Solicitation, total small business set-aside
TDA Transformer 9-11 Interim Repair
W9127N25RA012
Department of the Army, W071 Endist Portland. Electrical Contractors and Other Wiring Installation Contractors.
Response deadline
August 14, 2025 at 8:00 PM EDT
Closed 468 days ago. Posted September 10, 2025, first published May 13, 2025. Scheduled to archive September 12, 2025.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed in 2025
40 like it are open now in electrical contractors and other wiring installation contractors
- 541 Electrical Power Distribution Equipment Testing, Inspection, and Maintenance - VAMC Cleveland
Department of Veterans Affairs, 250-Network Contract Office 10
Combined synopsis and solicitationSmall businessNAICS 238210Cleveland, OH36C25027Q0014Due tomorrowNov 27 - Forest Service - Solar Batteries Frenchman Work Center
Forest Service, Usda-Fs, Csa Southwest 6
Combined synopsis and solicitationSmall businessNAICS 238210California127EAW27Q0002Due in 2 daysNov 28 - Request for Information/Market Intelligence Notice: Repair Electrical Distribution System Switchgear Stations & Addition of Redundancy Cable Use of Progressive Design Build (PDB) with Other Transaction Authority (OTA)
Department of the Air Force, FA7060 11TH Contracting SQ PK
Sources soughtNAICS 238210District of ColumbiaFA706027R0001Due in 4 daysNov 30
All 40 open in electrical contractors and other wiring installation contractors
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
- Who may compete
- Total small business set-aside. Only small businesses may compete. Small, under NAICS 238210 (electrical contractors and other wiring installation contractors), means no more than $19 million in average annual receipts, counted with affiliates. Open Small business opportunities
- Time to respond
- Bidders had 93 days from the day the solicitation was posted, May 13, 2025, to the deadline. The deadline moved 4 times: it was first June 13, 2025 and ended as August 14, 2025.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
*The purpose of this amendment (W9127N25RA0120008) is to revise Block 13B of the SF 1442 to state that an offer guarantee is not required. Payment and Performance Bonds are required in accordance with FAR 52.228-15, Performance and Payment Bonds—Construction. All other terms and conditions remain unchanged.
*The purpose of this amendment (W9127N25RA0120007) is to update the Wage Determination - specifically WA20250050 dated 18 July 2025.
*The purpose of this amendment is to provide photographs in response to questions raised during the second site visit. TDA USACE is offering up additional locations to complete the task of fixing the transformers.
*The purpose of this amendment is fourfold:To extend the solicitation closing date to August 14, 2025. To incorporate a second site visit, scheduled for July 21, 2025, in response to the unique nature of the requirement (see SF30 for full details). To clarify that AutoCAD will be used in place of MicroStation for all CAD files, reflecting the agency-wide transition toward AutoCAD as the new standard. Updated Wage Determinations - WDOR20250079 and WDWA20250050
*This update reflects CLIN 9 has been revised--replacing the two optional SLINs for asbestos removal (under and over 5 pounds) with a single CLIN for asbestos removal.
*This update adds an additional week to the solicitation. New closing date is 07/14/2025.
*This update adds an additional two (2) weeks to the solicitation. New closing date is 07/07/2025.
*This update adds an additional week to the solicitation. New closing date is 06/20/2025.
*This update adds in two videos of the transformers and where the work will be conducted.
The U.S. Army Corps of Engineer (USACE) Portland District intends to solicit construction firms who are interested in submitting a competitive firm-fixed-price proposal for this project. This announcement is for the construction/modification/repair of The Dalles T9, T10, and T11 transformers located in Klickitat County, Washington and Wasco County, Oregon.
Project Scope: The US Army Corps of Engineers (USACE) Portland District seeks Heavy and Civil Engineering Construction Contractors who can provide construction services for The Dalles Lock and Dam (“the Dalles” and “TDA”). The Dalles T9, T10, and T11 transformers are identical 230,000/132,790-13200 Volt, 233,000 kVA class Forced Oil and Forced Air (FOA) three-phase transformers manufactured by General Electric’s Pittsfield, Massachusetts facility in 1972. The T10 transformer was forced out of service in 2018 due to a failed high-voltage neutral conductor internal to the tank between the H1 and H2 windings. All three transformers are located outside on the powerplant intake deck on the Columbia River.
