{"canonical":"https://sealedbidder.com/opportunities/w9127n26ra004","key":"W9127N26RA004","url":"https://sealedbidder.com/opportunities/w9127n26ra004","title":"THE DALLES OIL ACCOUNTABILITY MEASURES","solicitation_number":"W9127N26RA004","notice_type":"o","open":false,"removed":false,"removed_at":null,"response_deadline":"2026-02-26T19:00:00Z","first_posted":"2025-10-07","last_posted":"2026-02-20","department":"DEPT OF DEFENSE","subagency":"DEPT OF THE ARMY","office":"W071 ENDIST PORTLAND","naics":"238210","psc":"Z2JZ","set_aside":null,"place_state":"OR","place_scope":"site","site":"The Dalles Dam","place_state_source":null,"place_evidence":null,"place_county":"41065","place_county_name":"Wasco County","place_city":"4172950","place_city_name":"The Dalles","winner":null,"award_amount":null,"publications":[{"notice_id":"3132bd4eee5b466e96e6bbe2a4552d3e","title":"The Dalles Dam Oil Accountability Measures","solicitation_number":"W9127N26RA004","notice_type":"p","base_type":"p","posted":"2025-10-07","posted_at":"2025-10-07T18:55:40.492Z","due_at":"2025-10-21T17:00:00Z","due_date":"2025-10-21","cancelled":false,"archived":true,"archive_date":"2025-11-05","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/3132bd4eee5b466e96e6bbe2a4552d3e/view","enriched":true,"history":[{"index":3,"title":"The Dalles Dam Oil Accountability Measures","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-10-16T19:15:03.140Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"bbede31202324b378b2c2c27517b5d65","solicitation_number":"W9127N26RA004","parent_opportunity_id":"3132bd4eee5b466e96e6bbe2a4552d3e"},{"index":1,"title":"The Dalles Dam Oil Accountability Measures","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-10-07T18:55:40.492Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"3132bd4eee5b466e96e6bbe2a4552d3e","solicitation_number":"W9127N26RA004"}]},{"notice_id":"bbede31202324b378b2c2c27517b5d65","title":"The Dalles Dam Oil Accountability Measures","solicitation_number":"W9127N26RA004","notice_type":"p","base_type":"p","posted":"2025-10-16","posted_at":"2025-10-16T19:15:03.140Z","due_at":"2025-10-21T17:00:00Z","due_date":"2025-10-21","cancelled":false,"archived":true,"archive_date":"2025-11-05","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/bbede31202324b378b2c2c27517b5d65/view","enriched":true,"history":[{"index":3,"title":"The Dalles Dam Oil Accountability Measures","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-10-16T19:15:03.140Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"bbede31202324b378b2c2c27517b5d65","solicitation_number":"W9127N26RA004","parent_opportunity_id":"3132bd4eee5b466e96e6bbe2a4552d3e"},{"index":1,"title":"The Dalles Dam Oil Accountability Measures","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-10-07T18:55:40.492Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"3132bd4eee5b466e96e6bbe2a4552d3e","solicitation_number":"W9127N26RA004"}]},{"notice_id":"912dfe4e86c742e48049d734ba305a4d","title":"THE DALLES OIL ACCOUNTABILITY MEASURES","solicitation_number":"W9127N26RA004","notice_type":"o","base_type":"o","posted":"2025-11-14","posted_at":"2025-11-14T17:05:44.191Z","due_at":"2025-12-15T19:00:00Z","due_date":"2025-12-15","cancelled":false,"archived":true,"archive_date":"2025-12-30","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/912dfe4e86c742e48049d734ba305a4d/view","enriched":true,"history":[{"index":23,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T16:26:19.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"b8ae5a29986d407080b14ebc2756e8f9","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":21,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T14:57:22.142Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dbb18e8123a4455e9863b620fd97d958","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":20,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-13T15:15:17.141Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"577a85dc81d240c88353a5c081e28ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":19,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T18:37:35.852Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dc60a3b89cba49f2aad6ddc4d0df2a85","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":18,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:10:39.296Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"25e250999084468cada7173e4b0ac734","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":17,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:08:50.758Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f2a0576f08fd4b5f99bb5c02fa230ccc","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":16,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-12T19:50:24.281Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f65194d512f549f98458954957687399","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":15,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-05T18:17:21.540Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"967d1cdf2b61445eb728c50ace6d1a9d","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":14,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-23T16:21:36.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"489c6926b91048bd8424852a5793ef3f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":13,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:41:58.905Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9a707bc559dc484ba4f1d9082a57c148","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":12,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:38:32.853Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d722de2191e34756b99acb921d6c82db","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":11,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T16:41:58.213Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"79bdd16e09c547b78533ab5498d69a22","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":10,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-11T13:49:23.849Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9f113c8389f0405fb5dbf321b067a990","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":9,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-10T19:20:54.767Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5a29204e7e6c42598a46e4ec51d147df","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":8,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-08T22:22:28.939Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f1ac66ff944a95844754fe2540d2a7","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":7,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T20:54:08.202Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"fd4ac3d8932e46a5b1f840a9c87262da","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":6,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:59:48.906Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b07faed24389484497756d2ee8254ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":5,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:16:01.774Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2137e768ddc646a7b23b47d148a50aec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":4,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-19T00:09:08.134Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ac8c60611de24fd896b7bbc6c59b9301","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":3,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-18T13:46:40.606Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c7437bf0ed5a4e748e01f5b0d05af9ec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":2,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-17T13:49:49.868Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"58cec72778274b4cbfb6dc74e4eddf0f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":1,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-14T17:05:44.191Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"912dfe4e86c742e48049d734ba305a4d","solicitation_number":"W9127N26RA004"}]},{"notice_id":"58cec72778274b4cbfb6dc74e4eddf0f","title":"THE DALLES OIL ACCOUNTABILITY MEASURES","solicitation_number":"W9127N26RA004","notice_type":"o","base_type":"o","posted":"2025-11-17","posted_at":"2025-11-17T13:49:49.868Z","due_at":"2025-12-15T19:00:00Z","due_date":"2025-12-15","cancelled":false,"archived":true,"archive_date":"2025-12-30","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/58cec72778274b4cbfb6dc74e4eddf0f/view","enriched":true,"history":[{"index":23,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T16:26:19.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"b8ae5a29986d407080b14ebc2756e8f9","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":21,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T14:57:22.142Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dbb18e8123a4455e9863b620fd97d958","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":20,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-13T15:15:17.141Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"577a85dc81d240c88353a5c081e28ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":19,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T18:37:35.852Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dc60a3b89cba49f2aad6ddc4d0df2a85","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":18,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:10:39.296Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"25e250999084468cada7173e4b0ac734","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":17,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:08:50.758Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f2a0576f08fd4b5f99bb5c02fa230ccc","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":16,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-12T19:50:24.281Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f65194d512f549f98458954957687399","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":15,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-05T18:17:21.540Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"967d1cdf2b61445eb728c50ace6d1a9d","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":14,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-23T16:21:36.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"489c6926b91048bd8424852a5793ef3f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":13,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:41:58.905Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9a707bc559dc484ba4f1d9082a57c148","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":12,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:38:32.853Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d722de2191e34756b99acb921d6c82db","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":11,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T16:41:58.213Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"79bdd16e09c547b78533ab5498d69a22","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":10,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-11T13:49:23.849Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9f113c8389f0405fb5dbf321b067a990","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":9,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-10T19:20:54.767Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5a29204e7e6c42598a46e4ec51d147df","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":8,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-08T22:22:28.939Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f1ac66ff944a95844754fe2540d2a7","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":7,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T20:54:08.202Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"fd4ac3d8932e46a5b1f840a9c87262da","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":6,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:59:48.906Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b07faed24389484497756d2ee8254ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":5,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:16:01.774Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2137e768ddc646a7b23b47d148a50aec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":4,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-19T00:09:08.134Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ac8c60611de24fd896b7bbc6c59b9301","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":3,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-18T13:46:40.606Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c7437bf0ed5a4e748e01f5b0d05af9ec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":2,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-17T13:49:49.868Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"58cec72778274b4cbfb6dc74e4eddf0f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":1,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-14T17:05:44.191Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"912dfe4e86c742e48049d734ba305a4d","solicitation_number":"W9127N26RA004"}]},{"notice_id":"ac8c60611de24fd896b7bbc6c59b9301","title":"THE DALLES OIL ACCOUNTABILITY MEASURES","solicitation_number":"W9127N26RA004","notice_type":"o","base_type":"o","posted":"2025-11-18","posted_at":"2025-11-19T00:09:08.134Z","due_at":"2025-12-15T19:00:00Z","due_date":"2025-12-15","cancelled":false,"archived":true,"archive_date":"2025-12-30","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/ac8c60611de24fd896b7bbc6c59b9301/view","enriched":true,"history":[{"index":23,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T16:26:19.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"b8ae5a29986d407080b14ebc2756e8f9","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":21,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T14:57:22.142Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dbb18e8123a4455e9863b620fd97d958","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":20,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-13T15:15:17.141Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"577a85dc81d240c88353a5c081e28ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":19,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T18:37:35.852Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dc60a3b89cba49f2aad6ddc4d0df2a85","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":18,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:10:39.296Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"25e250999084468cada7173e4b0ac734","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":17,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:08:50.758Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f2a0576f08fd4b5f99bb5c02fa230ccc","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":16,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-12T19:50:24.281Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f65194d512f549f98458954957687399","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":15,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-05T18:17:21.540Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"967d1cdf2b61445eb728c50ace6d1a9d","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":14,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-23T16:21:36.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"489c6926b91048bd8424852a5793ef3f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":13,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:41:58.905Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9a707bc559dc484ba4f1d9082a57c148","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":12,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:38:32.853Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d722de2191e34756b99acb921d6c82db","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":11,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T16:41:58.213Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"79bdd16e09c547b78533ab5498d69a22","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":10,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-11T13:49:23.849Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9f113c8389f0405fb5dbf321b067a990","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":9,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-10T19:20:54.767Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5a29204e7e6c42598a46e4ec51d147df","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":8,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-08T22:22:28.939Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f1ac66ff944a95844754fe2540d2a7","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":7,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T20:54:08.202Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"fd4ac3d8932e46a5b1f840a9c87262da","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":6,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:59:48.906Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b07faed24389484497756d2ee8254ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":5,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:16:01.774Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2137e768ddc646a7b23b47d148a50aec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":4,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-19T00:09:08.134Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ac8c60611de24fd896b7bbc6c59b9301","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":3,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-18T13:46:40.606Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c7437bf0ed5a4e748e01f5b0d05af9ec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":2,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-17T13:49:49.868Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"58cec72778274b4cbfb6dc74e4eddf0f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":1,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-14T17:05:44.191Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"912dfe4e86c742e48049d734ba305a4d","solicitation_number":"W9127N26RA004"}]},{"notice_id":"c7437bf0ed5a4e748e01f5b0d05af9ec","title":"THE DALLES OIL ACCOUNTABILITY MEASURES","solicitation_number":"W9127N26RA004","notice_type":"o","base_type":"o","posted":"2025-11-18","posted_at":"2025-11-18T13:46:40.606Z","due_at":"2025-12-15T19:00:00Z","due_date":"2025-12-15","cancelled":false,"archived":true,"archive_date":"2025-12-30","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/c7437bf0ed5a4e748e01f5b0d05af9ec/view","enriched":true,"history":[{"index":23,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T16:26:19.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"b8ae5a29986d407080b14ebc2756e8f9","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":21,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T14:57:22.142Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dbb18e8123a4455e9863b620fd97d958","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":20,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-13T15:15:17.141Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"577a85dc81d240c88353a5c081e28ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":19,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T18:37:35.852Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dc60a3b89cba49f2aad6ddc4d0df2a85","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":18,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:10:39.296Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"25e250999084468cada7173e4b0ac734","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":17,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:08:50.758Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f2a0576f08fd4b5f99bb5c02fa230ccc","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":16,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-12T19:50:24.281Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f65194d512f549f98458954957687399","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":15,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-05T18:17:21.540Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"967d1cdf2b61445eb728c50ace6d1a9d","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":14,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-23T16:21:36.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"489c6926b91048bd8424852a5793ef3f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":13,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:41:58.905Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9a707bc559dc484ba4f1d9082a57c148","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":12,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:38:32.853Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d722de2191e34756b99acb921d6c82db","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":11,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T16:41:58.213Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"79bdd16e09c547b78533ab5498d69a22","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":10,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-11T13:49:23.849Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9f113c8389f0405fb5dbf321b067a990","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":9,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-10T19:20:54.767Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5a29204e7e6c42598a46e4ec51d147df","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":8,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-08T22:22:28.939Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f1ac66ff944a95844754fe2540d2a7","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":7,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T20:54:08.202Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"fd4ac3d8932e46a5b1f840a9c87262da","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":6,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:59:48.906Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b07faed24389484497756d2ee8254ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":5,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:16:01.774Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2137e768ddc646a7b23b47d148a50aec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":4,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-19T00:09:08.134Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ac8c60611de24fd896b7bbc6c59b9301","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":3,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-18T13:46:40.606Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c7437bf0ed5a4e748e01f5b0d05af9ec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":2,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-17T13:49:49.868Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"58cec72778274b4cbfb6dc74e4eddf0f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":1,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-14T17:05:44.191Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"912dfe4e86c742e48049d734ba305a4d","solicitation_number":"W9127N26RA004"}]},{"notice_id":"2137e768ddc646a7b23b47d148a50aec","title":"THE DALLES OIL ACCOUNTABILITY MEASURES","solicitation_number":"W9127N26RA004","notice_type":"o","base_type":"o","posted":"2025-11-20","posted_at":"2025-11-20T18:16:01.774Z","due_at":"2025-12-15T19:00:00Z","due_date":"2025-12-15","cancelled":false,"archived":true,"archive_date":"2025-12-30","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/2137e768ddc646a7b23b47d148a50aec/view","enriched":true,"history":[{"index":23,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T16:26:19.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"b8ae5a29986d407080b14ebc2756e8f9","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":21,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T14:57:22.142Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dbb18e8123a4455e9863b620fd97d958","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":20,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-13T15:15:17.141Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"577a85dc81d240c88353a5c081e28ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":19,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T18:37:35.852Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dc60a3b89cba49f2aad6ddc4d0df2a85","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":18,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:10:39.296Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"25e250999084468cada7173e4b0ac734","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":17,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:08:50.758Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f2a0576f08fd4b5f99bb5c02fa230ccc","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":16,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-12T19:50:24.281Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f65194d512f549f98458954957687399","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":15,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-05T18:17:21.540Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"967d1cdf2b61445eb728c50ace6d1a9d","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":14,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-23T16:21:36.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"489c6926b91048bd8424852a5793ef3f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":13,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:41:58.905Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9a707bc559dc484ba4f1d9082a57c148","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":12,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:38:32.853Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d722de2191e34756b99acb921d6c82db","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":11,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T16:41:58.213Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"79bdd16e09c547b78533ab5498d69a22","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":10,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-11T13:49:23.849Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9f113c8389f0405fb5dbf321b067a990","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":9,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-10T19:20:54.767Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5a29204e7e6c42598a46e4ec51d147df","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":8,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-08T22:22:28.939Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f1ac66ff944a95844754fe2540d2a7","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":7,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T20:54:08.202Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"fd4ac3d8932e46a5b1f840a9c87262da","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":6,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:59:48.906Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b07faed24389484497756d2ee8254ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":5,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:16:01.774Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2137e768ddc646a7b23b47d148a50aec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":4,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-19T00:09:08.134Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ac8c60611de24fd896b7bbc6c59b9301","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":3,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-18T13:46:40.606Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c7437bf0ed5a4e748e01f5b0d05af9ec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":2,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-17T13:49:49.868Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"58cec72778274b4cbfb6dc74e4eddf0f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":1,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-14T17:05:44.191Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"912dfe4e86c742e48049d734ba305a4d","solicitation_number":"W9127N26RA004"}]},{"notice_id":"b07faed24389484497756d2ee8254ad5","title":"THE DALLES OIL ACCOUNTABILITY MEASURES","solicitation_number":"W9127N26RA004","notice_type":"o","base_type":"o","posted":"2025-11-20","posted_at":"2025-11-20T18:59:48.906Z","due_at":"2025-12-15T19:00:00Z","due_date":"2025-12-15","cancelled":false,"archived":true,"archive_date":"2025-12-30","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/b07faed24389484497756d2ee8254ad5/view","enriched":true,"history":[{"index":23,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T16:26:19.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"b8ae5a29986d407080b14ebc2756e8f9","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":21,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T14:57:22.142Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dbb18e8123a4455e9863b620fd97d958","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":20,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-13T15:15:17.141Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"577a85dc81d240c88353a5c081e28ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":19,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T18:37:35.852Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dc60a3b89cba49f2aad6ddc4d0df2a85","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":18,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:10:39.296Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"25e250999084468cada7173e4b0ac734","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":17,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:08:50.758Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f2a0576f08fd4b5f99bb5c02fa230ccc","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":16,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-12T19:50:24.281Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f65194d512f549f98458954957687399","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":15,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-05T18:17:21.540Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"967d1cdf2b61445eb728c50ace6d1a9d","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":14,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-23T16:21:36.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"489c6926b91048bd8424852a5793ef3f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":13,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:41:58.905Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9a707bc559dc484ba4f1d9082a57c148","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":12,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:38:32.853Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d722de2191e34756b99acb921d6c82db","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":11,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T16:41:58.213Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"79bdd16e09c547b78533ab5498d69a22","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":10,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-11T13:49:23.849Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9f113c8389f0405fb5dbf321b067a990","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":9,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-10T19:20:54.767Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5a29204e7e6c42598a46e4ec51d147df","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":8,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-08T22:22:28.939Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f1ac66ff944a95844754fe2540d2a7","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":7,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T20:54:08.202Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"fd4ac3d8932e46a5b1f840a9c87262da","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":6,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:59:48.906Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b07faed24389484497756d2ee8254ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":5,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:16:01.774Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2137e768ddc646a7b23b47d148a50aec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":4,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-19T00:09:08.134Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ac8c60611de24fd896b7bbc6c59b9301","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":3,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-18T13:46:40.606Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c7437bf0ed5a4e748e01f5b0d05af9ec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":2,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-17T13:49:49.868Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"58cec72778274b4cbfb6dc74e4eddf0f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":1,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-14T17:05:44.191Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"912dfe4e86c742e48049d734ba305a4d","solicitation_number":"W9127N26RA004"}]},{"notice_id":"fd4ac3d8932e46a5b1f840a9c87262da","title":"THE DALLES OIL ACCOUNTABILITY MEASURES","solicitation_number":"W9127N26RA004","notice_type":"o","base_type":"o","posted":"2025-11-20","posted_at":"2025-11-20T20:54:08.202Z","due_at":"2025-12-15T19:00:00Z","due_date":"2025-12-15","cancelled":false,"archived":true,"archive_date":"2025-12-30","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/fd4ac3d8932e46a5b1f840a9c87262da/view","enriched":true,"history":[{"index":23,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T16:26:19.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"b8ae5a29986d407080b14ebc2756e8f9","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":21,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T14:57:22.142Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dbb18e8123a4455e9863b620fd97d958","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":20,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-13T15:15:17.141Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"577a85dc81d240c88353a5c081e28ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":19,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T18:37:35.852Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dc60a3b89cba49f2aad6ddc4d0df2a85","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":18,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:10:39.296Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"25e250999084468cada7173e4b0ac734","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":17,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:08:50.758Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f2a0576f08fd4b5f99bb5c02fa230ccc","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":16,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-12T19:50:24.281Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f65194d512f549f98458954957687399","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":15,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-05T18:17:21.540Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"967d1cdf2b61445eb728c50ace6d1a9d","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":14,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-23T16:21:36.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"489c6926b91048bd8424852a5793ef3f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":13,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:41:58.905Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9a707bc559dc484ba4f1d9082a57c148","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":12,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:38:32.853Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d722de2191e34756b99acb921d6c82db","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":11,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T16:41:58.213Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"79bdd16e09c547b78533ab5498d69a22","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":10,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-11T13:49:23.849Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9f113c8389f0405fb5dbf321b067a990","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":9,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-10T19:20:54.767Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5a29204e7e6c42598a46e4ec51d147df","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":8,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-08T22:22:28.939Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f1ac66ff944a95844754fe2540d2a7","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":7,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T20:54:08.202Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"fd4ac3d8932e46a5b1f840a9c87262da","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":6,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:59:48.906Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b07faed24389484497756d2ee8254ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":5,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:16:01.774Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2137e768ddc646a7b23b47d148a50aec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":4,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-19T00:09:08.134Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ac8c60611de24fd896b7bbc6c59b9301","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":3,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-18T13:46:40.606Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c7437bf0ed5a4e748e01f5b0d05af9ec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":2,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-17T13:49:49.868Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"58cec72778274b4cbfb6dc74e4eddf0f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":1,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-14T17:05:44.191Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"912dfe4e86c742e48049d734ba305a4d","solicitation_number":"W9127N26RA004"}]},{"notice_id":"97f1ac66ff944a95844754fe2540d2a7","title":"THE DALLES OIL ACCOUNTABILITY MEASURES","solicitation_number":"W9127N26RA004","notice_type":"o","base_type":"o","posted":"2025-12-08","posted_at":"2025-12-08T22:22:28.939Z","due_at":"2025-12-15T19:00:00Z","due_date":"2025-12-15","cancelled":false,"archived":true,"archive_date":"2025-12-30","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/97f1ac66ff944a95844754fe2540d2a7/view","enriched":true,"history":[{"index":23,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T16:26:19.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"b8ae5a29986d407080b14ebc2756e8f9","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":21,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T14:57:22.142Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dbb18e8123a4455e9863b620fd97d958","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":20,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-13T15:15:17.141Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"577a85dc81d240c88353a5c081e28ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":19,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T18:37:35.852Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dc60a3b89cba49f2aad6ddc4d0df2a85","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":18,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:10:39.296Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"25e250999084468cada7173e4b0ac734","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":17,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:08:50.758Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f2a0576f08fd4b5f99bb5c02fa230ccc","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":16,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-12T19:50:24.281Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f65194d512f549f98458954957687399","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":15,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-05T18:17:21.540Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"967d1cdf2b61445eb728c50ace6d1a9d","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":14,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-23T16:21:36.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"489c6926b91048bd8424852a5793ef3f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":13,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:41:58.905Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9a707bc559dc484ba4f1d9082a57c148","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":12,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:38:32.853Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d722de2191e34756b99acb921d6c82db","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":11,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T16:41:58.213Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"79bdd16e09c547b78533ab5498d69a22","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":10,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-11T13:49:23.849Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9f113c8389f0405fb5dbf321b067a990","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":9,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-10T19:20:54.767Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5a29204e7e6c42598a46e4ec51d147df","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":8,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-08T22:22:28.939Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f1ac66ff944a95844754fe2540d2a7","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":7,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T20:54:08.202Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"fd4ac3d8932e46a5b1f840a9c87262da","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":6,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:59:48.906Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b07faed24389484497756d2ee8254ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":5,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:16:01.774Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2137e768ddc646a7b23b47d148a50aec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":4,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-19T00:09:08.134Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ac8c60611de24fd896b7bbc6c59b9301","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":3,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-18T13:46:40.606Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c7437bf0ed5a4e748e01f5b0d05af9ec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":2,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-17T13:49:49.868Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"58cec72778274b4cbfb6dc74e4eddf0f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":1,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-14T17:05:44.191Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"912dfe4e86c742e48049d734ba305a4d","solicitation_number":"W9127N26RA004"}]},{"notice_id":"5a29204e7e6c42598a46e4ec51d147df","title":"THE DALLES OIL ACCOUNTABILITY MEASURES","solicitation_number":"W9127N26RA004","notice_type":"o","base_type":"o","posted":"2025-12-10","posted_at":"2025-12-10T19:20:54.767Z","due_at":"2026-01-15T19:00:00Z","due_date":"2026-01-15","cancelled":false,"archived":true,"archive_date":"2026-01-30","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/5a29204e7e6c42598a46e4ec51d147df/view","enriched":true,"history":[{"index":23,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T16:26:19.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"b8ae5a29986d407080b14ebc2756e8f9","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":21,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T14:57:22.142Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dbb18e8123a4455e9863b620fd97d958","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":20,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-13T15:15:17.141Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"577a85dc81d240c88353a5c081e28ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":19,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T18:37:35.852Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dc60a3b89cba49f2aad6ddc4d0df2a85","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":18,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:10:39.296Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"25e250999084468cada7173e4b0ac734","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":17,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:08:50.758Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f2a0576f08fd4b5f99bb5c02fa230ccc","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":16,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-12T19:50:24.281Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f65194d512f549f98458954957687399","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":15,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-05T18:17:21.540Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"967d1cdf2b61445eb728c50ace6d1a9d","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":14,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-23T16:21:36.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"489c6926b91048bd8424852a5793ef3f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":13,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:41:58.905Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9a707bc559dc484ba4f1d9082a57c148","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":12,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:38:32.853Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d722de2191e34756b99acb921d6c82db","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":11,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T16:41:58.213Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"79bdd16e09c547b78533ab5498d69a22","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":10,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-11T13:49:23.849Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9f113c8389f0405fb5dbf321b067a990","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":9,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-10T19:20:54.767Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5a29204e7e6c42598a46e4ec51d147df","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":8,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-08T22:22:28.939Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f1ac66ff944a95844754fe2540d2a7","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":7,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T20:54:08.202Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"fd4ac3d8932e46a5b1f840a9c87262da","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":6,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:59:48.906Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b07faed24389484497756d2ee8254ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":5,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:16:01.774Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2137e768ddc646a7b23b47d148a50aec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":4,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-19T00:09:08.134Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ac8c60611de24fd896b7bbc6c59b9301","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":3,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-18T13:46:40.606Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c7437bf0ed5a4e748e01f5b0d05af9ec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":2,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-17T13:49:49.868Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"58cec72778274b4cbfb6dc74e4eddf0f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":1,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-14T17:05:44.191Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"912dfe4e86c742e48049d734ba305a4d","solicitation_number":"W9127N26RA004"}]},{"notice_id":"9f113c8389f0405fb5dbf321b067a990","title":"THE DALLES OIL ACCOUNTABILITY MEASURES","solicitation_number":"W9127N26RA004","notice_type":"o","base_type":"o","posted":"2025-12-11","posted_at":"2025-12-11T13:49:23.849Z","due_at":"2026-01-15T19:00:00Z","due_date":"2026-01-15","cancelled":false,"archived":true,"archive_date":"2026-01-30","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/9f113c8389f0405fb5dbf321b067a990/view","enriched":true,"history":[{"index":23,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T16:26:19.