Skip to content

SealedBidder is a private company, not a government agency.

Sign upDashboard
  • 8,711 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell SealedBidder what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and SealedBidder tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $99 a month. See your matches before you pay.
See plans

Solicitation, total small business set-aside, first published as presolicitation

Sacramento River Erosion (SRE) C5 Pioneer Bridge Levee Improvements

W9123825BA002

Department of the Army, W075 Endist Sacramento. Other Heavy and Civil Engineering Construction.

Awarded

CAM-DUTRA JV-II LLC

$5,828,823.11 obligated so far on USAspending

Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities

This one was awarded in 2025

143 like it are open now in other heavy and civil engineering construction

All 143 open in other heavy and civil engineering construction

Reading this notice

Worked out from the publications and the award on this page.

Kind of notice
Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
Who may compete
Total small business set-aside. Only small businesses may compete. Small, under NAICS 237990 (other heavy and civil engineering construction), means no more than $45 million in average annual receipts, counted with affiliates. Open Small business opportunities
Time to respond
Bidders had 35 days from the day the solicitation was posted, March 20, 2025, to the deadline. The deadline moved once: it was first May 2, 2025 and ended as April 24, 2025.
Before the solicitation
The agency published a presolicitation on March 5, 2025, 15 days before the solicitation.
How it ended
Awarded to CAM-DUTRA JV-II LLC on May 30, 2025, 36 days after offers were due. The contracting office reported 4 offers (full and open competition after exclusion of sources).

Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.

Description

As published on SAM.gov.

See attached Bid Abstract

AMENDMENT 0002 - update the Technical Specifications Section 01 50 00, paragraph 2.2.2.1 (c) and include the date, time, and teams link for the bid opening.AMENDMENT 0001 - replaced specifications in its entirety and updated wage determination. Project is design-bid-build construction services to construct levee improvements at Sacramento River Erosion (SRE) Site 1, located under the I-80 Pioneer Bridge in Sacramento, California (CA). The project is anticipated to reduce the risk of levee failure from an erosion related levee breach for approximately 1,000 feet along the Sacramento River. The project is anticipated to include several erosion protection measures located above and below the average low flow water surface elevation (~7 feet NAVD88 as defined) using rock bank protection to include a 3.5-foot-thick lens of launchable Graded Stone C below the water surface to protect the bank from scour and erosion as well as Graded Stone C extended above the water surface to the top of the bank under the Pioneer Bridge section. The project is anticipated to include a 3.5-foot-thick lens of soil-rock mix above the water surface to protect the bank from wave wash generated by boat wakes and wind waves, demolition and removal of the existing upper bank material under the I-80 Pioneer Bridge section to provide a suitable foundation for the Graded Stone C, and In-stream Woody Material (IWM) to be placed below the water line to create in-stream cover for fisheries throughout the seasons and provide flow deflection along the bank. Work shall be completed by barge.

Attachments

Files and links listed on SAM.gov. Files we hold a copy of download from here; the rest open SAM's download, which needs no account. Links open the sites the agency named.

The contract, on USAspending

Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.

UEI
MVULGL7HL8C7
CAGE
9SXE5
Vendor location
Palo Alto, CA
Contract
W9123825CA009, definitive contract
Obligated
$5,828,823.11
Actions
6 between May 30, 2025 and February 25, 2026
Competition
Full and Open Competition After Exclusion of Sources, 4 offers received
Set-aside reported
Small Business Set Aside - Total
Described as
Sacramento River Erosion (Sre) C5 Pioneer Bridge Levee Improvements
Match
solicitation number W9123825BA002 equals the FPDS solicitation identifier; same awarding office W91238 (high confidence)

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. March 5, 2025

    Presolicitation

    USACE SPK DBB Construction - Sacramento River Erosion Contract 5 Pioneer Bridge Levee Improvements- Sacramento, California

    Due May 2, 2025 at 1:00 PM EDT. SAM.gov, notice f6420f6861774dcf83aafb6d294ad39a

    1 revision on SAM
    • March 5, 2025: publish, presolicitation
  2. March 21, 2025

    Solicitation

    Due April 24, 2025 at 1:00 PM EDT. SAM.gov, notice 5d4262ae6fa944d5ab454c4bc8fa0bf6

    6 revisions on SAM
    • April 25, 2025: publish, solicitation
    • April 18, 2025: publish, solicitation
    • April 3, 2025: publish, solicitation
    • April 2, 2025: publish, solicitation
    • March 21, 2025: publish, solicitation
    • March 21, 2025: publish, solicitation
  3. March 21, 2025

    Solicitation

    Due April 24, 2025 at 1:00 PM EDT. SAM.gov, notice c93e68e17a6b4168b711454908e0fc78

    6 revisions on SAM
    • April 25, 2025: publish, solicitation
    • April 18, 2025: publish, solicitation
    • April 3, 2025: publish, solicitation
    • April 2, 2025: publish, solicitation
    • March 21, 2025: publish, solicitation
    • March 21, 2025: publish, solicitation
  4. April 2, 2025

    Solicitation

    Due April 24, 2025 at 1:00 PM EDT. SAM.gov, notice 092eb020dab84584b4a0d7601f674658

    6 revisions on SAM
    • April 25, 2025: publish, solicitation
    • April 18, 2025: publish, solicitation
    • April 3, 2025: publish, solicitation
    • April 2, 2025: publish, solicitation
    • March 21, 2025: publish, solicitation
    • March 21, 2025: publish, solicitation
  5. April 3, 2025

    Solicitation

    Due April 24, 2025 at 1:00 PM EDT. SAM.gov, notice fd6dfad732f94fb3938f11dd6846bf49

    6 revisions on SAM
    • April 25, 2025: publish, solicitation
    • April 18, 2025: publish, solicitation
    • April 3, 2025: publish, solicitation
    • April 2, 2025: publish, solicitation
    • March 21, 2025: publish, solicitation
    • March 21, 2025: publish, solicitation
  6. April 18, 2025

    Solicitation

    Due April 24, 2025 at 1:00 PM EDT. SAM.gov, notice ef64f8ce7b3940809d403aeed984e904

    6 revisions on SAM
    • April 25, 2025: publish, solicitation
    • April 18, 2025: publish, solicitation
    • April 3, 2025: publish, solicitation
    • April 2, 2025: publish, solicitation
    • March 21, 2025: publish, solicitation
    • March 21, 2025: publish, solicitation
  7. April 25, 2025

    Solicitation

    Due April 24, 2025 at 1:00 PM EDT. SAM.gov, notice c82c603206e74a06a2af42e9a1d730b9

    6 revisions on SAM
    • April 25, 2025: publish, solicitation
    • April 18, 2025: publish, solicitation
    • April 3, 2025: publish, solicitation
    • April 2, 2025: publish, solicitation
    • March 21, 2025: publish, solicitation
    • March 21, 2025: publish, solicitation

Points of contact