Special notice
PLA Market Survey - Missile Defense Agency (MDA) Ground Test Facility Infrastructure (GTFI), Redstone Arsenal, AL
W9127823R0069_PLAMarketSurvey
Department of the Army, W074 Endist Mobile. Commercial and Institutional Building Construction.
Response deadline
March 5, 2024 at 5:00 PM EST
Closed 997 days ago. Posted February 20, 2024. Scheduled to archive March 20, 2024.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed in 2024
191 like it are open now in commercial and institutional building construction
- Construction | 619-21-106 | EHRM Infrastructure Upgrades - Montgomery (VA-27-00002289)
Department of Veterans Affairs, Pcac
SolicitationSDVOSBNAICS 236220Montgomery, AL36C77626R0112Closes in 39 daysJan 5, 2027 - Outdoor Fitness Facility, Building 389— Supply, Delivery, and Limited Installation Support
Department of the Air Force, FA6648 482 LSS LGC
Sources soughtNAICS 236220Ship to Homestead, FLHARBSS-2027-01Due todayNov 27 - 657-24-102JC - Prepare Site for New PET/CT, Room A011D (MD) FY27 NRM VISN Base, CON (VA-27-00017492) 657-27-1-8434-0001
Department of Veterans Affairs, 255-Network Contract Office 15
PresolicitationSDVOSBNAICS 236220Missouri36C25527R0016Due todayNov 27
All 191 open in commercial and institutional building construction
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Special notice. Industry days, draft requirements, program announcements and other notices that are not a solicitation. Glossary
Description
As published on SAM.gov.
This is a SPECIAL NOTICE. No proposals are being requested or accepted with this notice. The Corps of Engineers Mobile District is soliciting comments from the construction community addressing the mandated use of Project Labor Agreements (PLA) for large scale construction projects (exceeding $35 million) within the Redstone Arsenal, AL and the surrounding area. This market survey is being posted for the construction of the Missile Defense Agency Ground Test Facility Infrastructure (GFTI).
Description of Work: The U.S. Army Corps of Engineers, Mobile District, anticipates conversion of approximately 163,466 SF of existing administrative space in Von Braun IV on Redstone Arsenal to data center; Research, Development, Testing and Engineer (RDT&E) laboratories; and updated administrative space for the Missile Defense Agency (MDA) Missile Defense System (MDS) mission.
The existing facility is a five-story reinforced concrete and structural steel building on concrete footings, pre-cast wall panels, and build-up roofs. Required functional areas include RDT&E laboratory space, data center/computer operations, administrative space, meeting rooms, access control, break rooms, and storage areas. New construction includes a 1,722 SF exterior stairwell and a 14,138 SF one-story building expansion to house electrical gear for the new data center.
Supporting facilities includes high efficiency mechanical systems, electrically driven chillers, fire pumps, electrical supply and distribution, and uninterruptable power supplies and standby generators for mission critical loads.
The project also includes domestic water, sanitary sewer, storm drainage, electrical substation modifications, primary power transmission, natural gas and electrical services, fire protection and alarm systems, connectivity to telecommunications network and distributed service, modification of utility yard access roads, chilled water distribution, physical security, new mechanical and electrical equipment yards, and other site improvements. Accessibility will be provided in accordance with ADA-ABA guidelines.
Antiterrorism force protection measures include building standoff distances, lighting, bollards, control gates and berms. A PLA is defined as a pre-hire collective bargaining agreement with one or more labor organizations that establishes the terms and conditions of employment for a specific construction project and is an agreement described in 29 U.S.C. 158(f).
1) Do you have knowledge that a PLA has been used in the local area on projects of this kind? If so, please provide supporting documentation.
2) Are you aware of skilled labor shortages in the area for those crafts that will be needed to complete the referenced project? If so, please elaborate and provide supporting documentation where possible.
3) Are you aware of time sensitive issues/scheduling requirements that would affect the rate at which the referenced project should be completed? If so, please elaborate and provide supporting documentation where possible.
4) Identify specific reasons why or how you believe a PLA would advance the Federal Government’s interest in achieving economy and efficiency in Federal procurement.
5) Identify specific reasons why you do not believe a PLA would advance the Federal Government’s interest in achieving economy and efficiency in Federal procurement.
6) Identify any additional information you believe should be considered on the use of a PLA on the referenced project.
7) Identify any additional information you believe should be considered on the non-use of a PLA on the referenced project. (ii) The information gathered in this exercise should include the following information on projects completed in the last 2-5 years (or other timeframe, as appropriate): 1) Project Name and Location 2) Detailed Project Description 3) Initial Cost Estimate vs. Actual Final Cost 4) Was the project completed on time? 5) Number of craft trades present on the project 6) Was a PLA used?
7) Were there any challenges experienced during the project? Interested Offerors shall respond to this Special Notice no later than 1600 CST, Friday, 5 March 2024. E-mail your response stephanie.m.scalise@usace.army.mil. This Special Notice is not to be construed as a commitment by the Government, nor will the Government pay for the information solicited.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
February 20, 2024
Special notice, originally sources sought
Due March 5, 2024 at 5:00 PM EST. SAM.gov, notice 6aa2e1aa3d4a4a20a089a19ea9050d67
Points of contact
- Stephanie M. ScaliseStephanie.m.scalise@usace.army.mil
- Kyle RodgersKyle.M.Rodgers@usace.army.mil