Solicitation, total small business set-aside, first published as presolicitation
Gavin's Point Powerhouse DC and Low Voltage Panel Board Replacement
W9128F25RA018
Department of the Army, W071 Endist Omaha. Electrical Contractors and Other Wiring Installation Contractors.
Response deadline
July 16, 2025 at 3:00 PM EDT
Closed 497 days ago. Posted June 26, 2025, first published May 19, 2025. Scheduled to archive September 30, 2025.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed in 2025
41 like it are open now in electrical contractors and other wiring installation contractors
- Electrical Installation of 5-Station Cubicle and One Single Hotel Desk Arrangement
Agricultural Research Service, USDA ARS Afm Apd
Combined synopsis and solicitationSmall businessNAICS 238210Madison, WI1232SA27Q0021Due todayNov 25 - USDA Forest Service - Hebgen Lake District Office Network Cabling and IT Room Improvements
Forest Service, Usda-Fs, Csa Intermountain 9
Combined synopsis and solicitationSmall businessNAICS 238210West Yellowstone, MT1240LU26Q0132Due tomorrowNov 26 - 541 Electrical Power Distribution Equipment Testing, Inspection, and Maintenance - VAMC Cleveland
Department of Veterans Affairs, 250-Network Contract Office 10
Combined synopsis and solicitationSmall businessNAICS 238210Cleveland, OH36C25027Q0014Due in 2 daysNov 27
All 41 open in electrical contractors and other wiring installation contractors
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
- Who may compete
- Total small business set-aside. Only small businesses may compete. Small, under NAICS 238210 (electrical contractors and other wiring installation contractors), means no more than $19 million in average annual receipts, counted with affiliates. Open Small business opportunities
- Time to respond
- Bidders had 37 days from the day the solicitation was posted, June 9, 2025, to the deadline. The deadline moved 2 times: it was first July 11, 2025 and ended as July 16, 2025.
- Before the solicitation
- The agency published a presolicitation on May 19, 2025, 21 days before the solicitation.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
Amendment 0001 has been posted to SAM.gov. Proposal due date extended to 16 July 2025. Reminder that this amendment must be acknowledged and submitted with an offer.
**************************************************************************************************************************
The solicitation is restricted to Small Businesses.
Site Visit:
A Site Visit will be scheduled and additional information regarding the site visit will be provided in the solicitation via FAR Clause 52.236-27. The site visit is scheduled for 25 June 2025 at 10am local time.
Project Description: Scope of project includes all work required to:
1. Replace the entire line up in the Control Room of the DC, preferred AC and 480V circuits. This is physically one large cubical. Switchgears 11, 12, and 13, located on the same drawing have already been replaced and are not a part of this scope.
2. Relocate the 480V breakers to the floor below and provide remote control and status in the control room per specifications.
3. A short section of the main feeder wires will need to be replaced as they come into the new MCC and Panels. In past projects at other dams the feeder wires were brittle and insulation broke when they were bent for the new equipment requiring the last 30 feet of feeder wire to be replaced from new terminal blocks located on the floor directly below the control room to the new panels.
Optional Work
1. Replace the 16 lighting panels located in the powerhouse. See drawing 83E232A and (83E1501A.2 items in red). Note: six (6) of 16 panels are 120V AC panels with the DC contractor for emergency lighting. These will be isolated from the AC portion in each panel. The DC Contactors will be located on the wall in a panel beside the AC or inside the cutout in a separate box above an off-the-shelf 120V AC panel. The other 10 of 16 are 120/240 AC only panels. The ampacity of the lighting panels has been reduced due to lower loads. See specifications for the details and ampacity of each panel.
2. Replace the 12 lighting transformers for the associated lighting panels.
3. Remove the voltage regulator and install a new conductor for this circuit. Work shall be in accordance with specifications issued with this solicitation.
The Contractor will be required to commence work upon receipt of contract award and complete the work 600 calendar days after receipt of Notice to Proceed, this is subject to change after solicitation issuance.