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"b8ae5a29986d407080b14ebc2756e8f9","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":21,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T14:57:22.142Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dbb18e8123a4455e9863b620fd97d958","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":20,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-13T15:15:17.141Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"577a85dc81d240c88353a5c081e28ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":19,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T18:37:35.852Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dc60a3b89cba49f2aad6ddc4d0df2a85","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":18,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:10:39.296Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"25e250999084468cada7173e4b0ac734","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":17,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:08:50.758Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f2a0576f08fd4b5f99bb5c02fa230ccc","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":16,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-12T19:50:24.281Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f65194d512f549f98458954957687399","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":15,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-05T18:17:21.540Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"967d1cdf2b61445eb728c50ace6d1a9d","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":14,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-23T16:21:36.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"489c6926b91048bd8424852a5793ef3f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":13,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:41:58.905Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9a707bc559dc484ba4f1d9082a57c148","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":12,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:38:32.853Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d722de2191e34756b99acb921d6c82db","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":11,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T16:41:58.213Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"79bdd16e09c547b78533ab5498d69a22","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":10,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-11T13:49:23.849Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9f113c8389f0405fb5dbf321b067a990","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":9,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-10T19:20:54.767Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5a29204e7e6c42598a46e4ec51d147df","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":8,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-08T22:22:28.939Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f1ac66ff944a95844754fe2540d2a7","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":7,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T20:54:08.202Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"fd4ac3d8932e46a5b1f840a9c87262da","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":6,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:59:48.906Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b07faed24389484497756d2ee8254ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":5,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:16:01.774Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2137e768ddc646a7b23b47d148a50aec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":4,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-19T00:09:08.134Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ac8c60611de24fd896b7bbc6c59b9301","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":3,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-18T13:46:40.606Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c7437bf0ed5a4e748e01f5b0d05af9ec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":2,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-17T13:49:49.868Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"58cec72778274b4cbfb6dc74e4eddf0f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":1,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-14T17:05:44.191Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"912dfe4e86c742e48049d734ba305a4d","solicitation_number":"W9127N26RA004"}]},{"notice_id":"79bdd16e09c547b78533ab5498d69a22","title":"THE DALLES OIL ACCOUNTABILITY MEASURES","solicitation_number":"W9127N26RA004","notice_type":"o","base_type":"o","posted":"2025-12-15","posted_at":"2025-12-15T16:41:58.213Z","due_at":"2026-01-15T19:00:00Z","due_date":"2026-01-15","cancelled":false,"archived":true,"archive_date":"2026-01-30","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/79bdd16e09c547b78533ab5498d69a22/view","enriched":true,"history":[{"index":23,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T16:26:19.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"b8ae5a29986d407080b14ebc2756e8f9","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":21,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T14:57:22.142Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dbb18e8123a4455e9863b620fd97d958","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":20,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-13T15:15:17.141Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"577a85dc81d240c88353a5c081e28ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":19,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T18:37:35.852Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dc60a3b89cba49f2aad6ddc4d0df2a85","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":18,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:10:39.296Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"25e250999084468cada7173e4b0ac734","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":17,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:08:50.758Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f2a0576f08fd4b5f99bb5c02fa230ccc","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":16,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-12T19:50:24.281Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f65194d512f549f98458954957687399","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":15,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-05T18:17:21.540Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"967d1cdf2b61445eb728c50ace6d1a9d","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":14,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-23T16:21:36.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"489c6926b91048bd8424852a5793ef3f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":13,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:41:58.905Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9a707bc559dc484ba4f1d9082a57c148","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":12,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:38:32.853Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d722de2191e34756b99acb921d6c82db","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":11,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T16:41:58.213Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"79bdd16e09c547b78533ab5498d69a22","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":10,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-11T13:49:23.849Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9f113c8389f0405fb5dbf321b067a990","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":9,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-10T19:20:54.767Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5a29204e7e6c42598a46e4ec51d147df","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":8,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-08T22:22:28.939Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f1ac66ff944a95844754fe2540d2a7","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":7,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T20:54:08.202Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"fd4ac3d8932e46a5b1f840a9c87262da","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":6,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:59:48.906Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b07faed24389484497756d2ee8254ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":5,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:16:01.774Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2137e768ddc646a7b23b47d148a50aec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":4,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-19T00:09:08.134Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ac8c60611de24fd896b7bbc6c59b9301","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":3,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-18T13:46:40.606Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c7437bf0ed5a4e748e01f5b0d05af9ec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":2,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-17T13:49:49.868Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"58cec72778274b4cbfb6dc74e4eddf0f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":1,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-14T17:05:44.191Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"912dfe4e86c742e48049d734ba305a4d","solicitation_number":"W9127N26RA004"}]},{"notice_id":"9a707bc559dc484ba4f1d9082a57c148","title":"THE DALLES OIL ACCOUNTABILITY MEASURES","solicitation_number":"W9127N26RA004","notice_type":"o","base_type":"o","posted":"2025-12-19","posted_at":"2025-12-19T14:41:58.905Z","due_at":"2026-01-15T19:00:00Z","due_date":"2026-01-15","cancelled":false,"archived":true,"archive_date":"2026-01-30","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/9a707bc559dc484ba4f1d9082a57c148/view","enriched":true,"history":[{"index":23,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T16:26:19.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"b8ae5a29986d407080b14ebc2756e8f9","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":21,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T14:57:22.142Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dbb18e8123a4455e9863b620fd97d958","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":20,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-13T15:15:17.141Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"577a85dc81d240c88353a5c081e28ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":19,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T18:37:35.852Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dc60a3b89cba49f2aad6ddc4d0df2a85","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":18,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:10:39.296Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"25e250999084468cada7173e4b0ac734","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":17,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:08:50.758Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f2a0576f08fd4b5f99bb5c02fa230ccc","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":16,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-12T19:50:24.281Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f65194d512f549f98458954957687399","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":15,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-05T18:17:21.540Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"967d1cdf2b61445eb728c50ace6d1a9d","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":14,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-23T16:21:36.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"489c6926b91048bd8424852a5793ef3f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":13,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:41:58.905Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9a707bc559dc484ba4f1d9082a57c148","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":12,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:38:32.853Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d722de2191e34756b99acb921d6c82db","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":11,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T16:41:58.213Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"79bdd16e09c547b78533ab5498d69a22","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":10,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-11T13:49:23.849Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9f113c8389f0405fb5dbf321b067a990","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":9,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-10T19:20:54.767Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5a29204e7e6c42598a46e4ec51d147df","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":8,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-08T22:22:28.939Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f1ac66ff944a95844754fe2540d2a7","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":7,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T20:54:08.202Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"fd4ac3d8932e46a5b1f840a9c87262da","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":6,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:59:48.906Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b07faed24389484497756d2ee8254ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":5,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:16:01.774Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2137e768ddc646a7b23b47d148a50aec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":4,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-19T00:09:08.134Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ac8c60611de24fd896b7bbc6c59b9301","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":3,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-18T13:46:40.606Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c7437bf0ed5a4e748e01f5b0d05af9ec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":2,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-17T13:49:49.868Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"58cec72778274b4cbfb6dc74e4eddf0f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":1,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-14T17:05:44.191Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"912dfe4e86c742e48049d734ba305a4d","solicitation_number":"W9127N26RA004"}]},{"notice_id":"d722de2191e34756b99acb921d6c82db","title":"THE DALLES OIL ACCOUNTABILITY MEASURES","solicitation_number":"W9127N26RA004","notice_type":"o","base_type":"o","posted":"2025-12-19","posted_at":"2025-12-19T14:38:32.853Z","due_at":"2026-01-15T19:00:00Z","due_date":"2026-01-15","cancelled":false,"archived":true,"archive_date":"2026-01-30","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/d722de2191e34756b99acb921d6c82db/view","enriched":true,"history":[{"index":23,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T16:26:19.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"b8ae5a29986d407080b14ebc2756e8f9","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":21,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T14:57:22.142Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dbb18e8123a4455e9863b620fd97d958","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":20,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-13T15:15:17.141Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"577a85dc81d240c88353a5c081e28ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":19,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T18:37:35.852Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dc60a3b89cba49f2aad6ddc4d0df2a85","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":18,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:10:39.296Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"25e250999084468cada7173e4b0ac734","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":17,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:08:50.758Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f2a0576f08fd4b5f99bb5c02fa230ccc","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":16,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-12T19:50:24.281Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f65194d512f549f98458954957687399","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":15,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-05T18:17:21.540Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"967d1cdf2b61445eb728c50ace6d1a9d","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":14,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-23T16:21:36.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"489c6926b91048bd8424852a5793ef3f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":13,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:41:58.905Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9a707bc559dc484ba4f1d9082a57c148","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":12,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:38:32.853Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d722de2191e34756b99acb921d6c82db","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":11,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T16:41:58.213Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"79bdd16e09c547b78533ab5498d69a22","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":10,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-11T13:49:23.849Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9f113c8389f0405fb5dbf321b067a990","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":9,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-10T19:20:54.767Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5a29204e7e6c42598a46e4ec51d147df","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":8,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-08T22:22:28.939Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f1ac66ff944a95844754fe2540d2a7","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":7,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T20:54:08.202Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"fd4ac3d8932e46a5b1f840a9c87262da","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":6,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:59:48.906Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b07faed24389484497756d2ee8254ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":5,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:16:01.774Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2137e768ddc646a7b23b47d148a50aec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":4,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-19T00:09:08.134Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ac8c60611de24fd896b7bbc6c59b9301","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":3,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-18T13:46:40.606Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c7437bf0ed5a4e748e01f5b0d05af9ec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":2,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-17T13:49:49.868Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"58cec72778274b4cbfb6dc74e4eddf0f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":1,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-14T17:05:44.191Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"912dfe4e86c742e48049d734ba305a4d","solicitation_number":"W9127N26RA004"}]},{"notice_id":"489c6926b91048bd8424852a5793ef3f","title":"THE DALLES OIL ACCOUNTABILITY MEASURES","solicitation_number":"W9127N26RA004","notice_type":"o","base_type":"o","posted":"2025-12-23","posted_at":"2025-12-23T16:21:36.428Z","due_at":"2026-01-15T19:00:00Z","due_date":"2026-01-15","cancelled":false,"archived":true,"archive_date":"2026-01-30","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/489c6926b91048bd8424852a5793ef3f/view","enriched":true,"history":[{"index":23,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T16:26:19.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"b8ae5a29986d407080b14ebc2756e8f9","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":21,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T14:57:22.142Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dbb18e8123a4455e9863b620fd97d958","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":20,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-13T15:15:17.141Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"577a85dc81d240c88353a5c081e28ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":19,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T18:37:35.852Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dc60a3b89cba49f2aad6ddc4d0df2a85","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":18,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:10:39.296Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"25e250999084468cada7173e4b0ac734","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":17,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:08:50.758Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f2a0576f08fd4b5f99bb5c02fa230ccc","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":16,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-12T19:50:24.281Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f65194d512f549f98458954957687399","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":15,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-05T18:17:21.540Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"967d1cdf2b61445eb728c50ace6d1a9d","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":14,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-23T16:21:36.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"489c6926b91048bd8424852a5793ef3f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":13,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:41:58.905Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9a707bc559dc484ba4f1d9082a57c148","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":12,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:38:32.853Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d722de2191e34756b99acb921d6c82db","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":11,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T16:41:58.213Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"79bdd16e09c547b78533ab5498d69a22","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":10,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-11T13:49:23.849Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9f113c8389f0405fb5dbf321b067a990","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":9,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-10T19:20:54.767Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5a29204e7e6c42598a46e4ec51d147df","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":8,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-08T22:22:28.939Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f1ac66ff944a95844754fe2540d2a7","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":7,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T20:54:08.202Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"fd4ac3d8932e46a5b1f840a9c87262da","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":6,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:59:48.906Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b07faed24389484497756d2ee8254ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":5,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:16:01.774Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2137e768ddc646a7b23b47d148a50aec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":4,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-19T00:09:08.134Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ac8c60611de24fd896b7bbc6c59b9301","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":3,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-18T13:46:40.606Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c7437bf0ed5a4e748e01f5b0d05af9ec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":2,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-17T13:49:49.868Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"58cec72778274b4cbfb6dc74e4eddf0f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":1,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-14T17:05:44.191Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"912dfe4e86c742e48049d734ba305a4d","solicitation_number":"W9127N26RA004"}]},{"notice_id":"967d1cdf2b61445eb728c50ace6d1a9d","title":"THE DALLES OIL ACCOUNTABILITY MEASURES","solicitation_number":"W9127N26RA004","notice_type":"o","base_type":"o","posted":"2026-01-05","posted_at":"2026-01-05T18:17:21.540Z","due_at":"2026-01-15T19:00:00Z","due_date":"2026-01-15","cancelled":false,"archived":true,"archive_date":"2026-01-30","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/967d1cdf2b61445eb728c50ace6d1a9d/view","enriched":true,"history":[{"index":23,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T16:26:19.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"b8ae5a29986d407080b14ebc2756e8f9","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":21,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T14:57:22.142Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dbb18e8123a4455e9863b620fd97d958","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":20,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-13T15:15:17.141Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"577a85dc81d240c88353a5c081e28ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":19,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T18:37:35.852Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dc60a3b89cba49f2aad6ddc4d0df2a85","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":18,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:10:39.296Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"25e250999084468cada7173e4b0ac734","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":17,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:08:50.758Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f2a0576f08fd4b5f99bb5c02fa230ccc","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":16,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-12T19:50:24.281Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f65194d512f549f98458954957687399","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":15,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-05T18:17:21.540Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"967d1cdf2b61445eb728c50ace6d1a9d","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":14,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-23T16:21:36.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"489c6926b91048bd8424852a5793ef3f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":13,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:41:58.905Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9a707bc559dc484ba4f1d9082a57c148","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":12,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:38:32.853Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d722de2191e34756b99acb921d6c82db","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":11,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T16:41:58.213Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"79bdd16e09c547b78533ab5498d69a22","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":10,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-11T13:49:23.849Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9f113c8389f0405fb5dbf321b067a990","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":9,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-10T19:20:54.767Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5a29204e7e6c42598a46e4ec51d147df","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":8,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-08T22:22:28.939Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f1ac66ff944a95844754fe2540d2a7","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":7,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T20:54:08.202Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"fd4ac3d8932e46a5b1f840a9c87262da","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":6,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:59:48.906Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b07faed24389484497756d2ee8254ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":5,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:16:01.774Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2137e768ddc646a7b23b47d148a50aec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":4,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-19T00:09:08.134Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ac8c60611de24fd896b7bbc6c59b9301","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":3,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-18T13:46:40.606Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c7437bf0ed5a4e748e01f5b0d05af9ec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":2,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-17T13:49:49.868Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"58cec72778274b4cbfb6dc74e4eddf0f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":1,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-14T17:05:44.191Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"912dfe4e86c742e48049d734ba305a4d","solicitation_number":"W9127N26RA004"}]},{"notice_id":"f65194d512f549f98458954957687399","title":"THE DALLES OIL ACCOUNTABILITY MEASURES","solicitation_number":"W9127N26RA004","notice_type":"o","base_type":"o","posted":"2026-01-12","posted_at":"2026-01-12T19:50:24.281Z","due_at":"2026-01-28T19:00:00Z","due_date":"2026-01-28","cancelled":false,"archived":true,"archive_date":"2026-02-12","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/f65194d512f549f98458954957687399/view","enriched":true,"history":[{"index":23,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T16:26:19.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"b8ae5a29986d407080b14ebc2756e8f9","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":21,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T14:57:22.142Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dbb18e8123a4455e9863b620fd97d958","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":20,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-13T15:15:17.141Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"577a85dc81d240c88353a5c081e28ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":19,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T18:37:35.852Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dc60a3b89cba49f2aad6ddc4d0df2a85","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":18,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:10:39.296Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"25e250999084468cada7173e4b0ac734","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":17,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:08:50.758Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f2a0576f08fd4b5f99bb5c02fa230ccc","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":16,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-12T19:50:24.281Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f65194d512f549f98458954957687399","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":15,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-05T18:17:21.540Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"967d1cdf2b61445eb728c50ace6d1a9d","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":14,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-23T16:21:36.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"489c6926b91048bd8424852a5793ef3f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":13,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:41:58.905Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9a707bc559dc484ba4f1d9082a57c148","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":12,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:38:32.853Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d722de2191e34756b99acb921d6c82db","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":11,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T16:41:58.213Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"79bdd16e09c547b78533ab5498d69a22","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":10,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-11T13:49:23.849Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9f113c8389f0405fb5dbf321b067a990","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":9,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-10T19:20:54.767Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5a29204e7e6c42598a46e4ec51d147df","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":8,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-08T22:22:28.939Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f1ac66ff944a95844754fe2540d2a7","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":7,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T20:54:08.202Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"fd4ac3d8932e46a5b1f840a9c87262da","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":6,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:59:48.906Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b07faed24389484497756d2ee8254ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":5,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:16:01.774Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2137e768ddc646a7b23b47d148a50aec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":4,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-19T00:09:08.134Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ac8c60611de24fd896b7bbc6c59b9301","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":3,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-18T13:46:40.606Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c7437bf0ed5a4e748e01f5b0d05af9ec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":2,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-17T13:49:49.868Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"58cec72778274b4cbfb6dc74e4eddf0f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":1,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-14T17:05:44.191Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"912dfe4e86c742e48049d734ba305a4d","solicitation_number":"W9127N26RA004"}]},{"notice_id":"25e250999084468cada7173e4b0ac734","title":"THE DALLES OIL ACCOUNTABILITY MEASURES","solicitation_number":"W9127N26RA004","notice_type":"o","base_type":"o","posted":"2026-01-27","posted_at":"2026-01-27T15:10:39.296Z","due_at":"2026-02-26T19:00:00Z","due_date":"2026-02-26","cancelled":false,"archived":true,"archive_date":"2026-03-13","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/25e250999084468cada7173e4b0ac734/view","enriched":true,"history":[{"index":23,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T16:26:19.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"b8ae5a29986d407080b14ebc2756e8f9","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":21,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T14:57:22.142Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dbb18e8123a4455e9863b620fd97d958","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":20,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-13T15:15:17.141Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"577a85dc81d240c88353a5c081e28ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":19,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T18:37:35.852Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dc60a3b89cba49f2aad6ddc4d0df2a85","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":18,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:10:39.296Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"25e250999084468cada7173e4b0ac734","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":17,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:08:50.758Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f2a0576f08fd4b5f99bb5c02fa230ccc","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":16,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-12T19:50:24.281Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f65194d512f549f98458954957687399","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":15,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-05T18:17:21.540Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"967d1cdf2b61445eb728c50ace6d1a9d","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":14,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-23T16:21:36.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"489c6926b91048bd8424852a5793ef3f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":13,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:41:58.905Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9a707bc559dc484ba4f1d9082a57c148","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":12,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:38:32.853Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d722de2191e34756b99acb921d6c82db","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":11,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T16:41:58.213Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"79bdd16e09c547b78533ab5498d69a22","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":10,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-11T13:49:23.849Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9f113c8389f0405fb5dbf321b067a990","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":9,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-10T19:20:54.767Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5a29204e7e6c42598a46e4ec51d147df","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":8,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-08T22:22:28.939Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f1ac66ff944a95844754fe2540d2a7","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":7,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T20:54:08.202Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"fd4ac3d8932e46a5b1f840a9c87262da","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":6,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:59:48.906Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b07faed24389484497756d2ee8254ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":5,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:16:01.774Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2137e768ddc646a7b23b47d148a50aec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":4,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-19T00:09:08.134Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ac8c60611de24fd896b7bbc6c59b9301","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":3,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-18T13:46:40.606Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c7437bf0ed5a4e748e01f5b0d05af9ec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":2,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-17T13:49:49.868Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"58cec72778274b4cbfb6dc74e4eddf0f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":1,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-14T17:05:44.191Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"912dfe4e86c742e48049d734ba305a4d","solicitation_number":"W9127N26RA004"}]},{"notice_id":"dc60a3b89cba49f2aad6ddc4d0df2a85","title":"THE DALLES OIL ACCOUNTABILITY MEASURES","solicitation_number":"W9127N26RA004","notice_type":"o","base_type":"o","posted":"2026-01-27","posted_at":"2026-01-27T18:37:35.852Z","due_at":"2026-02-26T19:00:00Z","due_date":"2026-02-26","cancelled":false,"archived":true,"archive_date":"2026-03-13","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/dc60a3b89cba49f2aad6ddc4d0df2a85/view","enriched":true,"history":[{"index":23,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T16:26:19.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"b8ae5a29986d407080b14ebc2756e8f9","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":21,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T14:57:22.142Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dbb18e8123a4455e9863b620fd97d958","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":20,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-13T15:15:17.141Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"577a85dc81d240c88353a5c081e28ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":19,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T18:37:35.852Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dc60a3b89cba49f2aad6ddc4d0df2a85","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":18,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:10:39.296Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"25e250999084468cada7173e4b0ac734","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":17,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:08:50.758Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f2a0576f08fd4b5f99bb5c02fa230ccc","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":16,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-12T19:50:24.281Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f65194d512f549f98458954957687399","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":15,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-05T18:17:21.540Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"967d1cdf2b61445eb728c50ace6d1a9d","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":14,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-23T16:21:36.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"489c6926b91048bd8424852a5793ef3f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":13,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:41:58.905Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9a707bc559dc484ba4f1d9082a57c148","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":12,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:38:32.853Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d722de2191e34756b99acb921d6c82db","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":11,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T16:41:58.213Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"79bdd16e09c547b78533ab5498d69a22","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":10,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-11T13:49:23.849Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9f113c8389f0405fb5dbf321b067a990","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":9,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-10T19:20:54.767Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5a29204e7e6c42598a46e4ec51d147df","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":8,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-08T22:22:28.939Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f1ac66ff944a95844754fe2540d2a7","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":7,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T20:54:08.202Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"fd4ac3d8932e46a5b1f840a9c87262da","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":6,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:59:48.906Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b07faed24389484497756d2ee8254ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":5,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:16:01.774Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2137e768ddc646a7b23b47d148a50aec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":4,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-19T00:09:08.134Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ac8c60611de24fd896b7bbc6c59b9301","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":3,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-18T13:46:40.606Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c7437bf0ed5a4e748e01f5b0d05af9ec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":2,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-17T13:49:49.868Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"58cec72778274b4cbfb6dc74e4eddf0f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":1,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-14T17:05:44.191Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"912dfe4e86c742e48049d734ba305a4d","solicitation_number":"W9127N26RA004"}]},{"notice_id":"f2a0576f08fd4b5f99bb5c02fa230ccc","title":"THE DALLES OIL ACCOUNTABILITY MEASURES","solicitation_number":"W9127N26RA004","notice_type":"o","base_type":"o","posted":"2026-01-27","posted_at":"2026-01-27T15:08:50.758Z","due_at":"2026-01-28T19:00:00Z","due_date":"2026-01-28","cancelled":false,"archived":true,"archive_date":"2026-02-12","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/f2a0576f08fd4b5f99bb5c02fa230ccc/view","enriched":true,"history":[{"index":23,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T16:26:19.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"b8ae5a29986d407080b14ebc2756e8f9","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":21,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T14:57:22.142Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dbb18e8123a4455e9863b620fd97d958","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":20,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-13T15:15:17.141Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"577a85dc81d240c88353a5c081e28ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":19,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T18:37:35.852Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dc60a3b89cba49f2aad6ddc4d0df2a85","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":18,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:10:39.296Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"25e250999084468cada7173e4b0ac734","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":17,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:08:50.758Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f2a0576f08fd4b5f99bb5c02fa230ccc","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":16,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-12T19:50:24.281Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f65194d512f549f98458954957687399","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":15,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-05T18:17:21.540Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"967d1cdf2b61445eb728c50ace6d1a9d","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":14,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-23T16:21:36.