{"canonical":"https://sealedbidder.com/opportunities/w912bv25qa036","key":"W912BV25QA036","url":"https://sealedbidder.com/opportunities/w912bv25qa036","title":"Waterline Boring at Fall River Lake, KS","solicitation_number":"W912BV25QA036","notice_type":"o","open":false,"removed":false,"removed_at":null,"response_deadline":"2025-09-30T19:00:00Z","first_posted":"2025-08-28","last_posted":"2025-09-25","department":"DEPT OF DEFENSE","subagency":"DEPT OF THE ARMY","office":"W076 ENDIST TULSA","naics":"237110","psc":"Y1NZ","set_aside":"SBA","place_state":"KS","place_scope":"site","site":null,"place_state_source":"sam_street","place_evidence":"U.S. ARMY CORPS OF ENGINEERS; RALL RIVER LAKE PROJECT OFFICE; 2543 LAKE ROAD FALL RIVER, KS 67047","place_county":null,"place_county_name":null,"place_city":null,"place_city_name":null,"winner":null,"award_amount":null,"publications":[{"notice_id":"a4d01ccb5854402f95251296780b2c2e","title":"Waterline Boring at Fall River Lake, KS","solicitation_number":"W912BV25QA036","notice_type":"o","base_type":"o","posted":"2025-08-28","posted_at":"2025-08-28T19:35:56.301Z","due_at":"2025-09-23T19:00:00Z","due_date":"2025-09-23","cancelled":false,"archived":true,"archive_date":"2025-10-08","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/a4d01ccb5854402f95251296780b2c2e/view","enriched":true,"history":[{"index":7,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-25T18:12:29.771Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"42b99708a1d74319954f4d239cf5b746","solicitation_number":"W912BV25QA036","parent_opportunity_id":"a4d01ccb5854402f95251296780b2c2e"},{"index":5,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-24T19:53:01.876Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3d8999d1e165429a8f714ae178ae64cb","solicitation_number":"W912BV25QA036","parent_opportunity_id":"a4d01ccb5854402f95251296780b2c2e"},{"index":4,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-22T20:59:15.523Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c7be70bfb376472d8efd6d3f5ef7b1fc","solicitation_number":"W912BV25QA036","parent_opportunity_id":"a4d01ccb5854402f95251296780b2c2e"},{"index":3,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-16T20:11:11.678Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1dc2de8c064849f694d4e6d9e8ce70d8","solicitation_number":"W912BV25QA036","parent_opportunity_id":"a4d01ccb5854402f95251296780b2c2e"},{"index":2,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-04T15:25:52.055Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5004361064804ac8b65798b9752c09c5","solicitation_number":"W912BV25QA036","parent_opportunity_id":"a4d01ccb5854402f95251296780b2c2e"},{"index":1,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-28T19:35:56.301Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a4d01ccb5854402f95251296780b2c2e","solicitation_number":"W912BV25QA036"}]},{"notice_id":"5004361064804ac8b65798b9752c09c5","title":"Waterline Boring at Fall River Lake, KS","solicitation_number":"W912BV25QA036","notice_type":"o","base_type":"o","posted":"2025-09-04","posted_at":"2025-09-04T15:25:52.055Z","due_at":"2025-09-23T19:00:00Z","due_date":"2025-09-23","cancelled":false,"archived":true,"archive_date":"2025-10-08","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/5004361064804ac8b65798b9752c09c5/view","enriched":true,"history":[{"index":7,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-25T18:12:29.771Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"42b99708a1d74319954f4d239cf5b746","solicitation_number":"W912BV25QA036","parent_opportunity_id":"a4d01ccb5854402f95251296780b2c2e"},{"index":5,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-24T19:53:01.876Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3d8999d1e165429a8f714ae178ae64cb","solicitation_number":"W912BV25QA036","parent_opportunity_id":"a4d01ccb5854402f95251296780b2c2e"},{"index":4,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-22T20:59:15.523Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c7be70bfb376472d8efd6d3f5ef7b1fc","solicitation_number":"W912BV25QA036","parent_opportunity_id":"a4d01ccb5854402f95251296780b2c2e"},{"index":3,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-16T20:11:11.678Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1dc2de8c064849f694d4e6d9e8ce70d8","solicitation_number":"W912BV25QA036","parent_opportunity_id":"a4d01ccb5854402f95251296780b2c2e"},{"index":2,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-04T15:25:52.055Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5004361064804ac8b65798b9752c09c5","solicitation_number":"W912BV25QA036","parent_opportunity_id":"a4d01ccb5854402f95251296780b2c2e"},{"index":1,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-28T19:35:56.301Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a4d01ccb5854402f95251296780b2c2e","solicitation_number":"W912BV25QA036"}]},{"notice_id":"1dc2de8c064849f694d4e6d9e8ce70d8","title":"Waterline Boring at Fall River Lake, KS","solicitation_number":"W912BV25QA036","notice_type":"o","base_type":"o","posted":"2025-09-16","posted_at":"2025-09-16T20:11:11.678Z","due_at":"2025-09-23T19:00:00Z","due_date":"2025-09-23","cancelled":false,"archived":true,"archive_date":"2025-10-08","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/1dc2de8c064849f694d4e6d9e8ce70d8/view","enriched":true,"history":[{"index":7,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-25T18:12:29.771Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"42b99708a1d74319954f4d239cf5b746","solicitation_number":"W912BV25QA036","parent_opportunity_id":"a4d01ccb5854402f95251296780b2c2e"},{"index":5,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-24T19:53:01.876Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3d8999d1e165429a8f714ae178ae64cb","solicitation_number":"W912BV25QA036","parent_opportunity_id":"a4d01ccb5854402f95251296780b2c2e"},{"index":4,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-22T20:59:15.523Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c7be70bfb376472d8efd6d3f5ef7b1fc","solicitation_number":"W912BV25QA036","parent_opportunity_id":"a4d01ccb5854402f95251296780b2c2e"},{"index":3,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-16T20:11:11.678Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1dc2de8c064849f694d4e6d9e8ce70d8","solicitation_number":"W912BV25QA036","parent_opportunity_id":"a4d01ccb5854402f95251296780b2c2e"},{"index":2,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-04T15:25:52.055Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5004361064804ac8b65798b9752c09c5","solicitation_number":"W912BV25QA036","parent_opportunity_id":"a4d01ccb5854402f95251296780b2c2e"},{"index":1,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-28T19:35:56.301Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a4d01ccb5854402f95251296780b2c2e","solicitation_number":"W912BV25QA036"}]},{"notice_id":"c7be70bfb376472d8efd6d3f5ef7b1fc","title":"Waterline Boring at Fall River