Sources sought, total small business set-aside
Ft. Bragg Concrete Crushing and Recycling
W91247-26-R-XXXX
Department of the Army, W6QM MICC Fdo FT Bragg. Site Preparation Contractors.
Response deadline
July 9, 2025 at 5:00 PM EDT
Closed 505 days ago. Posted June 25, 2025. Scheduled to archive July 24, 2025.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed in 2025
6 like it are open now in site preparation contractors
- Camptonville Housing Decommissioning
Forest Service, USDA Forest Serivce
Combined synopsis and solicitationSmall businessNAICS 238910Nevada City, CA127EAX26Q0076Closes in 9 daysDec 5 - Forest Wide Decommissioning Project
Forest Service, Usda-Fs, Csa Southwest 7
Combined synopsis and solicitationSmall businessNAICS 238910Arizona127EAX27Q0013Closes in 11 daysDec 7 - UTILITY EXCAVATION AND REPAIR SERVICES IDIQ
Department of Energy, Fermilab - DOE Contractor
SolicitationSmall businessNAICS 238910Batavia, IL385439GMKCloses in 11 daysDec 7
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Sources sought. Market research. The agency wants to know who could do the work before it decides how to compete it. Glossary
- Who may compete
- Total small business set-aside. Only small businesses may compete. Small, under NAICS 238910 (site preparation contractors), means no more than $19 million in average annual receipts, counted with affiliates. Open Small business opportunities
- What comes next
- No solicitation was published under this number after the sources sought of June 25, 2025. An agency sometimes issues the solicitation under a new number.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
General
This is a non-personal services contract to provide concrete crushing operations for stockpiled concrete, bricks, blocks, and asphalt to a usable aggregate to be used on training roads, parking lots, and other identified areas for fill material.
- The Government will not exercise any supervision or control over the contract service providers.
- The Contractor shall perform to the standards specified in this Performance Work Statement (PWS).
- Contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
- See attachment for Additional details and documentation.
The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to complete the requirements as outlined and defined in this PWS.
Specific Tasks for Concrete Crushing:
5.1. The Contractor, shall determine and utilize the most cost-effective crushing and recycling services, emphasizing innovation and commercial best practices, to maximize diversion. Using the Contractor provided equipment, the Contractor shall crush concrete into 1 ½ inch or minus rock product and stockpile in designated area. When requested by the Government, the Contractor shall crush and store some large pieces of concrete into 5-to-8-inch pieces to use for riprap. For concrete that is greater in size than 2 by 2 feet, a processer shall be used to break down the concrete into an appropriate size to be crushed. Provide equipment and personnel to
remove debris (wood, paper, non-ferrous metals, plastics, etc.) and the use of magnets to remove ferrous metals. (wood, paper, non-ferrous metals, plastics, etc.) shall be removed off Fort Bragg and disposed of in a title D landfill.
5.1.1. The Contractor shall provide a monthly report of tonnage as Material Solid Waste (MSW) and material recyclables, by the 5th of each month. The monthly summary report shall, at a minimum, identify the alternative waste streams, (wood, paper, non-ferrous metals, plastics, etc.), landfill/transfer station tipping fees, and percent MSW and recyclable. (See Deliverables Schedule, paragraph 8.1, Deliverables A018).
5.2. The equipment normally used to process waste concrete are Crushers, Screener, Conveyors, Magnets, Processer, Excavator, Loader, Dozer, water tank or water truck for dust control.
5.3. The Contractor shall remove foreign debris and metals from crushed concrete.
5.4. The Contractor shall adjust the crushing of operations to the maximum output to meet the size and contaminants requirements.
5.5. The processing area shall be cleaned up with the use of a road magnet, once every two weeks to remove ferrous metals to reduce road hazards and hazards to personnel.
5.6. The Contractor shall provide the services necessary to plan and execute the required tasks of this Performance Work Statement (PWS) within the contract period. The work shall be completed in accordance with the PWS and all applicable federal, state, and local laws and regulations.
5.7. National and DoD Policy:
Contractor will comply with all national and DoD policies regarding health protection issues including pandemic outbreaks. Local Health Protection Conditions (HPCON) change based on risk levels in the surrounding area Fort Bragg, North Carolina, and in cooperation with local, state, and national guidance. The Contractor shall comply with installation and higher headquarters policies aimed at mitigating the spread of dangerous communicable diseases.
5.8. Contractor Vehicles/Equipment:
Vehicles/Equipment shall be maintained and serviced IAW the manufacturers’ recommendations. The Contractor shall ensure vehicles/equipment receive periodic safety checks, and all irregularities shall be repaired before the vehicle/equipment is operated. The vehicle/equipment operator shall immediately clean up all spills caused during the operation. All operators of Contractor-furnished vehicles/equipment shall have a valid driver’s license and operate IAW installation traffic regulations. The Contractor shall not leave vehicles/equipment unattended unless properly locked and secured.
5.8.1. The Contractor shall have serviceable vehicles and equipment to ensure the completion of contract requirements in the event of breakdowns, repair, or other mechanical issues. Vehicles and equipment identified as unserviceable shall be repaired or replaced NLT seven (7) calendar days at no additional cost to the Government. The Contractor shall also provide maintenance and repair service.
5.9. Tonnage Report:
The Contractor shall submit an end of week report. The report shall include a weekly total and a running total of the tonnage of concrete crushed, the tonnage transported of trash and foreign debris (not to include metals which will be collected at Lamont Landfill) to offsite facilities this action will include a Tip report and other daily events (storm delays, maintenance, work stoppages, etc.) to the COR and Landfill Manager NLT Close of Business (COB) of the following business day. (Refer to Deliverables Schedule, paragraph 8.1, Deliverables A020.)
5.10. Crushed Concrete:
The Contractor shall produce a minimum of 900 tons of crushed concrete free of wood, paper, non-ferrous metals, plastics, etc. daily.
5.11. Historical Data:
Historically, Fort Bragg has contracted the crushing of approximately 100,000 to 400,000 tons of concrete annually, with a daily production rate of around 1,000 tons. The crushed concrete is then stockpiled in a designated area near the waste stockpile, arranged in lifts to minimize the area’s footprint.
5.12. SSHP Air Sampling Report
The Contractor shall submit a SSHP Air Sampling Report to the KO/COR and Landfill Manager in accordance with CFR 1910.1026(d)(2) based on this initial eight-hour time-weighted average findings, shall dictate the reporting requirements for this activity (See Deliverables Schedule, paragraph 8.1, Deliverables A015).
- If initial monitoring indicates that employee exposures are below the action level, the employer may discontinue monitoring for those employees whose exposures are represented by such monitoring.
- If monitoring reveals employee exposures to be at or above the action level, the employer shall perform periodic monitoring at least every six months.
- If monitoring reveals employee exposures to be above the PEL, the employer shall perform periodic monitoring at least every three months.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
June 25, 2025
Sources sought
Due July 9, 2025 at 5:00 PM EDT. SAM.gov, notice f710649d3ffa4224b7b86b402a7ad6cc
2 revisions on SAM
- June 25, 2025: publish, sources sought