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"489c6926b91048bd8424852a5793ef3f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":13,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:41:58.905Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9a707bc559dc484ba4f1d9082a57c148","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":12,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:38:32.853Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d722de2191e34756b99acb921d6c82db","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":11,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T16:41:58.213Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"79bdd16e09c547b78533ab5498d69a22","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":10,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-11T13:49:23.849Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9f113c8389f0405fb5dbf321b067a990","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":9,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-10T19:20:54.767Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5a29204e7e6c42598a46e4ec51d147df","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":8,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-08T22:22:28.939Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f1ac66ff944a95844754fe2540d2a7","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":7,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T20:54:08.202Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"fd4ac3d8932e46a5b1f840a9c87262da","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":6,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:59:48.906Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b07faed24389484497756d2ee8254ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":5,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:16:01.774Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2137e768ddc646a7b23b47d148a50aec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":4,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-19T00:09:08.134Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ac8c60611de24fd896b7bbc6c59b9301","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":3,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-18T13:46:40.606Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c7437bf0ed5a4e748e01f5b0d05af9ec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":2,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-17T13:49:49.868Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"58cec72778274b4cbfb6dc74e4eddf0f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":1,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-14T17:05:44.191Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"912dfe4e86c742e48049d734ba305a4d","solicitation_number":"W9127N26RA004"}]},{"notice_id":"577a85dc81d240c88353a5c081e28ad5","title":"THE DALLES OIL ACCOUNTABILITY MEASURES","solicitation_number":"W9127N26RA004","notice_type":"o","base_type":"o","posted":"2026-02-13","posted_at":"2026-02-13T15:15:17.141Z","due_at":"2026-02-26T19:00:00Z","due_date":"2026-02-26","cancelled":false,"archived":true,"archive_date":"2026-03-13","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/577a85dc81d240c88353a5c081e28ad5/view","enriched":true,"history":[{"index":23,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T16:26:19.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"b8ae5a29986d407080b14ebc2756e8f9","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":21,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T14:57:22.142Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dbb18e8123a4455e9863b620fd97d958","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":20,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-13T15:15:17.141Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"577a85dc81d240c88353a5c081e28ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":19,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T18:37:35.852Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dc60a3b89cba49f2aad6ddc4d0df2a85","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":18,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:10:39.296Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"25e250999084468cada7173e4b0ac734","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":17,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:08:50.758Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f2a0576f08fd4b5f99bb5c02fa230ccc","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":16,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-12T19:50:24.281Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f65194d512f549f98458954957687399","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":15,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-05T18:17:21.540Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"967d1cdf2b61445eb728c50ace6d1a9d","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":14,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-23T16:21:36.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"489c6926b91048bd8424852a5793ef3f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":13,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:41:58.905Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9a707bc559dc484ba4f1d9082a57c148","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":12,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:38:32.853Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d722de2191e34756b99acb921d6c82db","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":11,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T16:41:58.213Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"79bdd16e09c547b78533ab5498d69a22","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":10,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-11T13:49:23.849Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9f113c8389f0405fb5dbf321b067a990","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":9,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-10T19:20:54.767Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5a29204e7e6c42598a46e4ec51d147df","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":8,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-08T22:22:28.939Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f1ac66ff944a95844754fe2540d2a7","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":7,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T20:54:08.202Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"fd4ac3d8932e46a5b1f840a9c87262da","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":6,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:59:48.906Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b07faed24389484497756d2ee8254ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":5,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:16:01.774Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2137e768ddc646a7b23b47d148a50aec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":4,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-19T00:09:08.134Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ac8c60611de24fd896b7bbc6c59b9301","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":3,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-18T13:46:40.606Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c7437bf0ed5a4e748e01f5b0d05af9ec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":2,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-17T13:49:49.868Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"58cec72778274b4cbfb6dc74e4eddf0f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":1,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-14T17:05:44.191Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"912dfe4e86c742e48049d734ba305a4d","solicitation_number":"W9127N26RA004"}]},{"notice_id":"b8ae5a29986d407080b14ebc2756e8f9","title":"THE DALLES OIL ACCOUNTABILITY MEASURES","solicitation_number":"W9127N26RA004","notice_type":"o","base_type":"o","posted":"2026-02-20","posted_at":"2026-02-20T16:26:19.577Z","due_at":"2026-02-26T19:00:00Z","due_date":"2026-02-26","cancelled":false,"archived":true,"archive_date":"2026-03-13","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/b8ae5a29986d407080b14ebc2756e8f9/view","enriched":true,"history":[{"index":23,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T16:26:19.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"b8ae5a29986d407080b14ebc2756e8f9","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":21,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T14:57:22.142Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dbb18e8123a4455e9863b620fd97d958","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":20,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-13T15:15:17.141Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"577a85dc81d240c88353a5c081e28ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":19,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T18:37:35.852Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dc60a3b89cba49f2aad6ddc4d0df2a85","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":18,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:10:39.296Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"25e250999084468cada7173e4b0ac734","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":17,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:08:50.758Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f2a0576f08fd4b5f99bb5c02fa230ccc","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":16,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-12T19:50:24.281Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f65194d512f549f98458954957687399","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":15,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-05T18:17:21.540Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"967d1cdf2b61445eb728c50ace6d1a9d","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":14,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-23T16:21:36.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"489c6926b91048bd8424852a5793ef3f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":13,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:41:58.905Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9a707bc559dc484ba4f1d9082a57c148","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":12,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:38:32.853Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d722de2191e34756b99acb921d6c82db","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":11,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T16:41:58.213Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"79bdd16e09c547b78533ab5498d69a22","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":10,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-11T13:49:23.849Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9f113c8389f0405fb5dbf321b067a990","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":9,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-10T19:20:54.767Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5a29204e7e6c42598a46e4ec51d147df","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":8,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-08T22:22:28.939Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f1ac66ff944a95844754fe2540d2a7","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":7,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T20:54:08.202Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"fd4ac3d8932e46a5b1f840a9c87262da","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":6,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:59:48.906Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b07faed24389484497756d2ee8254ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":5,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:16:01.774Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2137e768ddc646a7b23b47d148a50aec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":4,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-19T00:09:08.134Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ac8c60611de24fd896b7bbc6c59b9301","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":3,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-18T13:46:40.606Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c7437bf0ed5a4e748e01f5b0d05af9ec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":2,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-17T13:49:49.868Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"58cec72778274b4cbfb6dc74e4eddf0f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":1,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-14T17:05:44.191Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"912dfe4e86c742e48049d734ba305a4d","solicitation_number":"W9127N26RA004"}]},{"notice_id":"dbb18e8123a4455e9863b620fd97d958","title":"THE DALLES OIL ACCOUNTABILITY MEASURES","solicitation_number":"W9127N26RA004","notice_type":"o","base_type":"o","posted":"2026-02-20","posted_at":"2026-02-20T14:57:22.142Z","due_at":"2026-02-26T19:00:00Z","due_date":"2026-02-26","cancelled":false,"archived":true,"archive_date":"2026-03-13","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/dbb18e8123a4455e9863b620fd97d958/view","enriched":true,"history":[{"index":23,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T16:26:19.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"b8ae5a29986d407080b14ebc2756e8f9","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":21,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T14:57:22.142Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dbb18e8123a4455e9863b620fd97d958","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":20,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-13T15:15:17.141Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"577a85dc81d240c88353a5c081e28ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":19,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T18:37:35.852Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dc60a3b89cba49f2aad6ddc4d0df2a85","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":18,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:10:39.296Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"25e250999084468cada7173e4b0ac734","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":17,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:08:50.758Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f2a0576f08fd4b5f99bb5c02fa230ccc","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":16,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-12T19:50:24.281Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f65194d512f549f98458954957687399","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":15,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-05T18:17:21.540Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"967d1cdf2b61445eb728c50ace6d1a9d","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":14,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-23T16:21:36.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"489c6926b91048bd8424852a5793ef3f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":13,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:41:58.905Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9a707bc559dc484ba4f1d9082a57c148","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":12,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:38:32.853Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d722de2191e34756b99acb921d6c82db","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":11,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T16:41:58.213Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"79bdd16e09c547b78533ab5498d69a22","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":10,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-11T13:49:23.849Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9f113c8389f0405fb5dbf321b067a990","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":9,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-10T19:20:54.767Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5a29204e7e6c42598a46e4ec51d147df","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":8,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-08T22:22:28.939Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f1ac66ff944a95844754fe2540d2a7","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":7,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T20:54:08.202Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"fd4ac3d8932e46a5b1f840a9c87262da","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":6,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:59:48.906Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b07faed24389484497756d2ee8254ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":5,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:16:01.774Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2137e768ddc646a7b23b47d148a50aec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":4,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-19T00:09:08.134Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ac8c60611de24fd896b7bbc6c59b9301","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":3,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-18T13:46:40.606Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c7437bf0ed5a4e748e01f5b0d05af9ec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":2,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-17T13:49:49.868Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"58cec72778274b4cbfb6dc74e4eddf0f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":1,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-14T17:05:44.191Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"912dfe4e86c742e48049d734ba305a4d","solicitation_number":"W9127N26RA004"}]}],"latest_notice_id":"dbb18e8123a4455e9863b620fd97d958","first_type":"p","notices":[{"dates":{"posted":"2025-10-07","posted_at":"2025-10-07T18:55:40.492Z","created_at":"2025-10-07T18:53:01.263Z","modified_at":"2025-11-06T04:55:45.018Z","response_deadline":{"raw":"2025-10-21T10:00:00-07:00","utc":"2025-10-21T17:00:00Z","date":"2025-10-21","time":"10:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/3132bd4eee5b466e96e6bbe2a4552d3e/view"},"naics":{"codes":["238210"],"primary":"238210"},"title":"The Dalles Dam Oil Accountability Measures","agency":{"office":{"code":"W9127N","name":"W071 ENDIST PORTLAND"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"97204-3495","city":"PORTLAND","state":"OR","country":"USA"},"organization_id":"100255230","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-11-05","archive_type":"auto15"},"history":[{"index":3,"title":"The Dalles Dam Oil Accountability Measures","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-10-16T19:15:03.140Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"bbede31202324b378b2c2c27517b5d65","solicitation_number":"W9127N26RA004","parent_opportunity_id":"3132bd4eee5b466e96e6bbe2a4552d3e"},{"index":1,"title":"The Dalles Dam Oil Accountability Measures","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-10-07T18:55:40.492Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"3132bd4eee5b466e96e6bbe2a4552d3e","solicitation_number":"W9127N26RA004"}],"contacts":[{"name":"Andrew Sprys","role":"primary","email":"andrew.j.sprys@usace.army.mil"},{"name":"Cory Pfenning","role":"secondary","email":"cory.r.pfenning@usace.army.mil","phone":"5038479540"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"3132bd4eee5b466e96e6bbe2a4552d3e","lineage_id":"3132bd4eee5b466e96e6bbe2a4552d3e","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-27T00:04:00.683170844Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T17:48:36.003679Z","row_sha256":"8bd12710baac667a48554f29682eadd218f8d4b7e495e4136111d9721497d3f3","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-27T00:04:00.683170844Z","first_seen_at":"2026-09-16T17:48:36.003679Z"},"description":{"html":"<p><strong>SYNOPSIS</strong></p>\n\n<p></p>\n\n<p>The U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for The Dalles Dam Oil Accountability Measures in the Dalles, Oregon. The proposed project will be a competitive, firm-fixed price (FFP) contract.</p>\n\n<p></p>\n\n<p><strong>Background:</strong> The Dalles Dam is located in The Dalles, Oregon. The Dalles Dam (TDA) is a concrete gravity run-of-the-river dam spanning the Columbia River, two miles east of the city of The Dalles, Oregon, United States. It joins Wasco County Oregon, with Klickitat County Washington, 300 miles upriver from the mouth of the Columbia River near Astoria, Oregon. The project is designed to improve the monitoring of the amount of oil that could be released into the Columbia River. Its main objective is to minimize the oil release.</p>\n\n<p></p>\n\n<p><strong>Purpose:</strong> There are approximately 400,000 gallons of oil at the TDA powerhouse. Oil monitoring measures currently consist primarily of visual observations of sight glasses, observations of oil leaks on and around equipment, and purchase and disposal records of lubricants. The Federal Government agreed to develop and apply an Oil Accountability Plan (OAP) pursuant to the August 2014 settlement agreement with Columbia Riverkeepers.&nbsp; The OAP is intended to account for oils and greases used, including the oils and greases used in turbines, wicket gate bearings, and fish-way equipment. This project would improve the ability to consistently and reliably account and monitor leakage of oils through automated systems and greatly increase the timeliness of level monitoring. It would also assist in fulfilling the requirements of the Portland Districts Standing Environmental Policy 200-1, Oil Accountability while significantly reducing the O&amp;M costs to do so. The purpose of this project is to improve accuracy and increase automation of instrumentation to account for oil in oil-filled equipment, bulk storage containers, and high-risk equipment. It is also to aid in the identification of oil leaks as early as possible and fully account for potential leaks.</p>\n\n<p></p>\n\n<p><strong>Contract Period of Performance: </strong>The estimated Period of Performance for this contract is Notice to Proceed through approximately17-February-2027</p>\n\n<p></p>\n\n<p><strong>Magnitude of Construction:</strong> The estimated cost of the project is $1,000,000 to $5,000,000.</p>\n\n<p></p>\n\n<p><strong>Set Asides and Codes:</strong> <strong>Full and Open Competition - Unrestricted</strong>. The North American Industrial Classification Code (NAICS) for this potential requirement would be 238210, &ldquo;Electrical Contractors and Other Wiring Installation Contractors&rdquo;. The related size standard is $19M. The Product Service Code (PSC) is N036 - Installation Of Equipment- Special Industry Machinery.</p>\n\n<p></p>\n\n<p><strong>Selection Process:</strong> This is Full and Open competitive acquisition using Request for Proposals (RFP) using FAR Part 15 procedures.&nbsp;</p>\n\n<p></p>\n\n<p></p>\n\n<p><strong>Anticipated Solicitation Release Date:</strong> The government anticipates releasing the solicitation in October 2025. The closing date for proposals will be approximately 30 to 60 days later (TBD). Actual dates and times will be identified in the solicitation. Responses to this synopsis are not required. Additional details may be found in the solicitation when it is posted.</p>\n\n<p></p>\n\n<p><strong>System for Award Management (SAM):</strong> Offerors must register in the SAM at https://www.sam.gov/portal/public/SAM/ prior to submission of bids and prior to receiving an award.</p>\n\n<p></p>\n\n<p><strong>Point of Contact: </strong>The USACE-NWP points of contact for this action are Andrew Sprys at andrew.j.sprys@usace.army.mil and Cory Pfenning at cory.r.pfenning@usace.army.mil. Email is the only method for receiving responses to this pre-solicitation notice.</p>\n\n<p></p>\n\n<p>Point of Contact for small business questions or assistance is the Portland District Deputy for Small Business, Maura Timmerman at (402) 370-0095 or maura.j.timmermann@usace.army.mil.</p>\n\n<p></p>\n\n<p>THIS PRE-SOLICITATION NOTICE IS FOR THE PURPOSE OF INFORMING INDUSTRY THAT THIS SOLICITATION WILL BE POSTED ON SAM ON OR ABOUT 31 OCTOBER 2025. THIS NOTICE IS NOT A REQUEST FOR PROPOSALS AND PROPOSALS RECEIVED AS A RESULT OF THIS PRE-SOLICITATION NOTICE WILL NOT BE ACCEPTED OR EVALUATED.</p>\n\n<p></p>\n\n<p>THE GOVERNMENT RESERVES THE RIGHT TO CANCEL THIS SOLICITATION EITHER BEFORE OR AFTER THE CLOSING DATE. NO REIMBURSEMENT WILL BE MADE FOR ANY COSTS ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO THIS PRESOLICITATION NOTICE OR ANY FOLLOW-UP INFORMATION REQUEST.</p>","text":"SYNOPSIS\n\nThe U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for The Dalles Dam Oil Accountability Measures in the Dalles, Oregon. The proposed project will be a competitive, firm-fixed price (FFP) contract.\n\nBackground: The Dalles Dam is located in The Dalles, Oregon. The Dalles Dam (TDA) is a concrete gravity run-of-the-river dam spanning the Columbia River, two miles east of the city of The Dalles, Oregon, United States. It joins Wasco County Oregon, with Klickitat County Washington, 300 miles upriver from the mouth of the Columbia River near Astoria, Oregon. The project is designed to improve the monitoring of the amount of oil that could be released into the Columbia River. Its main objective is to minimize the oil release.\n\nPurpose: There are approximately 400,000 gallons of oil at the TDA powerhouse. Oil monitoring measures currently consist primarily of visual observations of sight glasses, observations of oil leaks on and around equipment, and purchase and disposal records of lubricants. The Federal Government agreed to develop and apply an Oil Accountability Plan (OAP) pursuant to the August 2014 settlement agreement with Columbia Riverkeepers. The OAP is intended to account for oils and greases used, including the oils and greases used in turbines, wicket gate bearings, and fish-way equipment. This project would improve the ability to consistently and reliably account and monitor leakage of oils through automated systems and greatly increase the timeliness of level monitoring. It would also assist in fulfilling the requirements of the Portland Districts Standing Environmental Policy 200-1, Oil Accountability while significantly reducing the O&M costs to do so. The purpose of this project is to improve accuracy and increase automation of instrumentation to account for oil in oil-filled equipment, bulk storage containers, and high-risk equipment. It is also to aid in the identification of oil leaks as early as possible and fully account for potential leaks.\n\nContract Period of Performance: The estimated Period of Performance for this contract is Notice to Proceed through approximately17-February-2027\n\nMagnitude of Construction: The estimated cost of the project is $1,000,000 to $5,000,000.\n\nSet Asides and Codes: Full and Open Competition - Unrestricted. The North American Industrial Classification Code (NAICS) for this potential requirement would be 238210, “Electrical Contractors and Other Wiring Installation Contractors”. The related size standard is $19M. The Product Service Code (PSC) is N036 - Installation Of Equipment- Special Industry Machinery.\n\nSelection Process: This is Full and Open competitive acquisition using Request for Proposals (RFP) using FAR Part 15 procedures.\n\nAnticipated Solicitation Release Date: The government anticipates releasing the solicitation in October 2025. The closing date for proposals will be approximately 30 to 60 days later (TBD). Actual dates and times will be identified in the solicitation. Responses to this synopsis are not required. Additional details may be found in the solicitation when it is posted.\n\nSystem for Award Management (SAM): Offerors must register in the SAM at https://www.sam.gov/portal/public/SAM/ prior to submission of bids and prior to receiving an award.\n\nPoint of Contact: The USACE-NWP points of contact for this action are Andrew Sprys at andrew.j.sprys@usace.army.mil and Cory Pfenning at cory.r.pfenning@usace.army.mil. Email is the only method for receiving responses to this pre-solicitation notice.\n\nPoint of Contact for small business questions or assistance is the Portland District Deputy for Small Business, Maura Timmerman at (402) 370-0095 or maura.j.timmermann@usace.army.mil.\n\nTHIS PRE-SOLICITATION NOTICE IS FOR THE PURPOSE OF INFORMING INDUSTRY THAT THIS SOLICITATION WILL BE POSTED ON SAM ON OR ABOUT 31 OCTOBER 2025. THIS NOTICE IS NOT A REQUEST FOR PROPOSALS AND PROPOSALS RECEIVED AS A RESULT OF THIS PRE-SOLICITATION NOTICE WILL NOT BE ACCEPTED OR EVALUATED.\n\nTHE GOVERNMENT RESERVES THE RIGHT TO CANCEL THIS SOLICITATION EITHER BEFORE OR AFTER THE CLOSING DATE. NO REIMBURSEMENT WILL BE MADE FOR ANY COSTS ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO THIS PRESOLICITATION NOTICE OR ANY FOLLOW-UP INFORMATION REQUEST.","origin":"detail"},"notice_type":{"code":"p","label":"Presolicitation"},"schema_version":1,"solicitation_number":"W9127N26RA004","place_of_performance":{"zip":"97058","city":{"code":"72950","name":"The Dalles"},"state":{"code":"OR","name":"Oregon"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"N036"},{"dates":{"posted":"2025-10-16","posted_at":"2025-10-16T19:15:03.140Z","created_at":"2025-10-16T19:14:23.310Z","modified_at":"2025-11-06T04:55:45.018Z","response_deadline":{"raw":"2025-10-21T10:00:00-07:00","utc":"2025-10-21T17:00:00Z","date":"2025-10-21","time":"10:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/bbede31202324b378b2c2c27517b5d65/view"},"naics":{"codes":["238210"],"primary":"238210"},"title":"The Dalles Dam Oil Accountability Measures","agency":{"office":{"code":"W9127N","name":"W071 ENDIST PORTLAND"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"97204-3495","city":"PORTLAND","state":"OR","country":"USA"},"organization_id":"100255230","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-11-05","archive_type":"auto15"},"history":[{"index":3,"title":"The Dalles Dam Oil Accountability Measures","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-10-16T19:15:03.140Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"bbede31202324b378b2c2c27517b5d65","solicitation_number":"W9127N26RA004","parent_opportunity_id":"3132bd4eee5b466e96e6bbe2a4552d3e"},{"index":1,"title":"The Dalles Dam Oil Accountability Measures","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-10-07T18:55:40.492Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"3132bd4eee5b466e96e6bbe2a4552d3e","solicitation_number":"W9127N26RA004"}],"contacts":[{"name":"Andrew Sprys","role":"primary","email":"andrew.j.sprys@usace.army.mil"},{"name":"Cory Pfenning","role":"secondary","email":"cory.r.pfenning@usace.army.mil","phone":"5038479540"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"bbede31202324b378b2c2c27517b5d65","lineage_id":"3132bd4eee5b466e96e6bbe2a4552d3e","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-26T00:50:10.439051597Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T17:48:36.003679Z","row_sha256":"fcd90f719cf91ffa611e9ac58c45ede7dad949673eb0083e86e56744f4b2cee5","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-26T00:50:10.439051597Z","first_seen_at":"2026-09-16T17:48:36.003679Z"},"description":{"html":"<p><strong>SYNOPSIS</strong></p>\n\n<p></p>\n\n<p>The U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for The Dalles Dam Oil Accountability Measures in the Dalles, Oregon. The proposed project will be a competitive, firm-fixed price (FFP) contract.</p>\n\n<p></p>\n\n<p><strong>Background:</strong> The Dalles Dam is located in The Dalles, Oregon. The Dalles Dam (TDA) is a concrete gravity run-of-the-river dam spanning the Columbia River, two miles east of the city of The Dalles, Oregon, United States. It joins Wasco County Oregon, with Klickitat County Washington, 300 miles upriver from the mouth of the Columbia River near Astoria, Oregon. The project is designed to improve the monitoring of the amount of oil that could be released into the Columbia River. Its main objective is to minimize the oil release.</p>\n\n<p></p>\n\n<p><strong>Purpose:</strong> There are approximately 400,000 gallons of oil at the TDA powerhouse. Oil monitoring measures currently consist primarily of visual observations of sight glasses, observations of oil leaks on and around equipment, and purchase and disposal records of lubricants. The Federal Government agreed to develop and apply an Oil Accountability Plan (OAP) pursuant to the August 2014 settlement agreement with Columbia Riverkeepers.&nbsp; The OAP is intended to account for oils and greases used, including the oils and greases used in turbines, wicket gate bearings, and fish-way equipment. This project would improve the ability to consistently and reliably account and monitor leakage of oils through automated systems and greatly increase the timeliness of level monitoring. It would also assist in fulfilling the requirements of the Portland Districts Standing Environmental Policy 200-1, Oil Accountability while significantly reducing the O&amp;M costs to do so. The purpose of this project is to improve accuracy and increase automation of instrumentation to account for oil in oil-filled equipment, bulk storage containers, and high-risk equipment. It is also to aid in the identification of oil leaks as early as possible and fully account for potential leaks.</p>\n\n<p></p>\n\n<p><strong>Contract Period of Performance: </strong>The estimated Period of Performance for this contract is Notice to Proceed through approximately17-February-2027</p>\n\n<p></p>\n\n<p><strong>Magnitude of Construction:</strong> The estimated cost of the project is $1,000,000 to $5,000,000.</p>\n\n<p></p>\n\n<p><strong>Set Asides and Codes:</strong> <strong>Full and Open Competition - Unrestricted</strong>. The North American Industrial Classification Code (NAICS) for this potential requirement would be 238210, &ldquo;Electrical Contractors and Other Wiring Installation Contractors&rdquo;. The related size standard is $19M. The Product Service Code (PSC) is N036 - Installation Of Equipment- Special Industry Machinery.</p>\n\n<p></p>\n\n<p><strong>Selection Process:</strong> This is Full and Open competitive acquisition using Request for Proposals (RFP) using FAR Part 15 procedures.&nbsp;</p>\n\n<p></p>\n\n<p></p>\n\n<p><strong>Anticipated Solicitation Release Date:</strong> The government anticipates releasing the solicitation in October 2025. The closing date for proposals will be approximately 30 to 60 days later (TBD). Actual dates and times will be identified in the solicitation. Responses to this synopsis are not required. Additional details may be found in the solicitation when it is posted.</p>\n\n<p></p>\n\n<p><strong>System for Award Management (SAM):</strong> Offerors must register in the SAM at https://www.sam.gov/portal/public/SAM/ prior to submission of bids and prior to receiving an award.</p>\n\n<p></p>\n\n<p><strong>Point of Contact: </strong>The USACE-NWP points of contact for this action are Andrew Sprys at andrew.j.sprys@usace.army.mil and Cory Pfenning at cory.r.pfenning@usace.army.mil. Email is the only method for receiving responses to this pre-solicitation notice.</p>\n\n<p></p>\n\n<p>Point of Contact for small business questions or assistance is the Portland District Deputy for Small Business, Maura Timmerman at (402) 370-0095 or maura.j.timmermann@usace.army.mil.</p>\n\n<p></p>\n\n<p>THIS PRE-SOLICITATION NOTICE IS FOR THE PURPOSE OF INFORMING INDUSTRY THAT THIS SOLICITATION WILL BE POSTED ON SAM ON OR ABOUT 31 OCTOBER 2025. THIS NOTICE IS NOT A REQUEST FOR PROPOSALS AND PROPOSALS RECEIVED AS A RESULT OF THIS PRE-SOLICITATION NOTICE WILL NOT BE ACCEPTED OR EVALUATED.</p>\n\n<p></p>\n\n<p>THE GOVERNMENT RESERVES THE RIGHT TO CANCEL THIS SOLICITATION EITHER BEFORE OR AFTER THE CLOSING DATE. NO REIMBURSEMENT WILL BE MADE FOR ANY COSTS ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO THIS PRESOLICITATION NOTICE OR ANY FOLLOW-UP INFORMATION REQUEST.</p>","text":"SYNOPSIS\n\nThe U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for The Dalles Dam Oil Accountability Measures in the Dalles, Oregon. The proposed project will be a competitive, firm-fixed price (FFP) contract.\n\nBackground: The Dalles Dam is located in The Dalles, Oregon. The Dalles Dam (TDA) is a concrete gravity run-of-the-river dam spanning the Columbia River, two miles east of the city of The Dalles, Oregon, United States. It joins Wasco County Oregon, with Klickitat County Washington, 300 miles upriver from the mouth of the Columbia River near Astoria, Oregon. The project is designed to improve the monitoring of the amount of oil that could be released into the Columbia River. Its main objective is to minimize the oil release.\n\nPurpose: There are approximately 400,000 gallons of oil at the TDA powerhouse. Oil monitoring measures currently consist primarily of visual observations of sight glasses, observations of oil leaks on and around equipment, and purchase and disposal records of lubricants. The Federal Government agreed to develop and apply an Oil Accountability Plan (OAP) pursuant to the August 2014 settlement agreement with Columbia Riverkeepers. The OAP is intended to account for oils and greases used, including the oils and greases used in turbines, wicket gate bearings, and fish-way equipment. This project would improve the ability to consistently and reliably account and monitor leakage of oils through automated systems and greatly increase the timeliness of level monitoring. It would also assist in fulfilling the requirements of the Portland Districts Standing Environmental Policy 200-1, Oil Accountability while significantly reducing the O&M costs to do so. The purpose of this project is to improve accuracy and increase automation of instrumentation to account for oil in oil-filled equipment, bulk storage containers, and high-risk equipment. It is also to aid in the identification of oil leaks as early as possible and fully account for potential leaks.\n\nContract Period of Performance: The estimated Period of Performance for this contract is Notice to Proceed through approximately17-February-2027\n\nMagnitude of Construction: The estimated cost of the project is $1,000,000 to $5,000,000.\n\nSet Asides and Codes: Full and Open Competition - Unrestricted. The North American Industrial Classification Code (NAICS) for this potential requirement would be 238210, “Electrical Contractors and Other Wiring Installation Contractors”. The related size standard is $19M. The Product Service Code (PSC) is N036 - Installation Of Equipment- Special Industry Machinery.\n\nSelection Process: This is Full and Open competitive acquisition using Request for Proposals (RFP) using FAR Part 15 procedures.\n\nAnticipated Solicitation Release Date: The government anticipates releasing the solicitation in October 2025. The closing date for proposals will be approximately 30 to 60 days later (TBD). Actual dates and times will be identified in the solicitation. Responses to this synopsis are not required. Additional details may be found in the solicitation when it is posted.\n\nSystem for Award Management (SAM): Offerors must register in the SAM at https://www.sam.gov/portal/public/SAM/ prior to submission of bids and prior to receiving an award.\n\nPoint of Contact: The USACE-NWP points of contact for this action are Andrew Sprys at andrew.j.sprys@usace.army.mil and Cory Pfenning at cory.r.pfenning@usace.army.mil. Email is the only method for receiving responses to this pre-solicitation notice.\n\nPoint of Contact for small business questions or assistance is the Portland District Deputy for Small Business, Maura Timmerman at (402) 370-0095 or maura.j.timmermann@usace.army.mil.\n\nTHIS PRE-SOLICITATION NOTICE IS FOR THE PURPOSE OF INFORMING INDUSTRY THAT THIS SOLICITATION WILL BE POSTED ON SAM ON OR ABOUT 31 OCTOBER 2025. THIS NOTICE IS NOT A REQUEST FOR PROPOSALS AND PROPOSALS RECEIVED AS A RESULT OF THIS PRE-SOLICITATION NOTICE WILL NOT BE ACCEPTED OR EVALUATED.\n\nTHE GOVERNMENT RESERVES THE RIGHT TO CANCEL THIS SOLICITATION EITHER BEFORE OR AFTER THE CLOSING DATE. NO REIMBURSEMENT WILL BE MADE FOR ANY COSTS ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO THIS PRESOLICITATION NOTICE OR ANY FOLLOW-UP INFORMATION REQUEST.","origin":"detail"},"notice_type":{"code":"p","label":"Presolicitation"},"schema_version":1,"solicitation_number":"W9127N26RA004","place_of_performance":{"zip":"97058","city":{"code":"72950","name":"The Dalles"},"state":{"code":"OR","name":"Oregon"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z2JZ"},{"dates":{"posted":"2025-11-14","posted_at":"2025-11-14T17:05:44.191Z","created_at":"2025-11-14T16:53:47.357Z","modified_at":"2026-03-13T04:04:29.084Z","response_deadline":{"raw":"2025-12-15T11:00:00-08:00","utc":"2025-12-15T19:00:00Z","date":"2025-12-15","time":"11:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-28800}},"links":{"sam":"https://sam.gov/workspace/contract/opp/912dfe4e86c742e48049d734ba305a4d/view"},"naics":{"codes":["238210"],"primary":"238210"},"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","agency":{"office":{"code":"W9127N","name":"W071 ENDIST PORTLAND"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"97204-3495","city":"PORTLAND","state":"OR","country":"USA"},"organization_id":"100255230","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-12-30","archive_type":"auto15"},"history":[{"index":23,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T16:26:19.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"b8ae5a29986d407080b14ebc2756e8f9","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":21,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T14:57:22.142Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dbb18e8123a4455e9863b620fd97d958","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":20,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-13T15:15:17.141Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"577a85dc81d240c88353a5c081e28ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":19,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T18:37:35.852Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dc60a3b89cba49f2aad6ddc4d0df2a85","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":18,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:10:39.296Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"25e250999084468cada7173e4b0ac734","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":17,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:08:50.758Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f2a0576f08fd4b5f99bb5c02fa230ccc","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":16,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-12T19:50:24.281Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f65194d512f549f98458954957687399","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":15,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-05T18:17:21.540Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"967d1cdf2b61445eb728c50ace6d1a9d","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":14,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-23T16:21:36.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"489c6926b91048bd8424852a5793ef3f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":13,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:41:58.905Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9a707bc559dc484ba4f1d9082a57c148","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":12,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:38:32.853Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d722de2191e34756b99acb921d6c82db","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":11,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T16:41:58.213Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"79bdd16e09c547b78533ab5498d69a22","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":10,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-11T13:49:23.849Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9f113c8389f0405fb5dbf321b067a990","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":9,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-10T19:20:54.767Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5a29204e7e6c42598a46e4ec51d147df","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":8,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-08T22:22:28.939Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f1ac66ff944a95844754fe2540d2a7","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":7,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T20:54:08.202Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"fd4ac3d8932e46a5b1f840a9c87262da","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":6,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:59:48.906Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b07faed24389484497756d2ee8254ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":5,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:16:01.774Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2137e768ddc646a7b23b47d148a50aec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":4,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-19T00:09:08.134Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ac8c60611de24fd896b7bbc6c59b9301","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":3,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-18T13:46:40.606Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c7437bf0ed5a4e748e01f5b0d05af9ec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":2,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-17T13:49:49.868Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"58cec72778274b4cbfb6dc74e4eddf0f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":1,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-14T17:05:44.191Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"912dfe4e86c742e48049d734ba305a4d","solicitation_number":"W9127N26RA004"}],"contacts":[{"name":"Andrew Sprys","role":"primary","email":"andrew.j.sprys@usace.army.mil"},{"name":"Cory Pfenning","role":"secondary","email":"cory.r.pfenning@usace.army.mil"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"912dfe4e86c742e48049d734ba305a4d","lineage_id":"912dfe4e86c742e48049d734ba305a4d","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-22T03:42:22.205708693Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T17:48:36.003679Z","row_sha256":"7afb4dac6b260c782b88a8dc46d05e71dfcaefc2d61486f084ee22fb21d141ee","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-22T03:42:22.205708693Z","first_seen_at":"2026-09-16T17:48:36.003679Z"},"description":{"html":"<p>***14-NOV-2025*** The full solicitation package will be posted shortly.</p>\n\n<p></p>\n\n<p><strong>SYNOPSIS</strong></p>\n\n<p>The U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for The Dalles Dam Oil Accountability Measures in the Dalles, Oregon. The proposed project will be a competitive, firm-fixed price (FFP) contract.</p>\n\n<p></p>\n\n<p><strong>Background:</strong> The Dalles Dam is located in The Dalles, Oregon. The Dalles Dam (TDA) is a concrete gravity run-of-the-river dam spanning the Columbia River, two miles east of the city of The Dalles, Oregon, United States. It joins Wasco County Oregon, with Klickitat County Washington, 300 miles upriver from the mouth of the Columbia River near Astoria, Oregon. The project is designed to improve the monitoring of the amount of oil that could be released into the Columbia River. Its main objective is to minimize the oil release.