Lake, KS","solicitation_number":"W912BV25QA036","notice_type":"o","base_type":"o","posted":"2025-09-22","posted_at":"2025-09-22T20:59:15.523Z","due_at":"2025-09-25T19:00:00Z","due_date":"2025-09-25","cancelled":false,"archived":true,"archive_date":"2025-10-08","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/c7be70bfb376472d8efd6d3f5ef7b1fc/view","enriched":true,"history":[{"index":7,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-25T18:12:29.771Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"42b99708a1d74319954f4d239cf5b746","solicitation_number":"W912BV25QA036","parent_opportunity_id":"a4d01ccb5854402f95251296780b2c2e"},{"index":5,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-24T19:53:01.876Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3d8999d1e165429a8f714ae178ae64cb","solicitation_number":"W912BV25QA036","parent_opportunity_id":"a4d01ccb5854402f95251296780b2c2e"},{"index":4,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-22T20:59:15.523Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c7be70bfb376472d8efd6d3f5ef7b1fc","solicitation_number":"W912BV25QA036","parent_opportunity_id":"a4d01ccb5854402f95251296780b2c2e"},{"index":3,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-16T20:11:11.678Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1dc2de8c064849f694d4e6d9e8ce70d8","solicitation_number":"W912BV25QA036","parent_opportunity_id":"a4d01ccb5854402f95251296780b2c2e"},{"index":2,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-04T15:25:52.055Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5004361064804ac8b65798b9752c09c5","solicitation_number":"W912BV25QA036","parent_opportunity_id":"a4d01ccb5854402f95251296780b2c2e"},{"index":1,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-28T19:35:56.301Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a4d01ccb5854402f95251296780b2c2e","solicitation_number":"W912BV25QA036"}]},{"notice_id":"3d8999d1e165429a8f714ae178ae64cb","title":"Waterline Boring at Fall River Lake, KS","solicitation_number":"W912BV25QA036","notice_type":"o","base_type":"o","posted":"2025-09-24","posted_at":"2025-09-24T19:53:01.876Z","due_at":"2025-09-26T19:00:00Z","due_date":"2025-09-26","cancelled":false,"archived":true,"archive_date":"2025-10-08","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/3d8999d1e165429a8f714ae178ae64cb/view","enriched":true,"history":[{"index":7,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-25T18:12:29.771Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"42b99708a1d74319954f4d239cf5b746","solicitation_number":"W912BV25QA036","parent_opportunity_id":"a4d01ccb5854402f95251296780b2c2e"},{"index":5,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-24T19:53:01.876Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3d8999d1e165429a8f714ae178ae64cb","solicitation_number":"W912BV25QA036","parent_opportunity_id":"a4d01ccb5854402f95251296780b2c2e"},{"index":4,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-22T20:59:15.523Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c7be70bfb376472d8efd6d3f5ef7b1fc","solicitation_number":"W912BV25QA036","parent_opportunity_id":"a4d01ccb5854402f95251296780b2c2e"},{"index":3,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-16T20:11:11.678Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1dc2de8c064849f694d4e6d9e8ce70d8","solicitation_number":"W912BV25QA036","parent_opportunity_id":"a4d01ccb5854402f95251296780b2c2e"},{"index":2,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-04T15:25:52.055Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5004361064804ac8b65798b9752c09c5","solicitation_number":"W912BV25QA036","parent_opportunity_id":"a4d01ccb5854402f95251296780b2c2e"},{"index":1,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-28T19:35:56.301Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a4d01ccb5854402f95251296780b2c2e","solicitation_number":"W912BV25QA036"}]},{"notice_id":"42b99708a1d74319954f4d239cf5b746","title":"Waterline Boring at Fall River Lake, KS","solicitation_number":"W912BV25QA036","notice_type":"o","base_type":"o","posted":"2025-09-25","posted_at":"2025-09-25T18:12:29.771Z","due_at":"2025-09-30T19:00:00Z","due_date":"2025-09-30","cancelled":false,"archived":true,"archive_date":"2025-10-08","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/42b99708a1d74319954f4d239cf5b746/view","enriched":true,"history":[{"index":7,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-25T18:12:29.771Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"42b99708a1d74319954f4d239cf5b746","solicitation_number":"W912BV25QA036","parent_opportunity_id":"a4d01ccb5854402f95251296780b2c2e"},{"index":5,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-24T19:53:01.876Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3d8999d1e165429a8f714ae178ae64cb","solicitation_number":"W912BV25QA036","parent_opportunity_id":"a4d01ccb5854402f95251296780b2c2e"},{"index":4,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-22T20:59:15.523Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c7be70bfb376472d8efd6d3f5ef7b1fc","solicitation_number":"W912BV25QA036","parent_opportunity_id":"a4d01ccb5854402f95251296780b2c2e"},{"index":3,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-16T20:11:11.678Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1dc2de8c064849f694d4e6d9e8ce70d8","solicitation_number":"W912BV25QA036","parent_opportunity_id":"a4d01ccb5854402f95251296780b2c2e"},{"index":2,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-04T15:25:52.055Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5004361064804ac8b65798b9752c09c5","solicitation_number":"W912BV25QA036","parent_opportunity_id":"a4d01ccb5854402f95251296780b2c2e"},{"index":1,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-28T19:35:56.301Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a4d01ccb5854402f95251296780b2c2e","solicitation_number":"W912BV25QA036"}]}],"latest_notice_id":"42b99708a1d74319954f4d239cf5b746","first_type":"o","notices":[{"dates":{"posted":"2025-08-28","posted_at":"2025-08-28T19:35:56.301Z","created_at":"2025-08-28T19:35:56.226Z","modified_at":"2025-10-08T05:08:44.781Z","response_deadline":{"raw":"2025-09-23T14:00:00-05:00","utc":"2025-09-23T19:00:00Z","date":"2025-09-23","time":"14:00:00","timezone":"America/Chicago","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/a4d01ccb5854402f95251296780b2c2e/view"},"naics":{"codes":["237110"],"primary":"237110"},"title":"Waterline Boring at Fall River Lake, KS","agency":{"office":{"code":"W912BV","name":"W076 ENDIST TULSA"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"74137-4290","city":"TULSA","state":"OK","country":"USA"},"organization_id":"100221322","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-10-08","archive_type":"auto_custom"},"history":[{"index":7,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-25T18:12:29.771Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"42b99708a1d74319954f4d239cf5b746","solicitation_number":"W912BV25QA036","parent_opportunity_id":"a4d01ccb5854402f95251296780b2c2e"},{"index":5,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-24T19:53:01.876Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3d8999d1e165429a8f714ae178ae64cb","solicitation_number":"W912BV25QA036","parent_opportunity_id":"a4d01ccb5854402f95251296780b2c2e"},{"index":4,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-22T20:59:15.523Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c7be70bfb376472d8efd6d3f5ef7b1fc","solicitation_number":"W912BV25QA036","parent_opportunity_id":"a4d01ccb5854402f95251296780b2c2e"},{"index":3,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-16T20:11:11.678Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1dc2de8c064849f694d4e6d9e8ce70d8","solicitation_number":"W912BV25QA036","parent_opportunity_id":"a4d01ccb5854402f95251296780b2c2e"},{"index":2,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-04T15:25:52.055Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5004361064804ac8b65798b9752c09c5","solicitation_number":"W912BV25QA036","parent_opportunity_id":"a4d01ccb5854402f95251296780b2c2e"},{"index":1,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-28T19:35:56.301Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a4d01ccb5854402f95251296780b2c2e","solicitation_number":"W912BV25QA036"}],"contacts":[{"name":"Lee