Solicitation, total small business set-aside
PSL Cell 9 Upgrade
W912CH-24-R-L007
Department of the Army, W4GG HQ US Army TACOM. All Other Miscellaneous Electrical Equipment and Component Manufacturing.
Response deadline
August 1, 2024 at 2:00 PM EDT
Closed 846 days ago. Posted July 24, 2024, first published April 25, 2024. Scheduled to archive August 16, 2024.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed in 2024
88 like it are open now in all other miscellaneous electrical equipment and component manufacturing
- CABLE ASSEMBLY,SPECIAL
Defense Logistics Agency, DLA Aviation
Combined synopsis and solicitationSDVOSBNAICS 335999Ship to the buyerSPE4A627T104ZDue tomorrowNov 25 - FIXTURE,LED LIGHT
Department of the Navy, NAVSUP Weapon Systems Support Mech
SolicitationNAICS 335999Ship to the buyerN0010427QBB10Due in 2 daysNov 27 - CIRCUIT CARD ASSEMB
Department of the Navy, NAVSUP Weapon Systems Support Mech
SolicitationNAICS 335999Ship to the buyerN0010427QUA34Due in 2 daysNov 27
All 88 open in all other miscellaneous electrical equipment and component manufacturing
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
- Who may compete
- Total small business set-aside. Only small businesses may compete. Small, under NAICS 335999 (all other miscellaneous electrical equipment and component manufacturing), means no more than 600 employees, counted with affiliates. Open Small business opportunities
- Time to respond
- Bidders had 98 days from the day the solicitation was posted, April 25, 2024, to the deadline. The deadline moved 5 times: it was first May 16, 2024 and ended as August 1, 2024.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
C.1 Project Title: PSL, Cell 9, Shielded Wiring for Electrified Powertrain Testing C.2 Objectives: Electrified power train components and electrified propulsion continue to be developed and tested by the US Army, Ground Vehicle Systems Center (GVSC), Ground Vehicle Power and Mobility (GVPM), Propulsion Systems Laboratory (PSL) facility.
The electrified propulsion technologies under development emit an Electromagnet Interference (EMI) that can be disruptive to the accuracy and control of the existing Data Acquisition (DAQ) equipment. The existing DAQ equipment typically uses wiring and cables compatible with the low EMI interference generated from the testing of conventional mechanical propulsion systems.
New multi-strand wires and cables which are shielded and grounded, specialized probes, and EMI protective jackets are required to accurately test and collect data while testing electrified propulsion technologies. Currently, GVPM cell 9 is the only test cell capable of performing the critical full load cooling test on an Abrams class vehicle. Cell 9 requires the stated new EMI protected laboratory equipment if full load cooling testing is to be performed on an electrified Abrams.
It is envisioned that the new EMI protected laboratory equipment may also be used in GVPM test cells 2, 4, 5, and the Electrical Components Laboratory (ECL) which are also transitioning towards the development and testing of highly electrified propulsion components, powerpacks, and full vehicles. This action is a Full and Open Competiton. Please see attached Amendment 0003 to Solicitation W912CH-24-R-L007 for full description on SF 30 Block 14 Continuation Page. Questions are due by 28 June 2024 to Rodolfo Hernandez at rodolfo.hernandez-diaz.civ@army.mil.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
April 25, 2024
Solicitation
Due May 16, 2024 at 11:00 AM EDT. SAM.gov, notice 1d3e564a3bd849b0af62462741e07702
May 16, 2024
Solicitation
Due May 31, 2024 at 11:00 AM EDT. SAM.gov, notice 7b79ed0e4189483d98a9ce71a284cce6
May 16, 2024
Solicitation
Due May 31, 2024 at 11:00 AM EDT. SAM.gov, notice 91b89cdb7c95439daa10dea90430d812
June 4, 2024
Solicitation
Due June 7, 2024 at 11:00 AM EDT. SAM.gov, notice 2d5a23a775644428b2bd44900e1323df
June 21, 2024
Solicitation
Due July 11, 2024 at 2:00 PM EDT. SAM.gov, notice c51f4aa6cb5c403885061bcf40e4430c
July 11, 2024
Solicitation
Due July 24, 2024 at 2:00 PM EDT. SAM.gov, notice bb42477c6fbd48d293c90f20456b24b2
July 15, 2024
Solicitation
Due July 24, 2024 at 2:00 PM EDT. SAM.gov, notice 64ca53e4d89f45b28a9945650f6f0637
July 24, 2024
Solicitation
Due August 1, 2024 at 2:00 PM EDT. SAM.gov, notice ce37475ab91c4dd1b91db76b54c493a3
Points of contact
- Rodolfo Hernandez-Diazrodolfo.hernandez-diaz.civ@army.mil