</p>\n\n<p></p>\n\n<p><strong>Purpose:</strong> There are approximately 400,000 gallons of oil at the TDA powerhouse. Oil monitoring measures currently consist primarily of visual observations of sight glasses, observations of oil leaks on and around equipment, and purchase and disposal records of lubricants. The Federal Government agreed to develop and apply an Oil Accountability Plan (OAP) pursuant to the August 2014 settlement agreement with Columbia Riverkeepers.&nbsp; The OAP is intended to account for oils and greases used, including the oils and greases used in turbines, wicket gate bearings, and fish-way equipment. This project would improve the ability to consistently and reliably account and monitor leakage of oils through automated systems and greatly increase the timeliness of level monitoring. It would also assist in fulfilling the requirements of the Portland Districts Standing Environmental Policy 200-1, Oil Accountability while significantly reducing the O&amp;M costs to do so. The purpose of this project is to improve accuracy and increase automation of instrumentation to account for oil in oil-filled equipment, bulk storage containers, and high-risk equipment. It is also to aid in the identification of oil leaks as early as possible and fully account for potential leaks.</p>","text":"***14-NOV-2025*** The full solicitation package will be posted shortly.\n\nSYNOPSIS\n\nThe U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for The Dalles Dam Oil Accountability Measures in the Dalles, Oregon. The proposed project will be a competitive, firm-fixed price (FFP) contract.\n\nBackground: The Dalles Dam is located in The Dalles, Oregon. The Dalles Dam (TDA) is a concrete gravity run-of-the-river dam spanning the Columbia River, two miles east of the city of The Dalles, Oregon, United States. It joins Wasco County Oregon, with Klickitat County Washington, 300 miles upriver from the mouth of the Columbia River near Astoria, Oregon. The project is designed to improve the monitoring of the amount of oil that could be released into the Columbia River. Its main objective is to minimize the oil release.\n\nPurpose: There are approximately 400,000 gallons of oil at the TDA powerhouse. Oil monitoring measures currently consist primarily of visual observations of sight glasses, observations of oil leaks on and around equipment, and purchase and disposal records of lubricants. The Federal Government agreed to develop and apply an Oil Accountability Plan (OAP) pursuant to the August 2014 settlement agreement with Columbia Riverkeepers. The OAP is intended to account for oils and greases used, including the oils and greases used in turbines, wicket gate bearings, and fish-way equipment. This project would improve the ability to consistently and reliably account and monitor leakage of oils through automated systems and greatly increase the timeliness of level monitoring. It would also assist in fulfilling the requirements of the Portland Districts Standing Environmental Policy 200-1, Oil Accountability while significantly reducing the O&M costs to do so. The purpose of this project is to improve accuracy and increase automation of instrumentation to account for oil in oil-filled equipment, bulk storage containers, and high-risk equipment. It is also to aid in the identification of oil leaks as early as possible and fully account for potential leaks.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W9127N26RA004","place_of_performance":{"zip":"97058","city":{"code":"72950","name":"The Dalles"},"state":{"code":"OR","name":"Oregon"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z2JZ"},{"dates":{"posted":"2025-11-17","posted_at":"2025-11-17T13:49:49.868Z","created_at":"2025-11-14T19:57:43.690Z","modified_at":"2026-03-13T04:04:29.084Z","response_deadline":{"raw":"2025-12-15T11:00:00-08:00","utc":"2025-12-15T19:00:00Z","date":"2025-12-15","time":"11:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-28800}},"links":{"sam":"https://sam.gov/workspace/contract/opp/58cec72778274b4cbfb6dc74e4eddf0f/view"},"naics":{"codes":["238210"],"primary":"238210"},"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","agency":{"office":{"code":"W9127N","name":"W071 ENDIST PORTLAND"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"97204-3495","city":"PORTLAND","state":"OR","country":"USA"},"organization_id":"100255230","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-12-30","archive_type":"auto15"},"history":[{"index":23,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T16:26:19.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"b8ae5a29986d407080b14ebc2756e8f9","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":21,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T14:57:22.142Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dbb18e8123a4455e9863b620fd97d958","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":20,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-13T15:15:17.141Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"577a85dc81d240c88353a5c081e28ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":19,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T18:37:35.852Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dc60a3b89cba49f2aad6ddc4d0df2a85","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":18,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:10:39.296Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"25e250999084468cada7173e4b0ac734","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":17,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:08:50.758Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f2a0576f08fd4b5f99bb5c02fa230ccc","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":16,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-12T19:50:24.281Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f65194d512f549f98458954957687399","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":15,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-05T18:17:21.540Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"967d1cdf2b61445eb728c50ace6d1a9d","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":14,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-23T16:21:36.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"489c6926b91048bd8424852a5793ef3f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":13,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:41:58.905Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9a707bc559dc484ba4f1d9082a57c148","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":12,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:38:32.853Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d722de2191e34756b99acb921d6c82db","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":11,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T16:41:58.213Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"79bdd16e09c547b78533ab5498d69a22","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":10,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-11T13:49:23.849Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9f113c8389f0405fb5dbf321b067a990","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":9,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-10T19:20:54.767Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5a29204e7e6c42598a46e4ec51d147df","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":8,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-08T22:22:28.939Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f1ac66ff944a95844754fe2540d2a7","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":7,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T20:54:08.202Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"fd4ac3d8932e46a5b1f840a9c87262da","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":6,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:59:48.906Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b07faed24389484497756d2ee8254ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":5,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:16:01.774Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2137e768ddc646a7b23b47d148a50aec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":4,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-19T00:09:08.134Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ac8c60611de24fd896b7bbc6c59b9301","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":3,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-18T13:46:40.606Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c7437bf0ed5a4e748e01f5b0d05af9ec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":2,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-17T13:49:49.868Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"58cec72778274b4cbfb6dc74e4eddf0f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":1,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-14T17:05:44.191Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"912dfe4e86c742e48049d734ba305a4d","solicitation_number":"W9127N26RA004"}],"contacts":[{"name":"Andrew Sprys","role":"primary","email":"andrew.j.sprys@usace.army.mil"},{"name":"Cory Pfenning","role":"secondary","email":"cory.r.pfenning@usace.army.mil"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"58cec72778274b4cbfb6dc74e4eddf0f","lineage_id":"912dfe4e86c742e48049d734ba305a4d","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-22T02:59:21.599985778Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T17:48:36.003679Z","row_sha256":"6bc7685ecd3a13b69151bdb95f67580f923010111c798d798fc0b511c38b9276","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-22T02:59:21.599985778Z","first_seen_at":"2026-09-16T17:48:36.003679Z"},"description":{"html":"<p>***14-NOV-2025*** The full solicitation package will be posted shortly.</p>\n\n<p></p>\n\n<p><strong>SYNOPSIS</strong></p>\n\n<p>The U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for The Dalles Dam Oil Accountability Measures in the Dalles, Oregon. The proposed project will be a competitive, firm-fixed price (FFP) contract.</p>\n\n<p></p>\n\n<p><strong>Background:</strong> The Dalles Dam is located in The Dalles, Oregon. The Dalles Dam (TDA) is a concrete gravity run-of-the-river dam spanning the Columbia River, two miles east of the city of The Dalles, Oregon, United States. It joins Wasco County Oregon, with Klickitat County Washington, 300 miles upriver from the mouth of the Columbia River near Astoria, Oregon. The project is designed to improve the monitoring of the amount of oil that could be released into the Columbia River. Its main objective is to minimize the oil release.</p>\n\n<p></p>\n\n<p><strong>Purpose:</strong> There are approximately 400,000 gallons of oil at the TDA powerhouse. Oil monitoring measures currently consist primarily of visual observations of sight glasses, observations of oil leaks on and around equipment, and purchase and disposal records of lubricants. The Federal Government agreed to develop and apply an Oil Accountability Plan (OAP) pursuant to the August 2014 settlement agreement with Columbia Riverkeepers.&nbsp; The OAP is intended to account for oils and greases used, including the oils and greases used in turbines, wicket gate bearings, and fish-way equipment. This project would improve the ability to consistently and reliably account and monitor leakage of oils through automated systems and greatly increase the timeliness of level monitoring. It would also assist in fulfilling the requirements of the Portland Districts Standing Environmental Policy 200-1, Oil Accountability while significantly reducing the O&amp;M costs to do so. The purpose of this project is to improve accuracy and increase automation of instrumentation to account for oil in oil-filled equipment, bulk storage containers, and high-risk equipment. It is also to aid in the identification of oil leaks as early as possible and fully account for potential leaks.</p>","text":"***14-NOV-2025*** The full solicitation package will be posted shortly.\n\nSYNOPSIS\n\nThe U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for The Dalles Dam Oil Accountability Measures in the Dalles, Oregon. The proposed project will be a competitive, firm-fixed price (FFP) contract.\n\nBackground: The Dalles Dam is located in The Dalles, Oregon. The Dalles Dam (TDA) is a concrete gravity run-of-the-river dam spanning the Columbia River, two miles east of the city of The Dalles, Oregon, United States. It joins Wasco County Oregon, with Klickitat County Washington, 300 miles upriver from the mouth of the Columbia River near Astoria, Oregon. The project is designed to improve the monitoring of the amount of oil that could be released into the Columbia River. Its main objective is to minimize the oil release.\n\nPurpose: There are approximately 400,000 gallons of oil at the TDA powerhouse. Oil monitoring measures currently consist primarily of visual observations of sight glasses, observations of oil leaks on and around equipment, and purchase and disposal records of lubricants. The Federal Government agreed to develop and apply an Oil Accountability Plan (OAP) pursuant to the August 2014 settlement agreement with Columbia Riverkeepers. The OAP is intended to account for oils and greases used, including the oils and greases used in turbines, wicket gate bearings, and fish-way equipment. This project would improve the ability to consistently and reliably account and monitor leakage of oils through automated systems and greatly increase the timeliness of level monitoring. It would also assist in fulfilling the requirements of the Portland Districts Standing Environmental Policy 200-1, Oil Accountability while significantly reducing the O&M costs to do so. The purpose of this project is to improve accuracy and increase automation of instrumentation to account for oil in oil-filled equipment, bulk storage containers, and high-risk equipment. It is also to aid in the identification of oil leaks as early as possible and fully account for potential leaks.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W9127N26RA004","place_of_performance":{"zip":"97058","city":{"code":"72950","name":"The Dalles"},"state":{"code":"OR","name":"Oregon"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z2JZ"},{"dates":{"posted":"2025-11-18","posted_at":"2025-11-19T00:09:08.134Z","created_at":"2025-11-18T20:36:00.597Z","modified_at":"2026-03-13T04:04:29.084Z","response_deadline":{"raw":"2025-12-15T11:00:00-08:00","utc":"2025-12-15T19:00:00Z","date":"2025-12-15","time":"11:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-28800}},"links":{"sam":"https://sam.gov/workspace/contract/opp/ac8c60611de24fd896b7bbc6c59b9301/view"},"naics":{"codes":["238210"],"primary":"238210"},"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","agency":{"office":{"code":"W9127N","name":"W071 ENDIST PORTLAND"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"97204-3495","city":"PORTLAND","state":"OR","country":"USA"},"organization_id":"100255230","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-12-30","archive_type":"auto15"},"history":[{"index":23,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T16:26:19.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"b8ae5a29986d407080b14ebc2756e8f9","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":21,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T14:57:22.142Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dbb18e8123a4455e9863b620fd97d958","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":20,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-13T15:15:17.141Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"577a85dc81d240c88353a5c081e28ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":19,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T18:37:35.852Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dc60a3b89cba49f2aad6ddc4d0df2a85","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":18,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:10:39.296Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"25e250999084468cada7173e4b0ac734","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":17,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:08:50.758Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f2a0576f08fd4b5f99bb5c02fa230ccc","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":16,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-12T19:50:24.281Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f65194d512f549f98458954957687399","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":15,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-05T18:17:21.540Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"967d1cdf2b61445eb728c50ace6d1a9d","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":14,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-23T16:21:36.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"489c6926b91048bd8424852a5793ef3f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":13,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:41:58.905Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9a707bc559dc484ba4f1d9082a57c148","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":12,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:38:32.853Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d722de2191e34756b99acb921d6c82db","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":11,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T16:41:58.213Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"79bdd16e09c547b78533ab5498d69a22","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":10,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-11T13:49:23.849Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9f113c8389f0405fb5dbf321b067a990","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":9,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-10T19:20:54.767Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5a29204e7e6c42598a46e4ec51d147df","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":8,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-08T22:22:28.939Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f1ac66ff944a95844754fe2540d2a7","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":7,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T20:54:08.202Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"fd4ac3d8932e46a5b1f840a9c87262da","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":6,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:59:48.906Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b07faed24389484497756d2ee8254ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":5,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:16:01.774Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2137e768ddc646a7b23b47d148a50aec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":4,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-19T00:09:08.134Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ac8c60611de24fd896b7bbc6c59b9301","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":3,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-18T13:46:40.606Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c7437bf0ed5a4e748e01f5b0d05af9ec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":2,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-17T13:49:49.868Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"58cec72778274b4cbfb6dc74e4eddf0f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":1,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-14T17:05:44.191Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"912dfe4e86c742e48049d734ba305a4d","solicitation_number":"W9127N26RA004"}],"contacts":[{"name":"Andrew Sprys","role":"primary","email":"andrew.j.sprys@usace.army.mil"},{"name":"Cory Pfenning","role":"secondary","email":"cory.r.pfenning@usace.army.mil"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"ac8c60611de24fd896b7bbc6c59b9301","lineage_id":"912dfe4e86c742e48049d734ba305a4d","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-22T02:36:09.368646082Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T17:48:36.003679Z","row_sha256":"ccda3ef4c573588c3087fa533b740c3ad63ff1eb6371a4b148dcf75696d88266","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-22T02:36:09.368646082Z","first_seen_at":"2026-09-16T17:48:36.003679Z"},"description":{"html":"<p>18 November 2025:&nbsp; The solicitation drawings and the reference drawings (13 total drawing files) are attached.&nbsp;&nbsp;</p>\n\n<p><strong>SYNOPSIS</strong></p>\n\n<p>The U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for The Dalles Dam Oil Accountability Measures in the Dalles, Oregon. The proposed project will be a competitive, firm-fixed price (FFP) contract.</p>\n\n<p></p>\n\n<p><strong>Background:</strong> The Dalles Dam is located in The Dalles, Oregon. The Dalles Dam (TDA) is a concrete gravity run-of-the-river dam spanning the Columbia River, two miles east of the city of The Dalles, Oregon, United States. It joins Wasco County Oregon, with Klickitat County Washington, 300 miles upriver from the mouth of the Columbia River near Astoria, Oregon. The project is designed to improve the monitoring of the amount of oil that could be released into the Columbia River. Its main objective is to minimize the oil release.</p>\n\n<p></p>\n\n<p><strong>Purpose:</strong> There are approximately 400,000 gallons of oil at the TDA powerhouse. Oil monitoring measures currently consist primarily of visual observations of sight glasses, observations of oil leaks on and around equipment, and purchase and disposal records of lubricants. The Federal Government agreed to develop and apply an Oil Accountability Plan (OAP) pursuant to the August 2014 settlement agreement with Columbia Riverkeepers.&nbsp; The OAP is intended to account for oils and greases used, including the oils and greases used in turbines, wicket gate bearings, and fish-way equipment. This project would improve the ability to consistently and reliably account and monitor leakage of oils through automated systems and greatly increase the timeliness of level monitoring. It would also assist in fulfilling the requirements of the Portland Districts Standing Environmental Policy 200-1, Oil Accountability while significantly reducing the O&amp;M costs to do so. The purpose of this project is to improve accuracy and increase automation of instrumentation to account for oil in oil-filled equipment, bulk storage containers, and high-risk equipment. It is also to aid in the identification of oil leaks as early as possible and fully account for potential leaks.</p>","text":"18 November 2025: The solicitation drawings and the reference drawings (13 total drawing files) are attached.\n\nSYNOPSIS\n\nThe U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for The Dalles Dam Oil Accountability Measures in the Dalles, Oregon. The proposed project will be a competitive, firm-fixed price (FFP) contract.\n\nBackground: The Dalles Dam is located in The Dalles, Oregon. The Dalles Dam (TDA) is a concrete gravity run-of-the-river dam spanning the Columbia River, two miles east of the city of The Dalles, Oregon, United States. It joins Wasco County Oregon, with Klickitat County Washington, 300 miles upriver from the mouth of the Columbia River near Astoria, Oregon. The project is designed to improve the monitoring of the amount of oil that could be released into the Columbia River. Its main objective is to minimize the oil release.\n\nPurpose: There are approximately 400,000 gallons of oil at the TDA powerhouse. Oil monitoring measures currently consist primarily of visual observations of sight glasses, observations of oil leaks on and around equipment, and purchase and disposal records of lubricants. The Federal Government agreed to develop and apply an Oil Accountability Plan (OAP) pursuant to the August 2014 settlement agreement with Columbia Riverkeepers. The OAP is intended to account for oils and greases used, including the oils and greases used in turbines, wicket gate bearings, and fish-way equipment. This project would improve the ability to consistently and reliably account and monitor leakage of oils through automated systems and greatly increase the timeliness of level monitoring. It would also assist in fulfilling the requirements of the Portland Districts Standing Environmental Policy 200-1, Oil Accountability while significantly reducing the O&M costs to do so. The purpose of this project is to improve accuracy and increase automation of instrumentation to account for oil in oil-filled equipment, bulk storage containers, and high-risk equipment. It is also to aid in the identification of oil leaks as early as possible and fully account for potential leaks.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W9127N26RA004","place_of_performance":{"zip":"97058","city":{"code":"72950","name":"The Dalles"},"state":{"code":"OR","name":"Oregon"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z2JZ"},{"dates":{"posted":"2025-11-18","posted_at":"2025-11-18T13:46:40.606Z","created_at":"2025-11-18T13:46:13.872Z","modified_at":"2026-03-13T04:04:29.084Z","response_deadline":{"raw":"2025-12-15T11:00:00-08:00","utc":"2025-12-15T19:00:00Z","date":"2025-12-15","time":"11:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-28800}},"links":{"sam":"https://sam.gov/workspace/contract/opp/c7437bf0ed5a4e748e01f5b0d05af9ec/view"},"naics":{"codes":["238210"],"primary":"238210"},"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","agency":{"office":{"code":"W9127N","name":"W071 ENDIST PORTLAND"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"97204-3495","city":"PORTLAND","state":"OR","country":"USA"},"organization_id":"100255230","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-12-30","archive_type":"auto15"},"history":[{"index":23,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T16:26:19.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"b8ae5a29986d407080b14ebc2756e8f9","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":21,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T14:57:22.142Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dbb18e8123a4455e9863b620fd97d958","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":20,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-13T15:15:17.141Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"577a85dc81d240c88353a5c081e28ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":19,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T18:37:35.852Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dc60a3b89cba49f2aad6ddc4d0df2a85","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":18,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:10:39.296Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"25e250999084468cada7173e4b0ac734","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":17,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:08:50.758Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f2a0576f08fd4b5f99bb5c02fa230ccc","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":16,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-12T19:50:24.281Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f65194d512f549f98458954957687399","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":15,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-05T18:17:21.540Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"967d1cdf2b61445eb728c50ace6d1a9d","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":14,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-23T16:21:36.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"489c6926b91048bd8424852a5793ef3f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":13,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:41:58.905Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9a707bc559dc484ba4f1d9082a57c148","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":12,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:38:32.853Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d722de2191e34756b99acb921d6c82db","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":11,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T16:41:58.213Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"79bdd16e09c547b78533ab5498d69a22","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":10,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-11T13:49:23.849Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9f113c8389f0405fb5dbf321b067a990","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":9,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-10T19:20:54.767Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5a29204e7e6c42598a46e4ec51d147df","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":8,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-08T22:22:28.939Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f1ac66ff944a95844754fe2540d2a7","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":7,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T20:54:08.202Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"fd4ac3d8932e46a5b1f840a9c87262da","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":6,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:59:48.906Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b07faed24389484497756d2ee8254ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":5,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:16:01.774Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2137e768ddc646a7b23b47d148a50aec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":4,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-19T00:09:08.134Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ac8c60611de24fd896b7bbc6c59b9301","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":3,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-18T13:46:40.606Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c7437bf0ed5a4e748e01f5b0d05af9ec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":2,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-17T13:49:49.868Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"58cec72778274b4cbfb6dc74e4eddf0f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":1,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-14T17:05:44.191Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"912dfe4e86c742e48049d734ba305a4d","solicitation_number":"W9127N26RA004"}],"contacts":[{"name":"Andrew Sprys","role":"primary","email":"andrew.j.sprys@usace.army.mil"},{"name":"Cory Pfenning","role":"secondary","email":"cory.r.pfenning@usace.army.mil"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"c7437bf0ed5a4e748e01f5b0d05af9ec","lineage_id":"912dfe4e86c742e48049d734ba305a4d","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-22T02:39:39.306312883Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T17:48:36.003679Z","row_sha256":"fceb8f0ebec587428ad382161b4cadeb4ef4bcb6c47e05d00ca65a962ed611fe","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-22T02:39:39.306312883Z","first_seen_at":"2026-09-16T17:48:36.003679Z"},"description":{"html":"<p><strong>SYNOPSIS</strong></p>\n\n<p>The U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for The Dalles Dam Oil Accountability Measures in the Dalles, Oregon. The proposed project will be a competitive, firm-fixed price (FFP) contract.</p>\n\n<p></p>\n\n<p><strong>Background:</strong> The Dalles Dam is located in The Dalles, Oregon. The Dalles Dam (TDA) is a concrete gravity run-of-the-river dam spanning the Columbia River, two miles east of the city of The Dalles, Oregon, United States. It joins Wasco County Oregon, with Klickitat County Washington, 300 miles upriver from the mouth of the Columbia River near Astoria, Oregon. The project is designed to improve the monitoring of the amount of oil that could be released into the Columbia River. Its main objective is to minimize the oil release.</p>\n\n<p></p>\n\n<p><strong>Purpose:</strong> There are approximately 400,000 gallons of oil at the TDA powerhouse. Oil monitoring measures currently consist primarily of visual observations of sight glasses, observations of oil leaks on and around equipment, and purchase and disposal records of lubricants. The Federal Government agreed to develop and apply an Oil Accountability Plan (OAP) pursuant to the August 2014 settlement agreement with Columbia Riverkeepers.&nbsp; The OAP is intended to account for oils and greases used, including the oils and greases used in turbines, wicket gate bearings, and fish-way equipment. This project would improve the ability to consistently and reliably account and monitor leakage of oils through automated systems and greatly increase the timeliness of level monitoring. It would also assist in fulfilling the requirements of the Portland Districts Standing Environmental Policy 200-1, Oil Accountability while significantly reducing the O&amp;M costs to do so. The purpose of this project is to improve accuracy and increase automation of instrumentation to account for oil in oil-filled equipment, bulk storage containers, and high-risk equipment. It is also to aid in the identification of oil leaks as early as possible and fully account for potential leaks.</p>","text":"SYNOPSIS\n\nThe U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for The Dalles Dam Oil Accountability Measures in the Dalles, Oregon. The proposed project will be a competitive, firm-fixed price (FFP) contract.\n\nBackground: The Dalles Dam is located in The Dalles, Oregon. The Dalles Dam (TDA) is a concrete gravity run-of-the-river dam spanning the Columbia River, two miles east of the city of The Dalles, Oregon, United States. It joins Wasco County Oregon, with Klickitat County Washington, 300 miles upriver from the mouth of the Columbia River near Astoria, Oregon. The project is designed to improve the monitoring of the amount of oil that could be released into the Columbia River. Its main objective is to minimize the oil release.\n\nPurpose: There are approximately 400,000 gallons of oil at the TDA powerhouse. Oil monitoring measures currently consist primarily of visual observations of sight glasses, observations of oil leaks on and around equipment, and purchase and disposal records of lubricants. The Federal Government agreed to develop and apply an Oil Accountability Plan (OAP) pursuant to the August 2014 settlement agreement with Columbia Riverkeepers. The OAP is intended to account for oils and greases used, including the oils and greases used in turbines, wicket gate bearings, and fish-way equipment. This project would improve the ability to consistently and reliably account and monitor leakage of oils through automated systems and greatly increase the timeliness of level monitoring. It would also assist in fulfilling the requirements of the Portland Districts Standing Environmental Policy 200-1, Oil Accountability while significantly reducing the O&M costs to do so. The purpose of this project is to improve accuracy and increase automation of instrumentation to account for oil in oil-filled equipment, bulk storage containers, and high-risk equipment. It is also to aid in the identification of oil leaks as early as possible and fully account for potential leaks.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W9127N26RA004","place_of_performance":{"zip":"97058","city":{"code":"72950","name":"The Dalles"},"state":{"code":"OR","name":"Oregon"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z2JZ"},{"dates":{"posted":"2025-11-20","posted_at":"2025-11-20T18:16:01.774Z","created_at":"2025-11-20T18:06:19.409Z","modified_at":"2026-03-13T04:04:29.084Z","response_deadline":{"raw":"2025-12-15T11:00:00-08:00","utc":"2025-12-15T19:00:00Z","date":"2025-12-15","time":"11:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-28800}},"links":{"sam":"https://sam.gov/workspace/contract/opp/2137e768ddc646a7b23b47d148a50aec/view"},"naics":{"codes":["238210"],"primary":"238210"},"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","agency":{"office":{"code":"W9127N","name":"W071 ENDIST PORTLAND"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"97204-3495","city":"PORTLAND","state":"OR","country":"USA"},"organization_id":"100255230","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-12-30","archive_type":"auto15"},"history":[{"index":23,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T16:26:19.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"b8ae5a29986d407080b14ebc2756e8f9","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":21,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T14:57:22.142Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dbb18e8123a4455e9863b620fd97d958","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":20,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-13T15:15:17.141Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"577a85dc81d240c88353a5c081e28ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":19,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T18:37:35.852Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dc60a3b89cba49f2aad6ddc4d0df2a85","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":18,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:10:39.296Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"25e250999084468cada7173e4b0ac734","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":17,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:08:50.758Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f2a0576f08fd4b5f99bb5c02fa230ccc","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":16,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-12T19:50:24.281Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f65194d512f549f98458954957687399","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":15,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-05T18:17:21.540Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"967d1cdf2b61445eb728c50ace6d1a9d","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":14,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-23T16:21:36.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"489c6926b91048bd8424852a5793ef3f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":13,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:41:58.905Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9a707bc559dc484ba4f1d9082a57c148","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":12,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:38:32.853Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d722de2191e34756b99acb921d6c82db","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":11,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T16:41:58.213Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"79bdd16e09c547b78533ab5498d69a22","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":10,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-11T13:49:23.849Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9f113c8389f0405fb5dbf321b067a990","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":9,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-10T19:20:54.767Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5a29204e7e6c42598a46e4ec51d147df","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":8,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-08T22:22:28.939Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f1ac66ff944a95844754fe2540d2a7","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":7,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T20:54:08.202Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"fd4ac3d8932e46a5b1f840a9c87262da","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":6,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:59:48.906Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b07faed24389484497756d2ee8254ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":5,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:16:01.774Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2137e768ddc646a7b23b47d148a50aec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":4,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-19T00:09:08.134Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ac8c60611de24fd896b7bbc6c59b9301","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":3,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-18T13:46:40.606Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c7437bf0ed5a4e748e01f5b0d05af9ec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":2,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-17T13:49:49.868Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"58cec72778274b4cbfb6dc74e4eddf0f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":1,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-14T17:05:44.191Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"912dfe4e86c742e48049d734ba305a4d","solicitation_number":"W9127N26RA004"}],"contacts":[{"name":"Andrew Sprys","role":"primary","email":"andrew.j.sprys@usace.army.mil"},{"name":"Cory Pfenning","role":"secondary","email":"cory.r.pfenning@usace.army.mil"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"2137e768ddc646a7b23b47d148a50aec","lineage_id":"912dfe4e86c742e48049d734ba305a4d","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-21T03:56:16.332932689Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T17:48:36.003679Z","row_sha256":"548a761b7ae6adbbd73126b632e87afb07e0786ce1c99ab1770068da122b320a","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-21T03:56:16.332932689Z","first_seen_at":"2026-09-16T17:48:36.003679Z"},"description":{"html":"<p>18 November 2025:&nbsp; The solicitation drawings and the reference drawings (13 total drawing files) are attached.&nbsp;&nbsp;</p>\n\n<p><strong>SYNOPSIS</strong></p>\n\n<p>The U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for The Dalles Dam Oil Accountability Measures in the Dalles, Oregon. The proposed project will be a competitive, firm-fixed price (FFP) contract.</p>\n\n<p></p>\n\n<p><strong>Background:</strong> The Dalles Dam is located in The Dalles, Oregon. The Dalles Dam (TDA) is a concrete gravity run-of-the-river dam spanning the Columbia River, two miles east of the city of The Dalles, Oregon, United States. It joins Wasco County Oregon, with Klickitat County Washington, 300 miles upriver from the mouth of the Columbia River near Astoria, Oregon. The project is designed to improve the monitoring of the amount of oil that could be released into the Columbia River. Its main objective is to minimize the oil release.</p>\n\n<p></p>\n\n<p><strong>Purpose:</strong> There are approximately 400,000 gallons of oil at the TDA powerhouse. Oil monitoring measures currently consist primarily of visual observations of sight glasses, observations of oil leaks on and around equipment, and purchase and disposal records of lubricants. The Federal Government agreed to develop and apply an Oil Accountability Plan (OAP) pursuant to the August 2014 settlement agreement with Columbia Riverkeepers.&nbsp; The OAP is intended to account for oils and greases used, including the oils and greases used in turbines, wicket gate bearings, and fish-way equipment. This project would improve the ability to consistently and reliably account and monitor leakage of oils through automated systems and greatly increase the timeliness of level monitoring. It would also assist in fulfilling the requirements of the Portland Districts Standing Environmental Policy 200-1, Oil Accountability while significantly reducing the O&amp;M costs to do so. The purpose of this project is to improve accuracy and increase automation of instrumentation to account for oil in oil-filled equipment, bulk storage containers, and high-risk equipment. It is also to aid in the identification of oil leaks as early as possible and fully account for potential leaks.</p>","text":"18 November 2025: The solicitation drawings and the reference drawings (13 total drawing files) are attached.\n\nSYNOPSIS\n\nThe U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for The Dalles Dam Oil Accountability Measures in the Dalles, Oregon. The proposed project will be a competitive, firm-fixed price (FFP) contract.\n\nBackground: The Dalles Dam is located in The Dalles, Oregon. The Dalles Dam (TDA) is a concrete gravity run-of-the-river dam spanning the Columbia River, two miles east of the city of The Dalles, Oregon, United States. It joins Wasco County Oregon, with Klickitat County Washington, 300 miles upriver from the mouth of the Columbia River near Astoria, Oregon. The project is designed to improve the monitoring of the amount of oil that could be released into the Columbia River. Its main objective is to minimize the oil release.\n\nPurpose: There are approximately 400,000 gallons of oil at the TDA powerhouse. Oil monitoring measures currently consist primarily of visual observations of sight glasses, observations of oil leaks on and around equipment, and purchase and disposal records of lubricants. The Federal Government agreed to develop and apply an Oil Accountability Plan (OAP) pursuant to the August 2014 settlement agreement with Columbia Riverkeepers. The OAP is intended to account for oils and greases used, including the oils and greases used in turbines, wicket gate bearings, and fish-way equipment. This project would improve the ability to consistently and reliably account and monitor leakage of oils through automated systems and greatly increase the timeliness of level monitoring. It would also assist in fulfilling the requirements of the Portland Districts Standing Environmental Policy 200-1, Oil Accountability while significantly reducing the O&M costs to do so. The purpose of this project is to improve accuracy and increase automation of instrumentation to account for oil in oil-filled equipment, bulk storage containers, and high-risk equipment. It is also to aid in the identification of oil leaks as early as possible and fully account for potential leaks.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W9127N26RA004","place_of_performance":{"zip":"97058","city":{"code":"72950","name":"The Dalles"},"state":{"code":"OR","name":"Oregon"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z2JZ"},{"dates":{"posted":"2025-11-20","posted_at":"2025-11-20T18:59:48.906Z","created_at":"2025-11-20T18:58:22.882Z","modified_at":"2026-03-13T04:04:29.084Z","response_deadline":{"raw":"2025-12-15T11:00:00-08:00","utc":"2025-12-15T19:00:00Z","date":"2025-12-15","time":"11:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-28800}},"links":{"sam":"https://sam.gov/workspace/contract/opp/b07faed24389484497756d2ee8254ad5/view"},"naics":{"codes":["238210"],"primary":"238210"},"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","agency":{"office":{"code":"W9127N","name":"W071 ENDIST PORTLAND"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"97204-3495","city":"PORTLAND","state":"OR","country":"USA"},"organization_id":"100255230","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-12-30","archive_type":"auto15"},"history":[{"index":23,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T16:26:19.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"b8ae5a29986d407080b14ebc2756e8f9","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":21,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T14:57:22.142Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dbb18e8123a4455e9863b620fd97d958","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":20,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-13T15:15:17.141Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"577a85dc81d240c88353a5c081e28ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":19,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T18:37:35.852Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dc60a3b89cba49f2aad6ddc4d0df2a85","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":18,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:10:39.296Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"25e250999084468cada7173e4b0ac734","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":17,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:08:50.758Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f2a0576f08fd4b5f99bb5c02fa230ccc","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":16,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-12T19:50:24.281Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f65194d512f549f98458954957687399","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":15,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-05T18:17:21.540Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"967d1cdf2b61445eb728c50ace6d1a9d","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":14,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-23T16:21:36.