Maddox","role":"primary","email":"lee.h.maddox@usace.army.mil","phone":"918-669-4393"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"a4d01ccb5854402f95251296780b2c2e","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"a4d01ccb5854402f95251296780b2c2e","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-02T02:10:06.807770022Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"4cda633fd8f8e30a1791b8726f91fa3cb955df4d158b0fb6b94a24479b5af774","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-02T02:10:06.807770022Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"WATERLINE BORING AT FALL RIVER, KS.   This project covers the requirements that shall be required by the contractor to provide labor, equipment and various materials to install a new 2-inch High-Density Polyethylene (HDPE) water line. This water line is approximately ??? feet of underground burial and will be incased in a 6? steel sleeve to allow protection from debris and allow the Corp of Engineers an avenue for future replacement.THIS ACQUISITION IS 100% SET ASIDE FOR SMALL BUSINESS.  IN ACCORDANCE WITH FAR 36.204, DISCLOSURE OF THE MAGNITUDE OF CONSTRUCTION PROJECTS, THE ESTIMATED MAGNITUDE OF CONSTRUCTION FOR THIS PROJECT IS BETWEEN $100,000 AND $250,000.  THE NAICS CODE FOR THIS PROJECT IS 237110, WATER AND SEWER LINE AND RELATED STRUCTURES CONSTRUCTION.  THE SIZE STANDARD IS $45M.  THE PERIOD OF PERFORMANCE IS 60 DAYS.  PLEASE NOTE: THIS SOLICITATION REQUIRES BIDDERS TO ENTER A NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY (NIST) SCORE IN THE SUPPLIER PERFORMANCE RISK SYSTEM (SPRS). THE NIST SCORE IS REQUIRED BEFORE AN AWARD CAN BE MADE.  CONTRACT SPECIALIST:  LEE MADDOX, LEE.H.MADDOX@USACE.ARMY.MIL.","text":"WATERLINE BORING AT FALL RIVER, KS. This project covers the requirements that shall be required by the contractor to provide labor, equipment and various materials to install a new 2-inch High-Density Polyethylene (HDPE) water line. This water line is approximately ??? feet of underground burial and will be incased in a 6? steel sleeve to allow protection from debris and allow the Corp of Engineers an avenue for future replacement.THIS ACQUISITION IS 100% SET ASIDE FOR SMALL BUSINESS. IN ACCORDANCE WITH FAR 36.204, DISCLOSURE OF THE MAGNITUDE OF CONSTRUCTION PROJECTS, THE ESTIMATED MAGNITUDE OF CONSTRUCTION FOR THIS PROJECT IS BETWEEN $100,000 AND $250,000. THE NAICS CODE FOR THIS PROJECT IS 237110, WATER AND SEWER LINE AND RELATED STRUCTURES CONSTRUCTION. THE SIZE STANDARD IS $45M. THE PERIOD OF PERFORMANCE IS 60 DAYS. PLEASE NOTE: THIS SOLICITATION REQUIRES BIDDERS TO ENTER A NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY (NIST) SCORE IN THE SUPPLIER PERFORMANCE RISK SYSTEM (SPRS). THE NIST SCORE IS REQUIRED BEFORE AN AWARD CAN BE MADE. CONTRACT SPECIALIST: LEE MADDOX, LEE.H.MADDOX@USACE.ARMY.MIL.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W912BV25QA036","product_service_code":"Y1NZ"},{"dates":{"posted":"2025-09-04","posted_at":"2025-09-04T15:25:52.055Z","created_at":"2025-09-04T15:25:51.220Z","modified_at":"2025-10-08T05:08:44.781Z","response_deadline":{"raw":"2025-09-23T14:00:00-05:00","utc":"2025-09-23T19:00:00Z","date":"2025-09-23","time":"14:00:00","timezone":"America/Chicago","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/5004361064804ac8b65798b9752c09c5/view"},"naics":{"codes":["237110"],"primary":"237110"},"title":"Waterline Boring at Fall River Lake, KS","agency":{"office":{"code":"W912BV","name":"W076 ENDIST TULSA"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"74137-4290","city":"TULSA","state":"OK","country":"USA"},"organization_id":"100221322","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-10-08","archive_type":"auto_custom"},"history":[{"index":7,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-25T18:12:29.771Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"42b99708a1d74319954f4d239cf5b746","solicitation_number":"W912BV25QA036","parent_opportunity_id":"a4d01ccb5854402f95251296780b2c2e"},{"index":5,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-24T19:53:01.876Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3d8999d1e165429a8f714ae178ae64cb","solicitation_number":"W912BV25QA036","parent_opportunity_id":"a4d01ccb5854402f95251296780b2c2e"},{"index":4,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-22T20:59:15.523Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c7be70bfb376472d8efd6d3f5ef7b1fc","solicitation_number":"W912BV25QA036","parent_opportunity_id":"a4d01ccb5854402f95251296780b2c2e"},{"index":3,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-16T20:11:11.678Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1dc2de8c064849f694d4e6d9e8ce70d8","solicitation_number":"W912BV25QA036","parent_opportunity_id":"a4d01ccb5854402f95251296780b2c2e"},{"index":2,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-04T15:25:52.055Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5004361064804ac8b65798b9752c09c5","solicitation_number":"W912BV25QA036","parent_opportunity_id":"a4d01ccb5854402f95251296780b2c2e"},{"index":1,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-28T19:35:56.301Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a4d01ccb5854402f95251296780b2c2e","solicitation_number":"W912BV25QA036"}],"contacts":[{"name":"Lee Maddox","role":"primary","email":"lee.h.maddox@usace.army.mil","phone":"918-669-4393"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"5004361064804ac8b65798b9752c09c5","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"a4d01ccb5854402f95251296780b2c2e","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-01T01:53:27.374798705Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"21d7842fc06946fa2ba1fa0e3895826b372d3e27a38b4fc49a6129f04e921911","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-01T01:53:27.374798705Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"WATERLINE BORING AT FALL RIVER, KS.   This project covers the requirements that shall be required by the contractor to provide labor, equipment and various materials to install a new 2-inch High-Density Polyethylene (HDPE) water line. This water line is approximately 1,715-feet of underground burial and will be incased in a 4? steel sleeve to allow protection from debris and allow the Corp of Engineers an avenue for future replacement.  THIS ACQUISITION IS 100% SET ASIDE FOR SMALL BUSINESS.  IN ACCORDANCE WITH FAR 36.204, DISCLOSURE OF THE MAGNITUDE OF CONSTRUCTION PROJECTS, THE ESTIMATED MAGNITUDE OF CONSTRUCTION FOR THIS PROJECT IS BETWEEN $100,000 AND $250,000.  