Sources sought
Winfield Roller Gate RFI
W91237-26-Q1C5L
Department of the Army, W072 Endist Huntington. Fabricated Structural Metal Manufacturing.
Response deadline
August 24, 2026 at 12:00 PM EDT
Closed 93 days ago. Posted July 30, 2026, first published July 13, 2026. Scheduled to archive September 8, 2026.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed in 2026
6 like it are open now in fabricated structural metal manufacturing
- KNOB
Defense Logistics Agency, DLA Weapons Support
Combined synopsis and solicitationNAICS 332312Ship to the buyerSPE7LX27U0754Due in 3 daysNov 27 - BOLT,MACHINE
Defense Logistics Agency, DLA Aviation
Combined synopsis and solicitationSDVOSBNAICS 332312Ship to the buyerSPE4A627U0321Closes in 9 daysDec 3 - Guatemala - Tactical Dock
Department of State, U.S.Embassy Guatemala City
SolicitationNAICS 332312Outside the US19GT5027Q0004Closes in 9 daysDec 4
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Sources sought. Market research. The agency wants to know who could do the work before it decides how to compete it. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 332312 (fabricated structural metal manufacturing), means no more than 500 employees, counted with affiliates. What a set-aside is
- What comes next
- No solicitation has been published under this number yet. The sources sought of July 13, 2026 is the earliest notice of the purchase.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
This Request For Information Notice is intended to garner industry input for questions regarding Roller Gate Fabrication for the Winfiled Lock and Dam Located in Red House, West Virgina.
Interested Contractors are encouraged to reply to the following questions after reviewing the Attached Technical Drawings:
1. Can the skin plate splices be performed using submerged arc welding?
2. Economies of scale: Are there significant efficiencies related to fabrication of 1 gate v 2 gates v 3 gates, etc.
3. Not grinding skin plate welds—What is the time and labor savings? Would not staggering skin plate splices increase efficiency/benefit fabrication? Note that splice welds would still be required to be ground flush at the intersections of longitudinal and transverse splice welds a minimum of 4” in all directions.
4. What factors do you consider when doing 100% RT on this quantity of welds? Shutting down shop? How is this cost factored in? What is the production rate? Cost per test?
5. Would a design featuring multiple pieces (2-4) with transverse gate splice(s) benefit fabrication? Would you prefer this splice be welded or bolted using slip critical bolted connection. Note that full assembly would be required at the shop prior to shipment for a full shop fit assembly.
6. Would a design featuring bolted on end shields and/or apron benefit fabrication/increase efficiency?
7. Would you be more or less likely to bid if this was a Construction Contractor (i.e. working with a prime contractor to install) vs a supply fabrication contract.
8. What can USACE do to reduce risk/contingency in bidding a project like this?
9. Are there connections that would be more cost efficient bolted instead of welded? Would it be more cost efficient to weld, or use slip critical bolts to connect splices on the skin plate(longitudinal and transverse)?
10. Are there a fabrication cost difference between bearing type and slip-critical bolted connections.
11. If final assembly of the gates is allowed in the field during installation, is this something that would be a benefit for fabrication/increase efficiency?
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Drawings.pdf876 KB, July 13, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
July 13, 2026
Sources sought
Due August 3, 2026 at 11:00 AM EDT. SAM.gov, notice 3633088476034fb6bf33e03b2c9506b4
2 revisions on SAM
- July 30, 2026: publish, sources sought
- July 13, 2026: publish, sources sought
July 30, 2026
Sources sought
Due August 24, 2026 at 12:00 PM EDT. SAM.gov, notice 01d75ad8f4a4441aaeecdb9dfee93e10
2 revisions on SAM
- July 30, 2026: publish, sources sought
- July 13, 2026: publish, sources sought
Points of contact
- Ellec Robinetteellec.t.robinette@usace.army.mil304-399-5226
- Philip Davisphilip.s.davis@usace.army.mil304-399-5297