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"489c6926b91048bd8424852a5793ef3f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":13,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:41:58.905Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9a707bc559dc484ba4f1d9082a57c148","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":12,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:38:32.853Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d722de2191e34756b99acb921d6c82db","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":11,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T16:41:58.213Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"79bdd16e09c547b78533ab5498d69a22","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":10,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-11T13:49:23.849Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9f113c8389f0405fb5dbf321b067a990","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":9,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-10T19:20:54.767Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5a29204e7e6c42598a46e4ec51d147df","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":8,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-08T22:22:28.939Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f1ac66ff944a95844754fe2540d2a7","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":7,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T20:54:08.202Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"fd4ac3d8932e46a5b1f840a9c87262da","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":6,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:59:48.906Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b07faed24389484497756d2ee8254ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":5,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:16:01.774Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2137e768ddc646a7b23b47d148a50aec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":4,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-19T00:09:08.134Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ac8c60611de24fd896b7bbc6c59b9301","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":3,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-18T13:46:40.606Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c7437bf0ed5a4e748e01f5b0d05af9ec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":2,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-17T13:49:49.868Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"58cec72778274b4cbfb6dc74e4eddf0f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":1,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-14T17:05:44.191Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"912dfe4e86c742e48049d734ba305a4d","solicitation_number":"W9127N26RA004"}],"contacts":[{"name":"Andrew Sprys","role":"primary","email":"andrew.j.sprys@usace.army.mil"},{"name":"Cory Pfenning","role":"secondary","email":"cory.r.pfenning@usace.army.mil"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"b07faed24389484497756d2ee8254ad5","lineage_id":"912dfe4e86c742e48049d734ba305a4d","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-22T00:52:53.586207212Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T17:48:36.003679Z","row_sha256":"ff7017b34d883ae32f6cbdefcec84dac6e8c9e66aea7696e42a64b419c78d174","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-22T00:52:53.586207212Z","first_seen_at":"2026-09-16T17:48:36.003679Z"},"description":{"html":"<p>18 November 2025:&nbsp; The solicitation drawings and the reference drawings (13 total drawing files) are attached.&nbsp;&nbsp;</p>\n\n<p><strong>SYNOPSIS</strong></p>\n\n<p>The U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for The Dalles Dam Oil Accountability Measures in the Dalles, Oregon. The proposed project will be a competitive, firm-fixed price (FFP) contract.</p>\n\n<p></p>\n\n<p><strong>Background:</strong> The Dalles Dam is located in The Dalles, Oregon. The Dalles Dam (TDA) is a concrete gravity run-of-the-river dam spanning the Columbia River, two miles east of the city of The Dalles, Oregon, United States. It joins Wasco County Oregon, with Klickitat County Washington, 300 miles upriver from the mouth of the Columbia River near Astoria, Oregon. The project is designed to improve the monitoring of the amount of oil that could be released into the Columbia River. Its main objective is to minimize the oil release.</p>\n\n<p></p>\n\n<p><strong>Purpose:</strong> There are approximately 400,000 gallons of oil at the TDA powerhouse. Oil monitoring measures currently consist primarily of visual observations of sight glasses, observations of oil leaks on and around equipment, and purchase and disposal records of lubricants. The Federal Government agreed to develop and apply an Oil Accountability Plan (OAP) pursuant to the August 2014 settlement agreement with Columbia Riverkeepers.&nbsp; The OAP is intended to account for oils and greases used, including the oils and greases used in turbines, wicket gate bearings, and fish-way equipment. This project would improve the ability to consistently and reliably account and monitor leakage of oils through automated systems and greatly increase the timeliness of level monitoring. It would also assist in fulfilling the requirements of the Portland Districts Standing Environmental Policy 200-1, Oil Accountability while significantly reducing the O&amp;M costs to do so. The purpose of this project is to improve accuracy and increase automation of instrumentation to account for oil in oil-filled equipment, bulk storage containers, and high-risk equipment. It is also to aid in the identification of oil leaks as early as possible and fully account for potential leaks.</p>","text":"18 November 2025: The solicitation drawings and the reference drawings (13 total drawing files) are attached.\n\nSYNOPSIS\n\nThe U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for The Dalles Dam Oil Accountability Measures in the Dalles, Oregon. The proposed project will be a competitive, firm-fixed price (FFP) contract.\n\nBackground: The Dalles Dam is located in The Dalles, Oregon. The Dalles Dam (TDA) is a concrete gravity run-of-the-river dam spanning the Columbia River, two miles east of the city of The Dalles, Oregon, United States. It joins Wasco County Oregon, with Klickitat County Washington, 300 miles upriver from the mouth of the Columbia River near Astoria, Oregon. The project is designed to improve the monitoring of the amount of oil that could be released into the Columbia River. Its main objective is to minimize the oil release.\n\nPurpose: There are approximately 400,000 gallons of oil at the TDA powerhouse. Oil monitoring measures currently consist primarily of visual observations of sight glasses, observations of oil leaks on and around equipment, and purchase and disposal records of lubricants. The Federal Government agreed to develop and apply an Oil Accountability Plan (OAP) pursuant to the August 2014 settlement agreement with Columbia Riverkeepers. The OAP is intended to account for oils and greases used, including the oils and greases used in turbines, wicket gate bearings, and fish-way equipment. This project would improve the ability to consistently and reliably account and monitor leakage of oils through automated systems and greatly increase the timeliness of level monitoring. It would also assist in fulfilling the requirements of the Portland Districts Standing Environmental Policy 200-1, Oil Accountability while significantly reducing the O&M costs to do so. The purpose of this project is to improve accuracy and increase automation of instrumentation to account for oil in oil-filled equipment, bulk storage containers, and high-risk equipment. It is also to aid in the identification of oil leaks as early as possible and fully account for potential leaks.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W9127N26RA004","place_of_performance":{"zip":"97058","city":{"code":"72950","name":"The Dalles"},"state":{"code":"OR","name":"Oregon"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z2JZ"},{"dates":{"posted":"2025-11-20","posted_at":"2025-11-20T20:54:08.202Z","created_at":"2025-11-20T20:52:10.007Z","modified_at":"2026-03-13T04:04:29.084Z","response_deadline":{"raw":"2025-12-15T11:00:00-08:00","utc":"2025-12-15T19:00:00Z","date":"2025-12-15","time":"11:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-28800}},"links":{"sam":"https://sam.gov/workspace/contract/opp/fd4ac3d8932e46a5b1f840a9c87262da/view"},"naics":{"codes":["238210"],"primary":"238210"},"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","agency":{"office":{"code":"W9127N","name":"W071 ENDIST PORTLAND"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"97204-3495","city":"PORTLAND","state":"OR","country":"USA"},"organization_id":"100255230","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-12-30","archive_type":"auto15"},"history":[{"index":23,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T16:26:19.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"b8ae5a29986d407080b14ebc2756e8f9","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":21,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T14:57:22.142Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dbb18e8123a4455e9863b620fd97d958","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":20,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-13T15:15:17.141Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"577a85dc81d240c88353a5c081e28ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":19,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T18:37:35.852Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dc60a3b89cba49f2aad6ddc4d0df2a85","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":18,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:10:39.296Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"25e250999084468cada7173e4b0ac734","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":17,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:08:50.758Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f2a0576f08fd4b5f99bb5c02fa230ccc","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":16,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-12T19:50:24.281Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f65194d512f549f98458954957687399","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":15,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-05T18:17:21.540Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"967d1cdf2b61445eb728c50ace6d1a9d","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":14,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-23T16:21:36.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"489c6926b91048bd8424852a5793ef3f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":13,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:41:58.905Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9a707bc559dc484ba4f1d9082a57c148","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":12,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:38:32.853Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d722de2191e34756b99acb921d6c82db","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":11,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T16:41:58.213Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"79bdd16e09c547b78533ab5498d69a22","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":10,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-11T13:49:23.849Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9f113c8389f0405fb5dbf321b067a990","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":9,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-10T19:20:54.767Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5a29204e7e6c42598a46e4ec51d147df","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":8,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-08T22:22:28.939Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f1ac66ff944a95844754fe2540d2a7","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":7,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T20:54:08.202Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"fd4ac3d8932e46a5b1f840a9c87262da","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":6,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:59:48.906Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b07faed24389484497756d2ee8254ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":5,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:16:01.774Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2137e768ddc646a7b23b47d148a50aec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":4,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-19T00:09:08.134Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ac8c60611de24fd896b7bbc6c59b9301","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":3,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-18T13:46:40.606Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c7437bf0ed5a4e748e01f5b0d05af9ec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":2,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-17T13:49:49.868Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"58cec72778274b4cbfb6dc74e4eddf0f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":1,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-14T17:05:44.191Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"912dfe4e86c742e48049d734ba305a4d","solicitation_number":"W9127N26RA004"}],"contacts":[{"name":"Andrew Sprys","role":"primary","email":"andrew.j.sprys@usace.army.mil"},{"name":"Cory Pfenning","role":"secondary","email":"cory.r.pfenning@usace.army.mil"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"fd4ac3d8932e46a5b1f840a9c87262da","lineage_id":"912dfe4e86c742e48049d734ba305a4d","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-22T01:11:54.067028841Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T17:48:36.003679Z","row_sha256":"212a20aad92086bec801c59bfc8c6db184512d97faf1e4fda5d6cf695d2b7e07","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-22T01:11:54.067028841Z","first_seen_at":"2026-09-16T17:48:36.003679Z"},"description":{"html":"<p>18 November 2025:&nbsp; The solicitation drawings and the reference drawings (13 total drawing files) are attached.&nbsp;&nbsp;</p>\n\n<p><strong>SYNOPSIS</strong></p>\n\n<p>The U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for The Dalles Dam Oil Accountability Measures in the Dalles, Oregon. The proposed project will be a competitive, firm-fixed price (FFP) contract.</p>\n\n<p></p>\n\n<p><strong>Background:</strong> The Dalles Dam is located in The Dalles, Oregon. The Dalles Dam (TDA) is a concrete gravity run-of-the-river dam spanning the Columbia River, two miles east of the city of The Dalles, Oregon, United States. It joins Wasco County Oregon, with Klickitat County Washington, 300 miles upriver from the mouth of the Columbia River near Astoria, Oregon. The project is designed to improve the monitoring of the amount of oil that could be released into the Columbia River. Its main objective is to minimize the oil release.</p>\n\n<p></p>\n\n<p><strong>Purpose:</strong> There are approximately 400,000 gallons of oil at the TDA powerhouse. Oil monitoring measures currently consist primarily of visual observations of sight glasses, observations of oil leaks on and around equipment, and purchase and disposal records of lubricants. The Federal Government agreed to develop and apply an Oil Accountability Plan (OAP) pursuant to the August 2014 settlement agreement with Columbia Riverkeepers.&nbsp; The OAP is intended to account for oils and greases used, including the oils and greases used in turbines, wicket gate bearings, and fish-way equipment. This project would improve the ability to consistently and reliably account and monitor leakage of oils through automated systems and greatly increase the timeliness of level monitoring. It would also assist in fulfilling the requirements of the Portland Districts Standing Environmental Policy 200-1, Oil Accountability while significantly reducing the O&amp;M costs to do so. The purpose of this project is to improve accuracy and increase automation of instrumentation to account for oil in oil-filled equipment, bulk storage containers, and high-risk equipment. It is also to aid in the identification of oil leaks as early as possible and fully account for potential leaks.</p>","text":"18 November 2025: The solicitation drawings and the reference drawings (13 total drawing files) are attached.\n\nSYNOPSIS\n\nThe U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for The Dalles Dam Oil Accountability Measures in the Dalles, Oregon. The proposed project will be a competitive, firm-fixed price (FFP) contract.\n\nBackground: The Dalles Dam is located in The Dalles, Oregon. The Dalles Dam (TDA) is a concrete gravity run-of-the-river dam spanning the Columbia River, two miles east of the city of The Dalles, Oregon, United States. It joins Wasco County Oregon, with Klickitat County Washington, 300 miles upriver from the mouth of the Columbia River near Astoria, Oregon. The project is designed to improve the monitoring of the amount of oil that could be released into the Columbia River. Its main objective is to minimize the oil release.\n\nPurpose: There are approximately 400,000 gallons of oil at the TDA powerhouse. Oil monitoring measures currently consist primarily of visual observations of sight glasses, observations of oil leaks on and around equipment, and purchase and disposal records of lubricants. The Federal Government agreed to develop and apply an Oil Accountability Plan (OAP) pursuant to the August 2014 settlement agreement with Columbia Riverkeepers. The OAP is intended to account for oils and greases used, including the oils and greases used in turbines, wicket gate bearings, and fish-way equipment. This project would improve the ability to consistently and reliably account and monitor leakage of oils through automated systems and greatly increase the timeliness of level monitoring. It would also assist in fulfilling the requirements of the Portland Districts Standing Environmental Policy 200-1, Oil Accountability while significantly reducing the O&M costs to do so. The purpose of this project is to improve accuracy and increase automation of instrumentation to account for oil in oil-filled equipment, bulk storage containers, and high-risk equipment. It is also to aid in the identification of oil leaks as early as possible and fully account for potential leaks.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W9127N26RA004","place_of_performance":{"zip":"97058","city":{"code":"72950","name":"The Dalles"},"state":{"code":"OR","name":"Oregon"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z2JZ"},{"dates":{"posted":"2025-12-08","posted_at":"2025-12-08T22:22:28.939Z","created_at":"2025-12-08T22:22:08.559Z","modified_at":"2026-03-13T04:04:29.084Z","response_deadline":{"raw":"2025-12-15T11:00:00-08:00","utc":"2025-12-15T19:00:00Z","date":"2025-12-15","time":"11:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-28800}},"links":{"sam":"https://sam.gov/workspace/contract/opp/97f1ac66ff944a95844754fe2540d2a7/view"},"naics":{"codes":["238210"],"primary":"238210"},"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","agency":{"office":{"code":"W9127N","name":"W071 ENDIST PORTLAND"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"97204-3495","city":"PORTLAND","state":"OR","country":"USA"},"organization_id":"100255230","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-12-30","archive_type":"auto15"},"history":[{"index":23,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T16:26:19.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"b8ae5a29986d407080b14ebc2756e8f9","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":21,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T14:57:22.142Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dbb18e8123a4455e9863b620fd97d958","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":20,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-13T15:15:17.141Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"577a85dc81d240c88353a5c081e28ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":19,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T18:37:35.852Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dc60a3b89cba49f2aad6ddc4d0df2a85","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":18,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:10:39.296Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"25e250999084468cada7173e4b0ac734","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":17,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:08:50.758Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f2a0576f08fd4b5f99bb5c02fa230ccc","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":16,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-12T19:50:24.281Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f65194d512f549f98458954957687399","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":15,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-05T18:17:21.540Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"967d1cdf2b61445eb728c50ace6d1a9d","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":14,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-23T16:21:36.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"489c6926b91048bd8424852a5793ef3f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":13,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:41:58.905Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9a707bc559dc484ba4f1d9082a57c148","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":12,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:38:32.853Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d722de2191e34756b99acb921d6c82db","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":11,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T16:41:58.213Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"79bdd16e09c547b78533ab5498d69a22","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":10,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-11T13:49:23.849Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9f113c8389f0405fb5dbf321b067a990","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":9,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-10T19:20:54.767Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5a29204e7e6c42598a46e4ec51d147df","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":8,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-08T22:22:28.939Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f1ac66ff944a95844754fe2540d2a7","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":7,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T20:54:08.202Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"fd4ac3d8932e46a5b1f840a9c87262da","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":6,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:59:48.906Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b07faed24389484497756d2ee8254ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":5,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:16:01.774Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2137e768ddc646a7b23b47d148a50aec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":4,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-19T00:09:08.134Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ac8c60611de24fd896b7bbc6c59b9301","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":3,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-18T13:46:40.606Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c7437bf0ed5a4e748e01f5b0d05af9ec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":2,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-17T13:49:49.868Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"58cec72778274b4cbfb6dc74e4eddf0f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":1,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-14T17:05:44.191Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"912dfe4e86c742e48049d734ba305a4d","solicitation_number":"W9127N26RA004"}],"contacts":[{"name":"Andrew Sprys","role":"primary","email":"andrew.j.sprys@usace.army.mil"},{"name":"Cory Pfenning","role":"secondary","email":"cory.r.pfenning@usace.army.mil"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"97f1ac66ff944a95844754fe2540d2a7","lineage_id":"912dfe4e86c742e48049d734ba305a4d","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-20T01:05:56.629282756Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T17:48:36.003679Z","row_sha256":"63a592c41998c5fdebbc03f1da7e5c5efa92448a83f439be394de9eafa7109b8","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-20T01:05:56.629282756Z","first_seen_at":"2026-09-16T17:48:36.003679Z"},"description":{"html":"<p>18 November 2025:&nbsp; The solicitation drawings and the reference drawings (13 total drawing files) are attached.&nbsp;&nbsp;</p>\n\n<p><strong>SYNOPSIS</strong></p>\n\n<p>The U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for The Dalles Dam Oil Accountability Measures in the Dalles, Oregon. The proposed project will be a competitive, firm-fixed price (FFP) contract.</p>\n\n<p></p>\n\n<p><strong>Background:</strong> The Dalles Dam is located in The Dalles, Oregon. The Dalles Dam (TDA) is a concrete gravity run-of-the-river dam spanning the Columbia River, two miles east of the city of The Dalles, Oregon, United States. It joins Wasco County Oregon, with Klickitat County Washington, 300 miles upriver from the mouth of the Columbia River near Astoria, Oregon. The project is designed to improve the monitoring of the amount of oil that could be released into the Columbia River. Its main objective is to minimize the oil release.</p>\n\n<p></p>\n\n<p><strong>Purpose:</strong> There are approximately 400,000 gallons of oil at the TDA powerhouse. Oil monitoring measures currently consist primarily of visual observations of sight glasses, observations of oil leaks on and around equipment, and purchase and disposal records of lubricants. The Federal Government agreed to develop and apply an Oil Accountability Plan (OAP) pursuant to the August 2014 settlement agreement with Columbia Riverkeepers.&nbsp; The OAP is intended to account for oils and greases used, including the oils and greases used in turbines, wicket gate bearings, and fish-way equipment. This project would improve the ability to consistently and reliably account and monitor leakage of oils through automated systems and greatly increase the timeliness of level monitoring. It would also assist in fulfilling the requirements of the Portland Districts Standing Environmental Policy 200-1, Oil Accountability while significantly reducing the O&amp;M costs to do so. The purpose of this project is to improve accuracy and increase automation of instrumentation to account for oil in oil-filled equipment, bulk storage containers, and high-risk equipment. It is also to aid in the identification of oil leaks as early as possible and fully account for potential leaks.</p>","text":"18 November 2025: The solicitation drawings and the reference drawings (13 total drawing files) are attached.\n\nSYNOPSIS\n\nThe U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for The Dalles Dam Oil Accountability Measures in the Dalles, Oregon. The proposed project will be a competitive, firm-fixed price (FFP) contract.\n\nBackground: The Dalles Dam is located in The Dalles, Oregon. The Dalles Dam (TDA) is a concrete gravity run-of-the-river dam spanning the Columbia River, two miles east of the city of The Dalles, Oregon, United States. It joins Wasco County Oregon, with Klickitat County Washington, 300 miles upriver from the mouth of the Columbia River near Astoria, Oregon. The project is designed to improve the monitoring of the amount of oil that could be released into the Columbia River. Its main objective is to minimize the oil release.\n\nPurpose: There are approximately 400,000 gallons of oil at the TDA powerhouse. Oil monitoring measures currently consist primarily of visual observations of sight glasses, observations of oil leaks on and around equipment, and purchase and disposal records of lubricants. The Federal Government agreed to develop and apply an Oil Accountability Plan (OAP) pursuant to the August 2014 settlement agreement with Columbia Riverkeepers. The OAP is intended to account for oils and greases used, including the oils and greases used in turbines, wicket gate bearings, and fish-way equipment. This project would improve the ability to consistently and reliably account and monitor leakage of oils through automated systems and greatly increase the timeliness of level monitoring. It would also assist in fulfilling the requirements of the Portland Districts Standing Environmental Policy 200-1, Oil Accountability while significantly reducing the O&M costs to do so. The purpose of this project is to improve accuracy and increase automation of instrumentation to account for oil in oil-filled equipment, bulk storage containers, and high-risk equipment. It is also to aid in the identification of oil leaks as early as possible and fully account for potential leaks.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W9127N26RA004","place_of_performance":{"zip":"97058","city":{"code":"72950","name":"The Dalles"},"state":{"code":"OR","name":"Oregon"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z2JZ"},{"dates":{"posted":"2025-12-10","posted_at":"2025-12-10T19:20:54.767Z","created_at":"2025-12-10T19:11:43.863Z","modified_at":"2026-03-13T04:04:29.084Z","response_deadline":{"raw":"2026-01-15T11:00:00-08:00","utc":"2026-01-15T19:00:00Z","date":"2026-01-15","time":"11:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-28800}},"links":{"sam":"https://sam.gov/workspace/contract/opp/5a29204e7e6c42598a46e4ec51d147df/view"},"naics":{"codes":["238210"],"primary":"238210"},"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","agency":{"office":{"code":"W9127N","name":"W071 ENDIST PORTLAND"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"97204-3495","city":"PORTLAND","state":"OR","country":"USA"},"organization_id":"100255230","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-01-30","archive_type":"auto15"},"history":[{"index":23,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T16:26:19.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"b8ae5a29986d407080b14ebc2756e8f9","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":21,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T14:57:22.142Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dbb18e8123a4455e9863b620fd97d958","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":20,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-13T15:15:17.141Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"577a85dc81d240c88353a5c081e28ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":19,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T18:37:35.852Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dc60a3b89cba49f2aad6ddc4d0df2a85","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":18,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:10:39.296Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"25e250999084468cada7173e4b0ac734","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":17,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:08:50.758Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f2a0576f08fd4b5f99bb5c02fa230ccc","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":16,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-12T19:50:24.281Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f65194d512f549f98458954957687399","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":15,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-05T18:17:21.540Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"967d1cdf2b61445eb728c50ace6d1a9d","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":14,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-23T16:21:36.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"489c6926b91048bd8424852a5793ef3f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":13,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:41:58.905Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9a707bc559dc484ba4f1d9082a57c148","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":12,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:38:32.853Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d722de2191e34756b99acb921d6c82db","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":11,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T16:41:58.213Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"79bdd16e09c547b78533ab5498d69a22","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":10,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-11T13:49:23.849Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9f113c8389f0405fb5dbf321b067a990","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":9,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-10T19:20:54.767Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5a29204e7e6c42598a46e4ec51d147df","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":8,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-08T22:22:28.939Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f1ac66ff944a95844754fe2540d2a7","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":7,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T20:54:08.202Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"fd4ac3d8932e46a5b1f840a9c87262da","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":6,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:59:48.906Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b07faed24389484497756d2ee8254ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":5,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:16:01.774Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2137e768ddc646a7b23b47d148a50aec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":4,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-19T00:09:08.134Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ac8c60611de24fd896b7bbc6c59b9301","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":3,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-18T13:46:40.606Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c7437bf0ed5a4e748e01f5b0d05af9ec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":2,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-17T13:49:49.868Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"58cec72778274b4cbfb6dc74e4eddf0f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":1,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-14T17:05:44.191Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"912dfe4e86c742e48049d734ba305a4d","solicitation_number":"W9127N26RA004"}],"contacts":[{"name":"Andrew Sprys","role":"primary","email":"andrew.j.sprys@usace.army.mil"},{"name":"Cory Pfenning","role":"secondary","email":"cory.r.pfenning@usace.army.mil"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"5a29204e7e6c42598a46e4ec51d147df","lineage_id":"912dfe4e86c742e48049d734ba305a4d","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-19T03:47:58.139364163Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T17:48:36.003679Z","row_sha256":"78704f1b4829dade6bf41efec8f600f2380ce56cd69289bea201bf2240936379","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-19T03:47:58.139364163Z","first_seen_at":"2026-09-16T17:48:36.003679Z"},"description":{"html":"<p>18 November 2025:&nbsp; The solicitation drawings and the reference drawings (13 total drawing files) are attached.&nbsp;&nbsp;</p>\n\n<p><strong>SYNOPSIS</strong></p>\n\n<p>The U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for The Dalles Dam Oil Accountability Measures in the Dalles, Oregon. The proposed project will be a competitive, firm-fixed price (FFP) contract.</p>\n\n<p></p>\n\n<p><strong>Background:</strong> The Dalles Dam is located in The Dalles, Oregon. The Dalles Dam (TDA) is a concrete gravity run-of-the-river dam spanning the Columbia River, two miles east of the city of The Dalles, Oregon, United States. It joins Wasco County Oregon, with Klickitat County Washington, 300 miles upriver from the mouth of the Columbia River near Astoria, Oregon. The project is designed to improve the monitoring of the amount of oil that could be released into the Columbia River. Its main objective is to minimize the oil release.</p>\n\n<p></p>\n\n<p><strong>Purpose:</strong> There are approximately 400,000 gallons of oil at the TDA powerhouse. Oil monitoring measures currently consist primarily of visual observations of sight glasses, observations of oil leaks on and around equipment, and purchase and disposal records of lubricants. The Federal Government agreed to develop and apply an Oil Accountability Plan (OAP) pursuant to the August 2014 settlement agreement with Columbia Riverkeepers.&nbsp; The OAP is intended to account for oils and greases used, including the oils and greases used in turbines, wicket gate bearings, and fish-way equipment. This project would improve the ability to consistently and reliably account and monitor leakage of oils through automated systems and greatly increase the timeliness of level monitoring. It would also assist in fulfilling the requirements of the Portland Districts Standing Environmental Policy 200-1, Oil Accountability while significantly reducing the O&amp;M costs to do so. The purpose of this project is to improve accuracy and increase automation of instrumentation to account for oil in oil-filled equipment, bulk storage containers, and high-risk equipment. It is also to aid in the identification of oil leaks as early as possible and fully account for potential leaks.</p>","text":"18 November 2025: The solicitation drawings and the reference drawings (13 total drawing files) are attached.\n\nSYNOPSIS\n\nThe U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for The Dalles Dam Oil Accountability Measures in the Dalles, Oregon. The proposed project will be a competitive, firm-fixed price (FFP) contract.\n\nBackground: The Dalles Dam is located in The Dalles, Oregon. The Dalles Dam (TDA) is a concrete gravity run-of-the-river dam spanning the Columbia River, two miles east of the city of The Dalles, Oregon, United States. It joins Wasco County Oregon, with Klickitat County Washington, 300 miles upriver from the mouth of the Columbia River near Astoria, Oregon. The project is designed to improve the monitoring of the amount of oil that could be released into the Columbia River. Its main objective is to minimize the oil release.\n\nPurpose: There are approximately 400,000 gallons of oil at the TDA powerhouse. Oil monitoring measures currently consist primarily of visual observations of sight glasses, observations of oil leaks on and around equipment, and purchase and disposal records of lubricants. The Federal Government agreed to develop and apply an Oil Accountability Plan (OAP) pursuant to the August 2014 settlement agreement with Columbia Riverkeepers. The OAP is intended to account for oils and greases used, including the oils and greases used in turbines, wicket gate bearings, and fish-way equipment. This project would improve the ability to consistently and reliably account and monitor leakage of oils through automated systems and greatly increase the timeliness of level monitoring. It would also assist in fulfilling the requirements of the Portland Districts Standing Environmental Policy 200-1, Oil Accountability while significantly reducing the O&M costs to do so. The purpose of this project is to improve accuracy and increase automation of instrumentation to account for oil in oil-filled equipment, bulk storage containers, and high-risk equipment. It is also to aid in the identification of oil leaks as early as possible and fully account for potential leaks.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W9127N26RA004","place_of_performance":{"zip":"97058","city":{"code":"72950","name":"The Dalles"},"state":{"code":"OR","name":"Oregon"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z2JZ"},{"dates":{"posted":"2025-12-11","posted_at":"2025-12-11T13:49:23.849Z","created_at":"2025-12-10T19:23:41.262Z","modified_at":"2026-03-13T04:04:29.084Z","response_deadline":{"raw":"2026-01-15T11:00:00-08:00","utc":"2026-01-15T19:00:00Z","date":"2026-01-15","time":"11:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-28800}},"links":{"sam":"https://sam.gov/workspace/contract/opp/9f113c8389f0405fb5dbf321b067a990/view"},"naics":{"codes":["238210"],"primary":"238210"},"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","agency":{"office":{"code":"W9127N","name":"W071 ENDIST PORTLAND"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"97204-3495","city":"PORTLAND","state":"OR","country":"USA"},"organization_id":"100255230","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-01-30","archive_type":"auto15"},"history":[{"index":23,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T16:26:19.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"b8ae5a29986d407080b14ebc2756e8f9","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":21,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T14:57:22.142Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dbb18e8123a4455e9863b620fd97d958","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":20,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-13T15:15:17.141Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"577a85dc81d240c88353a5c081e28ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":19,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T18:37:35.852Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dc60a3b89cba49f2aad6ddc4d0df2a85","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":18,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:10:39.296Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"25e250999084468cada7173e4b0ac734","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":17,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:08:50.758Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f2a0576f08fd4b5f99bb5c02fa230ccc","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":16,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-12T19:50:24.281Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f65194d512f549f98458954957687399","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":15,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-05T18:17:21.540Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"967d1cdf2b61445eb728c50ace6d1a9d","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":14,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-23T16:21:36.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"489c6926b91048bd8424852a5793ef3f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":13,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:41:58.905Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9a707bc559dc484ba4f1d9082a57c148","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":12,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:38:32.853Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d722de2191e34756b99acb921d6c82db","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":11,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T16:41:58.213Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"79bdd16e09c547b78533ab5498d69a22","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":10,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-11T13:49:23.849Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9f113c8389f0405fb5dbf321b067a990","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":9,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-10T19:20:54.767Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5a29204e7e6c42598a46e4ec51d147df","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":8,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-08T22:22:28.939Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f1ac66ff944a95844754fe2540d2a7","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":7,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T20:54:08.202Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"fd4ac3d8932e46a5b1f840a9c87262da","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":6,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:59:48.906Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b07faed24389484497756d2ee8254ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":5,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:16:01.774Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2137e768ddc646a7b23b47d148a50aec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":4,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-19T00:09:08.134Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ac8c60611de24fd896b7bbc6c59b9301","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":3,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-18T13:46:40.606Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c7437bf0ed5a4e748e01f5b0d05af9ec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":2,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-17T13:49:49.868Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"58cec72778274b4cbfb6dc74e4eddf0f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":1,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-14T17:05:44.191Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"912dfe4e86c742e48049d734ba305a4d","solicitation_number":"W9127N26RA004"}],"contacts":[{"name":"Andrew Sprys","role":"primary","email":"andrew.j.sprys@usace.army.mil"},{"name":"Cory Pfenning","role":"secondary","email":"cory.r.pfenning@usace.army.mil"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"9f113c8389f0405fb5dbf321b067a990","lineage_id":"912dfe4e86c742e48049d734ba305a4d","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-19T03:20:56.596170995Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T17:48:36.003679Z","row_sha256":"8a73c491006a1f65af77ad3d53eb424933a2a77c8a2398283ca5f7aad1152e2d","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-19T03:20:56.596170995Z","first_seen_at":"2026-09-16T17:48:36.003679Z"},"description":{"html":"<p>18 November 2025:&nbsp; The solicitation drawings and the reference drawings (13 total drawing files) are attached.&nbsp;&nbsp;</p>\n\n<p><strong>SYNOPSIS</strong></p>\n\n<p>The U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for The Dalles Dam Oil Accountability Measures in the Dalles, Oregon. The proposed project will be a competitive, firm-fixed price (FFP) contract.</p>\n\n<p></p>\n\n<p><strong>Background:</strong> The Dalles Dam is located in The Dalles, Oregon. The Dalles Dam (TDA) is a concrete gravity run-of-the-river dam spanning the Columbia River, two miles east of the city of The Dalles, Oregon, United States. It joins Wasco County Oregon, with Klickitat County Washington, 300 miles upriver from the mouth of the Columbia River near Astoria, Oregon. The project is designed to improve the monitoring of the amount of oil that could be released into the Columbia River. Its main objective is to minimize the oil release.