# West Coast Hopper Maintenance Dredging 2025

Canonical: https://sealedbidder.com/opportunities/w9127n25b0005

- Solicitation number: W9127N25B0005
- Notice type: Award notice (first published as presolicitation)
- Status: Awarded to Manson Construction Co for $32,858,750.00
- Department: Department of the Army
- Agency: Department of the Army
- Contracting office: W071 Endist Portland (W9127N)
- NAICS: 237990 Other Heavy and Civil Engineering Construction
- Product or service code: Y1KF Construction Of Dredging Facilities
- Small business size standard: $45 million in average annual receipts (13 CFR 121.201, NAICS 237990)
- County: Multnomah County (FIPS 41051). https://sealedbidder.com/counties/multnomah-county-or-41051
- City: Portland. https://sealedbidder.com/cities/portland-or-4159000
- First posted: November 5, 2024
- Last posted: March 12, 2025
- SAM.gov: https://sam.gov/workspace/contract/opp/9868666e11714c1bb127735141e28bb5/view

## Reading this notice

- Kind of notice: Award notice. Who won, when, and for how much.
- Time to respond: Bidders had 30 days from the day the solicitation was posted, January 22, 2025, to the deadline. The deadline moved 2 times: it was first November 21, 2024 and ended as February 21, 2025.
- Before the solicitation: The agency published a presolicitation on November 5, 2024, 78 days before the solicitation.
- How it ended: Awarded to Manson Construction Co on March 11, 2025, 18 days after offers were due. The contracting office reported 1 offer (full and open competition).

## Description

Update: Amendment 0002 has been uploaded as of 18 February 2025.

Update: Amendment 0001 has been uploaded as of 12 February 2025.

THIS IS A SOLICITATION FOR THE WEST COAST HOPPER MAINTENANCE DREDGING 2025

The U.S. Army Corps of Engineers, Portland District, has a requirement to perform hopper dredging at multiple locations on the West Coast of the United States including Humboldt Bay, CA (HUM); Mouth of the Columbia River, OR/WA (MCR); Coos Bay, OR/WA (COO); and Lower Columbia River, OR/WA (LCR).  Please see the attached solicitation for details on the specifications of the requirement. The scope of this project consists of the Contractor furnishing all supervision, engineering, labor, materials, and equipment to perform the following work in strict accordance with the detailed requirements of this contract.

MAGNITUDE OF CONSTRUCTION: Between $10,000,000.00 and $50,000,000.00

Bid Period: The Solicitation was released 22 January 2025. The Bid Opening is on 21 February 2025 at 02:00PM Pacific Time.

Point of Contact: The USACE-NWP Contracting Office will be the sole point of contact for this action. Email responses to the Primary Point of Contacts are: Ian Lutjens at ian.k.lutjens@usace.army.mil and Brandon Lasich at brandon.m.lasich@usace.army.mil.

See attachments for Project requirements.

## Attachments

- [WCH25_PLANS_DRAFT.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/14f05694ae034cd2a2661e95f4d28a0f/download)
- [WCHC25_SPECS_ADVERTISE.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/f5217493fabc42919e50017533cfa257/download)
- [WCHC25_PLANS_ADVERTISE.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/c2db736c77884a3fa1c840e777389fb8/download)
- [WCHC25_SPECS_DRAFT.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/8e697c08ab514896b97ada80d2e17ec1/download)
- [25B0005 Small Business Commitment Document WCHD25.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/5484210e4c584e2991adc9ece3b64c06/download)
- [Questions and Answers-Draft 7N25B0005 WCH 2025.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/e76e49d1b0124ad682d0e7789f25df89/download)
- [WCHC25_SPECS_AMD0001.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/d4ad4673a98b4afdb3ad8a88d175a929/download)
- [WCHC25_SPECS_AMD0001_CONFORMED.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/fc748a8adc994295b5d489da8a08b8fb/download)
- [WCHC25_SPECS_AMD0002.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/6a0b0c60b4e74d789a22c0c8e46c4e69/download)
- [25B0005 Abstract WCHMD25.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/1690051111864c919ad61b90c931e4c9/download)

## Award on USAspending

- Recipient: Manson Construction Co (UEI UJGKNVYG6UZ3)
- Contract: W9127N25C0005, definitive contract
- Obligated: $29,904,165.10
- Competition: Full and Open Competition, 1 offers received
- Link: award number W9127N25C0005 equals the contract number; same awarding office W9127N (high confidence)
- Record: https://www.usaspending.gov/award/CONT_AWD_W9127N25C0005_9700_-NONE-_-NONE-/


## Open now in the same industry

143 open in NAICS 237990.