THE NAICS CODE FOR THIS PROJECT IS 237110, WATER AND SEWER LINE AND RELATED STRUCTURES CONSTRUCTION.  THE SIZE STANDARD IS $45M.  THE PERIOD OF PERFORMANCE IS 60 DAYS.  PLEASE NOTE: THIS SOLICITATION REQUIRES BIDDERS TO ENTER A NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY (NIST) SCORE IN THE SUPPLIER PERFORMANCE RISK SYSTEM (SPRS). THE NIST SCORE IS REQUIRED BEFORE AN AWARD CAN BE MADE.  CONTRACT SPECIALIST:  LEE MADDOX, LEE.H.MADDOX@USACE.ARMY.MIL.","text":"WATERLINE BORING AT FALL RIVER, KS. This project covers the requirements that shall be required by the contractor to provide labor, equipment and various materials to install a new 2-inch High-Density Polyethylene (HDPE) water line. This water line is approximately 1,715-feet of underground burial and will be incased in a 4? steel sleeve to allow protection from debris and allow the Corp of Engineers an avenue for future replacement. THIS ACQUISITION IS 100% SET ASIDE FOR SMALL BUSINESS. IN ACCORDANCE WITH FAR 36.204, DISCLOSURE OF THE MAGNITUDE OF CONSTRUCTION PROJECTS, THE ESTIMATED MAGNITUDE OF CONSTRUCTION FOR THIS PROJECT IS BETWEEN $100,000 AND $250,000. THE NAICS CODE FOR THIS PROJECT IS 237110, WATER AND SEWER LINE AND RELATED STRUCTURES CONSTRUCTION. THE SIZE STANDARD IS $45M. THE PERIOD OF PERFORMANCE IS 60 DAYS. PLEASE NOTE: THIS SOLICITATION REQUIRES BIDDERS TO ENTER A NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY (NIST) SCORE IN THE SUPPLIER PERFORMANCE RISK SYSTEM (SPRS). THE NIST SCORE IS REQUIRED BEFORE AN AWARD CAN BE MADE. CONTRACT SPECIALIST: LEE MADDOX, LEE.H.MADDOX@USACE.ARMY.MIL.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W912BV25QA036","place_of_performance":{"zip":"67047","street":"U.S. Army Corps of Engineers; Rall River Lake Project Office; 2543 Lake Road Fall River, KS 67047"},"product_service_code":"Y1NZ"},{"dates":{"posted":"2025-09-16","posted_at":"2025-09-16T20:11:11.678Z","created_at":"2025-09-16T20:11:10.892Z","modified_at":"2025-10-08T05:08:44.781Z","response_deadline":{"raw":"2025-09-23T14:00:00-05:00","utc":"2025-09-23T19:00:00Z","date":"2025-09-23","time":"14:00:00","timezone":"America/Chicago","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/1dc2de8c064849f694d4e6d9e8ce70d8/view"},"naics":{"codes":["237110"],"primary":"237110"},"title":"Waterline Boring at Fall River Lake, KS","agency":{"office":{"code":"W912BV","name":"W076 ENDIST TULSA"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"74137-4290","city":"TULSA","state":"OK","country":"USA"},"organization_id":"100221322","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-10-08","archive_type":"auto_custom"},"history":[{"index":7,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-25T18:12:29.771Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"42b99708a1d74319954f4d239cf5b746","solicitation_number":"W912BV25QA036","parent_opportunity_id":"a4d01ccb5854402f95251296780b2c2e"},{"index":5,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-24T19:53:01.876Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3d8999d1e165429a8f714ae178ae64cb","solicitation_number":"W912BV25QA036","parent_opportunity_id":"a4d01ccb5854402f95251296780b2c2e"},{"index":4,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-22T20:59:15.523Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c7be70bfb376472d8efd6d3f5ef7b1fc","solicitation_number":"W912BV25QA036","parent_opportunity_id":"a4d01ccb5854402f95251296780b2c2e"},{"index":3,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-16T20:11:11.678Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1dc2de8c064849f694d4e6d9e8ce70d8","solicitation_number":"W912BV25QA036","parent_opportunity_id":"a4d01ccb5854402f95251296780b2c2e"},{"index":2,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-04T15:25:52.055Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5004361064804ac8b65798b9752c09c5","solicitation_number":"W912BV25QA036","parent_opportunity_id":"a4d01ccb5854402f95251296780b2c2e"},{"index":1,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-28T19:35:56.301Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a4d01ccb5854402f95251296780b2c2e","solicitation_number":"W912BV25QA036"}],"contacts":[{"name":"Lee Maddox","role":"primary","email":"lee.h.maddox@usace.army.mil","phone":"918-669-4393"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"1dc2de8c064849f694d4e6d9e8ce70d8","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"a4d01ccb5854402f95251296780b2c2e","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-29T04:11:57.220195522Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"58ca149a4cf19b4cc8ed96d3128453b03d57be978ee86a3f418245b10fff741e","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-10-29T04:11:57.220195522Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"WATERLINE BORING AT FALL RIVER, KS.   This project covers the requirements that shall be required by the contractor to provide labor, equipment and various materials to install a new 2-inch High-Density Polyethylene (HDPE) water line. This water line is approximately 1,715-feet of underground burial and will be incased in a 4? steel sleeve to allow protection from debris and allow the Corp of Engineers an avenue for future replacement.  THIS ACQUISITION IS 100% SET ASIDE FOR SMALL BUSINESS.  IN ACCORDANCE WITH FAR 36.204, DISCLOSURE OF THE MAGNITUDE OF CONSTRUCTION PROJECTS, THE ESTIMATED MAGNITUDE OF CONSTRUCTION FOR THIS PROJECT IS BETWEEN $100,000 AND $250,000.  THE NAICS CODE FOR THIS PROJECT IS 237110, WATER AND SEWER LINE AND RELATED STRUCTURES CONSTRUCTION.  THE SIZE STANDARD IS $45M.  THE PERIOD OF PERFORMANCE IS 60 DAYS.  PLEASE NOTE: THIS SOLICITATION REQUIRES BIDDERS TO ENTER A NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY (NIST) SCORE IN THE SUPPLIER PERFORMANCE RISK SYSTEM (SPRS). THE NIST SCORE IS REQUIRED BEFORE AN AWARD CAN BE MADE.  CONTRACT SPECIALIST:  LEE MADDOX, LEE.H.MADDOX@USACE.ARMY.MIL.  AMENDMENT 0001 is to provide a corrected map on the last page of the SOW.  Corrected SOW included in the Solicitation Amendment W912BV25QA036 0001.","text":"WATERLINE BORING AT FALL RIVER, KS. This project covers the requirements that shall be required by the contractor to provide labor, equipment and various materials to install a new 2-inch High-Density Polyethylene (HDPE) water line. This water line is approximately 1,715-feet of underground burial and will be incased in a 4? steel sleeve to allow protection from debris and allow the Corp of Engineers an avenue for future replacement. THIS ACQUISITION IS 100% SET ASIDE FOR SMALL BUSINESS. IN ACCORDANCE WITH FAR 36.204, DISCLOSURE OF THE MAGNITUDE OF CONSTRUCTION PROJECTS, THE ESTIMATED MAGNITUDE OF CONSTRUCTION FOR THIS PROJECT IS BETWEEN $100,000 AND $250,000. THE NAICS CODE FOR THIS PROJECT IS 237110, WATER AND SEWER LINE AND RELATED STRUCTURES CONSTRUCTION. THE SIZE STANDARD IS $45M. THE PERIOD OF PERFORMANCE IS 60 DAYS. PLEASE NOTE: THIS SOLICITATION REQUIRES BIDDERS TO ENTER A NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY (NIST) SCORE IN THE SUPPLIER PERFORMANCE RISK SYSTEM (SPRS). THE NIST SCORE IS REQUIRED BEFORE AN AWARD CAN BE MADE. CONTRACT SPECIALIST: LEE MADDOX, LEE.H.MADDOX@USACE.ARMY.MIL. AMENDMENT 0001 is to provide a corrected map on the last page of the SOW. Corrected SOW included in the Solicitation Amendment W912BV25QA036 0001.