# Rogue River South Jetty Partial Repair 2025

Canonical: https://sealedbidder.com/opportunities/w9127n25ba010

- Solicitation number: W9127N25BA010
- Notice type: Award notice (first published as presolicitation)
- Status: Awarded to Suulutaaq, Inc. for $3,021,620.00
- Department: Department of the Army
- Agency: Department of the Army
- Contracting office: W071 Endist Portland (W9127N)
- NAICS: 237990 Other Heavy and Civil Engineering Construction
- Product or service code: Y1KZ Construction Of Other Conservation And Development Facilities
- Set-aside: Total small business set-aside
- Small business size standard: $45 million in average annual receipts (13 CFR 121.201, NAICS 237990)
- Place of performance: Gold Beach, Oregon
- County: Curry County (FIPS 41015). https://sealedbidder.com/counties/curry-county-or-41015
- City: Gold Beach. https://sealedbidder.com/cities/gold-beach-or-4129900
- First posted: June 30, 2025
- Last posted: September 24, 2025
- SAM.gov: https://sam.gov/workspace/contract/opp/954080cdcbd74c668975e754562ff3da/view

## Reading this notice

- Kind of notice: Award notice. Who won, when, and for how much.
- Who may compete: Total small business set-aside. Only small businesses may compete. Small, under NAICS 237990 (other heavy and civil engineering construction), means no more than $45 million in average annual receipts, counted with affiliates.
- Time to respond: Bidders had 35 days from the day the solicitation was posted, August 7, 2025, to the deadline. The deadline moved 2 times: it was first July 15, 2025 and ended as September 11, 2025.
- Before the solicitation: The agency published a presolicitation on June 30, 2025, 38 days before the solicitation.
- How it ended: Awarded to Suulutaaq, Inc. on September 23, 2025, 12 days after offers were due. The contracting office reported 7 offers (full and open competition after exclusion of sources).

## Description

11SEP25:

Addition of Bid Abstract - Sam - W9127N25BA010 Rogue River South Jetty Partial Repair 2025

04SEP25:

Addition of Amendment W9127N25BA010 0002

Updated Plan Sheets G-004 and LS 101

Bidder Inquiry Question and Answers

WD 20250065 Dated 28AUG25

Update Offer Due date from 0300 PM on 11SEP25 to 0:200 PM on 11SEP25.  Bid Opening remains at 0:300 11SEP25.

27AUG25:

Addition of Amendment W9127N25BA010 0001 (See Attachment).

This amendment updates the wage determination to OR20250065 Dated 22AUG25 and to adds clause: DFARS 252.232-7003

No other changes.

22AUG25:

Adding the Site Visit Roster to the attachments.  No other changes.

11AUG2025:

Plan Set did not load with orginal posting.  No other changes.

Solicitation Notice

W9127N25BA010 Rogue River South Jetty Partial Repair 2025

The project is located on the Southern Oregon Coast at the inlet to Rogue River in Gold Beach, Curry County, Oregon. The project consists of procurement, delivery, and placement of jetty armor stone this includes toe and side slope repairs with a 50-foot buffer on either side of the work area. Optional repairs include reconstruction on the channel side of the jetty and on the ocean side of the. The 50-foot buffer will be adjusted to start at the ending station on each side of the full repair area, depending on whether optional work is exercised. Rework and/or reconstruction of the full cross-section may be needed along at least a partial length of the mandatory repair zone.

This solicitation will be an Invitation for Bid (IFB). The lowest price and pricing factors only will be used to evaluate proposals. This acquisition will result in a single fixed-price contract.

The North American Industrial Classification Code (NAICS) for this potential requirement would be 237990 &ndash; &ldquo;Other Heavy and Civil Engineering Construction&rdquo;. The related size standard is $45.0 million. The PSC is Y1KZ Construction of other Conservations and Development Facilities.

Point of Contact:

The USACE-NWP Contracting Office will be the sole point of contact for this action. E-mail responses to the Primary Point of Contact, Brian Johnson at brian.m.johnson@usace.army.mil. E-mail is the preferred method for receiving responses to this Solicitation.

THE GOVERNMENT RESERVES THE RIGHT TO CANCEL THIS SOLICITATION EITHER BEFORE OR AFTER THE CLOSING DATE. NO REIMBURSEMENT WILL BE MADE FOR ANY COSTS ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO THIS SOLICITATION OR ANY FOLLOW-UP INFORMATION REQUESTS.