</p>\n\n<p></p>\n\n<p><strong>Purpose:</strong> There are approximately 400,000 gallons of oil at the TDA powerhouse. Oil monitoring measures currently consist primarily of visual observations of sight glasses, observations of oil leaks on and around equipment, and purchase and disposal records of lubricants. The Federal Government agreed to develop and apply an Oil Accountability Plan (OAP) pursuant to the August 2014 settlement agreement with Columbia Riverkeepers.&nbsp; The OAP is intended to account for oils and greases used, including the oils and greases used in turbines, wicket gate bearings, and fish-way equipment. This project would improve the ability to consistently and reliably account and monitor leakage of oils through automated systems and greatly increase the timeliness of level monitoring. It would also assist in fulfilling the requirements of the Portland Districts Standing Environmental Policy 200-1, Oil Accountability while significantly reducing the O&amp;M costs to do so. The purpose of this project is to improve accuracy and increase automation of instrumentation to account for oil in oil-filled equipment, bulk storage containers, and high-risk equipment. It is also to aid in the identification of oil leaks as early as possible and fully account for potential leaks.</p>","text":"18 November 2025: The solicitation drawings and the reference drawings (13 total drawing files) are attached.\n\nSYNOPSIS\n\nThe U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for The Dalles Dam Oil Accountability Measures in the Dalles, Oregon. The proposed project will be a competitive, firm-fixed price (FFP) contract.\n\nBackground: The Dalles Dam is located in The Dalles, Oregon. The Dalles Dam (TDA) is a concrete gravity run-of-the-river dam spanning the Columbia River, two miles east of the city of The Dalles, Oregon, United States. It joins Wasco County Oregon, with Klickitat County Washington, 300 miles upriver from the mouth of the Columbia River near Astoria, Oregon. The project is designed to improve the monitoring of the amount of oil that could be released into the Columbia River. Its main objective is to minimize the oil release.\n\nPurpose: There are approximately 400,000 gallons of oil at the TDA powerhouse. Oil monitoring measures currently consist primarily of visual observations of sight glasses, observations of oil leaks on and around equipment, and purchase and disposal records of lubricants. The Federal Government agreed to develop and apply an Oil Accountability Plan (OAP) pursuant to the August 2014 settlement agreement with Columbia Riverkeepers. The OAP is intended to account for oils and greases used, including the oils and greases used in turbines, wicket gate bearings, and fish-way equipment. This project would improve the ability to consistently and reliably account and monitor leakage of oils through automated systems and greatly increase the timeliness of level monitoring. It would also assist in fulfilling the requirements of the Portland Districts Standing Environmental Policy 200-1, Oil Accountability while significantly reducing the O&M costs to do so. The purpose of this project is to improve accuracy and increase automation of instrumentation to account for oil in oil-filled equipment, bulk storage containers, and high-risk equipment. It is also to aid in the identification of oil leaks as early as possible and fully account for potential leaks.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W9127N26RA004","place_of_performance":{"zip":"97058","city":{"code":"72950","name":"The Dalles"},"state":{"code":"OR","name":"Oregon"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z2JZ"},{"dates":{"posted":"2025-12-15","posted_at":"2025-12-15T16:41:58.213Z","created_at":"2025-12-15T16:39:26.387Z","modified_at":"2026-03-13T04:04:29.084Z","response_deadline":{"raw":"2026-01-15T11:00:00-08:00","utc":"2026-01-15T19:00:00Z","date":"2026-01-15","time":"11:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-28800}},"links":{"sam":"https://sam.gov/workspace/contract/opp/79bdd16e09c547b78533ab5498d69a22/view"},"naics":{"codes":["238210"],"primary":"238210"},"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","agency":{"office":{"code":"W9127N","name":"W071 ENDIST PORTLAND"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"97204-3495","city":"PORTLAND","state":"OR","country":"USA"},"organization_id":"100255230","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-01-30","archive_type":"auto15"},"history":[{"index":23,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T16:26:19.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"b8ae5a29986d407080b14ebc2756e8f9","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":21,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T14:57:22.142Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dbb18e8123a4455e9863b620fd97d958","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":20,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-13T15:15:17.141Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"577a85dc81d240c88353a5c081e28ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":19,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T18:37:35.852Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dc60a3b89cba49f2aad6ddc4d0df2a85","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":18,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:10:39.296Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"25e250999084468cada7173e4b0ac734","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":17,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:08:50.758Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f2a0576f08fd4b5f99bb5c02fa230ccc","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":16,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-12T19:50:24.281Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f65194d512f549f98458954957687399","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":15,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-05T18:17:21.540Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"967d1cdf2b61445eb728c50ace6d1a9d","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":14,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-23T16:21:36.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"489c6926b91048bd8424852a5793ef3f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":13,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:41:58.905Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9a707bc559dc484ba4f1d9082a57c148","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":12,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:38:32.853Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d722de2191e34756b99acb921d6c82db","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":11,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T16:41:58.213Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"79bdd16e09c547b78533ab5498d69a22","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":10,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-11T13:49:23.849Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9f113c8389f0405fb5dbf321b067a990","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":9,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-10T19:20:54.767Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5a29204e7e6c42598a46e4ec51d147df","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":8,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-08T22:22:28.939Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f1ac66ff944a95844754fe2540d2a7","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":7,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T20:54:08.202Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"fd4ac3d8932e46a5b1f840a9c87262da","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":6,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:59:48.906Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b07faed24389484497756d2ee8254ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":5,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:16:01.774Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2137e768ddc646a7b23b47d148a50aec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":4,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-19T00:09:08.134Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ac8c60611de24fd896b7bbc6c59b9301","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":3,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-18T13:46:40.606Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c7437bf0ed5a4e748e01f5b0d05af9ec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":2,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-17T13:49:49.868Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"58cec72778274b4cbfb6dc74e4eddf0f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":1,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-14T17:05:44.191Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"912dfe4e86c742e48049d734ba305a4d","solicitation_number":"W9127N26RA004"}],"contacts":[{"name":"Andrew Sprys","role":"primary","email":"andrew.j.sprys@usace.army.mil"},{"name":"Cory Pfenning","role":"secondary","email":"cory.r.pfenning@usace.army.mil"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"79bdd16e09c547b78533ab5498d69a22","lineage_id":"912dfe4e86c742e48049d734ba305a4d","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-19T02:03:29.040391012Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T17:48:36.003679Z","row_sha256":"f065bac5f79b6dafd33dd171abde959e29ab6035990fbabfec55f2c7538e32ed","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-19T02:03:29.040391012Z","first_seen_at":"2026-09-16T17:48:36.003679Z"},"description":{"html":"<p>18 November 2025:&nbsp; The solicitation drawings and the reference drawings (13 total drawing files) are attached.&nbsp;&nbsp;</p>\n\n<p><strong>SYNOPSIS</strong></p>\n\n<p>The U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for The Dalles Dam Oil Accountability Measures in the Dalles, Oregon. The proposed project will be a competitive, firm-fixed price (FFP) contract.</p>\n\n<p></p>\n\n<p><strong>Background:</strong> The Dalles Dam is located in The Dalles, Oregon. The Dalles Dam (TDA) is a concrete gravity run-of-the-river dam spanning the Columbia River, two miles east of the city of The Dalles, Oregon, United States. It joins Wasco County Oregon, with Klickitat County Washington, 300 miles upriver from the mouth of the Columbia River near Astoria, Oregon. The project is designed to improve the monitoring of the amount of oil that could be released into the Columbia River. Its main objective is to minimize the oil release.</p>\n\n<p></p>\n\n<p><strong>Purpose:</strong> There are approximately 400,000 gallons of oil at the TDA powerhouse. Oil monitoring measures currently consist primarily of visual observations of sight glasses, observations of oil leaks on and around equipment, and purchase and disposal records of lubricants. The Federal Government agreed to develop and apply an Oil Accountability Plan (OAP) pursuant to the August 2014 settlement agreement with Columbia Riverkeepers.&nbsp; The OAP is intended to account for oils and greases used, including the oils and greases used in turbines, wicket gate bearings, and fish-way equipment. This project would improve the ability to consistently and reliably account and monitor leakage of oils through automated systems and greatly increase the timeliness of level monitoring. It would also assist in fulfilling the requirements of the Portland Districts Standing Environmental Policy 200-1, Oil Accountability while significantly reducing the O&amp;M costs to do so. The purpose of this project is to improve accuracy and increase automation of instrumentation to account for oil in oil-filled equipment, bulk storage containers, and high-risk equipment. It is also to aid in the identification of oil leaks as early as possible and fully account for potential leaks.</p>","text":"18 November 2025: The solicitation drawings and the reference drawings (13 total drawing files) are attached.\n\nSYNOPSIS\n\nThe U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for The Dalles Dam Oil Accountability Measures in the Dalles, Oregon. The proposed project will be a competitive, firm-fixed price (FFP) contract.\n\nBackground: The Dalles Dam is located in The Dalles, Oregon. The Dalles Dam (TDA) is a concrete gravity run-of-the-river dam spanning the Columbia River, two miles east of the city of The Dalles, Oregon, United States. It joins Wasco County Oregon, with Klickitat County Washington, 300 miles upriver from the mouth of the Columbia River near Astoria, Oregon. The project is designed to improve the monitoring of the amount of oil that could be released into the Columbia River. Its main objective is to minimize the oil release.\n\nPurpose: There are approximately 400,000 gallons of oil at the TDA powerhouse. Oil monitoring measures currently consist primarily of visual observations of sight glasses, observations of oil leaks on and around equipment, and purchase and disposal records of lubricants. The Federal Government agreed to develop and apply an Oil Accountability Plan (OAP) pursuant to the August 2014 settlement agreement with Columbia Riverkeepers. The OAP is intended to account for oils and greases used, including the oils and greases used in turbines, wicket gate bearings, and fish-way equipment. This project would improve the ability to consistently and reliably account and monitor leakage of oils through automated systems and greatly increase the timeliness of level monitoring. It would also assist in fulfilling the requirements of the Portland Districts Standing Environmental Policy 200-1, Oil Accountability while significantly reducing the O&M costs to do so. The purpose of this project is to improve accuracy and increase automation of instrumentation to account for oil in oil-filled equipment, bulk storage containers, and high-risk equipment. It is also to aid in the identification of oil leaks as early as possible and fully account for potential leaks.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W9127N26RA004","place_of_performance":{"zip":"97058","city":{"code":"72950","name":"The Dalles"},"state":{"code":"OR","name":"Oregon"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z2JZ"},{"dates":{"posted":"2025-12-19","posted_at":"2025-12-19T14:41:58.905Z","created_at":"2025-12-19T14:40:14.649Z","modified_at":"2026-03-13T04:04:29.084Z","response_deadline":{"raw":"2026-01-15T11:00:00-08:00","utc":"2026-01-15T19:00:00Z","date":"2026-01-15","time":"11:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-28800}},"links":{"sam":"https://sam.gov/workspace/contract/opp/9a707bc559dc484ba4f1d9082a57c148/view"},"naics":{"codes":["238210"],"primary":"238210"},"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","agency":{"office":{"code":"W9127N","name":"W071 ENDIST PORTLAND"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"97204-3495","city":"PORTLAND","state":"OR","country":"USA"},"organization_id":"100255230","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-01-30","archive_type":"auto15"},"history":[{"index":23,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T16:26:19.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"b8ae5a29986d407080b14ebc2756e8f9","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":21,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T14:57:22.142Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dbb18e8123a4455e9863b620fd97d958","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":20,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-13T15:15:17.141Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"577a85dc81d240c88353a5c081e28ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":19,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T18:37:35.852Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dc60a3b89cba49f2aad6ddc4d0df2a85","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":18,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:10:39.296Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"25e250999084468cada7173e4b0ac734","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":17,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:08:50.758Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f2a0576f08fd4b5f99bb5c02fa230ccc","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":16,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-12T19:50:24.281Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f65194d512f549f98458954957687399","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":15,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-05T18:17:21.540Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"967d1cdf2b61445eb728c50ace6d1a9d","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":14,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-23T16:21:36.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"489c6926b91048bd8424852a5793ef3f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":13,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:41:58.905Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9a707bc559dc484ba4f1d9082a57c148","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":12,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:38:32.853Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d722de2191e34756b99acb921d6c82db","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":11,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T16:41:58.213Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"79bdd16e09c547b78533ab5498d69a22","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":10,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-11T13:49:23.849Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9f113c8389f0405fb5dbf321b067a990","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":9,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-10T19:20:54.767Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5a29204e7e6c42598a46e4ec51d147df","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":8,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-08T22:22:28.939Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f1ac66ff944a95844754fe2540d2a7","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":7,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T20:54:08.202Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"fd4ac3d8932e46a5b1f840a9c87262da","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":6,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:59:48.906Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b07faed24389484497756d2ee8254ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":5,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:16:01.774Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2137e768ddc646a7b23b47d148a50aec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":4,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-19T00:09:08.134Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ac8c60611de24fd896b7bbc6c59b9301","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":3,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-18T13:46:40.606Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c7437bf0ed5a4e748e01f5b0d05af9ec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":2,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-17T13:49:49.868Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"58cec72778274b4cbfb6dc74e4eddf0f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":1,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-14T17:05:44.191Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"912dfe4e86c742e48049d734ba305a4d","solicitation_number":"W9127N26RA004"}],"contacts":[{"name":"Andrew Sprys","role":"primary","email":"andrew.j.sprys@usace.army.mil"},{"name":"Cory Pfenning","role":"secondary","email":"cory.r.pfenning@usace.army.mil"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"9a707bc559dc484ba4f1d9082a57c148","lineage_id":"912dfe4e86c742e48049d734ba305a4d","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-18T03:20:58.298673200Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T17:48:36.003679Z","row_sha256":"54866262186fc7e74808b6009a1b50fd6c1dd3c0a1d9c22d0fdb2a322d959546","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-18T03:20:58.298673200Z","first_seen_at":"2026-09-16T17:48:36.003679Z"},"description":{"html":"<p>18 November 2025:&nbsp; The solicitation drawings and the reference drawings (13 total drawing files) are attached.&nbsp;&nbsp;</p>\n\n<p><strong>SYNOPSIS</strong></p>\n\n<p>The U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for The Dalles Dam Oil Accountability Measures in the Dalles, Oregon. The proposed project will be a competitive, firm-fixed price (FFP) contract.</p>\n\n<p></p>\n\n<p><strong>Background:</strong> The Dalles Dam is located in The Dalles, Oregon. The Dalles Dam (TDA) is a concrete gravity run-of-the-river dam spanning the Columbia River, two miles east of the city of The Dalles, Oregon, United States. It joins Wasco County Oregon, with Klickitat County Washington, 300 miles upriver from the mouth of the Columbia River near Astoria, Oregon. The project is designed to improve the monitoring of the amount of oil that could be released into the Columbia River. Its main objective is to minimize the oil release.</p>\n\n<p></p>\n\n<p><strong>Purpose:</strong> There are approximately 400,000 gallons of oil at the TDA powerhouse. Oil monitoring measures currently consist primarily of visual observations of sight glasses, observations of oil leaks on and around equipment, and purchase and disposal records of lubricants. The Federal Government agreed to develop and apply an Oil Accountability Plan (OAP) pursuant to the August 2014 settlement agreement with Columbia Riverkeepers.&nbsp; The OAP is intended to account for oils and greases used, including the oils and greases used in turbines, wicket gate bearings, and fish-way equipment. This project would improve the ability to consistently and reliably account and monitor leakage of oils through automated systems and greatly increase the timeliness of level monitoring. It would also assist in fulfilling the requirements of the Portland Districts Standing Environmental Policy 200-1, Oil Accountability while significantly reducing the O&amp;M costs to do so. The purpose of this project is to improve accuracy and increase automation of instrumentation to account for oil in oil-filled equipment, bulk storage containers, and high-risk equipment. It is also to aid in the identification of oil leaks as early as possible and fully account for potential leaks.</p>","text":"18 November 2025: The solicitation drawings and the reference drawings (13 total drawing files) are attached.\n\nSYNOPSIS\n\nThe U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for The Dalles Dam Oil Accountability Measures in the Dalles, Oregon. The proposed project will be a competitive, firm-fixed price (FFP) contract.\n\nBackground: The Dalles Dam is located in The Dalles, Oregon. The Dalles Dam (TDA) is a concrete gravity run-of-the-river dam spanning the Columbia River, two miles east of the city of The Dalles, Oregon, United States. It joins Wasco County Oregon, with Klickitat County Washington, 300 miles upriver from the mouth of the Columbia River near Astoria, Oregon. The project is designed to improve the monitoring of the amount of oil that could be released into the Columbia River. Its main objective is to minimize the oil release.\n\nPurpose: There are approximately 400,000 gallons of oil at the TDA powerhouse. Oil monitoring measures currently consist primarily of visual observations of sight glasses, observations of oil leaks on and around equipment, and purchase and disposal records of lubricants. The Federal Government agreed to develop and apply an Oil Accountability Plan (OAP) pursuant to the August 2014 settlement agreement with Columbia Riverkeepers. The OAP is intended to account for oils and greases used, including the oils and greases used in turbines, wicket gate bearings, and fish-way equipment. This project would improve the ability to consistently and reliably account and monitor leakage of oils through automated systems and greatly increase the timeliness of level monitoring. It would also assist in fulfilling the requirements of the Portland Districts Standing Environmental Policy 200-1, Oil Accountability while significantly reducing the O&M costs to do so. The purpose of this project is to improve accuracy and increase automation of instrumentation to account for oil in oil-filled equipment, bulk storage containers, and high-risk equipment. It is also to aid in the identification of oil leaks as early as possible and fully account for potential leaks.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W9127N26RA004","place_of_performance":{"zip":"97058","city":{"code":"72950","name":"The Dalles"},"state":{"code":"OR","name":"Oregon"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z2JZ"},{"dates":{"posted":"2025-12-19","posted_at":"2025-12-19T14:38:32.853Z","created_at":"2025-12-19T13:56:57.132Z","modified_at":"2026-03-13T04:04:29.084Z","response_deadline":{"raw":"2026-01-15T11:00:00-08:00","utc":"2026-01-15T19:00:00Z","date":"2026-01-15","time":"11:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-28800}},"links":{"sam":"https://sam.gov/workspace/contract/opp/d722de2191e34756b99acb921d6c82db/view"},"naics":{"codes":["238210"],"primary":"238210"},"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","agency":{"office":{"code":"W9127N","name":"W071 ENDIST PORTLAND"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"97204-3495","city":"PORTLAND","state":"OR","country":"USA"},"organization_id":"100255230","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-01-30","archive_type":"auto15"},"history":[{"index":23,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T16:26:19.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"b8ae5a29986d407080b14ebc2756e8f9","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":21,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T14:57:22.142Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dbb18e8123a4455e9863b620fd97d958","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":20,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-13T15:15:17.141Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"577a85dc81d240c88353a5c081e28ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":19,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T18:37:35.852Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dc60a3b89cba49f2aad6ddc4d0df2a85","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":18,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:10:39.296Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"25e250999084468cada7173e4b0ac734","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":17,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:08:50.758Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f2a0576f08fd4b5f99bb5c02fa230ccc","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":16,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-12T19:50:24.281Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f65194d512f549f98458954957687399","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":15,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-05T18:17:21.540Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"967d1cdf2b61445eb728c50ace6d1a9d","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":14,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-23T16:21:36.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"489c6926b91048bd8424852a5793ef3f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":13,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:41:58.905Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9a707bc559dc484ba4f1d9082a57c148","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":12,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:38:32.853Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d722de2191e34756b99acb921d6c82db","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":11,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T16:41:58.213Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"79bdd16e09c547b78533ab5498d69a22","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":10,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-11T13:49:23.849Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9f113c8389f0405fb5dbf321b067a990","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":9,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-10T19:20:54.767Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5a29204e7e6c42598a46e4ec51d147df","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":8,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-08T22:22:28.939Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f1ac66ff944a95844754fe2540d2a7","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":7,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T20:54:08.202Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"fd4ac3d8932e46a5b1f840a9c87262da","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":6,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:59:48.906Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b07faed24389484497756d2ee8254ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":5,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:16:01.774Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2137e768ddc646a7b23b47d148a50aec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":4,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-19T00:09:08.134Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ac8c60611de24fd896b7bbc6c59b9301","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":3,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-18T13:46:40.606Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c7437bf0ed5a4e748e01f5b0d05af9ec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":2,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-17T13:49:49.868Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"58cec72778274b4cbfb6dc74e4eddf0f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":1,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-14T17:05:44.191Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"912dfe4e86c742e48049d734ba305a4d","solicitation_number":"W9127N26RA004"}],"contacts":[{"name":"Andrew Sprys","role":"primary","email":"andrew.j.sprys@usace.army.mil"},{"name":"Cory Pfenning","role":"secondary","email":"cory.r.pfenning@usace.army.mil"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"d722de2191e34756b99acb921d6c82db","lineage_id":"912dfe4e86c742e48049d734ba305a4d","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-18T03:26:18.393334168Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T17:48:36.003679Z","row_sha256":"32cc107ee5feb893e072ef4cc3a29feccee64546f24bd4ebf3529e305bdb2a99","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-18T03:26:18.393334168Z","first_seen_at":"2026-09-16T17:48:36.003679Z"},"description":{"html":"<p>18 November 2025:&nbsp; The solicitation drawings and the reference drawings (13 total drawing files) are attached.&nbsp;&nbsp;</p>\n\n<p><strong>SYNOPSIS</strong></p>\n\n<p>The U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for The Dalles Dam Oil Accountability Measures in the Dalles, Oregon. The proposed project will be a competitive, firm-fixed price (FFP) contract.</p>\n\n<p></p>\n\n<p><strong>Background:</strong> The Dalles Dam is located in The Dalles, Oregon. The Dalles Dam (TDA) is a concrete gravity run-of-the-river dam spanning the Columbia River, two miles east of the city of The Dalles, Oregon, United States. It joins Wasco County Oregon, with Klickitat County Washington, 300 miles upriver from the mouth of the Columbia River near Astoria, Oregon. The project is designed to improve the monitoring of the amount of oil that could be released into the Columbia River. Its main objective is to minimize the oil release.</p>\n\n<p></p>\n\n<p><strong>Purpose:</strong> There are approximately 400,000 gallons of oil at the TDA powerhouse. Oil monitoring measures currently consist primarily of visual observations of sight glasses, observations of oil leaks on and around equipment, and purchase and disposal records of lubricants. The Federal Government agreed to develop and apply an Oil Accountability Plan (OAP) pursuant to the August 2014 settlement agreement with Columbia Riverkeepers.&nbsp; The OAP is intended to account for oils and greases used, including the oils and greases used in turbines, wicket gate bearings, and fish-way equipment. This project would improve the ability to consistently and reliably account and monitor leakage of oils through automated systems and greatly increase the timeliness of level monitoring. It would also assist in fulfilling the requirements of the Portland Districts Standing Environmental Policy 200-1, Oil Accountability while significantly reducing the O&amp;M costs to do so. The purpose of this project is to improve accuracy and increase automation of instrumentation to account for oil in oil-filled equipment, bulk storage containers, and high-risk equipment. It is also to aid in the identification of oil leaks as early as possible and fully account for potential leaks.</p>","text":"18 November 2025: The solicitation drawings and the reference drawings (13 total drawing files) are attached.\n\nSYNOPSIS\n\nThe U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for The Dalles Dam Oil Accountability Measures in the Dalles, Oregon. The proposed project will be a competitive, firm-fixed price (FFP) contract.\n\nBackground: The Dalles Dam is located in The Dalles, Oregon. The Dalles Dam (TDA) is a concrete gravity run-of-the-river dam spanning the Columbia River, two miles east of the city of The Dalles, Oregon, United States. It joins Wasco County Oregon, with Klickitat County Washington, 300 miles upriver from the mouth of the Columbia River near Astoria, Oregon. The project is designed to improve the monitoring of the amount of oil that could be released into the Columbia River. Its main objective is to minimize the oil release.\n\nPurpose: There are approximately 400,000 gallons of oil at the TDA powerhouse. Oil monitoring measures currently consist primarily of visual observations of sight glasses, observations of oil leaks on and around equipment, and purchase and disposal records of lubricants. The Federal Government agreed to develop and apply an Oil Accountability Plan (OAP) pursuant to the August 2014 settlement agreement with Columbia Riverkeepers. The OAP is intended to account for oils and greases used, including the oils and greases used in turbines, wicket gate bearings, and fish-way equipment. This project would improve the ability to consistently and reliably account and monitor leakage of oils through automated systems and greatly increase the timeliness of level monitoring. It would also assist in fulfilling the requirements of the Portland Districts Standing Environmental Policy 200-1, Oil Accountability while significantly reducing the O&M costs to do so. The purpose of this project is to improve accuracy and increase automation of instrumentation to account for oil in oil-filled equipment, bulk storage containers, and high-risk equipment. It is also to aid in the identification of oil leaks as early as possible and fully account for potential leaks.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W9127N26RA004","place_of_performance":{"zip":"97058","city":{"code":"72950","name":"The Dalles"},"state":{"code":"OR","name":"Oregon"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z2JZ"},{"dates":{"posted":"2025-12-23","posted_at":"2025-12-23T16:21:36.428Z","created_at":"2025-12-23T16:20:35.642Z","modified_at":"2026-03-13T04:04:29.084Z","response_deadline":{"raw":"2026-01-15T11:00:00-08:00","utc":"2026-01-15T19:00:00Z","date":"2026-01-15","time":"11:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-28800}},"links":{"sam":"https://sam.gov/workspace/contract/opp/489c6926b91048bd8424852a5793ef3f/view"},"naics":{"codes":["238210"],"primary":"238210"},"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","agency":{"office":{"code":"W9127N","name":"W071 ENDIST PORTLAND"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"97204-3495","city":"PORTLAND","state":"OR","country":"USA"},"organization_id":"100255230","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-01-30","archive_type":"auto15"},"history":[{"index":23,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T16:26:19.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"b8ae5a29986d407080b14ebc2756e8f9","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":21,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T14:57:22.142Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dbb18e8123a4455e9863b620fd97d958","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":20,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-13T15:15:17.141Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"577a85dc81d240c88353a5c081e28ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":19,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T18:37:35.852Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dc60a3b89cba49f2aad6ddc4d0df2a85","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":18,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:10:39.296Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"25e250999084468cada7173e4b0ac734","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":17,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:08:50.758Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f2a0576f08fd4b5f99bb5c02fa230ccc","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":16,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-12T19:50:24.281Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f65194d512f549f98458954957687399","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":15,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-05T18:17:21.540Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"967d1cdf2b61445eb728c50ace6d1a9d","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":14,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-23T16:21:36.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"489c6926b91048bd8424852a5793ef3f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":13,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:41:58.905Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9a707bc559dc484ba4f1d9082a57c148","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":12,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:38:32.853Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d722de2191e34756b99acb921d6c82db","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":11,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T16:41:58.213Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"79bdd16e09c547b78533ab5498d69a22","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":10,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-11T13:49:23.849Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9f113c8389f0405fb5dbf321b067a990","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":9,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-10T19:20:54.767Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5a29204e7e6c42598a46e4ec51d147df","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":8,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-08T22:22:28.939Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f1ac66ff944a95844754fe2540d2a7","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":7,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T20:54:08.202Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"fd4ac3d8932e46a5b1f840a9c87262da","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":6,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:59:48.906Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b07faed24389484497756d2ee8254ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":5,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:16:01.774Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2137e768ddc646a7b23b47d148a50aec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":4,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-19T00:09:08.134Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ac8c60611de24fd896b7bbc6c59b9301","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":3,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-18T13:46:40.606Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c7437bf0ed5a4e748e01f5b0d05af9ec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":2,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-17T13:49:49.868Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"58cec72778274b4cbfb6dc74e4eddf0f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":1,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-14T17:05:44.191Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"912dfe4e86c742e48049d734ba305a4d","solicitation_number":"W9127N26RA004"}],"contacts":[{"name":"Andrew Sprys","role":"primary","email":"andrew.j.sprys@usace.army.mil"},{"name":"Cory Pfenning","role":"secondary","email":"cory.r.pfenning@usace.army.mil"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"489c6926b91048bd8424852a5793ef3f","lineage_id":"912dfe4e86c742e48049d734ba305a4d","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-18T02:04:19.037547314Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T17:48:36.003679Z","row_sha256":"fad348cf3d846b3693504c15af12c7e62ecd02090637156a1ea618020552df23","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-18T02:04:19.037547314Z","first_seen_at":"2026-09-16T17:48:36.003679Z"},"description":{"html":"<p>18 November 2025:&nbsp; The solicitation drawings and the reference drawings (13 total drawing files) are attached.&nbsp;&nbsp;</p>\n\n<p><strong>SYNOPSIS</strong></p>\n\n<p>The U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for The Dalles Dam Oil Accountability Measures in the Dalles, Oregon. The proposed project will be a competitive, firm-fixed price (FFP) contract.</p>\n\n<p></p>\n\n<p><strong>Background:</strong> The Dalles Dam is located in The Dalles, Oregon. The Dalles Dam (TDA) is a concrete gravity run-of-the-river dam spanning the Columbia River, two miles east of the city of The Dalles, Oregon, United States. It joins Wasco County Oregon, with Klickitat County Washington, 300 miles upriver from the mouth of the Columbia River near Astoria, Oregon. The project is designed to improve the monitoring of the amount of oil that could be released into the Columbia River. Its main objective is to minimize the oil release.</p>\n\n<p></p>\n\n<p><strong>Purpose:</strong> There are approximately 400,000 gallons of oil at the TDA powerhouse. Oil monitoring measures currently consist primarily of visual observations of sight glasses, observations of oil leaks on and around equipment, and purchase and disposal records of lubricants. The Federal Government agreed to develop and apply an Oil Accountability Plan (OAP) pursuant to the August 2014 settlement agreement with Columbia Riverkeepers.&nbsp; The OAP is intended to account for oils and greases used, including the oils and greases used in turbines, wicket gate bearings, and fish-way equipment. This project would improve the ability to consistently and reliably account and monitor leakage of oils through automated systems and greatly increase the timeliness of level monitoring. It would also assist in fulfilling the requirements of the Portland Districts Standing Environmental Policy 200-1, Oil Accountability while significantly reducing the O&amp;M costs to do so. The purpose of this project is to improve accuracy and increase automation of instrumentation to account for oil in oil-filled equipment, bulk storage containers, and high-risk equipment. It is also to aid in the identification of oil leaks as early as possible and fully account for potential leaks.</p>","text":"18 November 2025: The solicitation drawings and the reference drawings (13 total drawing files) are attached.\n\nSYNOPSIS\n\nThe U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for The Dalles Dam Oil Accountability Measures in the Dalles, Oregon. The proposed project will be a competitive, firm-fixed price (FFP) contract.\n\nBackground: The Dalles Dam is located in The Dalles, Oregon. The Dalles Dam (TDA) is a concrete gravity run-of-the-river dam spanning the Columbia River, two miles east of the city of The Dalles, Oregon, United States. It joins Wasco County Oregon, with Klickitat County Washington, 300 miles upriver from the mouth of the Columbia River near Astoria, Oregon. The project is designed to improve the monitoring of the amount of oil that could be released into the Columbia River. Its main objective is to minimize the oil release.\n\nPurpose: There are approximately 400,000 gallons of oil at the TDA powerhouse. Oil monitoring measures currently consist primarily of visual observations of sight glasses, observations of oil leaks on and around equipment, and purchase and disposal records of lubricants. The Federal Government agreed to develop and apply an Oil Accountability Plan (OAP) pursuant to the August 2014 settlement agreement with Columbia Riverkeepers. The OAP is intended to account for oils and greases used, including the oils and greases used in turbines, wicket gate bearings, and fish-way equipment. This project would improve the ability to consistently and reliably account and monitor leakage of oils through automated systems and greatly increase the timeliness of level monitoring. It would also assist in fulfilling the requirements of the Portland Districts Standing Environmental Policy 200-1, Oil Accountability while significantly reducing the O&M costs to do so. The purpose of this project is to improve accuracy and increase automation of instrumentation to account for oil in oil-filled equipment, bulk storage containers, and high-risk equipment. It is also to aid in the identification of oil leaks as early as possible and fully account for potential leaks.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W9127N26RA004","place_of_performance":{"zip":"97058","city":{"code":"72950","name":"The Dalles"},"state":{"code":"OR","name":"Oregon"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z2JZ"},{"dates":{"posted":"2026-01-05","posted_at":"2026-01-05T18:17:21.540Z","created_at":"2026-01-05T18:16:25.280Z","modified_at":"2026-03-13T04:04:29.084Z","response_deadline":{"raw":"2026-01-15T11:00:00-08:00","utc":"2026-01-15T19:00:00Z","date":"2026-01-15","time":"11:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-28800}},"links":{"sam":"https://sam.gov/workspace/contract/opp/967d1cdf2b61445eb728c50ace6d1a9d/view"},"naics":{"codes":["238210"],"primary":"238210"},"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","agency":{"office":{"code":"W9127N","name":"W071 ENDIST PORTLAND"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"97204-3495","city":"PORTLAND","state":"OR","country":"USA"},"organization_id":"100255230","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-01-30","archive_type":"auto15"},"history":[{"index":23,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T16:26:19.