Acquisition Strategy: Proposals will be evaluated utilizing the Best Value Tradeoff source selection method. Nonpriced factors are equal in importance. This acquisition will result in a single fixed-price contract.
Magnitude of Construction: The estimated cost of the project is between $3,000,000 and $5,000,000.
Set Asides and Codes: This acquisition will be 100% Total Small Business Set-Aside. The North American Industrial Classification Code (NAICS) for this acquisition is NAICS: 238210 – Electrical Contractors and Other Wiring Installation. The PSC Code is Z2MD – Repair or Alteration of EPG Facilities – Hydro. The small business size standard is $19 million.
System for Award Management (SAM): Offerors must register in the SAM at https://www.sam.gov prior to submission of bids and prior to receiving an award.
Point of Contact: The USACE-NWP Contracting Office will be the sole point of contact for this action. E-mail responses to the Primary Point of Contact, Joseph Jarvis at joseph.b.jarvis@usace.army.mil. E-mail is the preferred method for receiving
responses to this notice.
THE GOVERNMENT RESERVES THE RIGHT TO CANCEL THIS SOLICITATION EITHER BEFORE OR AFTER THE CLOSING DATE. NO REIMBURSEMENT WILL BE MADE FOR ANY COSTS ASSOCIATED WITH PROVIDING INFORMATION IN
RESPONSE TO THIS PRESOLICITATION NOTICE OR ANY FOLLOW-UP INFORMATION REQUEST.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- TDTRANR25_SPECS_ADVERTISE.pdf21.9 MB, May 13, 2025
- DDP1.128_S-501XXX_covers.pdf291 KB, May 13, 2025
- contractor layout plan1.pdf2.7 MB, May 13, 2025
- contractor layout plan2.pdf2.9 MB, May 13, 2025
- contractor layout plan2_rev1.pdf335 KB, May 22, 2025
- contractor layout plan1_rev1.pdf4.1 MB, May 22, 2025
- Solicitation Amendment W9127N25RA0120001 SF 30.pdf3.2 MB, May 22, 2025
- Video 1 - T10 internal - neutral bar.mp480.5 MB, June 4, 2025
- Video 2 - neutral bus.mp4164.6 MB, June 4, 2025
- Solicitation Amendment W9127N25RA0120002 SF 30.pdf3.2 MB, June 10, 2025
- Solicitation Amendment - W9127N25RA0120003.pdf5.7 MB, June 20, 2025
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
May 13, 2025
Solicitation
Due June 13, 2025 at 8:00 PM EDT. SAM.gov, notice 4e0201502659408891201cb23fb1402d
16 revisions on SAM
- September 10, 2025: publish, solicitation
- September 10, 2025: publish, solicitation
- August 14, 2025: publish, solicitation
- August 12, 2025: publish, solicitation
- August 4, 2025: publish, solicitation
- July 11, 2025: publish, solicitation
- July 3, 2025: publish, solicitation
- July 2, 2025: publish, solicitation
- June 20, 2025: publish, solicitation
- June 10, 2025: publish, solicitation
- June 5, 2025: publish, solicitation
- June 4, 2025: publish, solicitation
- May 22, 2025: publish, solicitation
- May 13, 2025: publish, solicitation
- May 13, 2025: publish, solicitation
- January 22, 2025: publish, presolicitation
May 13, 2025
Solicitation, originally presolicitation
Due June 13, 2025 at 8:00 PM EDT. SAM.gov, notice 5e37c14c74f34bcd85dd0be42d1a9550
16 revisions on SAM
- September 10, 2025: publish, solicitation
- September 10, 2025: publish, solicitation
- August 14, 2025: publish, solicitation
- August 12, 2025: publish, solicitation
- August 4, 2025: publish, solicitation
- July 11, 2025: publish, solicitation
- July 3, 2025: publish, solicitation
- July 2, 2025: publish, solicitation
- June 20, 2025: publish, solicitation
- June 10, 2025: publish, solicitation