## Attachments

- [Pre-Solicitation Synopsis - SAM - 25BA010 Rogue River South Jetty Partial Repair 2025.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/003822d94b994b01ad4a4371101fe330/download)
- [W9127N25BA010 - Rogue River South Jetty Partial Repair 2025.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/3ea08dfb33954c9ca37ca4709d9f94fd/download)

## Award on USAspending

- Recipient: Suulutaaq, Inc. (UEI C9RAA5KDBKC5)
- Contract: W9127N25CA076, definitive contract
- Obligated: $3,021,620.00
- Competition: Full and Open Competition After Exclusion of Sources, 7 offers received
- Link: award number W9127N25CA076 equals the contract number; same awarding office W9127N (high confidence)
- Record: https://www.usaspending.gov/award/CONT_AWD_W9127N25CA076_9700_-NONE-_-NONE-/


## Open now in the same industry

143 open in NAICS 237990.

- JOHN DAY DAM UNIT 10 PACKING BOX REPLACEMENT (W9127N27BA011), due December 4, 2026 at 4:00 PM EST. https://sealedbidder.com/opportunities/w9127n27ba011
- Bonneville Powerhouse II Unwatering Pump Replacement (W9127N27BA012), due December 7, 2026 at 5:00 PM EST. https://sealedbidder.com/opportunities/w9127n27ba012
- W9127N27BA005 Foster Spillway Gate Nut Replacements and Re-Tensioning (W9127N27BA005), due December 16, 2026 at 3:00 PM EST. https://sealedbidder.com/opportunities/w9127n27ba005

## Publications

- June 30, 2025: Presolicitation, due July 15, 2025 at 6:00 PM EDT. Notice 086a47b0a0dd4846a72321c2aad06c37. https://sam.gov/workspace/contract/opp/086a47b0a0dd4846a72321c2aad06c37/view
- July 14, 2025: Presolicitation, due August 7, 2025 at 6:00 PM EDT. Notice 9abb34bb047a49b18adb706d95c97a48. https://sam.gov/workspace/contract/opp/9abb34bb047a49b18adb706d95c97a48/view
- August 7, 2025: Solicitation, due September 11, 2025 at 6:00 PM EDT. Notice 011699d93678435d8abd5b6f4eb556e6. https://sam.gov/workspace/contract/opp/011699d93678435d8abd5b6f4eb556e6/view
- August 11, 2025: Solicitation, due September 11, 2025 at 6:00 PM EDT. Notice 8f8d34cc7c8a4882bf6bf29015b2188b. https://sam.gov/workspace/contract/opp/8f8d34cc7c8a4882bf6bf29015b2188b/view
- August 22, 2025: Solicitation, due September 11, 2025 at 6:00 PM EDT. Notice 0f9e67d0326c4488bb262ab8cbb7e2e2. https://sam.gov/workspace/contract/opp/0f9e67d0326c4488bb262ab8cbb7e2e2/view
- August 27, 2025: Solicitation, due September 11, 2025 at 6:00 PM EDT. Notice 91e23795e3b44922b8e3d6046c5493c7. https://sam.gov/workspace/contract/opp/91e23795e3b44922b8e3d6046c5493c7/view
- August 27, 2025: Solicitation, due September 11, 2025 at 6:00 PM EDT. Notice 9850062f72374f69b05b67bea08a4952. https://sam.gov/workspace/contract/opp/9850062f72374f69b05b67bea08a4952/view
- September 4, 2025: Solicitation, due September 11, 2025 at 5:00 PM EDT. Notice a69c1cb6c961485fab73caf2fdc7fdf4. https://sam.gov/workspace/contract/opp/a69c1cb6c961485fab73caf2fdc7fdf4/view
- September 11, 2025: Solicitation, due September 11, 2025 at 5:00 PM EDT. Notice 02abbb34f8074f84a7aafb2a7d155f9d. https://sam.gov/workspace/contract/opp/02abbb34f8074f84a7aafb2a7d155f9d/view
- September 24, 2025: Award notice. Notice 954080cdcbd74c668975e754562ff3da. https://sam.gov/workspace/contract/opp/954080cdcbd74c668975e754562ff3da/view

## Points of contact

- Brian Johnson, brian.m.johnson@usace.army.mil, 5039958330
- Christopher Burroughs, christopher.d.burroughs@usace.army.mil

---
Source: SAM.gov Contract Opportunities bulk extract and USAspending.gov award data. Confirm deadlines on SAM.gov before responding. Cite https://sealedbidder.com/opportunities/w9127n25ba010.