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W912BV25QA036","place_of_performance":{"zip":"67047","street":"U.S. Army Corps of Engineers; Rall River Lake Project Office; 2543 Lake Road Fall River, KS 67047"},"product_service_code":"Y1NZ"},{"dates":{"posted":"2025-09-22","posted_at":"2025-09-22T20:59:15.523Z","created_at":"2025-09-22T20:59:11.739Z","modified_at":"2025-10-08T05:08:44.781Z","response_deadline":{"raw":"2025-09-25T14:00:00-05:00","utc":"2025-09-25T19:00:00Z","date":"2025-09-25","time":"14:00:00","timezone":"America/Chicago","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/c7be70bfb376472d8efd6d3f5ef7b1fc/view"},"naics":{"codes":["237110"],"primary":"237110"},"title":"Waterline Boring at Fall River Lake, KS","agency":{"office":{"code":"W912BV","name":"W076 ENDIST TULSA"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"74137-4290","city":"TULSA","state":"OK","country":"USA"},"organization_id":"100221322","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-10-08","archive_type":"auto_custom"},"history":[{"index":7,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-25T18:12:29.771Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"42b99708a1d74319954f4d239cf5b746","solicitation_number":"W912BV25QA036","parent_opportunity_id":"a4d01ccb5854402f95251296780b2c2e"},{"index":5,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-24T19:53:01.876Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3d8999d1e165429a8f714ae178ae64cb","solicitation_number":"W912BV25QA036","parent_opportunity_id":"a4d01ccb5854402f95251296780b2c2e"},{"index":4,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-22T20:59:15.523Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c7be70bfb376472d8efd6d3f5ef7b1fc","solicitation_number":"W912BV25QA036","parent_opportunity_id":"a4d01ccb5854402f95251296780b2c2e"},{"index":3,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-16T20:11:11.678Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1dc2de8c064849f694d4e6d9e8ce70d8","solicitation_number":"W912BV25QA036","parent_opportunity_id":"a4d01ccb5854402f95251296780b2c2e"},{"index":2,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-04T15:25:52.055Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5004361064804ac8b65798b9752c09c5","solicitation_number":"W912BV25QA036","parent_opportunity_id":"a4d01ccb5854402f95251296780b2c2e"},{"index":1,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-28T19:35:56.301Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a4d01ccb5854402f95251296780b2c2e","solicitation_number":"W912BV25QA036"}],"contacts":[{"name":"Lee Maddox","role":"primary","email":"lee.h.maddox@usace.army.mil","phone":"918-669-4393"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"c7be70bfb376472d8efd6d3f5ef7b1fc","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"a4d01ccb5854402f95251296780b2c2e","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-29T01:03:01.164121251Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"f21226f7a8bf11e55dcb15e7fe2f585a45a778d2cc0606e3ed46b7058edc1afa","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-10-29T01:03:01.164121251Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"WATERLINE BORING AT FALL RIVER, KS.   This project covers the requirements that shall be required by the contractor to provide labor, equipment and various materials to install a new 2-inch High-Density Polyethylene (HDPE) water line. This water line is approximately 1,715-feet of underground burial and will be incased in a 4? steel sleeve to allow protection from debris and allow the Corp of Engineers an avenue for future replacement.  THIS ACQUISITION IS 100% SET ASIDE FOR SMALL BUSINESS.  IN ACCORDANCE WITH FAR 36.204, DISCLOSURE OF THE MAGNITUDE OF CONSTRUCTION PROJECTS, THE ESTIMATED MAGNITUDE OF CONSTRUCTION FOR THIS PROJECT IS BETWEEN $100,000 AND $250,000.  THE NAICS CODE FOR THIS PROJECT IS 237110, WATER AND SEWER LINE AND RELATED STRUCTURES CONSTRUCTION.  THE SIZE STANDARD IS $45M.  THE PERIOD OF PERFORMANCE IS 60 DAYS.  PLEASE NOTE: THIS SOLICITATION REQUIRES BIDDERS TO ENTER A NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY (NIST) SCORE IN THE SUPPLIER PERFORMANCE RISK SYSTEM (SPRS). THE NIST SCORE IS REQUIRED BEFORE AN AWARD CAN BE MADE.  CONTRACT SPECIALIST:  LEE MADDOX, LEE.H.MADDOX@USACE.ARMY.MIL.  AMENDMENT 0001 is to provide a corrected map on the last page of the SOW.  Corrected SOW included in the Solicitation Amendment W912BV25QA036 0001. Amendment No. 0002 is hereby issued to extend the quote due date to 2 PM Central Time, 25 SEP 2025. This amendment also updates WD KS20250037, Heavy, 1/3/2025 to WD KS20250037, Heavy, 9/5/2025.","text":"WATERLINE BORING AT FALL RIVER, KS. This project covers the requirements that shall be required by the contractor to provide labor, equipment and various materials to install a new 2-inch High-Density Polyethylene (HDPE) water line. This water line is approximately 1,715-feet of underground burial and will be incased in a 4? steel sleeve to allow protection from debris and allow the Corp of Engineers an avenue for future replacement. THIS ACQUISITION IS 100% SET ASIDE FOR SMALL BUSINESS. IN ACCORDANCE WITH FAR 36.204, DISCLOSURE OF THE MAGNITUDE OF CONSTRUCTION PROJECTS, THE ESTIMATED MAGNITUDE OF CONSTRUCTION FOR THIS PROJECT IS BETWEEN $100,000 AND $250,000. THE NAICS CODE FOR THIS PROJECT IS 237110, WATER AND SEWER LINE AND RELATED STRUCTURES CONSTRUCTION. THE SIZE STANDARD IS $45M. THE PERIOD OF PERFORMANCE IS 60 DAYS. PLEASE NOTE: THIS SOLICITATION REQUIRES BIDDERS TO ENTER A NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY (NIST) SCORE IN THE SUPPLIER PERFORMANCE RISK SYSTEM (SPRS). THE NIST SCORE IS REQUIRED BEFORE AN AWARD CAN BE MADE. CONTRACT SPECIALIST: LEE MADDOX, LEE.H.MADDOX@USACE.ARMY.MIL. AMENDMENT 0001 is to provide a corrected map on the last page of the SOW. Corrected SOW included in the Solicitation Amendment W912BV25QA036 0001. Amendment No. 0002 is hereby issued to extend the quote due date to 2 PM Central Time, 25 SEP 2025. This amendment also updates WD KS20250037, Heavy, 1/3/2025 to WD KS20250037, Heavy, 9/5/2025.