- June 5, 2025: publish, solicitation
- June 4, 2025: publish, solicitation
- May 22, 2025: publish, solicitation
- May 13, 2025: publish, solicitation
- May 13, 2025: publish, solicitation
- January 22, 2025: publish, presolicitation
May 22, 2025
Solicitation
Due June 13, 2025 at 8:00 PM EDT. SAM.gov, notice bcd0231daec04fca9120001f79f1cbad
16 revisions on SAM
- September 10, 2025: publish, solicitation
- September 10, 2025: publish, solicitation
- August 14, 2025: publish, solicitation
- August 12, 2025: publish, solicitation
- August 4, 2025: publish, solicitation
- July 11, 2025: publish, solicitation
- July 3, 2025: publish, solicitation
- July 2, 2025: publish, solicitation
- June 20, 2025: publish, solicitation
- June 10, 2025: publish, solicitation
- June 5, 2025: publish, solicitation
- June 4, 2025: publish, solicitation
- May 22, 2025: publish, solicitation
- May 13, 2025: publish, solicitation
- May 13, 2025: publish, solicitation
- January 22, 2025: publish, presolicitation
June 4, 2025
Solicitation
Due June 13, 2025 at 8:00 PM EDT. SAM.gov, notice d19d7c34e029473289ca1f5d9396f8a5
16 revisions on SAM
- September 10, 2025: publish, solicitation
- September 10, 2025: publish, solicitation
- August 14, 2025: publish, solicitation
- August 12, 2025: publish, solicitation
- August 4, 2025: publish, solicitation
- July 11, 2025: publish, solicitation
- July 3, 2025: publish, solicitation
- July 2, 2025: publish, solicitation
- June 20, 2025: publish, solicitation
- June 10, 2025: publish, solicitation
- June 5, 2025: publish, solicitation
- June 4, 2025: publish, solicitation
- May 22, 2025: publish, solicitation
- May 13, 2025: publish, solicitation
- May 13, 2025: publish, solicitation
- January 22, 2025: publish, presolicitation
June 5, 2025
Solicitation
Due June 13, 2025 at 8:00 PM EDT. SAM.gov, notice 5fca78abed984d09ac90581a9dc5bfd1
16 revisions on SAM
- September 10, 2025: publish, solicitation
- September 10, 2025: publish, solicitation
- August 14, 2025: publish, solicitation
- August 12, 2025: publish, solicitation
- August 4, 2025: publish, solicitation
- July 11, 2025: publish, solicitation
- July 3, 2025: publish, solicitation
- July 2, 2025: publish, solicitation
- June 20, 2025: publish, solicitation
- June 10, 2025: publish, solicitation
- June 5, 2025: publish, solicitation
- June 4, 2025: publish, solicitation
- May 22, 2025: publish, solicitation
- May 13, 2025: publish, solicitation
- May 13, 2025: publish, solicitation
- January 22, 2025: publish, presolicitation
June 10, 2025
Solicitation
Due June 20, 2025 at 8:00 PM EDT. SAM.gov, notice d2b07c00d3b742be8fb504d73e807797
16 revisions on SAM
- September 10, 2025: publish, solicitation
- September 10, 2025: publish, solicitation
- August 14, 2025: publish, solicitation
- August 12, 2025: publish, solicitation
- August 4, 2025: publish, solicitation
- July 11, 2025: publish, solicitation
- July 3, 2025: publish, solicitation
- July 2, 2025: publish, solicitation
- June 20, 2025: publish, solicitation
- June 10, 2025: publish, solicitation
- June 5, 2025: publish, solicitation
- June 4, 2025: publish, solicitation
- May 22, 2025: publish, solicitation
- May 13, 2025: publish, solicitation
- May 13, 2025: publish, solicitation
- January 22, 2025: publish, presolicitation
June 20, 2025
Solicitation
Due July 7, 2025 at 8:00 PM EDT. SAM.gov, notice 6d248103ee1b4fe79dee8b1694e16697
16 revisions on SAM
- September 10, 2025: publish, solicitation
