Skip to content

SealedBidder is a private company, not a government agency.

Sign upDashboard
  • 8,711 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell SealedBidder what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and SealedBidder tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $99 a month. See your matches before you pay.
See plans

Combined synopsis and solicitation

GRADING, DRAINAGE AND PAVEMENT CONSTRUCTION, MAINTENANCE, AND REPAIRS POSTWIDE FORT NOVOSEL, ALABAMA

W911S025BA0001

Department of the Army, W6QM Micc-Fdo FT Eustis. Highway, Street, and Bridge Construction.

Response deadline

March 10, 2025 at 10:00 AM EDT

Closed 626 days ago. Posted March 12, 2025, first published February 7, 2025. Scheduled to archive March 25, 2025.

Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities

This one closed in 2025

36 like it are open now in highway, street, and bridge construction

All 36 open in highway, street, and bridge construction

Reading this notice

Worked out from the publications and the award on this page.

Kind of notice
Combined synopsis and solicitation. A streamlined commercial-item buy where the notice itself is the solicitation. Glossary
Who may compete
SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 237310 (highway, street, and bridge construction), means no more than $45 million in average annual receipts, counted with affiliates. What a set-aside is
Time to respond
Bidders had 31 days from the day the solicitation was posted, February 7, 2025, to the deadline.

Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.

Description

As published on SAM.gov.

The Purpose of thist is to providee an abstract of offeror's. 

The Contractor shall provide all labor, materials, equipment, supervision, transportation, and incidentals, except as specified herein as Government furnished, to perform all operations in connection with the grading, drainage, and paving required to construct, repair and maintain roads and parking lots at various locations on Fort Novosel property as directed by the Directorate of Public Works (DPW).  This work is governed by the applicable drawings and these specifications are subject to the terms and conditions of the contract.  Drawings of the areas to be paved shall be submitted to the Contractor with individual task orders as required.  All drawings provided to the Contractor are for reference/information only and may or may not be current or to scale. The Contractor shall provide any/all deviations to accepted local, state, and federal building practices/codes to the attention of the Construction Inspector and Contracting Officers Representative for review/consideration by the government. The Contractor shall be responsible for obtaining utility spotting/location and permits that may be required by Environmental Considerations FB-144R. If any work done by the contractor is not according to specifications listed below, that work shall be re-done per specs.  The re-work shall be done at the contractor’s expense.  General survey and layout requirements for existing roadways overlays, roadway widening, drainage structures and parking lot overlays shall be part of contractors bid.  Where layout and engineering work shall be required for establishing new roadway, parking lots and site work the contractor and government representative shall reach an agreed time frame during the scoping of project.  This cost shall be covered by the Field Engineering and Layout bid item shown on bid schedule.  When required, the Contractor is to provide the necessary documentation in order to obtain a NPDES permit for the new construction.  When all work is complete, the Contractor shall be required to provide the DPW with a complete set of As-Built drawings (both electronic and hard copy).

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. February 7, 2025

    Combined synopsis and solicitation

    Due March 10, 2025 at 10:00 AM EDT. SAM.gov, notice d8a60717a6254de48523ad82e209e7ff

    5 revisions on SAM
    • March 12, 2025: publish, combined synopsis and solicitation
    • March 12, 2025: publish, combined synopsis and solicitation
    • March 6, 2025: publish, combined synopsis and solicitation
    • March 4, 2025: publish, combined synopsis and solicitation
    • February 7, 2025: publish, combined synopsis and solicitation
  2. March 4, 2025

    Combined synopsis and solicitation

    Due March 10, 2025 at 10:00 AM EDT. SAM.gov, notice eec8943e5dd34d569cf597a55b845e94

    5 revisions on SAM
    • March 12, 2025: publish, combined synopsis and solicitation
    • March 12, 2025: publish, combined synopsis and solicitation
    • March 6, 2025: publish, combined synopsis and solicitation
    • March 4, 2025: publish, combined synopsis and solicitation
    • February 7, 2025: publish, combined synopsis and solicitation
  3. March 6, 2025

    Combined synopsis and solicitation

    Due March 10, 2025 at 10:00 AM EDT. SAM.gov, notice 75f8cef0ce774e60b8d8bd258bb2e22e

    5 revisions on SAM
    • March 12, 2025: publish, combined synopsis and solicitation
    • March 12, 2025: publish, combined synopsis and solicitation
    • March 6, 2025: publish, combined synopsis and solicitation
    • March 4, 2025: publish, combined synopsis and solicitation
    • February 7, 2025: publish, combined synopsis and solicitation
  4. March 12, 2025

    Combined synopsis and solicitation

    Due March 10, 2025 at 10:00 AM EDT. SAM.gov, notice 47928ebcbcf449e6a69a526d7fcda806

    5 revisions on SAM
    • March 12, 2025: publish, combined synopsis and solicitation
    • March 12, 2025: publish, combined synopsis and solicitation
    • March 6, 2025: publish, combined synopsis and solicitation
    • March 4, 2025: publish, combined synopsis and solicitation
    • February 7, 2025: publish, combined synopsis and solicitation
  5. March 12, 2025

    Combined synopsis and solicitation

    Due March 10, 2025 at 10:00 AM EDT. SAM.gov, notice 63bb27ae4f5e406da6e72e50dba3abe4

    5 revisions on SAM
    • March 12, 2025: publish, combined synopsis and solicitation
    • March 12, 2025: publish, combined synopsis and solicitation
    • March 6, 2025: publish, combined synopsis and solicitation
    • March 4, 2025: publish, combined synopsis and solicitation
    • February 7, 2025: publish, combined synopsis and solicitation

Points of contact