Estimated Construction Costs:
The estimated construction cost of this project is between $1,000,000 to $5,000,000.
NAICS Code:
The Primary North American Industry Classification System (NAICS) code anticipated for solicitation is 238210, Electrical Contractors and Other Wiring Installation Contractors, with a size standard for Small Business of $19M.
Obtaining Solicitation Documents:
Solicitation documents will be posted to the web via SAM.gov. Find solicitation announcement in SAM.gov. 1. Use the ‘All Award Data' to locate the project (by entering the solicitation number. 2. By using the ‘login' feature, it allows additional search features and allows you to keep your searches. Login might be required on some solicitations that are considered restricted. 3. Once you have located your project, click on link to solicitation to view the project. Files may be downloaded from the column on the left side reading ‘Attachments/Links’.
Contracting Office Address:
USACE Omaha District 1616 Capital Ave Omaha, NE 68102-4901
Point of Contact: All questions regarding this solicitation should be made to the Contract Specialist, who can be reached by email: Brandie.L.Murphy@usace.army.mil
Place of Performance:
Gavin's Point Powerhouse, Crofton, Nebraska
Note: Offerors please be advised that an online registration requirement in System for Award Management (SAM) database http://www.sam.gov/ exists and directed solicitation provisions concerning electronic annual Representations and Certifications on SAM. Representations and certifications are required to be updated annually as a minimum to keep information current, accurate and complete. The electronic annual representations and certifications are effective for one year from date of submission or update to SAM. Solicitation documents will be posted to the web via SAM.gov. Registration is required to access solicitation documents. SAM.gov provides secure access to acquisition-related information, synopsis or pre-solicitation notices and amendments.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Solicitation - W9128F25RA018.pdf5.7 MB, June 9, 2025
- Attachment 1 Pricing Schedule W9128F25RA018.pdf136 KB, June 9, 2025
- Attachment 2 Sections 00 21 00 and 00 22 00.pdf363 KB, June 9, 2025
- Davis Bacon Wage Determination NE20250078 3.14.2025pdf.pdf2.1 MB, June 9, 2025
- W9128F25RA018 GP DC and Lower Panel Specs.pdf1.6 MB, June 9, 2025
- W9128F25RA018 GP DC and Low Panel Solicitation Drawings.PDF11.2 MB, June 9, 2025
- Site Visit Gavins Point DC Panelboard 6.25.25.pdf411 KB, June 26, 2025
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
May 19, 2025
Presolicitation
Due July 11, 2025 at 3:00 PM EDT. SAM.gov, notice e48fd820cfeb46b087ed06087ffd83c1
2 revisions on SAM
- May 19, 2025: publish, presolicitation
- June 9, 2025: publish, solicitation
June 9, 2025
Solicitation, originally presolicitation
Due July 9, 2025 at 3:00 PM EDT. SAM.gov, notice f9939c70709f469b93c2d052b00e7252
4 revisions on SAM
- June 26, 2025: publish, solicitation
- May 19, 2025: publish, presolicitation
- June 26, 2025: publish, solicitation
- June 9, 2025: publish, solicitation
June 26, 2025
Solicitation
Due July 9, 2025 at 3:00 PM EDT. SAM.gov, notice 3d7bbad79e9e4a51911fe95b36e4fd4c
4 revisions on SAM
- June 26, 2025: publish, solicitation
- May 19, 2025: publish, presolicitation
- June 26, 2025: publish, solicitation
- June 9, 2025: publish, solicitation
June 26, 2025
Solicitation
Due July 16, 2025 at 3:00 PM EDT. SAM.gov, notice d3d98b6d38bd4e3a915bec8eeec9bb57
5 revisions on SAM
- June 26, 2025: publish, solicitation
- August 20, 2025: publish, award notice
- May 19, 2025: publish, presolicitation
- June 26, 2025: publish, solicitation
- June 9, 2025: publish, solicitation
Points of contact
- Brandie (Stallsworth) MurphyBrandie.L.murphy@usace.army.mil
- Daniel D. Monahandaniel.d.monahan@usace.army.mil