be for the project located at 915 N Grand Blvd, St. Louis, MO 63106 known as the VA St. Louis Health Care System – John Cochran (JC) Division medical center. The project is currently in the SD-1 design (15-20%) phase. The project site contains several existing facilities that will be demolished as part of the project to allow for construction of new facilities creating a medical campus. The design will incorporate transition of existing facilities to a new central energy plant prior to demolition of the existing plant. The project will require phased demolition, phased construction and occupancy of new facilities.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Cx_Sources_Sought.pdf74 KB, May 18, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
May 18, 2026
Sources sought
Due May 26, 2026 at 5:00 PM EDT. SAM.gov, notice 08d79681df0648c7a3b5a3b19043cfd3
1 revision on SAM
- May 18, 2026: publish, sources sought
Points of contact
- William J. Hillwilliam.j.hill@usace.army.mil8163893243
- LACY KAYlacy.kay@usace.army.mil8163893509