Skip to content

SealedBidder is a private company, not a government agency.

Sign upDashboard
  • 8,695 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell SealedBidder what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and SealedBidder tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans

Sources sought

Dover Air Force Base Dormitory

W912BU26DAFBDORM

Department of the Army, W2SD Endist Philadelphia. Commercial and Institutional Building Construction.

Response deadline

August 17, 2026 at 2:00 PM EDT

Closed 101 days ago. Posted August 14, 2026, first published July 30, 2026. Scheduled to archive September 1, 2026.

Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities

This one closed in 2026

191 like it are open now in commercial and institutional building construction

All 191 open in commercial and institutional building construction

Reading this notice

Worked out from the publications and the award on this page.

Kind of notice
Sources sought. Market research. The agency wants to know who could do the work before it decides how to compete it. Glossary
Who may compete
SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 236220 (commercial and institutional building construction), means no more than $45 million in average annual receipts, counted with affiliates. What a set-aside is
What comes next
No solicitation has been published under this number yet. The sources sought of July 30, 2026 is the earliest notice of the purchase.

Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.

Description

As published on SAM.gov.

Description of Work: This is a SOURCES SOUGHT NOTICE/INDUSTRY DAY and is for information purposes only.

THIS IS NOT A REQUEST FOR PROPOSALS, QUOTATIONS, OR BIDS.

The U.S. Army Corps of Engineers, Philadelphia District, intends to award a firm fixed price contract for Dover Air Force Base Dormitory, Dover, DE.

Contract work consists of:

  • Construct a 245-room dormitory consisting of a multi-level steel frame structure with reinforced concrete foundation and floor slabs, interior corridors, interior/exterior walls and finish systems, sloped metal roof, elevators, pavements, utilities, and other supporting site features. The dormitory space shall include Enhanced 1+1 room configurations with a private bathroom, living modules and laundry, vending, storage, administrative, recreation, and supporting facilities. The site work includes all utilities, site improvements, pavements, antiterrorism and force protection features, security enhancements, and other supporting work necessary to provide a complete and useable facility.
  • Innovative construction methodologies including industrialize/modular/panelized construction will be considered.  There is a strong interest in attracting industry partners outside those with previous federal contracting experience including prime and subcontractors with experience with dormitory construction for universities and similar owners.

 

Estimated cost range of the project is $100M-$150M.

The NAICS Code for this project is 236220 Commercial and Institutional Building Construction.

INDUSTRY DAY LOCATION 

The Landings Club. -479 Evreux St, Dover, DE 19902

Date:  18-19 August 2026 

18 August 2026  for the Industry day/ 1-on-1 

19  August 2026 for additional 1-on-1 capability briefings

ACCESS to DAFB

For DAFB access, please provide Name, Date of Birth, Driver’s license state, Driver’s license #, Company Name, Last 4 of SSN no later than 10AUG26

Respond with interest by 17AUG26. Provided information will not be shared.

POINT OF CONTACT

Project Manager: CPT Ramon F. Concepcion/ Ramon.F.Conception@usace.army.mil.

Sources Sought/Market Survey responses Requested to this Sources Sought Announcement/INDUSTRY DAY will be used by the Government to make appropriate acquisition decisions. Narratives are requested with the following information, which shall not exceed a total of ten (10) pages Interested Offerors can respond to this Sources Sought Synopsis to include the following information:

  1. Offeror’s name, address, points of contact with telephone numbers and e-mail addresses.
  2. Business size/classification to include any designations as Small Business, HUBZone, Service-Disabled Veteran Owned, 8(a), Women-Owned small businesses shall be indicated on first page of submission.
  3. Description of capability to perform similar or same projects listed above and manage subcontractors if applicable.

Past performance/experience on projects of similar scope and magnitude, describing no more than three (3) projects completed within the past five years. The past performance information should include project title, location, general description of the construction to demonstrate relevance to the proposed projects, the Offeror’s role, dollar value of contract, and name of the company, agency or government entity for which the work was performed with contact information (reference name, phone number and e-mail address).

DAFB Dormitory – Questions for an Industry Day

Please emphasize answering High Priority Questions (1-11) over Low Priority Questions (12-29).

High Priority Questions

  1. What alternative project delivery methods (e.g., design‑build, CM‑at‑risk, progressive design‑build) would you recommend to compress schedule and reduce change orders, and why? (USACE)
  2. What early contractor involvement or preconstruction services would most help to optimize cost, phasing, and constructability before the design is finalized? (USACE)
  3. Do you feel that the local sub-contractor pool availability will be a constraint in the execution of this project? (USACE)
  4. What are your thoughts on Alternative Construction Methods? (A-E)
  5. What alternative construction methods (including industrialized construction) have you previously applied to projects?  (A-E)
  6. What was the project impact of these methods, specifically to: (A-E)
    1. Schedule
    2. Cost
    3. Quality
  7. What are challenges associated with these methods? (A-E)
    1. Design – changes to current UFC and UFGS standards?
    2. Construction – Availability of contractors, availability of materials, Cost, transportation?
  8. What are the benefits associated with these methods? (A-E)
  9. What alternate construction method(s) do you recommend (linear/panelized, modular, etc ) for THIS project and why? (USACE)
  10. Is there anything you would like the government to know? (A-E)
  11. What constraints should be considered to ensure industrialized construction solutions can be prefabricated, transported, and erected for the area this project will be constructed? (USACE)

