Skip to content

SealedBidder is a private company, not a government agency.

Sign upDashboard
  • 8,430 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell SealedBidder what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and SealedBidder tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $99 a month. See your matches before you pay.
See plans

Solicitation, first published as special notice

Holt Lock Monolith R14 Restoration

W9127825RA015

Department of the Army, W074 Endist Mobile. Other Heavy and Civil Engineering Construction.

Response deadline

June 10, 2025 at 3:00 PM EDT

Closed 534 days ago. Posted June 2, 2025, first published March 27, 2025. Scheduled to archive May 16, 2026.

Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities

This one closed in 2025

142 like it are open now in other heavy and civil engineering construction

All 142 open in other heavy and civil engineering construction

Reading this notice

Worked out from the publications and the award on this page.

Kind of notice
Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
Who may compete
SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 237990 (other heavy and civil engineering construction), means no more than $45 million in average annual receipts, counted with affiliates. What a set-aside is
Time to respond
Bidders had 47 days from the day the solicitation was posted, April 24, 2025, to the deadline. The deadline moved 2 times: it was first May 28, 2025 and ended as June 10, 2025.

Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.

Description

As published on SAM.gov.

The objective of this project is for the Contractor to provide all labor, materials, and equipment necessary to repair monolith R14 in accordance with the plans and specifications. Work includes but not limited to horizontal drilling, installing horizontal post tension anchor bars, internal pressure grouting, epoxy injection of surface cracks, installing water stops, underwater concrete placement, and dewatering the lock chamber at Holt Lock. Amendment 0001 is posted 16 May 2025 to update the Table of Contents, Bid Schedule, Explanation of Bid Schedule, and several sections within the specifications as well as drawings. The response date has been extended to 4 June 2025. Amendment 0002 posted 2 June 2025 updates the Bid Scheule, Bid Schedule Notes, Explanation of the Bid Scheudle, Section 01 00 00, Section 13 51 00.10, Section 31 68 13, and extends the response date to 10 June 2025.

Attachments

Files and links listed on SAM.gov. Files we hold a copy of download from here; the rest open SAM's download, which needs no account. Links open the sites the agency named.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. March 27, 2025

    Special notice

    Design-Bid-Build Holt Lock Monolith R14 Restoration

    SAM.gov, notice 34587c8a46ca411bacd83e98ee164e7f

    4 revisions on SAM
    • April 15, 2025: publish, special notice
    • March 26, 2025: publish, sources sought
    • March 27, 2025: publish, special notice
    • March 27, 2025: publish, special notice
  2. March 27, 2025

    Special notice, originally sources sought

    Advance Notice Design-Bid-Build Holt Lock Monolith R14 Restoration

    SAM.gov, notice 819af132b0b948629277c4523dfb2703

    4 revisions on SAM
    • April 15, 2025: publish, special notice
    • March 26, 2025: publish, sources sought
    • March 27, 2025: publish, special notice
    • March 27, 2025: publish, special notice
  3. April 15, 2025

    Special notice

    Design-Bid-Build Holt Lock Monolith R14 Restoration

    SAM.gov, notice bf5b7d81b6a048298f583b5026e1421f

    4 revisions on SAM
    • April 15, 2025: publish, special notice
    • March 26, 2025: publish, sources sought
    • March 27, 2025: publish, special notice
    • March 27, 2025: publish, special notice
  4. April 24, 2025

    Solicitation

    Due May 28, 2025 at 3:00 PM EDT. SAM.gov, notice 76e7b5a6edcc48cabb73e055881f5253

    4 revisions on SAM
    • June 2, 2025: publish, solicitation
    • May 16, 2025: publish, solicitation
    • May 9, 2025: publish, solicitation
    • April 24, 2025: publish, solicitation
  5. May 9, 2025

    Solicitation

    Due May 28, 2025 at 3:00 PM EDT. SAM.gov, notice 8c171e52716f44c7a415abce29d6edac

    4 revisions on SAM
    • June 2, 2025: publish, solicitation
    • May 16, 2025: publish, solicitation
    • May 9, 2025: publish, solicitation
    • April 24, 2025: publish, solicitation
  6. May 16, 2025

    Solicitation

    Due June 4, 2025 at 3:00 PM EDT. SAM.gov, notice 1038779d775642b2895880d105a0a804

    4 revisions on SAM
    • June 2, 2025: publish, solicitation
    • May 16, 2025: publish, solicitation
    • May 9, 2025: publish, solicitation
    • April 24, 2025: publish, solicitation
  7. June 2, 2025

    Solicitation

    Due June 10, 2025 at 3:00 PM EDT. SAM.gov, notice a6efa1080f064442b662085b4cb4583e

    5 revisions on SAM
    • June 2, 2025: publish, solicitation
    • July 21, 2025: publish, award notice
    • May 16, 2025: publish, solicitation
    • May 9, 2025: publish, solicitation
    • April 24, 2025: publish, solicitation

Points of contact