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W912BV25QA036","place_of_performance":{"zip":"67047","street":"U.S. Army Corps of Engineers; Rall River Lake Project Office; 2543 Lake Road Fall River, KS 67047"},"product_service_code":"Y1NZ"},{"dates":{"posted":"2025-09-24","posted_at":"2025-09-24T19:53:01.876Z","created_at":"2025-09-24T19:53:01.067Z","modified_at":"2025-10-08T05:08:44.781Z","response_deadline":{"raw":"2025-09-26T14:00:00-05:00","utc":"2025-09-26T19:00:00Z","date":"2025-09-26","time":"14:00:00","timezone":"America/Chicago","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/3d8999d1e165429a8f714ae178ae64cb/view"},"naics":{"codes":["237110"],"primary":"237110"},"title":"Waterline Boring at Fall River Lake, KS","agency":{"office":{"code":"W912BV","name":"W076 ENDIST TULSA"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"74137-4290","city":"TULSA","state":"OK","country":"USA"},"organization_id":"100221322","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-10-08","archive_type":"auto_custom"},"history":[{"index":7,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-25T18:12:29.771Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"42b99708a1d74319954f4d239cf5b746","solicitation_number":"W912BV25QA036","parent_opportunity_id":"a4d01ccb5854402f95251296780b2c2e"},{"index":5,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-24T19:53:01.876Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3d8999d1e165429a8f714ae178ae64cb","solicitation_number":"W912BV25QA036","parent_opportunity_id":"a4d01ccb5854402f95251296780b2c2e"},{"index":4,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-22T20:59:15.523Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c7be70bfb376472d8efd6d3f5ef7b1fc","solicitation_number":"W912BV25QA036","parent_opportunity_id":"a4d01ccb5854402f95251296780b2c2e"},{"index":3,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-16T20:11:11.678Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1dc2de8c064849f694d4e6d9e8ce70d8","solicitation_number":"W912BV25QA036","parent_opportunity_id":"a4d01ccb5854402f95251296780b2c2e"},{"index":2,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-04T15:25:52.055Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5004361064804ac8b65798b9752c09c5","solicitation_number":"W912BV25QA036","parent_opportunity_id":"a4d01ccb5854402f95251296780b2c2e"},{"index":1,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-28T19:35:56.301Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a4d01ccb5854402f95251296780b2c2e","solicitation_number":"W912BV25QA036"}],"contacts":[{"name":"Lee Maddox","role":"primary","email":"lee.h.maddox@usace.army.mil","phone":"918-669-4393"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"3d8999d1e165429a8f714ae178ae64cb","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"a4d01ccb5854402f95251296780b2c2e","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-28T02:37:46.601255645Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"ee568d1a6b13e50da54fc481c47271eae57b288baa4568bd697623c76b48d33e","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-10-28T02:37:46.601255645Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"WATERLINE BORING AT FALL RIVER, KS.   This project covers the requirements that shall be required by the contractor to provide labor, equipment and various materials to install a new 2-inch High-Density Polyethylene (HDPE) water line. This water line is approximately 1,715-feet of underground burial and will be incased in a 4? steel sleeve to allow protection from debris and allow the Corp of Engineers an avenue for future replacement.  THIS ACQUISITION IS 100% SET ASIDE FOR SMALL BUSINESS.  IN ACCORDANCE WITH FAR 36.204, DISCLOSURE OF THE MAGNITUDE OF CONSTRUCTION PROJECTS, THE ESTIMATED MAGNITUDE OF CONSTRUCTION FOR THIS PROJECT IS BETWEEN $100,000 AND $250,000.  THE NAICS CODE FOR THIS PROJECT IS 237110, WATER AND SEWER LINE AND RELATED STRUCTURES CONSTRUCTION.  THE SIZE STANDARD IS $45M.  THE PERIOD OF PERFORMANCE IS 60 DAYS.  PLEASE NOTE: THIS SOLICITATION REQUIRES BIDDERS TO ENTER A NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY (NIST) SCORE IN THE SUPPLIER PERFORMANCE RISK SYSTEM (SPRS). THE NIST SCORE IS REQUIRED BEFORE AN AWARD CAN BE MADE.  CONTRACT SPECIALIST:  LEE MADDOX, LEE.H.MADDOX@USACE.ARMY.MIL.  AMENDMENT 0001 is to provide a corrected map on the last page of the SOW.  REVISED SOW included in the Solicitation Amendment W912BV25QA036 0003. Amendment No. 0003 is hereby issued to extend the quote due date to 2 PM Central Time, 26 SEP 2025. This amendment also updates WD KS20250037, Heavy, 1/3/2025 to WD KS20250037, Heavy, 9/5/2025.","text":"WATERLINE BORING AT FALL RIVER, KS. This project covers the requirements that shall be required by the contractor to provide labor, equipment and various materials to install a new 2-inch High-Density Polyethylene (HDPE) water line. This water line is approximately 1,715-feet of underground burial and will be incased in a 4? steel sleeve to allow protection from debris and allow the Corp of Engineers an avenue for future replacement. THIS ACQUISITION IS 100% SET ASIDE FOR SMALL BUSINESS. IN ACCORDANCE WITH FAR 36.204, DISCLOSURE OF THE MAGNITUDE OF CONSTRUCTION PROJECTS, THE ESTIMATED MAGNITUDE OF CONSTRUCTION FOR THIS PROJECT IS BETWEEN $100,000 AND $250,000. THE NAICS CODE FOR THIS PROJECT IS 237110, WATER AND SEWER LINE AND RELATED STRUCTURES CONSTRUCTION. THE SIZE STANDARD IS $45M. THE PERIOD OF PERFORMANCE IS 60 DAYS. PLEASE NOTE: THIS SOLICITATION REQUIRES BIDDERS TO ENTER A NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY (NIST) SCORE IN THE SUPPLIER PERFORMANCE RISK SYSTEM (SPRS). THE NIST SCORE IS REQUIRED BEFORE AN AWARD CAN BE MADE. CONTRACT SPECIALIST: LEE MADDOX, LEE.H.MADDOX@USACE.ARMY.MIL. AMENDMENT 0001 is to provide a corrected map on the last page of the SOW. REVISED SOW included in the Solicitation Amendment W912BV25QA036 0003. Amendment No. 0003 is hereby issued to extend the quote due date to 2 PM Central Time, 26 SEP 2025. This amendment also updates WD KS20250037, Heavy, 1/3/2025 to WD KS20250037, Heavy, 9/5/2025.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W912BV25QA036","place_of_performance":{"zip":"67047","street":"U.S. Army Corps of Engineers; Rall River Lake Project Office; 2543 Lake Road Fall River, KS 67047"},"product_service_code":"Y1NZ"},{"dates":{"posted":"2025-09-25","posted_at":"2025-09-25T18:12:29.771Z","created_at":"2025-09-25T18:12:28.979Z","modified_at":"2025-10-08T05:08:44.781Z","response_deadline":{"raw":"2025-09-30T14:00:00-05:00","utc":"2025-09-30T19:00:00Z","date":"2025-09-30","time":"14:00:00","timezone":"America/Chicago","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/42b99708a1d74319954f4d239cf5b746/view"},"naics":{"codes":["237110"],"primary":"237110"},"title":"Waterline Boring at Fall River Lake, KS","agency":{"office":{"code":"W912BV","name":"W076 ENDIST TULSA"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"74137-4290","city":"TULSA","state":"OK","country":"USA"},"organization_id":"100221322","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-10-08","archive_type":"auto_custom"},"history":[{"index":7,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-25T18:12:29.771Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"42b99708a1d74319954f4d239cf5b746","solicitation_number":"W912BV25QA036","parent_opportunity_id":"a4d01ccb5854402f95251296780b2c2e"},{"index":5,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-24T19:53:01.876Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"3d8999d1e165429a8f714ae178ae64cb","solicitation_number":"W912BV25QA036","parent_opportunity_id":"a4d01ccb5854402f95251296780b2c2e"},{"index":4,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-22T20:59:15.523Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c7be70bfb376472d8efd6d3f5ef7b1fc","solicitation_number":"W912BV25QA036","parent_opportunity_id":"a4d01ccb5854402f95251296780b2c2e"},{"index":3,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-16T20:11:11.678Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1dc2de8c064849f694d4e6d9e8ce70d8","solicitation_number":"W912BV25QA036","parent_opportunity_id":"a4d01ccb5854402f95251296780b2c2e"},{"index":2,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-04T15:25:52.055Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5004361064804ac8b65798b9752c09c5","solicitation_number":"W912BV25QA036","parent_opportunity_id":"a4d01ccb5854402f95251296780b2c2e"},{"index":1,"title":"Waterline Boring at Fall River Lake, KS","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-28T19:35:56.301Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"a4d01ccb5854402f95251296780b2c2e","solicitation_number":"W912BV25QA036"}],"contacts":[{"name":"Lee Maddox","role":"primary","email":"lee.h.maddox@usace.army.mil","phone":"918-669-4393"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"42b99708a1d74319954f4d239cf5b746","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"a4d01ccb5854402f95251296780b2c2e","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-28T01:53:17.985461190Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"269f0c3f4883e4e383a0cf5e30d32e981ac15fd5432301bb39ceef2137f957c8","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-10-28T01:53:17.985461190Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"WATERLINE BORING AT FALL RIVER, KS.   