- September 10, 2025: publish, solicitation
- August 14, 2025: publish, solicitation
- August 12, 2025: publish, solicitation
- August 4, 2025: publish, solicitation
- July 11, 2025: publish, solicitation
- July 3, 2025: publish, solicitation
- July 2, 2025: publish, solicitation
- June 20, 2025: publish, solicitation
- June 10, 2025: publish, solicitation
- June 5, 2025: publish, solicitation
- June 4, 2025: publish, solicitation
- May 22, 2025: publish, solicitation
- May 13, 2025: publish, solicitation
- May 13, 2025: publish, solicitation
- January 22, 2025: publish, presolicitation
July 2, 2025
Solicitation
Due July 14, 2025 at 8:00 PM EDT. SAM.gov, notice 6ac8e07a814c476aac750eb50d9b7fea
16 revisions on SAM
- September 10, 2025: publish, solicitation
- September 10, 2025: publish, solicitation
- August 14, 2025: publish, solicitation
- August 12, 2025: publish, solicitation
- August 4, 2025: publish, solicitation
- July 11, 2025: publish, solicitation
- July 3, 2025: publish, solicitation
- July 2, 2025: publish, solicitation
- June 20, 2025: publish, solicitation
- June 10, 2025: publish, solicitation
- June 5, 2025: publish, solicitation
- June 4, 2025: publish, solicitation
- May 22, 2025: publish, solicitation
- May 13, 2025: publish, solicitation
- May 13, 2025: publish, solicitation
- January 22, 2025: publish, presolicitation
July 3, 2025
Solicitation
Due July 14, 2025 at 8:00 PM EDT. SAM.gov, notice 3f524c0b35a84f3d82c31907265ba178
16 revisions on SAM
- September 10, 2025: publish, solicitation
- September 10, 2025: publish, solicitation
- August 14, 2025: publish, solicitation
- August 12, 2025: publish, solicitation
- August 4, 2025: publish, solicitation
- July 11, 2025: publish, solicitation
- July 3, 2025: publish, solicitation
- July 2, 2025: publish, solicitation
- June 20, 2025: publish, solicitation
- June 10, 2025: publish, solicitation
- June 5, 2025: publish, solicitation
- June 4, 2025: publish, solicitation
- May 22, 2025: publish, solicitation
- May 13, 2025: publish, solicitation
- May 13, 2025: publish, solicitation
- January 22, 2025: publish, presolicitation
July 11, 2025
Solicitation
Due August 14, 2025 at 8:00 PM EDT. SAM.gov, notice f0617672804c46c2bdf610429de0065e
16 revisions on SAM
- September 10, 2025: publish, solicitation
- September 10, 2025: publish, solicitation
- August 14, 2025: publish, solicitation
- August 12, 2025: publish, solicitation
- August 4, 2025: publish, solicitation
- July 11, 2025: publish, solicitation
- July 3, 2025: publish, solicitation
- July 2, 2025: publish, solicitation
- June 20, 2025: publish, solicitation
- June 10, 2025: publish, solicitation
- June 5, 2025: publish, solicitation
- June 4, 2025: publish, solicitation
- May 22, 2025: publish, solicitation
- May 13, 2025: publish, solicitation
- May 13, 2025: publish, solicitation
- January 22, 2025: publish, presolicitation
August 4, 2025
Solicitation
Due August 14, 2025 at 8:00 PM EDT. SAM.gov, notice e2d5358e583d4ab1b29625bf364fbbb3
16 revisions on SAM
- September 10, 2025: publish, solicitation
- September 10, 2025: publish, solicitation
- August 14, 2025: publish, solicitation
- August 12, 2025: publish, solicitation
- August 4, 2025: publish, solicitation
- July 11, 2025: publish, solicitation
- July 3, 2025: publish, solicitation
- July 2, 2025: publish, solicitation
- June 20, 2025: publish, solicitation
- June 10, 2025: publish, solicitation
- June 5, 2025: publish, solicitation