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"b8ae5a29986d407080b14ebc2756e8f9","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":21,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T14:57:22.142Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dbb18e8123a4455e9863b620fd97d958","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":20,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-13T15:15:17.141Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"577a85dc81d240c88353a5c081e28ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":19,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T18:37:35.852Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dc60a3b89cba49f2aad6ddc4d0df2a85","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":18,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:10:39.296Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"25e250999084468cada7173e4b0ac734","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":17,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:08:50.758Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f2a0576f08fd4b5f99bb5c02fa230ccc","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":16,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-12T19:50:24.281Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f65194d512f549f98458954957687399","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":15,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-05T18:17:21.540Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"967d1cdf2b61445eb728c50ace6d1a9d","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":14,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-23T16:21:36.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"489c6926b91048bd8424852a5793ef3f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":13,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:41:58.905Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9a707bc559dc484ba4f1d9082a57c148","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":12,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:38:32.853Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d722de2191e34756b99acb921d6c82db","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":11,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T16:41:58.213Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"79bdd16e09c547b78533ab5498d69a22","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":10,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-11T13:49:23.849Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9f113c8389f0405fb5dbf321b067a990","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":9,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-10T19:20:54.767Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5a29204e7e6c42598a46e4ec51d147df","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":8,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-08T22:22:28.939Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f1ac66ff944a95844754fe2540d2a7","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":7,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T20:54:08.202Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"fd4ac3d8932e46a5b1f840a9c87262da","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":6,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:59:48.906Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b07faed24389484497756d2ee8254ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":5,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:16:01.774Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2137e768ddc646a7b23b47d148a50aec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":4,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-19T00:09:08.134Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ac8c60611de24fd896b7bbc6c59b9301","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":3,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-18T13:46:40.606Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c7437bf0ed5a4e748e01f5b0d05af9ec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":2,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-17T13:49:49.868Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"58cec72778274b4cbfb6dc74e4eddf0f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":1,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-14T17:05:44.191Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"912dfe4e86c742e48049d734ba305a4d","solicitation_number":"W9127N26RA004"}],"contacts":[{"name":"Andrew Sprys","role":"primary","email":"andrew.j.sprys@usace.army.mil"},{"name":"Cory Pfenning","role":"secondary","email":"cory.r.pfenning@usace.army.mil"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"967d1cdf2b61445eb728c50ace6d1a9d","lineage_id":"912dfe4e86c742e48049d734ba305a4d","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-17T03:26:45.428644377Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T16:22:53.920682Z","row_sha256":"d1936f487f9da917e1a1f339379ec8cea280ec98d003301b0c4e08ee945d3010","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-17T03:26:45.428644377Z","first_seen_at":"2026-09-16T16:22:53.920682Z"},"description":{"html":"<p>18 November 2025:&nbsp; The solicitation drawings and the reference drawings (13 total drawing files) are attached.&nbsp;&nbsp;</p>\n\n<p><strong>SYNOPSIS</strong></p>\n\n<p>The U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for The Dalles Dam Oil Accountability Measures in the Dalles, Oregon. The proposed project will be a competitive, firm-fixed price (FFP) contract.</p>\n\n<p></p>\n\n<p><strong>Background:</strong> The Dalles Dam is located in The Dalles, Oregon. The Dalles Dam (TDA) is a concrete gravity run-of-the-river dam spanning the Columbia River, two miles east of the city of The Dalles, Oregon, United States. It joins Wasco County Oregon, with Klickitat County Washington, 300 miles upriver from the mouth of the Columbia River near Astoria, Oregon. The project is designed to improve the monitoring of the amount of oil that could be released into the Columbia River. Its main objective is to minimize the oil release.</p>\n\n<p></p>\n\n<p><strong>Purpose:</strong> There are approximately 400,000 gallons of oil at the TDA powerhouse. Oil monitoring measures currently consist primarily of visual observations of sight glasses, observations of oil leaks on and around equipment, and purchase and disposal records of lubricants. The Federal Government agreed to develop and apply an Oil Accountability Plan (OAP) pursuant to the August 2014 settlement agreement with Columbia Riverkeepers.&nbsp; The OAP is intended to account for oils and greases used, including the oils and greases used in turbines, wicket gate bearings, and fish-way equipment. This project would improve the ability to consistently and reliably account and monitor leakage of oils through automated systems and greatly increase the timeliness of level monitoring. It would also assist in fulfilling the requirements of the Portland Districts Standing Environmental Policy 200-1, Oil Accountability while significantly reducing the O&amp;M costs to do so. The purpose of this project is to improve accuracy and increase automation of instrumentation to account for oil in oil-filled equipment, bulk storage containers, and high-risk equipment. It is also to aid in the identification of oil leaks as early as possible and fully account for potential leaks.</p>","text":"18 November 2025: The solicitation drawings and the reference drawings (13 total drawing files) are attached.\n\nSYNOPSIS\n\nThe U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for The Dalles Dam Oil Accountability Measures in the Dalles, Oregon. The proposed project will be a competitive, firm-fixed price (FFP) contract.\n\nBackground: The Dalles Dam is located in The Dalles, Oregon. The Dalles Dam (TDA) is a concrete gravity run-of-the-river dam spanning the Columbia River, two miles east of the city of The Dalles, Oregon, United States. It joins Wasco County Oregon, with Klickitat County Washington, 300 miles upriver from the mouth of the Columbia River near Astoria, Oregon. The project is designed to improve the monitoring of the amount of oil that could be released into the Columbia River. Its main objective is to minimize the oil release.\n\nPurpose: There are approximately 400,000 gallons of oil at the TDA powerhouse. Oil monitoring measures currently consist primarily of visual observations of sight glasses, observations of oil leaks on and around equipment, and purchase and disposal records of lubricants. The Federal Government agreed to develop and apply an Oil Accountability Plan (OAP) pursuant to the August 2014 settlement agreement with Columbia Riverkeepers. The OAP is intended to account for oils and greases used, including the oils and greases used in turbines, wicket gate bearings, and fish-way equipment. This project would improve the ability to consistently and reliably account and monitor leakage of oils through automated systems and greatly increase the timeliness of level monitoring. It would also assist in fulfilling the requirements of the Portland Districts Standing Environmental Policy 200-1, Oil Accountability while significantly reducing the O&M costs to do so. The purpose of this project is to improve accuracy and increase automation of instrumentation to account for oil in oil-filled equipment, bulk storage containers, and high-risk equipment. It is also to aid in the identification of oil leaks as early as possible and fully account for potential leaks.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W9127N26RA004","place_of_performance":{"zip":"97058","city":{"code":"72950","name":"The Dalles"},"state":{"code":"OR","name":"Oregon"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z2JZ"},{"dates":{"posted":"2026-01-12","posted_at":"2026-01-12T19:50:24.281Z","created_at":"2026-01-12T19:49:06.291Z","modified_at":"2026-03-13T04:04:29.084Z","response_deadline":{"raw":"2026-01-28T11:00:00-08:00","utc":"2026-01-28T19:00:00Z","date":"2026-01-28","time":"11:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-28800}},"links":{"sam":"https://sam.gov/workspace/contract/opp/f65194d512f549f98458954957687399/view"},"naics":{"codes":["238210"],"primary":"238210"},"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","agency":{"office":{"code":"W9127N","name":"W071 ENDIST PORTLAND"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"97204-3495","city":"PORTLAND","state":"OR","country":"USA"},"organization_id":"100255230","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-02-12","archive_type":"auto15"},"history":[{"index":23,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T16:26:19.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"b8ae5a29986d407080b14ebc2756e8f9","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":21,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T14:57:22.142Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dbb18e8123a4455e9863b620fd97d958","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":20,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-13T15:15:17.141Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"577a85dc81d240c88353a5c081e28ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":19,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T18:37:35.852Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dc60a3b89cba49f2aad6ddc4d0df2a85","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":18,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:10:39.296Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"25e250999084468cada7173e4b0ac734","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":17,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:08:50.758Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f2a0576f08fd4b5f99bb5c02fa230ccc","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":16,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-12T19:50:24.281Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f65194d512f549f98458954957687399","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":15,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-05T18:17:21.540Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"967d1cdf2b61445eb728c50ace6d1a9d","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":14,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-23T16:21:36.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"489c6926b91048bd8424852a5793ef3f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":13,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:41:58.905Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9a707bc559dc484ba4f1d9082a57c148","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":12,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:38:32.853Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d722de2191e34756b99acb921d6c82db","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":11,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T16:41:58.213Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"79bdd16e09c547b78533ab5498d69a22","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":10,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-11T13:49:23.849Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9f113c8389f0405fb5dbf321b067a990","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":9,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-10T19:20:54.767Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5a29204e7e6c42598a46e4ec51d147df","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":8,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-08T22:22:28.939Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f1ac66ff944a95844754fe2540d2a7","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":7,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T20:54:08.202Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"fd4ac3d8932e46a5b1f840a9c87262da","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":6,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:59:48.906Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b07faed24389484497756d2ee8254ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":5,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:16:01.774Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2137e768ddc646a7b23b47d148a50aec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":4,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-19T00:09:08.134Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ac8c60611de24fd896b7bbc6c59b9301","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":3,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-18T13:46:40.606Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c7437bf0ed5a4e748e01f5b0d05af9ec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":2,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-17T13:49:49.868Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"58cec72778274b4cbfb6dc74e4eddf0f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":1,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-14T17:05:44.191Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"912dfe4e86c742e48049d734ba305a4d","solicitation_number":"W9127N26RA004"}],"contacts":[{"name":"Andrew Sprys","role":"primary","email":"andrew.j.sprys@usace.army.mil"},{"name":"Cory Pfenning","role":"secondary","email":"cory.r.pfenning@usace.army.mil"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"f65194d512f549f98458954957687399","lineage_id":"912dfe4e86c742e48049d734ba305a4d","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-16T04:44:13.662561469Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T16:22:53.920682Z","row_sha256":"859202b599be4a3f3d36463dba25d838999baa99b40590c0cb1617a8684256d7","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-16T04:44:13.662561469Z","first_seen_at":"2026-09-16T16:22:53.920682Z"},"description":{"html":"<p>18 November 2025:&nbsp; The solicitation drawings and the reference drawings (13 total drawing files) are attached.&nbsp;&nbsp;</p>\n\n<p><strong>SYNOPSIS</strong></p>\n\n<p>The U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for The Dalles Dam Oil Accountability Measures in the Dalles, Oregon. The proposed project will be a competitive, firm-fixed price (FFP) contract.</p>\n\n<p></p>\n\n<p><strong>Background:</strong> The Dalles Dam is located in The Dalles, Oregon. The Dalles Dam (TDA) is a concrete gravity run-of-the-river dam spanning the Columbia River, two miles east of the city of The Dalles, Oregon, United States. It joins Wasco County Oregon, with Klickitat County Washington, 300 miles upriver from the mouth of the Columbia River near Astoria, Oregon. The project is designed to improve the monitoring of the amount of oil that could be released into the Columbia River. Its main objective is to minimize the oil release.</p>\n\n<p></p>\n\n<p><strong>Purpose:</strong> There are approximately 400,000 gallons of oil at the TDA powerhouse. Oil monitoring measures currently consist primarily of visual observations of sight glasses, observations of oil leaks on and around equipment, and purchase and disposal records of lubricants. The Federal Government agreed to develop and apply an Oil Accountability Plan (OAP) pursuant to the August 2014 settlement agreement with Columbia Riverkeepers.&nbsp; The OAP is intended to account for oils and greases used, including the oils and greases used in turbines, wicket gate bearings, and fish-way equipment. This project would improve the ability to consistently and reliably account and monitor leakage of oils through automated systems and greatly increase the timeliness of level monitoring. It would also assist in fulfilling the requirements of the Portland Districts Standing Environmental Policy 200-1, Oil Accountability while significantly reducing the O&amp;M costs to do so. The purpose of this project is to improve accuracy and increase automation of instrumentation to account for oil in oil-filled equipment, bulk storage containers, and high-risk equipment. It is also to aid in the identification of oil leaks as early as possible and fully account for potential leaks.</p>","text":"18 November 2025: The solicitation drawings and the reference drawings (13 total drawing files) are attached.\n\nSYNOPSIS\n\nThe U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for The Dalles Dam Oil Accountability Measures in the Dalles, Oregon. The proposed project will be a competitive, firm-fixed price (FFP) contract.\n\nBackground: The Dalles Dam is located in The Dalles, Oregon. The Dalles Dam (TDA) is a concrete gravity run-of-the-river dam spanning the Columbia River, two miles east of the city of The Dalles, Oregon, United States. It joins Wasco County Oregon, with Klickitat County Washington, 300 miles upriver from the mouth of the Columbia River near Astoria, Oregon. The project is designed to improve the monitoring of the amount of oil that could be released into the Columbia River. Its main objective is to minimize the oil release.\n\nPurpose: There are approximately 400,000 gallons of oil at the TDA powerhouse. Oil monitoring measures currently consist primarily of visual observations of sight glasses, observations of oil leaks on and around equipment, and purchase and disposal records of lubricants. The Federal Government agreed to develop and apply an Oil Accountability Plan (OAP) pursuant to the August 2014 settlement agreement with Columbia Riverkeepers. The OAP is intended to account for oils and greases used, including the oils and greases used in turbines, wicket gate bearings, and fish-way equipment. This project would improve the ability to consistently and reliably account and monitor leakage of oils through automated systems and greatly increase the timeliness of level monitoring. It would also assist in fulfilling the requirements of the Portland Districts Standing Environmental Policy 200-1, Oil Accountability while significantly reducing the O&M costs to do so. The purpose of this project is to improve accuracy and increase automation of instrumentation to account for oil in oil-filled equipment, bulk storage containers, and high-risk equipment. It is also to aid in the identification of oil leaks as early as possible and fully account for potential leaks.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W9127N26RA004","place_of_performance":{"zip":"97058","city":{"code":"72950","name":"The Dalles"},"state":{"code":"OR","name":"Oregon"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z2JZ"},{"dates":{"posted":"2026-01-27","posted_at":"2026-01-27T15:10:39.296Z","created_at":"2026-01-27T15:10:21.956Z","modified_at":"2026-03-13T04:04:29.084Z","response_deadline":{"raw":"2026-02-26T11:00:00-08:00","utc":"2026-02-26T19:00:00Z","date":"2026-02-26","time":"11:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-28800}},"links":{"sam":"https://sam.gov/workspace/contract/opp/25e250999084468cada7173e4b0ac734/view"},"naics":{"codes":["238210"],"primary":"238210"},"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","agency":{"office":{"code":"W9127N","name":"W071 ENDIST PORTLAND"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"97204-3495","city":"PORTLAND","state":"OR","country":"USA"},"organization_id":"100255230","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-03-13","archive_type":"auto15"},"history":[{"index":23,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T16:26:19.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"b8ae5a29986d407080b14ebc2756e8f9","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":21,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T14:57:22.142Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dbb18e8123a4455e9863b620fd97d958","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":20,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-13T15:15:17.141Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"577a85dc81d240c88353a5c081e28ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":19,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T18:37:35.852Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dc60a3b89cba49f2aad6ddc4d0df2a85","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":18,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:10:39.296Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"25e250999084468cada7173e4b0ac734","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":17,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:08:50.758Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f2a0576f08fd4b5f99bb5c02fa230ccc","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":16,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-12T19:50:24.281Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f65194d512f549f98458954957687399","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":15,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-05T18:17:21.540Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"967d1cdf2b61445eb728c50ace6d1a9d","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":14,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-23T16:21:36.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"489c6926b91048bd8424852a5793ef3f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":13,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:41:58.905Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9a707bc559dc484ba4f1d9082a57c148","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":12,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:38:32.853Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d722de2191e34756b99acb921d6c82db","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":11,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T16:41:58.213Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"79bdd16e09c547b78533ab5498d69a22","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":10,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-11T13:49:23.849Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9f113c8389f0405fb5dbf321b067a990","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":9,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-10T19:20:54.767Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5a29204e7e6c42598a46e4ec51d147df","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":8,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-08T22:22:28.939Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f1ac66ff944a95844754fe2540d2a7","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":7,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T20:54:08.202Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"fd4ac3d8932e46a5b1f840a9c87262da","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":6,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:59:48.906Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b07faed24389484497756d2ee8254ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":5,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:16:01.774Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2137e768ddc646a7b23b47d148a50aec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":4,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-19T00:09:08.134Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ac8c60611de24fd896b7bbc6c59b9301","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":3,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-18T13:46:40.606Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c7437bf0ed5a4e748e01f5b0d05af9ec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":2,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-17T13:49:49.868Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"58cec72778274b4cbfb6dc74e4eddf0f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":1,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-14T17:05:44.191Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"912dfe4e86c742e48049d734ba305a4d","solicitation_number":"W9127N26RA004"}],"contacts":[{"name":"Andrew Sprys","role":"primary","email":"andrew.j.sprys@usace.army.mil"},{"name":"Cory Pfenning","role":"secondary","email":"cory.r.pfenning@usace.army.mil"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"25e250999084468cada7173e4b0ac734","lineage_id":"912dfe4e86c742e48049d734ba305a4d","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-14T11:37:22.911954435Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T16:22:53.920682Z","row_sha256":"b8c7977f6a90c202bd01f5d06abfcac897bc5ea12501ea5989211b931285b930","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-14T11:37:22.911954435Z","first_seen_at":"2026-09-16T16:22:53.920682Z"},"description":{"html":"<p>18 November 2025:&nbsp; The solicitation drawings and the reference drawings (13 total drawing files) are attached.&nbsp;&nbsp;</p>\n\n<p><strong>SYNOPSIS</strong></p>\n\n<p>The U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for The Dalles Dam Oil Accountability Measures in the Dalles, Oregon. The proposed project will be a competitive, firm-fixed price (FFP) contract.</p>\n\n<p></p>\n\n<p><strong>Background:</strong> The Dalles Dam is located in The Dalles, Oregon. The Dalles Dam (TDA) is a concrete gravity run-of-the-river dam spanning the Columbia River, two miles east of the city of The Dalles, Oregon, United States. It joins Wasco County Oregon, with Klickitat County Washington, 300 miles upriver from the mouth of the Columbia River near Astoria, Oregon. The project is designed to improve the monitoring of the amount of oil that could be released into the Columbia River. Its main objective is to minimize the oil release.</p>\n\n<p></p>\n\n<p><strong>Purpose:</strong> There are approximately 400,000 gallons of oil at the TDA powerhouse. Oil monitoring measures currently consist primarily of visual observations of sight glasses, observations of oil leaks on and around equipment, and purchase and disposal records of lubricants. The Federal Government agreed to develop and apply an Oil Accountability Plan (OAP) pursuant to the August 2014 settlement agreement with Columbia Riverkeepers.&nbsp; The OAP is intended to account for oils and greases used, including the oils and greases used in turbines, wicket gate bearings, and fish-way equipment. This project would improve the ability to consistently and reliably account and monitor leakage of oils through automated systems and greatly increase the timeliness of level monitoring. It would also assist in fulfilling the requirements of the Portland Districts Standing Environmental Policy 200-1, Oil Accountability while significantly reducing the O&amp;M costs to do so. The purpose of this project is to improve accuracy and increase automation of instrumentation to account for oil in oil-filled equipment, bulk storage containers, and high-risk equipment. It is also to aid in the identification of oil leaks as early as possible and fully account for potential leaks.</p>","text":"18 November 2025: The solicitation drawings and the reference drawings (13 total drawing files) are attached.\n\nSYNOPSIS\n\nThe U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for The Dalles Dam Oil Accountability Measures in the Dalles, Oregon. The proposed project will be a competitive, firm-fixed price (FFP) contract.\n\nBackground: The Dalles Dam is located in The Dalles, Oregon. The Dalles Dam (TDA) is a concrete gravity run-of-the-river dam spanning the Columbia River, two miles east of the city of The Dalles, Oregon, United States. It joins Wasco County Oregon, with Klickitat County Washington, 300 miles upriver from the mouth of the Columbia River near Astoria, Oregon. The project is designed to improve the monitoring of the amount of oil that could be released into the Columbia River. Its main objective is to minimize the oil release.\n\nPurpose: There are approximately 400,000 gallons of oil at the TDA powerhouse. Oil monitoring measures currently consist primarily of visual observations of sight glasses, observations of oil leaks on and around equipment, and purchase and disposal records of lubricants. The Federal Government agreed to develop and apply an Oil Accountability Plan (OAP) pursuant to the August 2014 settlement agreement with Columbia Riverkeepers. The OAP is intended to account for oils and greases used, including the oils and greases used in turbines, wicket gate bearings, and fish-way equipment. This project would improve the ability to consistently and reliably account and monitor leakage of oils through automated systems and greatly increase the timeliness of level monitoring. It would also assist in fulfilling the requirements of the Portland Districts Standing Environmental Policy 200-1, Oil Accountability while significantly reducing the O&M costs to do so. The purpose of this project is to improve accuracy and increase automation of instrumentation to account for oil in oil-filled equipment, bulk storage containers, and high-risk equipment. It is also to aid in the identification of oil leaks as early as possible and fully account for potential leaks.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W9127N26RA004","place_of_performance":{"zip":"97058","city":{"code":"72950","name":"The Dalles"},"state":{"code":"OR","name":"Oregon"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z2JZ"},{"dates":{"posted":"2026-01-27","posted_at":"2026-01-27T18:37:35.852Z","created_at":"2026-01-27T18:35:29.752Z","modified_at":"2026-03-13T04:04:29.084Z","response_deadline":{"raw":"2026-02-26T11:00:00-08:00","utc":"2026-02-26T19:00:00Z","date":"2026-02-26","time":"11:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-28800}},"links":{"sam":"https://sam.gov/workspace/contract/opp/dc60a3b89cba49f2aad6ddc4d0df2a85/view"},"naics":{"codes":["238210"],"primary":"238210"},"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","agency":{"office":{"code":"W9127N","name":"W071 ENDIST PORTLAND"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"97204-3495","city":"PORTLAND","state":"OR","country":"USA"},"organization_id":"100255230","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-03-13","archive_type":"auto15"},"history":[{"index":23,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T16:26:19.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"b8ae5a29986d407080b14ebc2756e8f9","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":21,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T14:57:22.142Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dbb18e8123a4455e9863b620fd97d958","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":20,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-13T15:15:17.141Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"577a85dc81d240c88353a5c081e28ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":19,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T18:37:35.852Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dc60a3b89cba49f2aad6ddc4d0df2a85","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":18,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:10:39.296Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"25e250999084468cada7173e4b0ac734","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":17,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:08:50.758Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f2a0576f08fd4b5f99bb5c02fa230ccc","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":16,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-12T19:50:24.281Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f65194d512f549f98458954957687399","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":15,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-05T18:17:21.540Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"967d1cdf2b61445eb728c50ace6d1a9d","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":14,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-23T16:21:36.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"489c6926b91048bd8424852a5793ef3f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":13,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:41:58.905Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9a707bc559dc484ba4f1d9082a57c148","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":12,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:38:32.853Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d722de2191e34756b99acb921d6c82db","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":11,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T16:41:58.213Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"79bdd16e09c547b78533ab5498d69a22","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":10,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-11T13:49:23.849Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9f113c8389f0405fb5dbf321b067a990","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":9,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-10T19:20:54.767Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5a29204e7e6c42598a46e4ec51d147df","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":8,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-08T22:22:28.939Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f1ac66ff944a95844754fe2540d2a7","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":7,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T20:54:08.202Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"fd4ac3d8932e46a5b1f840a9c87262da","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":6,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:59:48.906Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b07faed24389484497756d2ee8254ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":5,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:16:01.774Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2137e768ddc646a7b23b47d148a50aec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":4,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-19T00:09:08.134Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ac8c60611de24fd896b7bbc6c59b9301","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":3,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-18T13:46:40.606Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c7437bf0ed5a4e748e01f5b0d05af9ec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":2,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-17T13:49:49.868Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"58cec72778274b4cbfb6dc74e4eddf0f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":1,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-14T17:05:44.191Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"912dfe4e86c742e48049d734ba305a4d","solicitation_number":"W9127N26RA004"}],"contacts":[{"name":"Andrew Sprys","role":"primary","email":"andrew.j.sprys@usace.army.mil"},{"name":"Cory Pfenning","role":"secondary","email":"cory.r.pfenning@usace.army.mil"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"dc60a3b89cba49f2aad6ddc4d0df2a85","lineage_id":"912dfe4e86c742e48049d734ba305a4d","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-14T12:18:37.304867455Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T16:22:53.920682Z","row_sha256":"ff2c84484faa5dd55abd7c0029645e596cd2143e5f74f731086eccc9c6f5a653","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-14T12:18:37.304867455Z","first_seen_at":"2026-09-16T16:22:53.920682Z"},"description":{"html":"<p>18 November 2025:&nbsp; The solicitation drawings and the reference drawings (13 total drawing files) are attached.&nbsp;&nbsp;</p>\n\n<p><strong>SYNOPSIS</strong></p>\n\n<p>The U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for The Dalles Dam Oil Accountability Measures in the Dalles, Oregon. The proposed project will be a competitive, firm-fixed price (FFP) contract.</p>\n\n<p></p>\n\n<p><strong>Background:</strong> The Dalles Dam is located in The Dalles, Oregon. The Dalles Dam (TDA) is a concrete gravity run-of-the-river dam spanning the Columbia River, two miles east of the city of The Dalles, Oregon, United States. It joins Wasco County Oregon, with Klickitat County Washington, 300 miles upriver from the mouth of the Columbia River near Astoria, Oregon. The project is designed to improve the monitoring of the amount of oil that could be released into the Columbia River. Its main objective is to minimize the oil release.</p>\n\n<p></p>\n\n<p><strong>Purpose:</strong> There are approximately 400,000 gallons of oil at the TDA powerhouse. Oil monitoring measures currently consist primarily of visual observations of sight glasses, observations of oil leaks on and around equipment, and purchase and disposal records of lubricants. The Federal Government agreed to develop and apply an Oil Accountability Plan (OAP) pursuant to the August 2014 settlement agreement with Columbia Riverkeepers.&nbsp; The OAP is intended to account for oils and greases used, including the oils and greases used in turbines, wicket gate bearings, and fish-way equipment. This project would improve the ability to consistently and reliably account and monitor leakage of oils through automated systems and greatly increase the timeliness of level monitoring. It would also assist in fulfilling the requirements of the Portland Districts Standing Environmental Policy 200-1, Oil Accountability while significantly reducing the O&amp;M costs to do so. The purpose of this project is to improve accuracy and increase automation of instrumentation to account for oil in oil-filled equipment, bulk storage containers, and high-risk equipment. It is also to aid in the identification of oil leaks as early as possible and fully account for potential leaks.</p>","text":"18 November 2025: The solicitation drawings and the reference drawings (13 total drawing files) are attached.\n\nSYNOPSIS\n\nThe U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for The Dalles Dam Oil Accountability Measures in the Dalles, Oregon. The proposed project will be a competitive, firm-fixed price (FFP) contract.\n\nBackground: The Dalles Dam is located in The Dalles, Oregon. The Dalles Dam (TDA) is a concrete gravity run-of-the-river dam spanning the Columbia River, two miles east of the city of The Dalles, Oregon, United States. It joins Wasco County Oregon, with Klickitat County Washington, 300 miles upriver from the mouth of the Columbia River near Astoria, Oregon. The project is designed to improve the monitoring of the amount of oil that could be released into the Columbia River. Its main objective is to minimize the oil release.\n\nPurpose: There are approximately 400,000 gallons of oil at the TDA powerhouse. Oil monitoring measures currently consist primarily of visual observations of sight glasses, observations of oil leaks on and around equipment, and purchase and disposal records of lubricants. The Federal Government agreed to develop and apply an Oil Accountability Plan (OAP) pursuant to the August 2014 settlement agreement with Columbia Riverkeepers. The OAP is intended to account for oils and greases used, including the oils and greases used in turbines, wicket gate bearings, and fish-way equipment. This project would improve the ability to consistently and reliably account and monitor leakage of oils through automated systems and greatly increase the timeliness of level monitoring. It would also assist in fulfilling the requirements of the Portland Districts Standing Environmental Policy 200-1, Oil Accountability while significantly reducing the O&M costs to do so. The purpose of this project is to improve accuracy and increase automation of instrumentation to account for oil in oil-filled equipment, bulk storage containers, and high-risk equipment. It is also to aid in the identification of oil leaks as early as possible and fully account for potential leaks.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W9127N26RA004","place_of_performance":{"zip":"97058","city":{"code":"72950","name":"The Dalles"},"state":{"code":"OR","name":"Oregon"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z2JZ"},{"dates":{"posted":"2026-01-27","posted_at":"2026-01-27T15:08:50.758Z","created_at":"2026-01-27T15:07:51.676Z","modified_at":"2026-03-13T04:04:29.084Z","response_deadline":{"raw":"2026-01-28T11:00:00-08:00","utc":"2026-01-28T19:00:00Z","date":"2026-01-28","time":"11:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-28800}},"links":{"sam":"https://sam.gov/workspace/contract/opp/f2a0576f08fd4b5f99bb5c02fa230ccc/view"},"naics":{"codes":["238210"],"primary":"238210"},"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","agency":{"office":{"code":"W9127N","name":"W071 ENDIST PORTLAND"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"97204-3495","city":"PORTLAND","state":"OR","country":"USA"},"organization_id":"100255230","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-02-12","archive_type":"auto15"},"history":[{"index":23,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T16:26:19.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"b8ae5a29986d407080b14ebc2756e8f9","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":21,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T14:57:22.142Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dbb18e8123a4455e9863b620fd97d958","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":20,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-13T15:15:17.141Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"577a85dc81d240c88353a5c081e28ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":19,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T18:37:35.852Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dc60a3b89cba49f2aad6ddc4d0df2a85","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":18,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:10:39.296Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"25e250999084468cada7173e4b0ac734","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":17,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:08:50.758Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f2a0576f08fd4b5f99bb5c02fa230ccc","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":16,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-12T19:50:24.281Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f65194d512f549f98458954957687399","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":15,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-05T18:17:21.540Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"967d1cdf2b61445eb728c50ace6d1a9d","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":14,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-23T16:21:36.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"489c6926b91048bd8424852a5793ef3f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":13,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:41:58.905Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9a707bc559dc484ba4f1d9082a57c148","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":12,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:38:32.853Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d722de2191e34756b99acb921d6c82db","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":11,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T16:41:58.213Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"79bdd16e09c547b78533ab5498d69a22","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":10,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-11T13:49:23.849Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9f113c8389f0405fb5dbf321b067a990","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":9,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-10T19:20:54.767Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5a29204e7e6c42598a46e4ec51d147df","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":8,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-08T22:22:28.939Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f1ac66ff944a95844754fe2540d2a7","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":7,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T20:54:08.202Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"fd4ac3d8932e46a5b1f840a9c87262da","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":6,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:59:48.906Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b07faed24389484497756d2ee8254ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":5,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:16:01.774Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2137e768ddc646a7b23b47d148a50aec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":4,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-19T00:09:08.134Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ac8c60611de24fd896b7bbc6c59b9301","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":3,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-18T13:46:40.606Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c7437bf0ed5a4e748e01f5b0d05af9ec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":2,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-17T13:49:49.868Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"58cec72778274b4cbfb6dc74e4eddf0f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":1,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-14T17:05:44.191Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"912dfe4e86c742e48049d734ba305a4d","solicitation_number":"W9127N26RA004"}],"contacts":[{"name":"Andrew Sprys","role":"primary","email":"andrew.j.sprys@usace.army.mil"},{"name":"Cory Pfenning","role":"secondary","email":"cory.r.pfenning@usace.army.mil"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"f2a0576f08fd4b5f99bb5c02fa230ccc","lineage_id":"912dfe4e86c742e48049d734ba305a4d","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-14T12:26:58.333965267Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T16:22:53.920682Z","row_sha256":"7a4a28f6caccd816f558e6bbc54b1896bc62b4a4f1e88c71a1694e5c872b81c6","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-14T12:26:58.333965267Z","first_seen_at":"2026-09-16T16:22:53.920682Z"},"description":{"html":"<p>18 November 2025:&nbsp; The solicitation drawings and the reference drawings (13 total drawing files) are attached.&nbsp;&nbsp;</p>\n\n<p><strong>SYNOPSIS</strong></p>\n\n<p>The U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for The Dalles Dam Oil Accountability Measures in the Dalles, Oregon. The proposed project will be a competitive, firm-fixed price (FFP) contract.</p>\n\n<p></p>\n\n<p><strong>Background:</strong> The Dalles Dam is located in The Dalles, Oregon. The Dalles Dam (TDA) is a concrete gravity run-of-the-river dam spanning the Columbia River, two miles east of the city of The Dalles, Oregon, United States. It joins Wasco County Oregon, with Klickitat County Washington, 300 miles upriver from the mouth of the Columbia River near Astoria, Oregon. The project is designed to improve the monitoring of the amount of oil that could be released into the Columbia River. Its main objective is to minimize the oil release.