This project covers the requirements that shall be required by the contractor to provide labor, equipment and various materials to install a new 2-inch High-Density Polyethylene (HDPE) water line. This water line is approximately 1,715-feet of underground burial and will be incased in a 4? steel sleeve to allow protection from debris and allow the Corp of Engineers an avenue for future replacement.  THIS ACQUISITION IS 100% SET ASIDE FOR SMALL BUSINESS.  IN ACCORDANCE WITH FAR 36.204, DISCLOSURE OF THE MAGNITUDE OF CONSTRUCTION PROJECTS, THE ESTIMATED MAGNITUDE OF CONSTRUCTION FOR THIS PROJECT IS BETWEEN $100,000 AND $250,000.  THE NAICS CODE FOR THIS PROJECT IS 237110, WATER AND SEWER LINE AND RELATED STRUCTURES CONSTRUCTION.  THE SIZE STANDARD IS $45M.  THE PERIOD OF PERFORMANCE IS 60 DAYS.  PLEASE NOTE: THIS SOLICITATION REQUIRES BIDDERS TO ENTER A NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY (NIST) SCORE IN THE SUPPLIER PERFORMANCE RISK SYSTEM (SPRS). THE NIST SCORE IS REQUIRED BEFORE AN AWARD CAN BE MADE.  CONTRACT SPECIALIST:  LEE MADDOX, LEE.H.MADDOX@USACE.ARMY.MIL.  AMENDMENT 0001 is to provide a corrected map on the last page of the SOW.  REVISED SOW included in the Solicitation Amendment W912BV25QA036 0003. This amendment also updates WD KS20250037, Heavy, 1/3/2025 to WD KS20250037, Heavy, 9/5/2025.Amendment No. 0004 is hereby issued to extend the quote due date to 2 PM Central Time, 30 SEP 2025.","text":"WATERLINE BORING AT FALL RIVER, KS. This project covers the requirements that shall be required by the contractor to provide labor, equipment and various materials to install a new 2-inch High-Density Polyethylene (HDPE) water line. This water line is approximately 1,715-feet of underground burial and will be incased in a 4? steel sleeve to allow protection from debris and allow the Corp of Engineers an avenue for future replacement. THIS ACQUISITION IS 100% SET ASIDE FOR SMALL BUSINESS. IN ACCORDANCE WITH FAR 36.204, DISCLOSURE OF THE MAGNITUDE OF CONSTRUCTION PROJECTS, THE ESTIMATED MAGNITUDE OF CONSTRUCTION FOR THIS PROJECT IS BETWEEN $100,000 AND $250,000. THE NAICS CODE FOR THIS PROJECT IS 237110, WATER AND SEWER LINE AND RELATED STRUCTURES CONSTRUCTION. THE SIZE STANDARD IS $45M. THE PERIOD OF PERFORMANCE IS 60 DAYS. PLEASE NOTE: THIS SOLICITATION REQUIRES BIDDERS TO ENTER A NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY (NIST) SCORE IN THE SUPPLIER PERFORMANCE RISK SYSTEM (SPRS). THE NIST SCORE IS REQUIRED BEFORE AN AWARD CAN BE MADE. CONTRACT SPECIALIST: LEE MADDOX, LEE.H.MADDOX@USACE.ARMY.MIL. AMENDMENT 0001 is to provide a corrected map on the last page of the SOW. REVISED SOW included in the Solicitation Amendment W912BV25QA036 0003. This amendment also updates WD KS20250037, Heavy, 1/3/2025 to WD KS20250037, Heavy, 9/5/2025.Amendment No. 0004 is hereby issued to extend the quote due date to 2 PM Central Time, 30 SEP 2025.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W912BV25QA036","place_of_performance":{"zip":"67047","street":"U.S. Army Corps of Engineers; Rall River Lake Project Office; 2543 Lake Road Fall River, KS 67047"},"product_service_code":"Y1NZ"}],"due_at":"2025-09-30T19:00:00Z","due_date":"2025-09-30","closes_at":"2025-09-30T19:00:00Z","awardable":true,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912BV","office_name":"W076 ENDIST TULSA","state":"KS","county":null,"county_name":null,"city":null,"city_name":null,"country":null,"state_source":"sam_street","state_evidence":"U.S. ARMY CORPS OF ENGINEERS; RALL RIVER LAKE PROJECT OFFICE; 2543 LAKE ROAD FALL RIVER, KS 67047","site_key":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":true,"updated_at":"2026-10-28T02:50:49.787508Z","principal_notice_id":"42b99708a1d74319954f4d239cf5b746","description":{"text":"WATERLINE BORING AT FALL RIVER, KS. This project covers the requirements that shall be required by the contractor to provide labor, equipment and various materials to install a new 2-inch High-Density Polyethylene (HDPE) water line. This water line is approximately 1,715-feet of underground burial and will be incased in a 4? steel sleeve to allow protection from debris and allow the Corp of Engineers an avenue for future replacement. THIS ACQUISITION IS 100% SET ASIDE FOR SMALL BUSINESS. IN ACCORDANCE WITH FAR 36.204, DISCLOSURE OF THE MAGNITUDE OF CONSTRUCTION PROJECTS, THE ESTIMATED MAGNITUDE OF CONSTRUCTION FOR THIS PROJECT IS BETWEEN $100,000 AND $250,000. THE NAICS CODE FOR THIS PROJECT IS 237110, WATER AND SEWER LINE AND RELATED STRUCTURES CONSTRUCTION. THE SIZE STANDARD IS $45M. THE PERIOD OF PERFORMANCE IS 60 DAYS. PLEASE NOTE: THIS SOLICITATION REQUIRES BIDDERS TO ENTER A NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY (NIST) SCORE IN THE SUPPLIER PERFORMANCE RISK SYSTEM (SPRS). THE NIST SCORE IS REQUIRED BEFORE AN AWARD CAN BE MADE. CONTRACT SPECIALIST: LEE MADDOX, LEE.H.MADDOX@USACE.ARMY.MIL. AMENDMENT 0001 is to provide a corrected map on the last page of the SOW. REVISED SOW included in the Solicitation Amendment W912BV25QA036 0003. This amendment also updates WD KS20250037, Heavy, 1/3/2025 to WD KS20250037, Heavy, 9/5/2025.Amendment No. 0004 is hereby issued to extend the quote due date to 2 PM Central Time, 30 SEP 2025.","html":"WATERLINE BORING AT FALL RIVER, KS.   This project covers the requirements that shall be required by the contractor to provide labor, equipment and various materials to install a new 2-inch High-Density Polyethylene (HDPE) water line. This water line is approximately 1,715-feet of underground burial and will be incased in a 4? steel sleeve to allow protection from debris and allow the Corp of Engineers an avenue for future replacement.  THIS ACQUISITION IS 100% SET ASIDE FOR SMALL BUSINESS.  IN ACCORDANCE WITH FAR 36.204, DISCLOSURE OF THE MAGNITUDE OF CONSTRUCTION PROJECTS, THE ESTIMATED MAGNITUDE OF CONSTRUCTION FOR THIS PROJECT IS BETWEEN $100,000 AND $250,000.  THE NAICS CODE FOR THIS PROJECT IS 237110, WATER AND SEWER LINE AND RELATED STRUCTURES CONSTRUCTION.  THE SIZE STANDARD IS $45M.  THE PERIOD OF PERFORMANCE IS 60 DAYS.  