Skip to content

SealedBidder is a private company, not a government agency.

Sign upDashboard
  • 8,712 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell SealedBidder what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and SealedBidder tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $99 a month. See your matches before you pay.
See plans

Combined synopsis and solicitation, total small business set-aside

SAFETY SHOWER

W911S226U4017

Department of the Army, W6QM Micc-Ft Drum. Plumbing Fixture Fitting and Trim Manufacturing.

Response deadline

August 18, 2026 at 10:00 AM EDT

Closed 100 days ago. Posted August 10, 2026. Scheduled to archive August 10, 2027.

Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities

This one closed in 2026

3 like it are open now in plumbing fixture fitting and trim manufacturing

Reading this notice

Worked out from the publications and the award on this page.

Kind of notice
Combined synopsis and solicitation. A streamlined commercial-item buy where the notice itself is the solicitation. Glossary
Who may compete
Total small business set-aside. Only small businesses may compete. Small, under NAICS 332913 (plumbing fixture fitting and trim manufacturing), means no more than 1,000 employees, counted with affiliates. Open Small business opportunities
Time to respond
Bidders had 8 days from the day the solicitation was posted, August 10, 2026, to the deadline.

Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.

Description

As published on SAM.gov.

ATS EcoTower C1D2/26 ? Pneumatic, Skid-Mounted Safety Shower and Eyewash Station (or Equal) Primary Purpose: To provide rapid, compliant, and self-contained emergency decontamination (shower and eye/face wash) in remote locations or harsh environments lacking a potable water source, specifically within hazardous areas. ________________________________________ ���� Core System and Compliance Standards ? Safety Compliance: Must be fully compliant with ANSI/ISEAZ358.1 (2014) standards for emergency eyewash and shower equipment, ensuring continuous flow capabilities ? Electrical Hazard Classification: Must be certified for Class I, Division 2 (C1D2) hazardous locations to prevent ignition risks in environments where flammable gases or vapors may be present________________________________________ � Water Capacity and Thermal Regulation ? Fluid Capacity: Must include an integrated, heavy-duty insulated water storage tank with a minimum capacity of 325 gallons to guarantee a minimum of 15minutes of continuous tepid water flow. ? Tepid Water Delivery: Must feature an integrated, electrical immersion heating system (minimum 1,200 Watts) to actively maintain stored water temperatures above the ANSI-mandated minimum of 60�F (15.6�C) in freezing or cold-weather conditions ? Freeze Protection: Must utilize a self-regulating heat trace system to protect plumbing and supply lines from freezing down to an ambient operating temperature threshold of 0�F (-17.8�C) ________________________________________���� Pneumatic Operation and Mechanical Specifications ? Pumping System: Must utilize a pneumatically driven transfer pump (rather than electric) to deliver pressurized water to the showerhead and eyewash . This ensures complete spark-free operation in C1D2 zones and allows the unit to safely function during electrical outages via pneumatic backup ?Pneumatic Air Source Input: Must support a shop air compressor supply or specialized nitrogen tank supply with an operational pressure range of 60 to 120 PSI (recommended regulator set to 80 PSI) ? Flow Rates: ? Shower: Must deliver a regulated flow rate of at least 20 GPM (76 LPM) ? Eyewash: Must deliver a regulated flow rate of at least 0.4 GPM(1.5 LPM) with an integrated protective dust/debris cover________________________________________ ���� Structural and Mounting Specifications ? Skid-Mount Design: Must be built on a heavy-duty, corrosion-resistant, powder-coated steel skid frame designed for rapid deployment, positioning by forklift/crane, and high-wind structural stability. ? Footprint and Portability: Must maintain a compact, space-saving footprint suitable for deployment in tight industrial spaces, remote airfields, or forward operating environments ? Material Durability: All critical external piping and the showerhead assembly must be constructed from durable stainless steel or equivalent corrosion-resistant materials. ? Controls and Activation: Must feature a highly visible, easy-to-reach mechanical pull-handle mechanism for instant, hands-free activation of the shower ________________________________________ � Power Requirements ?Electrical Input: Must operate on standard, readily available utility or generator power:120V, single-phase, 60Hz, 20-Amp draw (typically utilizing a NEMA 5-20 plug configuration)

Attachments

Links the agency listed on SAM.gov. They open the sites it named, not files on SAM.gov.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. August 10, 2026

    Combined synopsis and solicitation

    Due August 18, 2026 at 10:00 AM EDT. SAM.gov, notice d5979f2abb544b6981b4dd5a2a2139bc

    1 revision on SAM
    • August 10, 2026: publish, combined synopsis and solicitation

Points of contact