Sources sought
Norfolk CSRM - PH1A - Floodwall Construction SATOC DBB in Norfolk, VA
W9123625S13MA
Department of the Army, W2SD Endist Norfolk. Other Heavy and Civil Engineering Construction.
Response deadline
June 19, 2025 at 2:00 PM EDT
Closed 525 days ago. Posted June 5, 2025. Scheduled to archive August 15, 2026.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed in 2025
143 like it are open now in other heavy and civil engineering construction
- Fort Eustis Dredge Material Management Area Construction in Newport News, Virginia
Department of the Army, W2SD Endist Norfolk
Sources soughtNAICS 237990VirginiaW91236-26-B-1AVXDue in 5 daysDec 1 - Norfolk Harbor Inner Channel and Channel to Newport News Maintenance Dredging
Department of the Army, W2SD Endist Norfolk
SolicitationNAICS 237990VirginiaW9123627BA003Due in 7 daysDec 3 - Fort Eustis Dredge Material Management Area (FEDMMA)
Department of the Army, W2SD Endist Norfolk
SolicitationSmall businessNAICS 237990VirginiaW9123626BA008Closes in 47 daysJan 12, 2027
All 143 open in other heavy and civil engineering construction
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Sources sought. Market research. The agency wants to know who could do the work before it decides how to compete it. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 237990 (other heavy and civil engineering construction), means no more than $45 million in average annual receipts, counted with affiliates. What a set-aside is
- What comes next
- No solicitation was published under this number after the sources sought of June 5, 2025. An agency sometimes issues the solicitation under a new number.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
The citywide, Norfolk CSRM Program is split into five (5) implementation phases. Phase 1 covers the downtown Norfolk area which extends from Ghent through Downtown Norfolk, connecting to the Campostella off-ramp. Phase 1 is split into Phases 1A, 1B, and 1C/D. Phase 1A is split into three acquisitions: (1) Phase 1A – Floodwall (DBB), (2) Harbor Park Pump Station (Design-Build), and (3) Newton’s Creek Pump Station (DBB).
This SATOC Construction Contract is intended to cover the Phase 1A Floodwall, which will extend from the Berkley Bridge to the Campostella off-ramp. The Harbor Park and Newton’s Creek pump stations are excluded from this contract. The scope may include, but is not limited to, new construction of a bin wall, L-shaped wall backfilled and supported by H-piles, a wetland living shoreline, T-wall supported by H-piles and pipe piles, 95-foot-wide double swing gate closure at the Norfolk Southern railroad tracks, vehicular gate crossings, and a sheet pile tieback wall. The Contractor shall be required to perform all work in accordance with the access and security requirements of the customer.
See attached document for addiitional information.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- I.A.02_Sources Sought PLA for NCSRM PH1A Floodwall 06052025.pdf494 KB, June 5, 2025
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
June 5, 2025
Sources sought
Due June 19, 2025 at 2:00 PM EDT. SAM.gov, notice c8c4909dc5cc4c27be47d75bf938332b
2 revisions on SAM
- October 1, 2026: publish, special notice
- June 5, 2025: publish, sources sought
Points of contact
- Raven D. Sasserraven.d.sasser@usace.army.mil7572017136
- Candace Lotomaucandace.c.lotomau@usace.army.mil7572017131