PLEASE NOTE: THIS SOLICITATION REQUIRES BIDDERS TO ENTER A NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY (NIST) SCORE IN THE SUPPLIER PERFORMANCE RISK SYSTEM (SPRS). THE NIST SCORE IS REQUIRED BEFORE AN AWARD CAN BE MADE.  CONTRACT SPECIALIST:  LEE MADDOX, LEE.H.MADDOX@USACE.ARMY.MIL.  AMENDMENT 0001 is to provide a corrected map on the last page of the SOW.  REVISED SOW included in the Solicitation Amendment W912BV25QA036 0003. This amendment also updates WD KS20250037, Heavy, 1/3/2025 to WD KS20250037, Heavy, 9/5/2025.Amendment No. 0004 is hereby issued to extend the quote due date to 2 PM Central Time, 30 SEP 2025.","origin":"detail"},"contacts":[{"name":"Lee Maddox","role":"primary","email":"lee.h.maddox@usace.army.mil","phone":"918-669-4393"}],"place_of_performance":{"zip":"67047","street":"U.S. Army Corps of Engineers; Rall River Lake Project Office; 2543 Lake Road Fall River, KS 67047"},"office_address":{"zip":"74137-4290","city":"TULSA","state":"OK","country":"USA"},"naics_codes":["237110"],"award":null,"attachments":[{"resource_id":"8c726e1288b14e87aa9ec0e95e6d7076","name":"dodprocurementtoolbox.com","kind":"link","mime_type":null,"size_bytes":null,"posted_at":"2025-08-28T19:35:56.301Z","export_controlled":false,"sha256":null,"url":"https://dodprocurementtoolbox.com/","mirrored":false}],"awards":[],"related":[{"key":"W912BV26RA016","latest_notice_id":"740b633947c4437eb506d23018133490","title":"Child Development Center (CDC), Tinker Air Force Base, Oklahoma","solicitation_number":"W912BV26RA016","notice_type":"o","first_type":"p","first_posted":"2026-08-13","last_posted":"2026-11-17","notices":7,"due_at":"2026-12-01T21:00:00Z","due_date":"2026-12-01","closes_at":"2026-12-01T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912BV","office_name":"W076 ENDIST TULSA","naics":"236220","psc":"Y1CZ","set_aside":null,"state":"OK","county":"40109","county_name":"Oklahoma County","city":"4048350","city_name":"Midwest City","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":"Tinker Air Force Base","site_key":"tinker-air-force-base-ok","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-18T05:19:57.406887Z"},{"key":"W912BV27RKT01","latest_notice_id":"5885b7e86a6e4771998a4b03888b29cf","title":"Denison Valve Replacement","solicitation_number":"W912BV27RKT01","notice_type":"r","first_type":"r","first_posted":"2026-11-05","last_posted":"2026-11-05","notices":1,"due_at":"2026-12-03T17:00:00Z","due_date":"2026-12-03","closes_at":"2026-12-03T17:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912BV","office_name":"W076 ENDIST TULSA","naics":"237990","psc":"N048","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"unknown","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-06T04:46:59.158685Z"},{"key":"W912BV27QA012","latest_notice_id":"0f463ab22fb342249857f5a41872fd31","title":"The procurement, delivery, installation, testing, and commission of a 20 HP Rotary Screw Air Compressor with Integrated Dryer System 120 GAL","solicitation_number":"W912BV27QA012","notice_type":"o","first_type":"o","first_posted":"2026-11-18","last_posted":"2026-11-18","notices":1,"due_at":"2026-12-09T20:00:00Z","due_date":"2026-12-09","closes_at":"2026-12-09T20:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912BV","office_name":"W076 ENDIST TULSA","naics":"333912","psc":"H143","set_aside":"SBA","state":"OK","county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"site","state_source":"sam_street","state_evidence":"NAVIGATION ��� MAJOR MAINTENANCE UNIT, HC 61, BOX 238, SALLISAW, OK 74955","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-19T04:41:36.780616Z"},{"key":"W912BV27QA009","latest_notice_id":"460f69fd9110444293bb9bb3195b0393","title":"Red River Area Gate Attendant Services","solicitation_number":"W912BV27QA009","notice_type":"k","first_type":"k","first_posted":"2026-11-19","last_posted":"2026-11-19","notices":1,"due_at":"2026-12-15T20:00:00Z","due_date":"2026-12-15","closes_at":"2026-12-15T20:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912BV","office_name":"W076 ENDIST TULSA","naics":"721211","psc":"M1PA","set_aside":"SBA","state":"OK","county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"site","state_source":"site","state_evidence":"OMA LAKE, EAST/WEST BURNS RUN ROVER; WAURIKA LAKE","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-20T05:30:09.595354Z"},{"key":"W912BV27QA016","latest_notice_id":"6d3cdb1aa99f42599362284dac8b0e4f","title":"CNG Afton and Bluff Landing PUA Tree Removal","solicitation_number":"W912BV27QA016","notice_type":"o","first_type":"o","first_posted":"2026-11-20","last_posted":"2026-11-20","notices":1,"due_at":"2026-12-16T20:00:00Z","due_date":"2026-12-16","closes_at":"2026-12-16T20:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912BV","office_name":"W076 ENDIST TULSA","naics":"561730","psc":"S208","set_aside":"SBA","state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"unknown","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-21T05:30:25.727497Z"}],"similar_open":[{"key":"PANNWD26P0000030600","latest_notice_id":"24f73ad16e3a48778f04e6a3d5581510","title":"Wilson Lake Sewage Lagoon Project (Minooka and Lucas Parks), USACE Kansas City","solicitation_number":"PANNWD26P0000030600","notice_type":"p","first_type":"r","first_posted":"2026-06-12","last_posted":"2026-11-18","notices":2,"due_at":"2026-12-03T16:00:00Z","due_date":"2026-12-03","closes_at":"2026-12-03T16:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912DQ","office_name":"W071 ENDIST KANSAS CITY","naics":"237110","psc":"Y1ND","set_aside":"SBA","state":"KS","county":"20105","county_name":"Lincoln County","city":"2069775","city_name":"Sylvan Grove","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-19T04:41:36.780616Z"},{"key":"W912BV27QA014","latest_notice_id":"984f9e18f2da4c61ba0cb94c7b9d6585","title":"Horizontal Drill Work Council Grove Lake, Kansas","solicitation_number":"W912BV27QA014","notice_type":"k","first_type":"k","first_posted":"2026-11-20","last_posted":"2026-11-20","notices":1,"due_at":"2026-12-21T19:00:00Z","due_date":"2026-12-21","closes_at":"2026-12-21T19:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912BV","office_name":"W076 ENDIST TULSA","naics":"237110","psc":"Y1NZ","set_aside":"SBA","state":"KS","county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"site","state_source":"title","state_evidence":"HORIZONTAL DRILL WORK COUNCIL GROVE LAKE, KANSAS","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-21T05:30:25.727497Z"},{"key":"140P2026R0091","latest_notice_id":"0ac6f3ab09e1463db51fb5c97ea5db85","title":"Y--HAVO 326181 Rehabilitate Rainshed&Water Treatment","solicitation_number":"140P2026R0091","notice_type":"o","first_type":"p","first_posted":"2026-06-17","last_posted":"2026-11-20","notices":6,"due_at":"2026-11-28T02:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-28T02:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-014","dept_name":"INTERIOR, DEPARTMENT OF THE","sub_key":"s-1443","sub_name":"NATIONAL PARK SERVICE","office_key":"o-140P20","office_name":"DSC CONTRACTING SERVICES DIVISION","naics":"237110","psc":"Y1NE","set_aside":null,"state":"HI","county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"site","state_source":"site","state_evidence":"Y--HAVO","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-21T05:30:25.727497Z"}],"similar_open_total":25,"indexable":false}