- JOHN DAY DAM UNIT 10 PACKING BOX REPLACEMENT (W9127N27BA011), due December 4, 2026 at 4:00 PM EST. https://sealedbidder.com/opportunities/w9127n27ba011
- Bonneville Powerhouse II Unwatering Pump Replacement (W9127N27BA012), due December 7, 2026 at 5:00 PM EST. https://sealedbidder.com/opportunities/w9127n27ba012
- W9127N27BA005 Foster Spillway Gate Nut Replacements and Re-Tensioning (W9127N27BA005), due December 16, 2026 at 3:00 PM EST. https://sealedbidder.com/opportunities/w9127n27ba005

## Publications

- November 5, 2024: Presolicitation, due November 21, 2024 at 3:00 PM EST. Notice 3e378bcf80544a77a5e46ac3701a9255. https://sam.gov/workspace/contract/opp/3e378bcf80544a77a5e46ac3701a9255/view
- November 29, 2024: Presolicitation, due November 21, 2024 at 3:00 PM EST. Notice c03444c2eaef4201b0d0657836afd217. https://sam.gov/workspace/contract/opp/c03444c2eaef4201b0d0657836afd217/view
- December 9, 2024: Presolicitation, due February 18, 2025 at 5:00 PM EST. Notice 6594bed73684474a95c6794216af371c. https://sam.gov/workspace/contract/opp/6594bed73684474a95c6794216af371c/view
- December 9, 2024: Presolicitation, due February 18, 2025 at 5:00 PM EST. Notice fde4fab7b1ca466db9bb72e6ee66b57b. https://sam.gov/workspace/contract/opp/fde4fab7b1ca466db9bb72e6ee66b57b/view
- January 6, 2025: Presolicitation, due February 18, 2025 at 5:00 PM EST. Notice 700c52af9ded4c73bb65b537fd0ba579. https://sam.gov/workspace/contract/opp/700c52af9ded4c73bb65b537fd0ba579/view
- January 22, 2025: Solicitation, due February 21, 2025 at 5:00 PM EST. Notice 7e0d49dcb2c14a7198a2111e128437ba. https://sam.gov/workspace/contract/opp/7e0d49dcb2c14a7198a2111e128437ba/view
- February 12, 2025: Solicitation, due February 21, 2025 at 5:00 PM EST. Notice 2ba064178eae404b918a641256668a01. https://sam.gov/workspace/contract/opp/2ba064178eae404b918a641256668a01/view
- February 18, 2025: Solicitation, due February 21, 2025 at 5:00 PM EST. Notice 672147cdc1004f9ebf3ab8939967d07c. https://sam.gov/workspace/contract/opp/672147cdc1004f9ebf3ab8939967d07c/view
- February 18, 2025: Solicitation, due February 21, 2025 at 5:00 PM EST. Notice 8af18444333d474f8079e4e2261b14a4. https://sam.gov/workspace/contract/opp/8af18444333d474f8079e4e2261b14a4/view
- February 21, 2025: Solicitation, due February 21, 2025 at 5:00 PM EST. Notice da0da7c7cdad4810ba1b67726519fd2d. https://sam.gov/workspace/contract/opp/da0da7c7cdad4810ba1b67726519fd2d/view
- March 12, 2025: Award notice. Notice 9868666e11714c1bb127735141e28bb5. https://sam.gov/workspace/contract/opp/9868666e11714c1bb127735141e28bb5/view

## Points of contact

- Ian Lutjens, ian.k.lutjens@usace.army.mil, 5038084434
- Brandon Lasich, brandon.m.lasich@usace.army.mil, 5038084637

---
Source: SAM.gov Contract Opportunities bulk extract and USAspending.gov award data. Confirm deadlines on SAM.gov before responding. Cite https://sealedbidder.com/opportunities/w9127n25b0005.
