Solicitation, total small business set-aside
5th Armored Brigade (5th AR BDE) Turf Replacement Fort Bliss, Texas.
W911SG26QA049
Department of the Army, W6QM Micc-Ft Bliss. All Other Specialty Trade Contractors.
Response deadline
August 21, 2026 at 12:00 PM EDT
Closed 96 days ago. Posted August 14, 2026, first published July 27, 2026. Scheduled to archive September 5, 2026.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed in 2026
21 like it are open now in all other specialty trade contractors
- Patio Renovation and Sun Sail Installation
Bureau of Engraving and Printing, Office of the Chief Procurement Officer
Sources soughtSmall businessNAICS 238990Fort Worth, TXBEP-WCF-POST15-SS-2026Closes in 9 daysDec 4 - TX-BALCONES CANYONLANDS NWR PRKNG LOT
Departmental Offices, FWS Contracting Activity
SolicitationSmall businessNAICS 238990Texas140FF027Q0063Closes in 12 daysDec 7 - Replace Condensate Pressure Pump
Department of Veterans Affairs, 262-Network Contract Office 22
Combined synopsis and solicitationSDVOSBNAICS 238990California36C26227Q0089Due todayNov 25
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
- Who may compete
- Total small business set-aside. Only small businesses may compete. Small, under NAICS 238990 (all other specialty trade contractors), means no more than $19 million in average annual receipts, counted with affiliates. Open Small business opportunities
- Time to respond
- Bidders had 25 days from the day the solicitation was posted, July 27, 2026, to the deadline.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
See attached PWS.
The 5th AR BDE is seeking to replace the existing training area and worn turf at the Brigade Headquarters. The current facility is severely degraded and presents active safety hazards to Soldiers. This requirement will deliver a permanent, high-quality, and resilient artificial turf solution to eliminate these safety risks and provide a modernized physical training environment that directly supports Army readiness. The entire turf area forms a perfect rectangle with the following outer boundary dimensions: Length 84 ft., Width 102 ft. The 84-foot length of the field is divided into three distinct sections: a Western gap, a central lane area, and an Eastern gap. Starting from the Western edge, there is a 22 ft. (22') open green turf gap before the lane section begins. Adjacent to the Western gap is the main lane area, which spans a total of 50 ft. (50') across. Following the lane section, there is a 12 ft. (12') open green turf gap extending to the Eastern edge of the field. There will be exactly 6 white lines marked across the field. Each of these white lines measures approximately 82.5 feet (82' 6") long, running parallel to the width of the field. The 50-foot central section is divided evenly into 5 numbered lanes. Each of the 5 lanes is exactly 10 feet (10') wide. Each lane contains a number (1 through 5). The numbers are exactly 3 feet 6 inches (3' 6") tall/long and with a width of 1.5 feet. Each number is horizontally centered within its 10-foot-wide lane. The numbers are placed exactly 3 feet (3') away from the designated starting line. The 5th Armored Brigade Logo is positioned directly in the middle of the 5 lanes, perfectly centered within the 50 ft. lane section. It has a length of 15 ft. and a width of 7.5 ft. The primary, thick structural lines of the "A" shape are to be colored a deep Jet Black. The lower half of the "A" symbol must be filled with a Crimson Red; the remaining top half will be painted white. The borders of the symbol will be Hunter Green.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Wage Determination No. 2015-5229 Rev. #29.pdf4.2 MB, July 27, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
July 27, 2026
Solicitation
Due August 21, 2026 at 12:00 PM EDT. SAM.gov, notice 5b2399b0cfbd41bcab15920ebbbab1e4
4 revisions on SAM
- August 14, 2026: publish, solicitation
- August 5, 2026: publish, solicitation
- July 28, 2026: publish, solicitation
- July 27, 2026: publish, solicitation
July 28, 2026
Solicitation
Due August 21, 2026 at 12:00 PM EDT. SAM.gov, notice 76a920de91ec439a805ea9ea5570e51b
4 revisions on SAM
- August 14, 2026: publish, solicitation
- August 5, 2026: publish, solicitation
- July 28, 2026: publish, solicitation
- July 27, 2026: publish, solicitation
August 5, 2026
Solicitation
Due August 21, 2026 at 12:00 PM EDT. SAM.gov, notice 2720c05fab1945a39c35079fdb210fe5
4 revisions on SAM
- August 14, 2026: publish, solicitation
- August 5, 2026: publish, solicitation
- July 28, 2026: publish, solicitation
- July 27, 2026: publish, solicitation
August 14, 2026
Solicitation
Due August 21, 2026 at 12:00 PM EDT. SAM.gov, notice b31536c6a34c4e41820420c41ae41fa6
5 revisions on SAM
- September 18, 2026: publish, award notice
- August 14, 2026: publish, solicitation
- August 5, 2026: publish, solicitation
- July 28, 2026: publish, solicitation
- July 27, 2026: publish, solicitation
Points of contact
- Joy Ajah-Jobjoy.ajah-job.civ@army.mil5028988346
- Franklin Godinezfranklin.godinez2.civ@army.mil