# B-21 Low Observable / Radio Frequency Hangar - OT Feasibility and Business Feedback

Canonical: https://sealedbidder.com/opportunities/w9126g27ra002

- Solicitation number: W9126G27RA002
- Notice type: Sources sought (first published as special notice)
- Status: Closed. Deadline was September 23, 2026 at 3:00 PM EDT
- Department: Department of the Army
- Agency: Department of the Army
- Contracting office: W076 Endist FT Worth (W9126G)
- NAICS: 236220 Commercial and Institutional Building Construction
- Product or service code: Y1BZ Construction Of Other Airfield Structures
- Small business size standard: $45 million in average annual receipts (13 CFR 121.201, NAICS 236220)
- County: Taylor County (FIPS 48441). https://sealedbidder.com/counties/taylor-county-tx-48441
- First posted: March 2, 2026
- Last posted: September 3, 2026
- SAM.gov: https://sam.gov/workspace/contract/opp/3df0d75440834afeabac7f2b006c41de/view

## Reading this notice

- Kind of notice: Sources sought. Market research. The agency wants to know who could do the work before it decides how to compete it.
- Who may compete: SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 236220 (commercial and institutional building construction), means no more than $45 million in average annual receipts, counted with affiliates.
- What comes next: No solicitation has been published under this number yet. The sources sought of September 3, 2026 is the earliest notice of the purchase.

## Description

SUBJECT: Sources Sought (RFI) - B-21 Low Observable / Radio Frequency HangarDISCLAIMER. THIS IS A REQUEST FOR INFORMATION (RFI) / SOURCES SOUGHT NOTICE ONLY. This notice is issued solely for market research, information, and planning purposes. It does not constitute a Request for Proposals (RFP), a Request for Qualifications (RFQ), or a commitment by the Government to write, issue, or award an agreement or contract. The Government will not pay for any information or administrative costs incurred in response to this notice. All response costs will be borne solely by the interested party.PURPOSE. The U.S. Army Corps of Engineers (USACE), Fort Worth District, is conducting active public market intelligence to gauge industry interest, capacity, and capability from commercial construction firms, design-builders, and Non-Traditional Defense Contractors (NDCs). The intent is to gather critical feedback regarding advanced commercial construction methodologies, project delivery risks, and acquisition preferences to support our upcoming project delivery selection.ACQUISITION STRATEGY AND NON-FAR MODEL.a. Statutory Authority: This project will potentially be executed as a Progressive Design-Build (PDB), Design-Build to Budget (DBtB) or Construction Management at Risk (CMatRisk) project utilizing Other Transaction Authority (OTA) pursuant to 10 U.S.C. Section 2808a.b. Non-FAR Environment: Prospective partners are advised that the Federal Acquisition Regulation (FAR) does NOT apply to this procurement. The negotiated, bilateral Other Transaction Agreement will serve as the sole governing contract. Standard FAR clauses are inapplicable, though federal statutory constraints such as federal fiscal law, criminal statutes, and general civil laws remain fully applicable.c. Agreement Mechanics(1) PBD Procurement Process: Phase 1, Design and Pre-Construction Services, a design-builder will be selected through a qualifications-based selection (QBS) process. The government will then negotiate a fee for Phase 1 services. There is no requirement to submit price proposals or design concepts during the initial selection. Phase 2, Final Design and Construction, is executed via a bilateral modification to the OT Agreement upon successful negotiation of a Guaranteed Maximum Price (GMP) at approximately 65% design maturity. The Agreement contains an off-ramp clause allowing the Government to retain the design and procure construction separately if GMP negotiations fail.(2) DBtB Procurement Process: Solicitation and evaluation during Phase 1 focuses on the qualifications, past performance, and integrated Design-Build experience of each offeror. The Government is evaluating the team and not necessarily how the offeror will design the structure. The Phase 1 evaluation results in the selection of three of the most highly qualified, competitive teams to proceed to Phase 2. Phase 2, the Government will issue the final RFP exclusively to the down-selected teams. This RFP includes the validated, performance-based requirements, establishes the firm Construction Cost Limit (CCL), and clearly defines the basic scope.(3) CMatRisk Procurement Process: Early involvement, separate contracts, guaranteed maximum price and collaborative delivery.PROJECT OVERVIEW AND SCOPE.a. Title: B-21 Low Observable / Radio Frequency Hangarb. Location: Dyess Air Force Base, Texasc. Scope: Construct a new 95,529 sq. ft. Low Observable Corrosion Control Hangar (LO) and a Radio Frequency Facility (RF) for the new B-21 weapons system. The project demands a highly collaborative and iterative design process to manage complexity and a critical schedule.d. Target Price Range (TPR): The Government has established the Government target price estimate for construction is between $280,000,000 and $300,000,000.e. Projected Award Date: The Government targets the formal award of the Agreement Phase 1 (Design and Preconstruction Services) on or about July 2027.f. Current Design is at 100%. The Government is willing to revert to a 35% design, allowing the awardee and designer the ability to collaborate during an OTA procurement process.g. Period of Performance (POP): The projected construction timeline is approximately 1217 calendar days following the execution of the Phase 2 Construction modification.h. Product Service Code (PSC): Y1BG (Construction of Electronic and Communications Facilities).i. NAICS Code: 236220 (Commercial and Institutional Building Construction).(1) INNOVATIVE METHODOLOGIES AND FEEDBACK AREAS. In accordance with Air Force Civil Engineer Center (AFCEC) Design Instruction number 3, the Government is seeking commercial industry feedback regarding the feasibility and market capacity for the following innovative methods:i. Modular and Off-Site Prefabrication: Fabricating large sections of the facility or complex mechanical, electrical, and plumbing (MEP) systems in factory-controlled environments to compress the construction schedule.ii. 3D Printing: Utilizing large-scale 3D printing for secondary building components, non-load-bearing walls, or perimeter security fencing.iii. Advanced Materials: Incorporating self-healing concrete to reduce lifecycle maintenance and maximize structural integrity, or utilizing high-performance insulation such as aerogels or vacuum-insulated panels to meet high-performance building standards.

## Attachments

- [dodprocurementtoolbox.com](https://dodprocurementtoolbox.com/) (link)

## Open now in the same industry

191 open in NAICS 236220.

- Design-Build Maintenance and Repair Army Reserve (MRAR) of Equipment Concentration Site (ECS), B-56767, at North Fort Hood, TX (W912QR25RA013), due December 8, 2026 at 2:00 PM EST. https://sealedbidder.com/opportunities/w912qr25ra013
- Replacement Cattle Dip Vat Drip Pad (Edinburg, TX) (124PCA27Q0006), due December 16, 2026 at 1:00 PM EST. https://sealedbidder.com/opportunities/124pca27q0006
- FCI Three Rivers-Replace Generators, Transformers, and Electrical Infrastructure (15BNAS27Q00000002), due December 18, 2026 at 11:00 AM EST. https://sealedbidder.com/opportunities/15bnas27q00000002

## Publications

- March 2, 2026: Special notice, due March 19, 2026 at 3:30 PM EDT. Notice b26857ad8914465e8def4ce46d8ab36e. https://sam.gov/workspace/contract/opp/b26857ad8914465e8def4ce46d8ab36e/view
- September 3, 2026: Sources sought, due September 23, 2026 at 3:00 PM EDT. Notice 3df0d75440834afeabac7f2b006c41de. https://sam.gov/workspace/contract/opp/3df0d75440834afeabac7f2b006c41de/view

## Points of contact

- Thomas Howard, thomas.w.howard@usace.army.mil, 8178861031

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://sealedbidder.com/opportunities/w9126g27ra002.