- June 4, 2025: publish, solicitation
- May 22, 2025: publish, solicitation
- May 13, 2025: publish, solicitation
- May 13, 2025: publish, solicitation
- January 22, 2025: publish, presolicitation
August 12, 2025
Solicitation
Due August 14, 2025 at 8:00 PM EDT. SAM.gov, notice d6a2e17d83034a4798dbebd8fd63768d
16 revisions on SAM
- September 10, 2025: publish, solicitation
- September 10, 2025: publish, solicitation
- August 14, 2025: publish, solicitation
- August 12, 2025: publish, solicitation
- August 4, 2025: publish, solicitation
- July 11, 2025: publish, solicitation
- July 3, 2025: publish, solicitation
- July 2, 2025: publish, solicitation
- June 20, 2025: publish, solicitation
- June 10, 2025: publish, solicitation
- June 5, 2025: publish, solicitation
- June 4, 2025: publish, solicitation
- May 22, 2025: publish, solicitation
- May 13, 2025: publish, solicitation
- May 13, 2025: publish, solicitation
- January 22, 2025: publish, presolicitation
August 14, 2025
Solicitation
Due August 14, 2025 at 8:00 PM EDT. SAM.gov, notice 02a76f4e51624bc18b1fee52ec0ed80b
16 revisions on SAM
- September 10, 2025: publish, solicitation
- September 10, 2025: publish, solicitation
- August 14, 2025: publish, solicitation
- August 12, 2025: publish, solicitation
- August 4, 2025: publish, solicitation
- July 11, 2025: publish, solicitation
- July 3, 2025: publish, solicitation
- July 2, 2025: publish, solicitation
- June 20, 2025: publish, solicitation
- June 10, 2025: publish, solicitation
- June 5, 2025: publish, solicitation
- June 4, 2025: publish, solicitation
- May 22, 2025: publish, solicitation
- May 13, 2025: publish, solicitation
- May 13, 2025: publish, solicitation
- January 22, 2025: publish, presolicitation
September 10, 2025
Solicitation
Due August 14, 2025 at 8:00 PM EDT. SAM.gov, notice 224ccd929e9349f7b684182b66731c1e
17 revisions on SAM
- May 2, 2026: publish, sources sought
- September 10, 2025: publish, solicitation
- September 10, 2025: publish, solicitation
- August 14, 2025: publish, solicitation
- August 12, 2025: publish, solicitation
- August 4, 2025: publish, solicitation
- July 11, 2025: publish, solicitation
- July 3, 2025: publish, solicitation
- July 2, 2025: publish, solicitation
- June 20, 2025: publish, solicitation
- June 10, 2025: publish, solicitation
- June 5, 2025: publish, solicitation
- June 4, 2025: publish, solicitation
- May 22, 2025: publish, solicitation
- May 13, 2025: publish, solicitation
- May 13, 2025: publish, solicitation
- January 22, 2025: publish, presolicitation
September 10, 2025
Solicitation
Due August 14, 2025 at 8:00 PM EDT. SAM.gov, notice 5eaebb1a1079445f84859ef97489af8f
16 revisions on SAM
- September 10, 2025: publish, solicitation
- September 10, 2025: publish, solicitation
- August 14, 2025: publish, solicitation
- August 12, 2025: publish, solicitation
- August 4, 2025: publish, solicitation
- July 11, 2025: publish, solicitation
- July 3, 2025: publish, solicitation
- July 2, 2025: publish, solicitation
- June 20, 2025: publish, solicitation
- June 10, 2025: publish, solicitation
- June 5, 2025: publish, solicitation
- June 4, 2025: publish, solicitation
- May 22, 2025: publish, solicitation
- May 13, 2025: publish, solicitation
- May 13, 2025: publish, solicitation
- January 22, 2025: publish, presolicitation
Points of contact
- Joseph B. Jarvisjoseph.b.jarvis@usace.army.mil
- Cory Pfenningcory.r.pfenning@usace.army.mil