</p>\n\n<p></p>\n\n<p><strong>Purpose:</strong> There are approximately 400,000 gallons of oil at the TDA powerhouse. Oil monitoring measures currently consist primarily of visual observations of sight glasses, observations of oil leaks on and around equipment, and purchase and disposal records of lubricants. The Federal Government agreed to develop and apply an Oil Accountability Plan (OAP) pursuant to the August 2014 settlement agreement with Columbia Riverkeepers.&nbsp; The OAP is intended to account for oils and greases used, including the oils and greases used in turbines, wicket gate bearings, and fish-way equipment. This project would improve the ability to consistently and reliably account and monitor leakage of oils through automated systems and greatly increase the timeliness of level monitoring. It would also assist in fulfilling the requirements of the Portland Districts Standing Environmental Policy 200-1, Oil Accountability while significantly reducing the O&amp;M costs to do so. The purpose of this project is to improve accuracy and increase automation of instrumentation to account for oil in oil-filled equipment, bulk storage containers, and high-risk equipment. It is also to aid in the identification of oil leaks as early as possible and fully account for potential leaks.</p>","text":"18 November 2025: The solicitation drawings and the reference drawings (13 total drawing files) are attached.\n\nSYNOPSIS\n\nThe U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for The Dalles Dam Oil Accountability Measures in the Dalles, Oregon. The proposed project will be a competitive, firm-fixed price (FFP) contract.\n\nBackground: The Dalles Dam is located in The Dalles, Oregon. The Dalles Dam (TDA) is a concrete gravity run-of-the-river dam spanning the Columbia River, two miles east of the city of The Dalles, Oregon, United States. It joins Wasco County Oregon, with Klickitat County Washington, 300 miles upriver from the mouth of the Columbia River near Astoria, Oregon. The project is designed to improve the monitoring of the amount of oil that could be released into the Columbia River. Its main objective is to minimize the oil release.\n\nPurpose: There are approximately 400,000 gallons of oil at the TDA powerhouse. Oil monitoring measures currently consist primarily of visual observations of sight glasses, observations of oil leaks on and around equipment, and purchase and disposal records of lubricants. The Federal Government agreed to develop and apply an Oil Accountability Plan (OAP) pursuant to the August 2014 settlement agreement with Columbia Riverkeepers. The OAP is intended to account for oils and greases used, including the oils and greases used in turbines, wicket gate bearings, and fish-way equipment. This project would improve the ability to consistently and reliably account and monitor leakage of oils through automated systems and greatly increase the timeliness of level monitoring. It would also assist in fulfilling the requirements of the Portland Districts Standing Environmental Policy 200-1, Oil Accountability while significantly reducing the O&M costs to do so. The purpose of this project is to improve accuracy and increase automation of instrumentation to account for oil in oil-filled equipment, bulk storage containers, and high-risk equipment. It is also to aid in the identification of oil leaks as early as possible and fully account for potential leaks.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W9127N26RA004","place_of_performance":{"zip":"97058","city":{"code":"72950","name":"The Dalles"},"state":{"code":"OR","name":"Oregon"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z2JZ"},{"dates":{"posted":"2026-02-13","posted_at":"2026-02-13T15:15:17.141Z","created_at":"2026-02-13T15:14:03.196Z","modified_at":"2026-03-13T04:04:29.084Z","response_deadline":{"raw":"2026-02-26T11:00:00-08:00","utc":"2026-02-26T19:00:00Z","date":"2026-02-26","time":"11:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-28800}},"links":{"sam":"https://sam.gov/workspace/contract/opp/577a85dc81d240c88353a5c081e28ad5/view"},"naics":{"codes":["238210"],"primary":"238210"},"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","agency":{"office":{"code":"W9127N","name":"W071 ENDIST PORTLAND"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"97204-3495","city":"PORTLAND","state":"OR","country":"USA"},"organization_id":"100255230","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-03-13","archive_type":"auto15"},"history":[{"index":23,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T16:26:19.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"b8ae5a29986d407080b14ebc2756e8f9","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":21,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T14:57:22.142Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dbb18e8123a4455e9863b620fd97d958","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":20,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-13T15:15:17.141Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"577a85dc81d240c88353a5c081e28ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":19,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T18:37:35.852Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dc60a3b89cba49f2aad6ddc4d0df2a85","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":18,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:10:39.296Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"25e250999084468cada7173e4b0ac734","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":17,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:08:50.758Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f2a0576f08fd4b5f99bb5c02fa230ccc","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":16,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-12T19:50:24.281Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f65194d512f549f98458954957687399","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":15,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-05T18:17:21.540Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"967d1cdf2b61445eb728c50ace6d1a9d","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":14,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-23T16:21:36.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"489c6926b91048bd8424852a5793ef3f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":13,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:41:58.905Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9a707bc559dc484ba4f1d9082a57c148","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":12,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:38:32.853Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d722de2191e34756b99acb921d6c82db","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":11,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T16:41:58.213Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"79bdd16e09c547b78533ab5498d69a22","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":10,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-11T13:49:23.849Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9f113c8389f0405fb5dbf321b067a990","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":9,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-10T19:20:54.767Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5a29204e7e6c42598a46e4ec51d147df","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":8,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-08T22:22:28.939Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f1ac66ff944a95844754fe2540d2a7","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":7,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T20:54:08.202Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"fd4ac3d8932e46a5b1f840a9c87262da","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":6,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:59:48.906Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b07faed24389484497756d2ee8254ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":5,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:16:01.774Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2137e768ddc646a7b23b47d148a50aec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":4,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-19T00:09:08.134Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ac8c60611de24fd896b7bbc6c59b9301","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":3,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-18T13:46:40.606Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c7437bf0ed5a4e748e01f5b0d05af9ec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":2,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-17T13:49:49.868Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"58cec72778274b4cbfb6dc74e4eddf0f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":1,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-14T17:05:44.191Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"912dfe4e86c742e48049d734ba305a4d","solicitation_number":"W9127N26RA004"}],"contacts":[{"name":"Andrew Sprys","role":"primary","email":"andrew.j.sprys@usace.army.mil"},{"name":"Cory Pfenning","role":"secondary","email":"cory.r.pfenning@usace.army.mil"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"577a85dc81d240c88353a5c081e28ad5","lineage_id":"912dfe4e86c742e48049d734ba305a4d","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-13T02:00:55.144694656Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T16:22:53.920682Z","row_sha256":"68947d7a053fb71c5b72181be0d4ec83014f674ae78ff2e90b37156db0fcb874","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-13T02:00:55.144694656Z","first_seen_at":"2026-09-16T16:22:53.920682Z"},"description":{"html":"<p>18 November 2025:&nbsp; The solicitation drawings and the reference drawings (13 total drawing files) are attached.&nbsp;&nbsp;</p>\n\n<p><strong>SYNOPSIS</strong></p>\n\n<p>The U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for The Dalles Dam Oil Accountability Measures in the Dalles, Oregon. The proposed project will be a competitive, firm-fixed price (FFP) contract.</p>\n\n<p></p>\n\n<p><strong>Background:</strong> The Dalles Dam is located in The Dalles, Oregon. The Dalles Dam (TDA) is a concrete gravity run-of-the-river dam spanning the Columbia River, two miles east of the city of The Dalles, Oregon, United States. It joins Wasco County Oregon, with Klickitat County Washington, 300 miles upriver from the mouth of the Columbia River near Astoria, Oregon. The project is designed to improve the monitoring of the amount of oil that could be released into the Columbia River. Its main objective is to minimize the oil release.</p>\n\n<p></p>\n\n<p><strong>Purpose:</strong> There are approximately 400,000 gallons of oil at the TDA powerhouse. Oil monitoring measures currently consist primarily of visual observations of sight glasses, observations of oil leaks on and around equipment, and purchase and disposal records of lubricants. The Federal Government agreed to develop and apply an Oil Accountability Plan (OAP) pursuant to the August 2014 settlement agreement with Columbia Riverkeepers.&nbsp; The OAP is intended to account for oils and greases used, including the oils and greases used in turbines, wicket gate bearings, and fish-way equipment. This project would improve the ability to consistently and reliably account and monitor leakage of oils through automated systems and greatly increase the timeliness of level monitoring. It would also assist in fulfilling the requirements of the Portland Districts Standing Environmental Policy 200-1, Oil Accountability while significantly reducing the O&amp;M costs to do so. The purpose of this project is to improve accuracy and increase automation of instrumentation to account for oil in oil-filled equipment, bulk storage containers, and high-risk equipment. It is also to aid in the identification of oil leaks as early as possible and fully account for potential leaks.</p>","text":"18 November 2025: The solicitation drawings and the reference drawings (13 total drawing files) are attached.\n\nSYNOPSIS\n\nThe U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for The Dalles Dam Oil Accountability Measures in the Dalles, Oregon. The proposed project will be a competitive, firm-fixed price (FFP) contract.\n\nBackground: The Dalles Dam is located in The Dalles, Oregon. The Dalles Dam (TDA) is a concrete gravity run-of-the-river dam spanning the Columbia River, two miles east of the city of The Dalles, Oregon, United States. It joins Wasco County Oregon, with Klickitat County Washington, 300 miles upriver from the mouth of the Columbia River near Astoria, Oregon. The project is designed to improve the monitoring of the amount of oil that could be released into the Columbia River. Its main objective is to minimize the oil release.\n\nPurpose: There are approximately 400,000 gallons of oil at the TDA powerhouse. Oil monitoring measures currently consist primarily of visual observations of sight glasses, observations of oil leaks on and around equipment, and purchase and disposal records of lubricants. The Federal Government agreed to develop and apply an Oil Accountability Plan (OAP) pursuant to the August 2014 settlement agreement with Columbia Riverkeepers. The OAP is intended to account for oils and greases used, including the oils and greases used in turbines, wicket gate bearings, and fish-way equipment. This project would improve the ability to consistently and reliably account and monitor leakage of oils through automated systems and greatly increase the timeliness of level monitoring. It would also assist in fulfilling the requirements of the Portland Districts Standing Environmental Policy 200-1, Oil Accountability while significantly reducing the O&M costs to do so. The purpose of this project is to improve accuracy and increase automation of instrumentation to account for oil in oil-filled equipment, bulk storage containers, and high-risk equipment. It is also to aid in the identification of oil leaks as early as possible and fully account for potential leaks.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W9127N26RA004","place_of_performance":{"zip":"97058","city":{"code":"72950","name":"The Dalles"},"state":{"code":"OR","name":"Oregon"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z2JZ"},{"dates":{"posted":"2026-02-20","posted_at":"2026-02-20T16:26:19.577Z","created_at":"2026-02-20T16:25:27.947Z","modified_at":"2026-03-13T04:04:29.084Z","response_deadline":{"raw":"2026-02-26T11:00:00-08:00","utc":"2026-02-26T19:00:00Z","date":"2026-02-26","time":"11:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-28800}},"links":{"sam":"https://sam.gov/workspace/contract/opp/b8ae5a29986d407080b14ebc2756e8f9/view"},"naics":{"codes":["238210"],"primary":"238210"},"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","agency":{"office":{"code":"W9127N","name":"W071 ENDIST PORTLAND"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"97204-3495","city":"PORTLAND","state":"OR","country":"USA"},"organization_id":"100255230","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-03-13","archive_type":"auto15"},"history":[{"index":23,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T16:26:19.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"b8ae5a29986d407080b14ebc2756e8f9","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":21,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T14:57:22.142Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dbb18e8123a4455e9863b620fd97d958","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":20,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-13T15:15:17.141Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"577a85dc81d240c88353a5c081e28ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":19,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T18:37:35.852Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dc60a3b89cba49f2aad6ddc4d0df2a85","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":18,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:10:39.296Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"25e250999084468cada7173e4b0ac734","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":17,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:08:50.758Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f2a0576f08fd4b5f99bb5c02fa230ccc","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":16,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-12T19:50:24.281Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f65194d512f549f98458954957687399","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":15,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-05T18:17:21.540Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"967d1cdf2b61445eb728c50ace6d1a9d","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":14,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-23T16:21:36.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"489c6926b91048bd8424852a5793ef3f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":13,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:41:58.905Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9a707bc559dc484ba4f1d9082a57c148","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":12,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:38:32.853Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d722de2191e34756b99acb921d6c82db","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":11,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T16:41:58.213Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"79bdd16e09c547b78533ab5498d69a22","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":10,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-11T13:49:23.849Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9f113c8389f0405fb5dbf321b067a990","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":9,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-10T19:20:54.767Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5a29204e7e6c42598a46e4ec51d147df","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":8,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-08T22:22:28.939Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f1ac66ff944a95844754fe2540d2a7","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":7,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T20:54:08.202Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"fd4ac3d8932e46a5b1f840a9c87262da","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":6,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:59:48.906Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b07faed24389484497756d2ee8254ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":5,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:16:01.774Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2137e768ddc646a7b23b47d148a50aec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":4,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-19T00:09:08.134Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ac8c60611de24fd896b7bbc6c59b9301","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":3,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-18T13:46:40.606Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c7437bf0ed5a4e748e01f5b0d05af9ec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":2,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-17T13:49:49.868Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"58cec72778274b4cbfb6dc74e4eddf0f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":1,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-14T17:05:44.191Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"912dfe4e86c742e48049d734ba305a4d","solicitation_number":"W9127N26RA004"}],"contacts":[{"name":"Andrew Sprys","role":"primary","email":"andrew.j.sprys@usace.army.mil"},{"name":"Cory Pfenning","role":"secondary","email":"cory.r.pfenning@usace.army.mil"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"b8ae5a29986d407080b14ebc2756e8f9","lineage_id":"912dfe4e86c742e48049d734ba305a4d","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-12T10:27:10.918085467Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T16:22:53.920682Z","row_sha256":"16620e60dcfe1ce6806b79d00df2e9522e961d557e7a0aae793b125af2d30e72","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-12T10:27:10.918085467Z","first_seen_at":"2026-09-16T16:22:53.920682Z"},"description":{"html":"<p>18 November 2025:&nbsp; The solicitation drawings and the reference drawings (13 total drawing files) are attached.&nbsp;&nbsp;</p>\n\n<p><strong>SYNOPSIS</strong></p>\n\n<p>The U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for The Dalles Dam Oil Accountability Measures in the Dalles, Oregon. The proposed project will be a competitive, firm-fixed price (FFP) contract.</p>\n\n<p></p>\n\n<p><strong>Background:</strong> The Dalles Dam is located in The Dalles, Oregon. The Dalles Dam (TDA) is a concrete gravity run-of-the-river dam spanning the Columbia River, two miles east of the city of The Dalles, Oregon, United States. It joins Wasco County Oregon, with Klickitat County Washington, 300 miles upriver from the mouth of the Columbia River near Astoria, Oregon. The project is designed to improve the monitoring of the amount of oil that could be released into the Columbia River. Its main objective is to minimize the oil release.</p>\n\n<p></p>\n\n<p><strong>Purpose:</strong> There are approximately 400,000 gallons of oil at the TDA powerhouse. Oil monitoring measures currently consist primarily of visual observations of sight glasses, observations of oil leaks on and around equipment, and purchase and disposal records of lubricants. The Federal Government agreed to develop and apply an Oil Accountability Plan (OAP) pursuant to the August 2014 settlement agreement with Columbia Riverkeepers.&nbsp; The OAP is intended to account for oils and greases used, including the oils and greases used in turbines, wicket gate bearings, and fish-way equipment. This project would improve the ability to consistently and reliably account and monitor leakage of oils through automated systems and greatly increase the timeliness of level monitoring. It would also assist in fulfilling the requirements of the Portland Districts Standing Environmental Policy 200-1, Oil Accountability while significantly reducing the O&amp;M costs to do so. The purpose of this project is to improve accuracy and increase automation of instrumentation to account for oil in oil-filled equipment, bulk storage containers, and high-risk equipment. It is also to aid in the identification of oil leaks as early as possible and fully account for potential leaks.</p>","text":"18 November 2025: The solicitation drawings and the reference drawings (13 total drawing files) are attached.\n\nSYNOPSIS\n\nThe U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for The Dalles Dam Oil Accountability Measures in the Dalles, Oregon. The proposed project will be a competitive, firm-fixed price (FFP) contract.\n\nBackground: The Dalles Dam is located in The Dalles, Oregon. The Dalles Dam (TDA) is a concrete gravity run-of-the-river dam spanning the Columbia River, two miles east of the city of The Dalles, Oregon, United States. It joins Wasco County Oregon, with Klickitat County Washington, 300 miles upriver from the mouth of the Columbia River near Astoria, Oregon. The project is designed to improve the monitoring of the amount of oil that could be released into the Columbia River. Its main objective is to minimize the oil release.\n\nPurpose: There are approximately 400,000 gallons of oil at the TDA powerhouse. Oil monitoring measures currently consist primarily of visual observations of sight glasses, observations of oil leaks on and around equipment, and purchase and disposal records of lubricants. The Federal Government agreed to develop and apply an Oil Accountability Plan (OAP) pursuant to the August 2014 settlement agreement with Columbia Riverkeepers. The OAP is intended to account for oils and greases used, including the oils and greases used in turbines, wicket gate bearings, and fish-way equipment. This project would improve the ability to consistently and reliably account and monitor leakage of oils through automated systems and greatly increase the timeliness of level monitoring. It would also assist in fulfilling the requirements of the Portland Districts Standing Environmental Policy 200-1, Oil Accountability while significantly reducing the O&M costs to do so. The purpose of this project is to improve accuracy and increase automation of instrumentation to account for oil in oil-filled equipment, bulk storage containers, and high-risk equipment. It is also to aid in the identification of oil leaks as early as possible and fully account for potential leaks.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W9127N26RA004","place_of_performance":{"zip":"97058","city":{"code":"72950","name":"The Dalles"},"state":{"code":"OR","name":"Oregon"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z2JZ"},{"dates":{"posted":"2026-02-20","posted_at":"2026-02-20T14:57:22.142Z","created_at":"2026-02-20T14:43:44.257Z","modified_at":"2026-03-13T04:04:29.084Z","response_deadline":{"raw":"2026-02-26T11:00:00-08:00","utc":"2026-02-26T19:00:00Z","date":"2026-02-26","time":"11:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-28800}},"links":{"sam":"https://sam.gov/workspace/contract/opp/dbb18e8123a4455e9863b620fd97d958/view"},"naics":{"codes":["238210"],"primary":"238210"},"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","agency":{"office":{"code":"W9127N","name":"W071 ENDIST PORTLAND"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"97204-3495","city":"PORTLAND","state":"OR","country":"USA"},"organization_id":"100255230","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-03-13","archive_type":"auto15"},"history":[{"index":23,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T16:26:19.577Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"b8ae5a29986d407080b14ebc2756e8f9","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":21,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-20T14:57:22.142Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dbb18e8123a4455e9863b620fd97d958","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":20,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-13T15:15:17.141Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"577a85dc81d240c88353a5c081e28ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":19,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T18:37:35.852Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"dc60a3b89cba49f2aad6ddc4d0df2a85","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":18,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:10:39.296Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"25e250999084468cada7173e4b0ac734","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":17,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-27T15:08:50.758Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f2a0576f08fd4b5f99bb5c02fa230ccc","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":16,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-12T19:50:24.281Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f65194d512f549f98458954957687399","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":15,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-05T18:17:21.540Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"967d1cdf2b61445eb728c50ace6d1a9d","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":14,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-23T16:21:36.428Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"489c6926b91048bd8424852a5793ef3f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":13,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:41:58.905Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9a707bc559dc484ba4f1d9082a57c148","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":12,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-19T14:38:32.853Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"d722de2191e34756b99acb921d6c82db","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":11,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T16:41:58.213Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"79bdd16e09c547b78533ab5498d69a22","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":10,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-11T13:49:23.849Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"9f113c8389f0405fb5dbf321b067a990","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":9,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-10T19:20:54.767Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"5a29204e7e6c42598a46e4ec51d147df","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":8,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-08T22:22:28.939Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"97f1ac66ff944a95844754fe2540d2a7","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":7,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T20:54:08.202Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"fd4ac3d8932e46a5b1f840a9c87262da","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":6,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:59:48.906Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"b07faed24389484497756d2ee8254ad5","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":5,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-20T18:16:01.774Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2137e768ddc646a7b23b47d148a50aec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":4,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-19T00:09:08.134Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"ac8c60611de24fd896b7bbc6c59b9301","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":3,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-18T13:46:40.606Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c7437bf0ed5a4e748e01f5b0d05af9ec","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":2,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-17T13:49:49.868Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"58cec72778274b4cbfb6dc74e4eddf0f","solicitation_number":"W9127N26RA004","parent_opportunity_id":"912dfe4e86c742e48049d734ba305a4d"},{"index":1,"title":"THE DALLES OIL ACCOUNTABILITY MEASURES","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-11-14T17:05:44.191Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"912dfe4e86c742e48049d734ba305a4d","solicitation_number":"W9127N26RA004"}],"contacts":[{"name":"Andrew Sprys","role":"primary","email":"andrew.j.sprys@usace.army.mil"},{"name":"Cory Pfenning","role":"secondary","email":"cory.r.pfenning@usace.army.mil"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"dbb18e8123a4455e9863b620fd97d958","lineage_id":"912dfe4e86c742e48049d734ba305a4d","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-12T10:30:52.925358525Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T16:22:53.920682Z","row_sha256":"302c4093c0fcfd56bd806a2c5246a59ee364189ce615dd8d6ca0b6150d09d5d5","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-12T10:30:52.925358525Z","first_seen_at":"2026-09-16T16:22:53.920682Z"},"description":{"html":"<p>18 November 2025:&nbsp; The solicitation drawings and the reference drawings (13 total drawing files) are attached.&nbsp;&nbsp;</p>\n\n<p><strong>SYNOPSIS</strong></p>\n\n<p>The U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for The Dalles Dam Oil Accountability Measures in the Dalles, Oregon. The proposed project will be a competitive, firm-fixed price (FFP) contract.</p>\n\n<p></p>\n\n<p><strong>Background:</strong> The Dalles Dam is located in The Dalles, Oregon. The Dalles Dam (TDA) is a concrete gravity run-of-the-river dam spanning the Columbia River, two miles east of the city of The Dalles, Oregon, United States. It joins Wasco County Oregon, with Klickitat County Washington, 300 miles upriver from the mouth of the Columbia River near Astoria, Oregon. The project is designed to improve the monitoring of the amount of oil that could be released into the Columbia River. Its main objective is to minimize the oil release.</p>\n\n<p></p>\n\n<p><strong>Purpose:</strong> There are approximately 400,000 gallons of oil at the TDA powerhouse. Oil monitoring measures currently consist primarily of visual observations of sight glasses, observations of oil leaks on and around equipment, and purchase and disposal records of lubricants. The Federal Government agreed to develop and apply an Oil Accountability Plan (OAP) pursuant to the August 2014 settlement agreement with Columbia Riverkeepers.&nbsp; The OAP is intended to account for oils and greases used, including the oils and greases used in turbines, wicket gate bearings, and fish-way equipment. This project would improve the ability to consistently and reliably account and monitor leakage of oils through automated systems and greatly increase the timeliness of level monitoring. It would also assist in fulfilling the requirements of the Portland Districts Standing Environmental Policy 200-1, Oil Accountability while significantly reducing the O&amp;M costs to do so. The purpose of this project is to improve accuracy and increase automation of instrumentation to account for oil in oil-filled equipment, bulk storage containers, and high-risk equipment. It is also to aid in the identification of oil leaks as early as possible and fully account for potential leaks.</p>","text":"18 November 2025: The solicitation drawings and the reference drawings (13 total drawing files) are attached.\n\nSYNOPSIS\n\nThe U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for The Dalles Dam Oil Accountability Measures in the Dalles, Oregon. The proposed project will be a competitive, firm-fixed price (FFP) contract.\n\nBackground: The Dalles Dam is located in The Dalles, Oregon. The Dalles Dam (TDA) is a concrete gravity run-of-the-river dam spanning the Columbia River, two miles east of the city of The Dalles, Oregon, United States. It joins Wasco County Oregon, with Klickitat County Washington, 300 miles upriver from the mouth of the Columbia River near Astoria, Oregon. The project is designed to improve the monitoring of the amount of oil that could be released into the Columbia River. Its main objective is to minimize the oil release.\n\nPurpose: There are approximately 400,000 gallons of oil at the TDA powerhouse. Oil monitoring measures currently consist primarily of visual observations of sight glasses, observations of oil leaks on and around equipment, and purchase and disposal records of lubricants. The Federal Government agreed to develop and apply an Oil Accountability Plan (OAP) pursuant to the August 2014 settlement agreement with Columbia Riverkeepers. The OAP is intended to account for oils and greases used, including the oils and greases used in turbines, wicket gate bearings, and fish-way equipment. This project would improve the ability to consistently and reliably account and monitor leakage of oils through automated systems and greatly increase the timeliness of level monitoring. It would also assist in fulfilling the requirements of the Portland Districts Standing Environmental Policy 200-1, Oil Accountability while significantly reducing the O&M costs to do so. The purpose of this project is to improve accuracy and increase automation of instrumentation to account for oil in oil-filled equipment, bulk storage containers, and high-risk equipment. It is also to aid in the identification of oil leaks as early as possible and fully account for potential leaks.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"W9127N26RA004","place_of_performance":{"zip":"97058","city":{"code":"72950","name":"The Dalles"},"state":{"code":"OR","name":"Oregon"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z2JZ"}],"due_at":"2026-02-26T19:00:00Z","due_date":"2026-02-26","closes_at":"2026-02-26T19:00:00Z","awardable":true,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W9127N","office_name":"W071 ENDIST PORTLAND","state":"OR","county":"41065","county_name":"Wasco County","city":"4172950","city_name":"The Dalles","country":"USA","state_source":null,"state_evidence":null,"site_key":"the-dalles-dam-or","winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":true,"updated_at":"2026-10-12T10:41:50.777204Z","principal_notice_id":"dbb18e8123a4455e9863b620fd97d958","description":{"text":"18 November 2025: The solicitation drawings and the reference drawings (13 total drawing files) are attached.\n\nSYNOPSIS\n\nThe U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for The Dalles Dam Oil Accountability Measures in the Dalles, Oregon. The proposed project will be a competitive, firm-fixed price (FFP) contract.\n\nBackground: The Dalles Dam is located in The Dalles, Oregon. The Dalles Dam (TDA) is a concrete gravity run-of-the-river dam spanning the Columbia River, two miles east of the city of The Dalles, Oregon, United States. It joins Wasco County Oregon, with Klickitat County Washington, 300 miles upriver from the mouth of the Columbia River near Astoria, Oregon. The project is designed to improve the monitoring of the amount of oil that could be released into the Columbia River. Its main objective is to minimize the oil release.\n\nPurpose: There are approximately 400,000 gallons of oil at the TDA powerhouse. Oil monitoring measures currently consist primarily of visual observations of sight glasses, observations of oil leaks on and around equipment, and purchase and disposal records of lubricants. The Federal Government agreed to develop and apply an Oil Accountability Plan (OAP) pursuant to the August 2014 settlement agreement with Columbia Riverkeepers. The OAP is intended to account for oils and greases used, including the oils and greases used in turbines, wicket gate bearings, and fish-way equipment. This project would improve the ability to consistently and reliably account and monitor leakage of oils through automated systems and greatly increase the timeliness of level monitoring. It would also assist in fulfilling the requirements of the Portland Districts Standing Environmental Policy 200-1, Oil Accountability while significantly reducing the O&M costs to do so. The purpose of this project is to improve accuracy and increase automation of instrumentation to account for oil in oil-filled equipment, bulk storage containers, and high-risk equipment. It is also to aid in the identification of oil leaks as early as possible and fully account for potential leaks.","html":"<p>18 November 2025:&nbsp; The solicitation drawings and the reference drawings (13 total drawing files) are attached.&nbsp;&nbsp;</p>\n\n<p><strong>SYNOPSIS</strong></p>\n\n<p>The U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for The Dalles Dam Oil Accountability Measures in the Dalles, Oregon. The proposed project will be a competitive, firm-fixed price (FFP) contract.</p>\n\n<p></p>\n\n<p><strong>Background:</strong> The Dalles Dam is located in The Dalles, Oregon. The Dalles Dam (TDA) is a concrete gravity run-of-the-river dam spanning the Columbia River, two miles east of the city of The Dalles, Oregon, United States. It joins Wasco County Oregon, with Klickitat County Washington, 300 miles upriver from the mouth of the Columbia River near Astoria, Oregon. The project is designed to improve the monitoring of the amount of oil that could be released into the Columbia River. Its main objective is to minimize the oil release.</p>\n\n<p></p>\n\n<p><strong>Purpose:</strong> There are approximately 400,000 gallons of oil at the TDA powerhouse. Oil monitoring measures currently consist primarily of visual observations of sight glasses, observations of oil leaks on and around equipment, and purchase and disposal records of lubricants. The Federal Government agreed to develop and apply an Oil Accountability Plan (OAP) pursuant to the August 2014 settlement agreement with Columbia Riverkeepers.&nbsp; The OAP is intended to account for oils and greases used, including the oils and greases used in turbines, wicket gate bearings, and fish-way equipment. This project would improve the ability to consistently and reliably account and monitor leakage of oils through automated systems and greatly increase the timeliness of level monitoring. It would also assist in fulfilling the requirements of the Portland Districts Standing Environmental Policy 200-1, Oil Accountability while significantly reducing the O&amp;M costs to do so. The purpose of this project is to improve accuracy and increase automation of instrumentation to account for oil in oil-filled equipment, bulk storage containers, and high-risk equipment. It is also to aid in the identification of oil leaks as early as possible and fully account for potential leaks.</p>","origin":"detail"},"contacts":[{"name":"Andrew Sprys","role":"primary","email":"andrew.j.sprys@usace.army.mil"},{"name":"Cory Pfenning","role":"secondary","email":"cory.r.pfenning@usace.army.mil"}],"place_of_performance":{"zip":"97058","city":{"code":"72950","name":"The Dalles"},"state":{"code":"OR","name":"Oregon"},"country":{"code":"USA","name":"UNITED STATES"}},"office_address":{"zip":"97204-3495","city":"PORTLAND","state":"OR","country":"USA"},"naics_codes":["238210"],"award":null,"attachments":[{"resource_id":"28c839fe415e4288a8285eaeff662e86","name":"Solicitation - W9127N26RA004 - TDOAM25_ADVERT.pdf","kind":"file","mime_type":".pdf","size_bytes":8631253,"posted_at":"2025-11-17T13:49:49.868Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/28c839fe415e4288a8285eaeff662e86/download","mirrored":false}],"awards":[],"related":[{"key":"W9127N27B1CXI","latest_notice_id":"0adf5ef68ed646e0b66ab6bfe9f00284","title":"USACE Portland District Dredges Slops Services","solicitation_number":"W9127N27B1CXI","notice_type":"r","first_type":"r","first_posted":"2026-11-12","last_posted":"2026-11-12","notices":1,"due_at":"2026-11-30T20:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T20:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W9127N","office_name":"W071 ENDIST PORTLAND","naics":"562998","psc":"S222","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"unknown","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-13T05:18:31.697344Z"},{"key":"W9127N27QA010","latest_notice_id":"4d3d53a2977242c688a7e1b7ad4ba189","title":"Hydropower Technical Research & Knowledge Exchange","solicitation_number":"W9127N27QA010","notice_type":"r","first_type":"r","first_posted":"2026-11-13","last_posted":"2026-11-13","notices":1,"due_at":"2026-12-03T20:00:00Z","due_date":"2026-12-03","closes_at":"2026-12-03T20:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W9127N","office_name":"W071 ENDIST PORTLAND","naics":"541990","psc":"R425","set_aside":null,"state":"CT","county":null,"county_name":null,"city":"0961870","city_name":"Portland","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-14T05:16:40.707321Z"},{"key":"W9127N27BA011","latest_notice_id":"991857b7284b475b909708630c17b116","title":"JOHN DAY DAM UNIT 10 PACKING BOX REPLACEMENT","solicitation_number":"W9127N27BA011","notice_type":"o","first_type":"o","first_posted":"2026-10-21","last_posted":"2026-10-21","notices":2,"due_at":"2026-12-04T21:00:00Z","due_date":"2026-12-04","closes_at":"2026-12-04T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W9127N","office_name":"W071 ENDIST PORTLAND","naics":"237990","psc":"Z2KA","set_aside":null,"state":"OR","county":"41055","county_name":"Sherman County","city":"4164200","city_name":"Rufus","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":"John Day Dam","site_key":"john-day-dam-or","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-22T04:09:15.685315Z"},{"key":"W9127N27BA012","latest_notice_id":"f8ae1b7b3296400c8bc920dbf27d9856","title":"Bonneville Powerhouse II Unwatering Pump Replacement","solicitation_number":"W9127N27BA012","notice_type":"o","first_type":"p","first_posted":"2026-11-05","last_posted":"2026-11-05","notices":4,"due_at":"2026-12-07T22:00:00Z","due_date":"2026-12-07","closes_at":"2026-12-07T22:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W9127N","office_name":"W071 ENDIST PORTLAND","naics":"237990","psc":"Z2KA","set_aside":"SBA","state":"OR","county":null,"county_name":null,"city":null,"city_name":null,"country":"USA","place_scope":"site","state_source":"site","state_evidence":"NWATERING PUMP REPLACEMENT AT THE BONNEVILLE LOCK AND DAM","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-06T04:46:59.158685Z"},{"key":"W9127N27BA010","latest_notice_id":"f82fe84f7a0b454cb6aee8e4e26b09e6","title":"NAVIGATION LOCK TAINTER VALVE (TV) REPAIR, TV1","solicitation_number":"W9127N27BA010","notice_type":"o","first_type":"o","first_posted":"2026-10-27","last_posted":"2026-11-25","notices":5,"due_at":"2026-12-09T19:00:00Z","due_date":"2026-12-09","closes_at":"2026-12-09T19:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W9127N","office_name":"W071 ENDIST PORTLAND","naics":"237990","psc":"Z2KA","set_aside":null,"state":"WA","county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"site","state_source":"sam_street","state_evidence":"THE DALLES DAM (WASHINGTON SIDE), LYLE, WA 98635.","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-26T04:43:42.403930Z"}],"similar_open":[{"key":"36C25027Q0014","latest_notice_id":"b13cc87179e947e7b42da2de44a6bde1","title":"J061--541 Electrical Power Distribution Equipment Testing, Inspection, and Maintenance - VAMC Cleveland","solicitation_number":"36C25027Q0014","notice_type":"k","first_type":"k","first_posted":"2026-10-09","last_posted":"2026-11-24","notices":5,"due_at":"2026-11-27T20:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T20:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C250","office_name":"250-NETWORK CONTRACT OFFICE 10 (36C250)","naics":"238210","psc":"J061","set_aside":"SBA","state":"OH","county":"39035","county_name":"Cuyahoga County","city":"3916000","city_name":"Cleveland","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-25T05:14:59.249783Z"},{"key":"127EAW27Q0002","latest_notice_id":"59c24c6aad3541448f35b465324ba88b","title":"Forest Service - Solar Batteries Frenchman Work Center","solicitation_number":"127EAW27Q0002","notice_type":"k","first_type":"k","first_posted":"2026-11-05","last_posted":"2026-11-17","notices":3,"due_at":"2026-11-28T00:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-28T00:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-012","dept_name":"AGRICULTURE, DEPARTMENT OF","sub_key":"s-12C2","sub_name":"FOREST SERVICE","office_key":"o-127EAW","office_name":"USDA-FS, CSA SOUTHWEST 6","naics":"238210","psc":"N061","set_aside":"SBA","state":"CA","county":null,"county_name":null,"city":null,"city_name":null,"country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-18T05:19:57.406887Z"},{"key":"FA706027R0001","latest_notice_id":"541189d6ec7b40e2b7a0dcf9030d56ec","title":"Request for Information/Market Intelligence Notice: Repair Electrical Distribution System Switchgear Stations & Addition of Redundancy Cable Use of Progressive Design Build (PDB) with Other Transaction Authority (OTA)","solicitation_number":"FA706027R0001","notice_type":"r","first_type":"r","first_posted":"2026-10-23","last_posted":"2026-10-23","notices":1,"due_at":"2026-11-30T15:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T15:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-057","dept_name":"DEPT OF DEFENSE","sub_key":"s-5700","sub_name":"DEPT OF THE AIR FORCE","office_key":"o-FA7060","office_name":"FA7060 11TH CONTRACTING SQ PK","naics":"238210","psc":"Z2JZ","set_aside":null,"state":"DC","county":"11001","county_name":"District of Columbia","city":null,"city_name":null,"country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-24T03:56:54.139438Z"}],"similar_open_total":40,"indexable":false}