Low Priority Questions

  1. How much staging area would be needed if some type of industrialized construction were used? (USACE)
  2. How much lead time would be required for procurement of prefabricated units? (USACE)
  3. Where would industrialized construction components be sourced from? (USACE)
  4. Can the modules be engineered to meet Anti-Terrorism/Force Protection (AT/FP) standards? (USACE)
  5. How do your standard designs adapt to meet Unified Facilities Criteria (UFC)? (USACE)
  6. What structural tolerances (vertical and horizontal) does your system require for the site-built foundation (e.g., pier, slab-on-grade ... etc.)? And does it require standard tolerances or more stringent tolerances? (USACE)
  7.  How are the structural connections between the modules and the foundation made, and are they accessible for inspection and future maintenance? (USACE)
  8.  How do you control and mitigate differential settlement between modules, especially on soils with low bearing capacity? What experience do you have installing vapor barriers and/or passive or active vapor removal systems?  Is the experience internal or through a subcontractor? (USACE)
  9. Are you aware of USACE ECB 2026-13 Reformed Unified Facilities Criteria (UFC) and Modernized Whole Building Design Guide (WBDG)? The primary goal of the UFC Reform was to more closely align DoD requirements with the International Building Code (IBC) and other recognized industry standards. The initiative rigorously challenged the extra criteria previously mandated for DoD facilities, focusing on designing to mission requirements and reducing the overall cost of military construction. How will this impact bidding and risk on the project? (USACE)
  10. From your experience, where does overspecification typically occur in dormitory projects (structural loading, fireproofing, finishes, etc), and what could be used instead to be more cost and schedule efficient? Which specifications or details commonly drive unnecessary cost (custom elements, proprietary systems, overly tight tolerances), and how might they be rewritten to allow cost‑effective equivalent products or methods? (USACE)
  11. What HVAC building systems tend to provide the best lifecycle cost and maintainability for dormitories the climate the project is being constructed? (USACE)
  12. What are typical schedule delays you see on similar projects (e.g., utility coordination, material lead times, inspections), and what design or contracting strategies have best mitigated them? (USACE)
  13. What long‑lead materials or equipment should the project be designed around to protect the critical path, and what alternatives can be considered to reduce risk of losing schedule? (USACE)
  14. Which details typically generate RFIs and field rework on dormitory projects, and how can the drawings and specifications be clarified to minimize ambiguities? (USACE)
  15. What contractual or commercial barriers typically prevent you from proposing bold ideas or meeting contract requirements, and how can this project avoid them? (USACE)
  16. Can you share examples where you significantly reduced cost or schedule on a similar building through unconventional means, and what design conditions made those successes possible? (USACE)
  17. Given the current local labor and subcontractor market, how should the design be tailored to align with the strengths and limitations of available trades? (USACE)
  18. Are there particular systems or materials that are difficult to staff or supply locally that we should avoid or redesign around? (USACE)

Telephone inquiries will not be accepted or acknowledged, and no feedback or evaluations will be provided to companies regarding their submissions. If you have any questions concerning this opportunity, please contact: Responses should be sent to Brian W. Cox@usace.army.mil on or before 17 August 2026, at 2:00 PM EST.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. July 30, 2026

    Sources sought

    Due August 17, 2026 at 2:00 PM EDT. SAM.gov, notice 8e787ed544f84ba1abc3b17b9dc74254

    4 revisions on SAM
    • August 14, 2026: publish, sources sought
    • August 4, 2026: publish, sources sought
    • July 30, 2026: publish, sources sought
    • July 30, 2026: publish, sources sought
  2. July 30, 2026

    Sources sought

    Due August 17, 2026 at 2:00 PM EDT. SAM.gov, notice baa143e84a5a4506b7f00c0f1c89b6dc

    4 revisions on SAM
    • August 14, 2026: publish, sources sought
    • August 4, 2026: publish, sources sought
    • July 30, 2026: publish, sources sought
    • July 30, 2026: publish, sources sought
  3. August 4, 2026

    Sources sought

    Due August 17, 2026 at 2:00 PM EDT. SAM.gov, notice 8f0495fe69cd4ac3ba7a3e9672fe8061

    4 revisions on SAM
    • August 14, 2026: publish, sources sought
    • August 4, 2026: publish, sources sought
    • July 30, 2026: publish, sources sought
    • July 30, 2026: publish, sources sought
  4. August 14, 2026

    Sources sought

    Due August 17, 2026 at 2:00 PM EDT. SAM.gov, notice 2e8f5f5c866346d5afbc3b28933e9c3a

    4 revisions on SAM
    • August 14, 2026: publish, sources sought
    • August 4, 2026: publish, sources sought
    • July 30, 2026: publish, sources sought
    • July 30, 2026: publish, sources sought

Points of contact