Special notice, total small business set-aside
Notice of Intent to single source Braddock Boat Motor Repair
W911WN25QA009
Department of the Army, W072 Endist Pittsburgh. Ship Building and Repairing.
Response deadline
April 9, 2025 at 12:00 PM EDT
Closed 595 days ago. Posted March 26, 2025. Scheduled to archive April 24, 2025.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed in 2025
107 like it are open now in ship building and repairing
- BOAT DAVIT OEM SERVICE
Department of the Navy, NAVSUP FLT Log CTR Puget Sound
SolicitationNAICS 336611Outside the USN0040627Q0039Due todayNov 25 - USNS CITY OF BISMARCK (T-EPF 9) VRA KR
Department of the Navy, NAVSUP FLT Log CTR Yokosuka
SolicitationNAICS 336611Outside the USN6264927RK003Due in 2 daysNov 27 - Ship Repair
Department of the Navy, NAVSUP FLC Sigonella Naples Office
SolicitationNAICS 336611Outside the USN6817127QN013Due in 2 daysNov 27
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Special notice. Industry days, draft requirements, program announcements and other notices that are not a solicitation. Glossary
- Who may compete
- Total small business set-aside. Only small businesses may compete. Small, under NAICS 336611 (ship building and repairing), means no more than 1,300 employees, counted with affiliates. Open Small business opportunities
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
- The intention is to award this requirement as a single source to GL Power Inc 450 Riverport Dr. Leetsdale, PA 15056
- GENERAL REQUIREMENTS. These specifications establish the requirements to replace and reprogram the electronic propulsion units. The following steps will need performed by the contractor:
The contractor shall install, configure, and test two new Twin Disc EC-300 Engine Control Units (EC-300s) for the dual Cummins marine diesel engines and their transmissions on the Braddock Locks and Dam work boat. This work will include installing the EC-300s, connecting existing wiring, programming the system, and conducting operational testing according to manufacturer specifications. A brief description of the work is detailed below.
Installation of EC-300s
Install the new EC-300s in the locations previously occupied by the removed EC-300s. Ensure the new EC-300s are securely fastened in their original positions, with minimal movement or vibration during vessel operation.
Electrical Connections
Connect all existing vessel wiring to the new EC-300s. No new wiring installation is expected. Verify that existing power supply connections meet the voltage and amperage requirements specified by Twin Disc to avoid damage to the units. Check the grounding of the system to ensure it is properly configured to prevent potential damage. Verify that signals and communication between the EC-300s and the dual Cummins engines/transmissions are correctly established through existing wiring. This shall include:
-
- Ensuring throttle and control signals are properly sent and received.
- Confirming communications bus connectivity between the EC-300s and engine/transmission systems.
- Verifying all necessary signals related to engine and transmission operation.
Programming and Configuration
Power up the new EC-300s and ensure they initialize correctly without errors. Program the new EC-300s according to the requirements of the dual Cummins marine diesel engines and their transmissions. This includes:
-
- Adjusting throttle response parameters to match engine specifications.
- Configuring transmission engagement and shift points for smooth operation.
- Establishing proper communication between the new EC-300s, engines, and other vessel systems via the communications bus.
- Inputting engine type, horsepower, transmission model, and other critical settings into the new EC-300s.
- Ensuring all required inputs and outputs are programmed into the new EC-300s for proper communication and control. This includes:
- Verifying engine sensors (RPM, temperature, pressure) are accurately reporting.
- Ensuring transmission signals (gear position, shift feedback) are correctly processed.
- Confirming helm controls (throttle, shift handles) are properly configured.
- Checking all auxiliary systems interfacing with the propulsion system (e.g., alarms, diagnostic sensors) are functioning as intended.
System Testing and Calibration
- Functional Testing: Conduct comprehensive testing of the new EC-300s to verify throttle and transmission controls are functioning correctly. Testing should include:
- Throttle Range Test: Ensure throttle operates across its full range and that engine RPM matches the throttle position.
- Transmission Test: Verify smooth shifting between forward, neutral, and reverse gears, ensuring compliance with manufacturer specifications.
- Diagnostic Monitoring: Use the Twin Disc diagnostic tool to check for error codes or anomalies.
- System Calibration: Adjust settings such as idle speed, throttle response curves, and transmission shift points to align with the vessel’s operational needs.
- Sea Trial Testing: Conduct a sea trial with lock personnel to verify that the new EC-300s operate the engines and transmissions correctly under real-world conditions, recording engine RPM, throttle response, and shift performance.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
March 26, 2025
Special notice
Due April 9, 2025 at 12:00 PM EDT. SAM.gov, notice d2243070335741a283105e2806fb491a
1 revision on SAM
- March 26, 2025: publish, special notice
Points of contact
- Richard Mathenarichard.a.mathena@usace.army.mil
- Leanna Lesefkaleanna.c.lesefka@usace.army.mil4123957549